Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24018A24818 January 2024License Amendment Request to Modify the Implementation Date of License Amendment No. 238
ML23331A49727 November 2023Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237Safe Shutdown
Operator Manual Action
Emergency Lighting
Fire Protection Program
ML23320A27716 November 2023License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11
ML23171B13120 June 2023Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube InspectionsHigh Radiation Area
Nondestructive Examination
ET 23-0003, License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications1 March 2023License Amendment Request (LAR) for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical SpecificationsAnticipated operational occurrence
Probabilistic Risk Assessment
Fuel cladding
ML23045A19514 February 2023Transmittal of the National Pollution Discharge Elimination System Permit Renewal Application for Wolf Creek Generating Station I-NE07-PO02Ultimate heat sink
Grab sample
Zebra Mussel
Veliger
ET 23-0002, Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections7 February 2023Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections
ML22353A55515 December 2022Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage RequirementsSurveillance Frequency Control Program
Pressure Boundary Leakage
ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections1 December 2022Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube InspectionsHigh Radiation Area
Nondestructive Examination
ET 22-0010, License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2 August 2022License Amendment Request (LAR) for Deviation from Fire Protection Program RequirementsSafe Shutdown
Fire Barrier
Operator Manual Action
Emergency Lighting
Incorporated by reference
Exemption Request
Maintenance Rule Program
Fire Protection Program
ET 22-0001, Removal of the Table of Contents from the Technical Specifications12 January 2022Removal of the Table of Contents from the Technical SpecificationsShutdown Margin
High Radiation Area
Ultimate heat sink
Post Accident Monitoring
ET 21-0004, License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating29 September 2021License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - OperatingSafe Shutdown
High winds
Mission time
Post Accident Monitoring
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
FLEX
Tornado-Generated Missile
Tornado Generated Missile
Seismically rugged
Design basis earthquake
Large early release frequency
B.5.b Mitigating Strategies
Earthquake
Maintenance Rule Program
Fuel cladding
Offsite Circuit
ET 21-0005, Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-19112 August 2021Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191Safe Shutdown
Boric Acid
High winds
Reactor Vessel Water Level
Mission time
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
FLEX
Foreign Material Exclusion
Large early release frequency
Severe Accident Management Guideline
Exemption Request
Earthquake
Maintenance Rule Program
Fuel cladding
Scaffolding
WO 21-0015, License Amendment Request (LAR) for Revision to the Emergency Plan25 May 2021License Amendment Request (LAR) for Revision to the Emergency PlanSafe Shutdown
Boric Acid
Health Physics Network
Shutdown Margin
High Radiation Area
Time to boil
Fire Protection Program
Grace period
Coast down
Siren
WM 21-0005, Supplement to License Amendment Request for Change to Owner Licensee Names24 May 2021Supplement to License Amendment Request for Change to Owner Licensee Names
ML21070A05811 March 2021Changes to Technical Specification Bases - Revisions 82, 83, 84, and 85Boric Acid
Stroke time
Power Operated Valves
Power change
WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange10 November 2020License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind FlangeHigh Radiation Area
Stroke time
Safe Shutdown Earthquake
Earthquake
Power Operated Valves
WM 20-0006, (WCGS) - License Amendment Request for Change to Owner Licensee Names4 November 2020(WCGS) - License Amendment Request for Change to Owner Licensee Names
ET 20-0007, License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers8 June 2020License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap ChangersSafe Shutdown
Anticipated operational occurrence
Reserve Station Service Transformer
Qualified Offsite Circuit
Offsite Circuit
Fire Protection Program
ET 20-0004, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)27 April 2020Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)Safe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Stroke time
Post Accident Monitoring
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Foreign Material Exclusion
Large early release frequency
Battery sizing
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies20 April 2020License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesHigh winds
Tornado Missile
Internal Flooding
Past operability
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Aging Management
Missed surveillance
Local Leak Rate Testing
Foreign Material Exclusion
Large early release frequency
Moisture barrier
Flooding Focused Evaluation
License Renewal
Fuel cladding
Power Uprate
WO 19-0033, License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System29 August 2019License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System
WO 19-0031, Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 48 August 2019Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4Time of Discovery
ML19052A5461 April 2019Issuance of Amendment No. 220 Revision to the Emergency PlanFire Protection Program
ET 19-0002, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.18 March 2019License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.Anticipated operational occurrence
ET 19-0003, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind Flange25 February 2019License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Remove Use of a Blind FlangeHigh Radiation Area
Stroke time
Power Operated Valves
ET 19-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 423 January 2019Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4Time of Discovery
Missed surveillance
WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term15 November 2018Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source TermShutdown Margin
Pressure Boundary Leakage
Power change
WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term9 August 2018Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term
ML18135A1469 May 2018Attachments I to V: Evaluation of Proposed Changes, Emergency Plan Change Summary, ERO Position Matrix, Summary of Shift Staffing and Letter of Consultation and Concurrence from Off-Site Response Organizations Ack of OpportunitySafe Shutdown
Boric Acid
Health Physics Network
Shutdown Margin
High Radiation Area
Time to boil
FLEX
Fukushima Dai-Ichi
Severe Accident Management Guideline
Fire Protection Program
Grace period
Coast down
Siren
WO 18-0016, License Amendment Request for Revision to the Emergency Plan9 May 2018License Amendment Request for Revision to the Emergency PlanFLEX
ET 18-0007, Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.15 February 2018Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.Ultimate heat sink
Internal Flooding
Probabilistic Risk Assessment
ML17363A14219 December 2017License Amendment Request (LAR) for Revision to the Emergency Plan (Attachments and Enclosures)Safe Shutdown
Boric Acid
Health Physics Network
Shutdown Margin
High Radiation Area
Time to boil
FLEX
Fukushima Dai-Ichi
Severe Accident Management Guideline
Minimum staff
Fire Protection Program
Grace period
Coast down
Siren
WM 17-0021, Updated Request for Consent to Indirect Transfer of Control5 September 2017Updated Request for Consent to Indirect Transfer of Control
WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses22 March 2017Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses
ML17054C22317 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed COLR ChangesShutdown Margin
ET 17-0001, License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses, Enclosure 10 - CAW-16-450017 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses, Enclosure 10 - CAW-16-4500
ML17054C22717 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Alternative Source Term, Rev 1
ML17054C23617 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses, Enclosure 9 - CAW-16-4499
ML17054C21917 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - EvaluationShutdown Margin
Anticipated operational occurrence
Fuel cladding
Backfit
Power change
ML17054C23517 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - WOG-93-066
ML17054C23017 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - A-3788, Technical Report, Appendix a, Fission Product Removal Effectiveness of Chemical Additives in PWR Containment Sprays
ML17054C23317 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - CAW-92-287
ML17054C22017 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification ChangesShutdown Margin
ML17054C22617 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - WCAP-18083-NP, Rev 0, Westinghouse Revised Thermal Design Procedure Uncertainty Calculations.
ML17054C22217 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Proposed Technical Specification Bases ChangesBoric Acid
Shutdown Margin
Anticipated operational occurrence
Fuel cladding
ML17054C23217 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - OG-92-25, Steam Generator Tube Uncovery IssueProbabilistic Risk Assessment
ML17054C22117 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Revised Technical Specification PagesShutdown Margin
ML17054C22917 January 2017License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Responses to NRC RAIs on August 2013 Methodology Transition LAR SubmittalBoric Acid
Safe Shutdown Earthquake
Coatings
Fuel cladding
Recently irradiated fuel
Power Uprate
Affidavit
NEI 99-01, Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors30 September 2016Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive ReactorsSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Grace period
Power change