MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] |
Text
ACCELERAT DOCUMENT DIST UTION SYSTEM REGULAT INFORMATION DISTRIBUTIO STEM (RIDS)
ACCESSION 1vBR: 9305180246 DOC. DATE: 93/05/10 NOTARIZED: YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) R
SUBJECT:
Application for amend to License NPF-21,revising TS to address core power stability, in ref to IE Bulletin 88-007, Suppl 1.Vendor proprietary ltr dtd 930402 summarizing ltr withheld. D stability licensing calculations encl.Subj DISTRIBUTION CODE: APOID COPIES RECEIVED:LTR) ENCL/ SIZE:
TITLE: Proprietary Review Distribution Pre Operating License Operating R NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDV LA 1 1 PDV PD 1 1 CLIFFORD,J 3 3 D
INTERNAL: ACRS 6 6 ODyCDOA. 1 1 OGC/HDS1 1 0 RE 01 1 1 EXTERNAL: NRC PDR 1 0 D
D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 13
% ~
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bm 968 ~ 3000 George Wasbtngton Way ~ Rtcbland, LWasbtngton 99352<968 ~ (509) 372-5000 May 10, 1993 G02-93-108 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C. 20555 Gentlemen:
Subject:
NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21, REQUEST FOR AMENDMENT TO STABILITY AND POWER/FLOW SECTIONS OF THE TECHNICAL SPECIFICATIONS
References:
- 1) IE Bulletin 88-07, Supplement 1, "Power Oscillations in Boiling Water Reactors (BWRs)," dated December 30, 1988.
- 2) Letter, G02-89-051, GC Sorensen (SS) to NRC, "Request for Amendment to Technical Specifications 3/4.2.6 and 3/2.4.7 in Support of the Supply System Response to IEB 88-07, Supplement 1," dated March 31, 1989.
- 3) Letter, G02-89-397, GC Sorensen (SS) to NRC, same subject, dated June 1, 1989.
- 4) Letter, RAC:92:145, RA'opeland (SPC) to LE Phillips,(NRC), "SPC Stability Evaluations," dated December 2, 1992.
In accordance with the Code of Federal Regulations, Title 10 Parts 50.90 and 2. 101, the Supply System is requesting a change to several sections of the Technical Specifications and Bases that address core power stability. The need to change the power flow map was identified during the performance of the Cycle 9 analyses and the calculation of stability decay ratios using the Siemens Power Corporation (SPC) stability codes. The changes will preserve a decay ratio of 0.9 or less as the lower boundary of the prohibited area on the power flow map, Region A. In addition to the changes to the size and shape of the stability regions, the revised power flow map reflects a change in the slope of the rod lines. Changes are being requested for the following Technical Specifications and Bases sections:
3/4.2.6 Power/Flow Instability 3/4.2.7 Stability Monitoring - Two Loop Operation 3/4.2.8 Stability Monitoring - Single Loop Operation 3/4.4.1 Recirculation System z"reooO 930518024b 9305i0 PDR ADQCK 05000397
'P PDR
OI
\ ~
A a<
t
~l C
t Al r
b3
't >,
j
Page Two REQUEST FOR AMENDMENTTO STABILITYAND POWER/FLOW SECTIONS OF THE TECHNICAL SPECIFICATIONS Since the location and slope of the rod lines on the power flow map change as the fuel exposure changes and new fuel types are installed, the rod lines are periodically revised. The 100% rod line is defined as the line on the power flow map that results from decreasing the core flow from the 100% power/100% flow point without control rod adjustments. The void coefficient for the 9x9-9X fuel, first inserted into the core at Cycle 7, is less negative than for 8x8-2 fuel. This causes a smaller reactivity decrease as flow decreases, thereby decreasing the slope of the rod lines. The original and the revised rod lines are shown on a power flow map in Figure 1. As can be seen, the new rod lines have a decreased slope and are therefore higher than the existing lines. These revised rod lines will be used in the Technical Specifications.
In response to IEB 88-07, Supplement 1 (Reference 1), References 2 and 3 requested changes to the Technical Specifications to establish stability regions on the power flow map required to comply with the bulletin. The commitment was also made to maintain the lower boundary of Region A to preserve a decay ratio of 0.9 or less. The requirements and commitments discussed in References 1 and 2 respectively, required that the regional exclusion zones be evaluated on a cycle specific basis to assure applicability. Based on the knowledge gained as a result of the WNP-2 instability event, SPC has concluded that the cycle stability analyses performed should be augmented by using both the COTRAN and STAIF stability computer codes. As discussed in Reference 4, SPC committed to the NRC that the more conservative of the two results will be used. In performing Cycle 9 analyses, both COTRAN and STAIF were used. The results of the SPC analyses are provided as an attachment to this letter. SPC considers the information contained in the letter of U. Fresk to R.A. Vopalensky, dated April 2, 1993, SPCWP-93-046, to be proprietary. In accordance with the requirements of 10 CFR 2.790(b), an affidavit is enclosed to support withholding this letter from public disclosure.
Both the COTRAN and STAIF codes calculated decay ratios greater than 0.9 below the revised 100% rod line. Therefore, Region A is being expanded to conform to the commitments made.
Currently, Region A lies above the 100% rod line for core flows from natural circulation up to 45% flow. The revised Region A lies above the line between a point at 36% power and 23.8%
flow and a point at 50.3% power and 35% core flow. Between 35% and 45% core flow, the Region A lower boundary is the 91% rod line. The 91% rod line as the lower boundary is more conservative than the 0.9 decay ratio calculated by SPC using STAIF or COTRAN. If a line of constant decay ratio equal 0.9 were plotted on the power flow map, it would intersect the 91% rod line at 32.3% core flow. The deflection at 35% core flow was selected to provide margin to the actual calculated intersection of 32.3% core flow. Region C is the region between the 75% rod line and the Region A lower boundary. The 75% rod line was selected to establish a boundary based on a calculated decay ratio of 0.75 (Reference Figures 3.2.6-1, 3.2.7-1, and 3.2.8-1).
The existing power flow maps in the Technical Specifications extend down to 20% core flow.
Since operation is not possible below the natural circulation flow line, which is at 23.8% core flow the revised power flow maps start at the natural circulation line (23.8% flow).
'I I
<<t~p t ~ tl "r t ~ " I t ' t ~ ~ tf t tI ~ " I ~
R t'
t ~ tt ~ t I r ~
~ t VVV VR
)I ~ g ~
~,
r r
Page Three REQUEST FOR AMENDMENTTO STABILITYAND POWER/FLOW SECTIONS ~-
OF THE TECHNICAL SPECIFICATIONS One negative aspect of increasing the size of Region A is that additional scram challenges may be experienced in the event of certain plant transients (i.e., recirculation pump trips or flow runback). This is within the design basis of the plant and does not present an unacceptable risk.
The Supply System has reviewed this amendment request per 10 CFR 50.92 and has determined that it does not represent a significant hazard because it does not:
- 1) Involve a significant increase in the probability or consequences of an accident previously evaluated because the change to the boundary of Region A maintains a decay ratio of 0.9 or less as recommended in IEB 88-07 and as committed to in References 2 and 3. As decay ratios approach 1.0 the potential for core instability increases. Calculations using the STAIF stability code indicated the possibility of decay ratios greater than 0.9 outside of the current Region A. The proposed change, by preserving decay ratios below 0.9, will reduce the probability of core power oscillations by requiring an immediate manual scram over a larger portion of the power/flow operating domain. Preserving the decay ratio below 0.9 cannot increase the consequences of an accident previously evaluated.
Rod lines on the power flow map are not a factor in initial assumptions of accidents or transient analyses and thus do not involve a significant increase in'he probability or consequences of an accident,
"') Create the possibility of a new or different kind of accident from any accident previously evaluated. Since a scram is required if Region A is entered, the revised Region A assures that power oscillations will not occur from flow runback events or recirculation pump trips and does not create the possibility of a new or different kind of accident.
- . This change maintains plant operation within existing safety analysis, therefore, because operation willbe within existing bounds, there is no possibility of a new or different kind of accident. Rod lines on the power flow map are not a factor in initial assumptions of accidents or transient analyses and therefore revisions to them do not increase the possibility of a new or different kind of accident from any accident previously evaluated.
- 3) Involve a significant reduction in a margin of safety because the change in size and shape of Region A has been proposed to maintain decay ratios below 0.9, preserving the existing margin of safety. Therefore, there is no reduction in margin due to this change.
- -Rod lines on the power flow map are not a factor in initial assumptions of accidents or transient analyses and therefore do not involve a reduction in a margin of safety.
Additionally, editorial changes to Technical Specification sections 3.2.7.a and 3.2.8.a are being made to change the words "greater than 0.75" to "greater than or equal to 0.75." This is considered an editorial change because the intent of each LCO, that the decay ratio must be less than 0.75, is clear. The absence of action to be taken in the event that the decay ratio equaled 0.75 can lead to confusion. The Supply System has reviewed this change and has determined that it does not represent a significant hazard.
e <<<'
I' ' L I'
~
l
~ ll I
<<'I <<
C <<
Page Four REQUEST FOR AMENDMENTTO STABILITYAND POWER/FLOW SECTIONS OF THE TECHNICAL SPECIFICATIONS I
The restrictions on the power flow map and the operating domain of WNP-2 should be in place upon completion of the R8 Spring refueling outage in June. The changes are more conservative than current Technical Specifications requirements, they will be implemented and administratively controlled through procedures to support start up in June. The Supply System will implement the changes in accordance with 10 CFR 50.59.
As discussed above, the Supply System concludes that this change does not involve a significant hazards consideration, nor is there a potential for a significant change in the types or significant increase in the amount of any effluents that may be released offsite, nor does the change involve a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) and therefore, per 10 CFR 51.22(b), an environmental assessment of these changes is not required.
This Technical Specification change request has been reviewed and approved by the WNP-2 Plant Operations Committee and the Supply System Corporate Nuclear Safety Review Board.
In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.
Sincerely,
. V. Parrish (Mail Drop 1023)
Assistant Managing Director, Operations Attachments: 1) Figure 1
- 2) SPC letter
- 3) marked up Tech Spec pages.
- 4) SPC Affidavit CC: JB Martin - NRC RV
. NS Reynolds - Winston & Strawn DL Williams - BPA/399 NRC Site Inspector - 901A JW Clifford - NRC W Bishop - EFSEC
0 0 +~
S i
S t ~
1 h
~ ~
'TATE OF WASHING )
Subject:
uest for Amend to Stability
) and Power/Flow Sections of COUNTY OF BENTON ) he Technic 1 ifi i n I. J. V. PARRISH, being duly sworn, subscribe to and say that I am the Assistant Managing Director, Operations for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.
Attached to this submittal is a copy of the following letter which is considered by its respective owner to contain proprietary information:
~ Summary of Stability Licensing Calculations in Support of WNP-2 Cycle 9.
Also attached is an affidavit executed by R. A. Copeland, Product Licensing Manager, Siemens Power Corporation, dated April 20, 1993, which provides the basis on which it is claimed that the subject report should be withheld from public disclosure under the provisions of 10 CFR 2.790.
The Washington Public Power Supply System treats the subject letter as proprietary information on the basis of statements by its owner. In submitting this information to the NRC in support of the "WNP-2 Request for Amendment to Stability and Power/Flow Sections of the Technical Specifications," the Supply System requests that the subject report be withheld from public disclosure in accordance with 10 CFR 2.790.
DATE , 1993 J.. Parrish, Assistant Managing Director perations On this date personally appeared before me J. V. PARRISH, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this ~day of 1993.
otary Public in and or the STATE OF WASHINGTON Residing at K nnewi k W hin n MyC i i 2 ~4 ~AM2 2 4