| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 12
| page count = 12
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REG LAT INFORMATION DISTRIBUTION STEM (RIDS)ACCESSION NBR:9610230234 DOC.DATE: 96/10/15 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REG LAT     INFORMATION DISTRIBUTION         STEM   (RIDS)
YES DOCKET~~~~FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION BEMIS,P.R.
ACCESSION NBR:9610230234
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
                  ~                  DOC.DATE: 96/10/15       NOTARIZED: YES             DOCKET FACIL:50-397       WPPSS Nuclear Project, Unit 2, Washington Public           Powe   05000397 AUTH. NAME             AUTHOR AFFILIATION BEMIS,P.R.~  ~        Washington Public Power Supply System RECIP.NAME
          ~                RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Application for amend to license NPF-21 to modify TS for secondary containment a Standby Gas Treatment sys to reflect revised secondary containment drawdown a post-accident-analyses results.Affidavit, encl.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR i ENCI SIZE: 2 TITLE: OR Submittal:
Application for     amend to license   NPF-21   to modify TS for secondary containment a Standby Gas Treatment sys to reflect revised secondary containment drawdown a post-accident
General Distribution NOTES: RECIPIENT ID CODE/NAME PD4-2 LA COLBURN,T COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1 1 0 R INTERNAL: ACRS NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT TERNAL: NOAC 1 1 1 1 1 1 1 1 1 1 FILE CENTE 1 HICB NRR/DSSA/SRXB OGC/HDS3 NRC PDR 1 1 1 1 1 1 1 0 1 1 D 0 C U M l p NOTE TO ALL"RZDS" RECIPIENTS:
              -analyses results. Affidavit,encl.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL'ESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL.12 A1 g I 0 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352-0968
DISTRIBUTION CODE: AOOID TITLE:    OR COPIES RECEIVED:LTR Submittal: General Distribution i ENCI       SIZE: 2 NOTES:
~(509)372-5000 October 15, 1996 G02-96-199 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
RECIPIENT           COPIES            RECIPIENT            COPIES ID CODE/NAME        LTTR ENCL        ID CODE/NAME         LTTR ENCL                0 PD4-2 LA                 1     1     PD4-2   PD               1      1 COLBURN,T                1     1                                                       R INTERNAL: ACRS                         1    1      FILE  CENTE      1      1      1 NRR/DE/EMCB             1    1                  HICB          1      1 NRR/DSSA/SPLB           1     1     NRR/DSSA/SRXB             1     1 NUDOCS-ABSTRACT          1     1     OGC/HDS3                  1     0 TERNAL: NOAC                        1     1     NRC PDR                  1     1 D
0 C
U M
l p
NOTE TO   ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
    'ESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR             13   ENCL .
12
 
A 1
g I 0
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 October 15, 1996 G02-96-199 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
%NP-2, OPERATING LICENSE NO.NPF-21 REQUEST FOR AMENDMENT TO SECONDARY CONTAINMENT AND STANDBY GAS TREATMENT SYSTEM TECHNICAL SPECIFICATIONS
          %NP-2, OPERATING LICENSE NO. NPF-21 REQUEST FOR AMENDMENTTO SECONDARY CONTAINMENTAND STANDBY GAS TREATMENT SYSTEM TECHNICALSPECIFICATIONS


==References:==
==References:==
: 1.      Letter, dated July 29, 1988, CM Powers (SS) to NRC, "Licensee Event Report No. 88-023"
: 2.      Letter, dated September 30, 1988, CM Powers (SS) to NRC, "Licensee Event Report No. 88-023-01"                                                      u
: 3.      Letter, GO2-89-176, dated September 29, 1989, GC Sorensen (SS) to NRC, "Unreviewed Safety Question Regarding Standby Gas Treatment"
: 4.      Letter, dated October 18, 1989, CM Powers (SS) to NRC, "Licensee Event Report No. 89-040"
: 5.      Letter, GO2-89-216, dated November 30, 1989, GC Sorensen (SS) to NRC, "Unreviewed Safety Question Regarding Standby Gas Treatment (SGT) System"
: 6.      Letter, GI2-90-009, dated January 3, 1990, RB Samworth (NRC) to GC Sorensen (SS), "Evaluation of JCO Regarding Standby Gas Treatment System Attainment of Secondary Containment Pressure"
: 7.      Letter, GO2-90-027, dated February 16, 1990, GC Sorensen                  (SS) to NRC, "Standby Gas Treatment System (TAC No. 75048)"
: 8.      Letter, GO2-90-155, dated September 25, 1990, GC Sorensen (SS) to NRC, "Standby Gas Treatment System (TAC No. 75048)"
9hi0230234 9hi0l5im PDR'ADOCK 05000397 P                        PDR',
  'I J
~I f


1.Letter, dated July 29, 1988, CM Powers (SS)to NRC,"Licensee Event Report No.88-023" 2.3.Letter, dated September 30, 1988, CM Powers (SS)to NRC,"Licensee Event Report No.88-023-01" u Letter, GO2-89-176, dated September 29, 1989, GC Sorensen (SS)to NRC,"Unreviewed Safety Question Regarding Standby Gas Treatment" 4.5.6.7.8.Letter, dated October 18, 1989, CM Powers (SS)to NRC,"Licensee Event Report No.89-040" Letter, GO2-89-216, dated November 30, 1989, GC Sorensen (SS)to NRC,"Unreviewed Safety Question Regarding Standby Gas Treatment (SGT)System" Letter, GI2-90-009, dated January 3, 1990, RB Samworth (NRC)to GC Sorensen (SS),"Evaluation of JCO Regarding Standby Gas Treatment System Attainment of Secondary Containment Pressure" Letter, GO2-90-027, dated February 16, 1990, GC Sorensen (SS)to NRC,"Standby Gas Treatment System (TAC No.75048)" Letter, GO2-90-155, dated September 25, 1990, GC Sorensen (SS)to NRC,"Standby Gas Treatment System (TAC No.75048)" 9hi0230234 9hi0l5im PDR'ADOCK 05000397 P PDR',
+ Page 2 REQUEST FOR AMENDMENTTO SECONDARY CONTAINMENTAND STANDBY GAS TREATMENT SYSTEM TECHNICAL SPECIFICATIONS
'I J~I f
+Page 2 REQUEST FOR AMENDMENT TO SECONDARY CONTAINMENT AND STANDBY GAS TREATMENT SYSTEM TECHNICAL SPECIFICATIONS


==References:==
==References:==
: 9.      Letter, GO2-92-076, dated March 31, 1992, JW Baker (SS) to NRC, (cont.)                  "Licensee Event Report No. 92-008-00"
: 10. Letter, GO2-92-268, dated December 22, 1992, GC Sorensen (SS) to NRC, "Standby Gas Treatment/Secondary Containment"
: 11. Letter, GI2-93-110, dated May 5, 1993, JW Clifford (NRC) to GC Sorensen (SS), "Standby Gas Treatment/Secondary Containment (TAC No. M75048)"
: 12. Letter, GO2-93-151, dated June 11, 1993, JV Parrish (SS) to NRC, "Licensee Event Report No. 92-008-01"
: 13. Letter, GI2-95-059, dated March 6, 1995, JW Clifford (NRC) to WPPSS, "Summary of Meeting on Post-Accident Containment Response"
: 14. Letter, GO2-96-170, dated August 21, 1996, DA Swank (SS) to NRC, "Additional Information Regarding the Justification for Continued Operation for the Standby Gas Treatment System"
: 15. Letter, GO2-95-265, dated December 8, 1995, JV Parrish (SS) to NRC, "Request for Amendment to Technical Specifications" In acc 0 rdance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, the Supply System hereby submits a request for amendment to the WNP-2 Technical Specifications. This proposed amendment modifies the Technical Specifications for secondary containment and the Standby Gas Treatment (SGT) system to reflect revised secondary containment drawdown and post-accident analyses results. Specifically, the proposed changes:
Enhance the secondary containment integrity surveillance requirements by establishing an acceptable operating region as a function of secondary containment differential pressure and SGT system flow.
Revise the secondary containment and SGT systenr Technical Specification to more accurately reflect the existing design which consists of 2fllter trains and 4 divisional subsystems.
Revise the SGT system surveillance requirements to reflect the change    in system flow rate from 4457    cfm to 5000 cfm.
(iv)            Delete the existing requirement to maintain the secondary containment at ~ 0.25 inch of vacuum water gauge at all times (i.e., during normal operation with the nonsafety-related secondary containment ventilation system).


9.Letter, GO2-92-076, dated March 31, 1992, JW Baker (SS)to NRC, (cont.)"Licensee Event Report No.92-008-00" 10.Letter, GO2-92-268, dated December 22, 1992, GC Sorensen (SS)to NRC,"Standby Gas Treatment/Secondary Containment" 11.Letter, GI2-93-110, dated May 5, 1993, JW Clifford (NRC)to GC Sorensen (SS),"Standby Gas Treatment/Secondary Containment (TAC No.M75048)" 12.Letter, GO2-93-151, dated June 11, 1993, JV Parrish (SS)to NRC,"Licensee Event Report No.92-008-01" 13.Letter, GI2-95-059, dated March 6, 1995, JW Clifford (NRC)to WPPSS,"Summary of Meeting on Post-Accident Containment Response" 14.Letter, GO2-96-170, dated August 21, 1996, DA Swank (SS)to NRC,"Additional Information Regarding the Justification for Continued Operation for the Standby Gas Treatment System" Letter, GO2-95-265, dated December 8, 1995, JV Parrish (SS)to NRC,"Request for Amendment to Technical Specifications" 15.In acc rdance wi 0 th the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, the Supply System hereby submits a request for amendment to the WNP-2 Technical Specifications.
I
This proposed amendment modifies the Technical Specifications for secondary containment and the Standby Gas Treatment (SGT)system to reflect revised secondary containment drawdown and post-accident analyses results.Specifically, the proposed changes: Enhance the secondary containment integrity surveillance requirements by establishing an acceptable operating region as a function of secondary containment differential pressure and SGT system flow.Revise the secondary containment and SGT systenr Technical Specification to more accurately reflect the existing design which consists of 2fllter trains and 4 divisional subsystems.
Revise the SGT system surveillance requirements to reflect the change in system flow rate from 4457 cfm to 5000 cfm.(iv)Delete the existing requirement to maintain the secondary containment at~0.25 inch of vacuum water gauge at all times (i.e., during normal operation with the nonsafety-related secondary containment ventilation system).
!" I  
.REQUEST FOR AMENDMENT TO SECONDARY CONTAINMENT AND STANDBY GAS TREATMENT SYSTEM, TECHNICAL SPECIFICATIONS Attachment 1 provides a detailed discussion of the changes, including background information and the bases for the changes.Attachment 2'contains the figures and tables referenced in the Attachment 1 discussion.
Attachment 3 provides marked up copies of the secondary containment and SGT system Technical Specifications and the supporting Bases pages, indicating the proposed changes.Attachment 3A contains the markups of the current WNP-2 Technical Specifications (CTS)and Attachment 3B contains the markups of the Improved Technical Specifications (ITS).The Supply System has proposed (Reference 15)conversion to the ITS based on NUREG-1434,"Standard Technical Specifications, General Electric Plants, BWR-6," Revision 1, dated April 1995, and it is expected that approval for conversion to the ITS will precede approval of this amendment request.The indicated Bases changes are included in the markups of the Technical Specifications for information only.The Bases changes will be incorporated into the Technical Specifications by the Supply System when the Technical Specification amendment is issued for implementation.
This proposed change resolves a long standing issue regarding the establishment of secondary containment vacuum under adverse environmental conditions.
The issue was reported to the NRC in LERs 88-023, 88-023-01, and 89-040 (References 1, 2, and 4)and also as an unreviewed safety question (USQ)(Reference 3).As evidenced by the large number of docketed correspondence between the Supply System and the NRC staff (see References 1-14), the issue has received a significant amount of attention.
The information provided in this Technical Specification amendment request is intended to justify the proposed changes as well as document the resolution of related issues identified in the justification for continued operation (JCO)for SGT system attainment of secondary containment pressure.The NRC staff reviewed Revision 0 of the JCO (Reference 3)and were provided with a copy of Revision 5 of the JCO, which contains the current design basis, at the February 6, 1995 meeting (Reference 13)and during a recent engineering inspection (IR 96-11 and Reference 14).Attachment 4 includes a copy of Revision 5 of the JCO and the associated closure information.
The JCO closure information has been included to provide a clear documented record of the issues addressed by the JCO and their resolutions.
The short term drawdown analysis was recently re-performed and some of the results vary slightly from those presented at the February 6, 1995 meeting due to more conservative assumptions for heat loading.Also, for consistency with the format and content requirements of the ITS, the proposed changes to the CTS are different than what was presented at the meeting.Attachment 5 contains model element details and background information pertaining to the GOTHIC computer code.GOTHIC was used in the post-accident analyses which support the proposed changes to the Technical Specifications.


~Page 4 REQUEST FOR AMENDMENT TO SECONDARY CONTAINMENT AND STANDBY GAS TREATMENT SYSTEM TECHNICAL SPECIFICATIONS Attachment 6 provides the No Significant Hazards Consideration and Environmental Considerations evaluations.
REQUEST FOR AMENDMENTTO SECONDARY CONTAINMENTAND STANDBY GAS TREATMENT SYSTEM,TECHNICAL SPECIFICATIONS  provides a detailed discussion of the changes, including background information and the bases for the changes. Attachment 2'contains the figures and tables referenced in the  discussion. Attachment 3 provides marked up copies of the secondary containment and SGT system Technical Specifications and the supporting Bases pages, indicating the proposed changes.      Attachment 3A contains the markups of the current WNP-2 Technical Specifications (CTS) and Attachment 3B contains the markups of the Improved Technical Specifications (ITS). The Supply System has proposed (Reference 15) conversion to the ITS based on NUREG-1434, "Standard Technical Specifications, General Electric Plants, BWR-6,"
The Supply System has concluded that the proposed changes to the WNP-2 Technical Specifications do not result in a significant hazards consideration.
Revision 1, dated April 1995, and it is expected that approval for conversion to the ITS will precede approval of this amendment request. The indicated Bases changes are included in the markups of the Technical Specifications for information only. The Bases changes will be incorporated into the Technical Specifications by the Supply System when the Technical Specification amendment is issued for implementation.
In addition, the changes meet the eligibility criteria for a categorical exclusion as set forth in 10 CFR 51.22(c)(9).
This proposed change resolves a long standing issue regarding the establishment of secondary containment vacuum under adverse environmental conditions. The issue was reported to the NRC in LERs 88-023, 88-023-01, and 89-040 (References 1, 2, and 4) and also as an unreviewed safety question (USQ) (Reference 3). As evidenced by the large number of docketed correspondence between the Supply System and the NRC staff (see References 1 - 14), the issue has received a significant amount of attention. The information provided in this Technical Specification amendment request is intended to justify the proposed changes as well as document the resolution of related issues identified in the justification for continued operation (JCO) for SGT system attainment of secondary containment pressure. The NRC staff reviewed Revision 0 of the JCO (Reference 3) and were provided with a copy of Revision 5 of the JCO, which contains the current design basis, at the February 6, 1995 meeting (Reference 13) and during a recent engineering inspection (IR 96-11 and Reference 14). Attachment 4 includes a copy of Revision 5 of the JCO and the associated closure information. The JCO closure information has been included to provide a clear documented record of the issues addressed by the JCO and their resolutions.
Therefore, in accordance with 10 CFR 51.22(b), an environmental assessment of the changes is not required.This Technical Specification amendment request has been reviewed and approved by the WNP-2 Plant Operations Committee and the Supply System Corporate Nuclear Safety Review Board.In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.It is also hereby requested that 30 days be allowed for implementation of this proposed amendment to accommodate completion of the required implementation actions.Should you have any questions or desire additional information regarding this matter, please call me or Ms.L.C.Fernandez at (509)377-4147.Respectfully, P.R.Bemis~~Vice President Nuclear Operations Mail Drop PE23 Attachments:
The short term drawdown analysis was recently re-performed and some of the results vary slightly from those presented at the February 6, 1995 meeting due to more conservative assumptions for heat loading. Also, for consistency with the format and content requirements of the ITS, the proposed changes to the CTS are different than what was presented at the meeting. contains model element details and background information pertaining to the GOTHIC computer code. GOTHIC was used in the post-accident analyses which support the proposed changes to the Technical Specifications.
1)2)3A)3B)4)5)6)Discussion and bases for changes Figures and Tables CTS and Bases markup ITS and Bases markup JCO (Revision 5)and closure summary GOTHIC model comparison information No Significant Hazards Consideration and Environmental Considerations evaluations CC: LJ Callan-NRC RIV KE Perkins, Jr.-NRC RIV, Walnut Creek Field Office NS Reynolds-Winston&Strawn TG Colburn-NRR DL Williams-BPA/399 NRC Sr.Resident Inspector-927N FS Adair-EFSEC 0~,
 
STATE OF WASHINGTON
~
))COUNTY OF BENTON)
Page 4 REQUEST FOR AMENDMENTTO SECONDARY CONTAINMENTAND STANDBY GAS TREATMENT SYSTEM TECHNICAL SPECIFICATIONS Attachment 6 provides the No Significant Hazards Consideration and Environmental Considerations evaluations. The Supply System has concluded that the proposed changes to the WNP-2 Technical Specifications do not result in a significant hazards consideration. In addition, the changes meet the eligibility criteria for a categorical exclusion as set forth in 10 CFR 51.22(c)(9). Therefore, in accordance with 10 CFR 51.22(b), an environmental assessment of the changes is not required.
This Technical Specification amendment request has been reviewed and approved by the WNP-2 Plant Operations Committee and the Supply System Corporate Nuclear Safety Review Board.
In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.
It is also hereby requested that 30 days be allowed for implementation of this proposed amendment to accommodate completion of the required implementation actions.
Should you have any questions or desire additional information regarding this matter, please call me or Ms. L. C. Fernandez at (509) 377-4147.
Respectfully, P. R. Bemis
    ~   ~
Vice President Nuclear Operations Mail Drop PE23 Attachments:
: 1)     Discussion and bases for changes
: 2)    Figures and Tables 3A)    CTS and Bases markup 3B)    ITS and Bases markup
: 4)    JCO (Revision 5) and closure summary
: 5)    GOTHIC model comparison information
: 6)    No Significant Hazards Consideration       and   Environmental   Considerations evaluations CC:     LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston & Strawn TG Colburn - NRR DL Williams - BPA/399 NRC Sr. Resident Inspector - 927N FS Adair - EFSEC
 
0
  ~,
 
STATE OF WASHINGTON )                                


==Subject:==
==Subject:==
Amendment to Technical Specifications Secondary Containment and Standby Gas Treatment System I, P.R.BEMIS, being duly sworn, subscribe to and say that I am the Vice President, Nuclear Operations for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein;that I have the full authority to execute this oath;that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.DATE 1>ItC , 1996 e Vic Presi ent, Nuclear Operations On this date personally appeared before me P.R.BEMIS, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
Amendment to Technical Specifications
GIVEN under my hand and seal this~lday of 1996.Public in and for the STATE OF WASHINGTON Residing a My Commission Expires g$~ill'lu QQ I eg J=l}}
                                )                              Secondary Containment and Standby Gas COUNTY OF BENTON                )                              Treatment System I, P. R. BEMIS, being duly sworn, subscribe to and say that I am the Vice President, Nuclear Operations for the WASHINGTONPUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.
DATE       1> ItC                       , 1996 e
Vic Presi ent, Nuclear Operations On this date personally appeared before me P. R. BEMIS, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this       ~lday of                                     1996.
Public in and for the STATE OF WASHINGTON Residing a My Commission Expires
 
g$ ~ ill 'lu QQ I eg       J
=l}}

Latest revision as of 07:02, 4 February 2020

Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl
ML17292A549
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/15/1996
From: Bemis P
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17292A550 List:
References
GO2-96-199, NUDOCS 9610230234
Download: ML17292A549 (12)


Text

{{#Wiki_filter:CATEGORY 1 REG LAT INFORMATION DISTRIBUTION STEM (RIDS) ACCESSION NBR:9610230234

                  ~                  DOC.DATE: 96/10/15       NOTARIZED: YES             DOCKET FACIL:50-397       WPPSS  Nuclear Project, Unit 2, Washington Public            Powe    05000397 AUTH. NAME              AUTHOR  AFFILIATION BEMIS,P.R.~  ~         Washington Public Power Supply System RECIP.NAME
         ~                RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Application for amend to license NPF-21 to modify TS for secondary containment a Standby Gas Treatment sys to reflect revised secondary containment drawdown a post-accident

             -analyses results. Affidavit,encl.

DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution i ENCI SIZE: 2 NOTES: RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD4-2 LA 1 1 PD4-2 PD 1 1 COLBURN,T 1 1 R INTERNAL: ACRS 1 1 FILE CENTE 1 1 1 NRR/DE/EMCB 1 1 HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 TERNAL: NOAC 1 1 NRC PDR 1 1 D 0 C U M l p NOTE TO ALL "RZDS" RECIPIENTS: PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

    'ESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR              13    ENCL  .

12

A 1 g I 0

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 October 15, 1996 G02-96-199 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

         %NP-2, OPERATING LICENSE NO. NPF-21 REQUEST FOR AMENDMENTTO SECONDARY CONTAINMENTAND STANDBY GAS TREATMENT SYSTEM TECHNICALSPECIFICATIONS

References:

1. Letter, dated July 29, 1988, CM Powers (SS) to NRC, "Licensee Event Report No. 88-023"
2. Letter, dated September 30, 1988, CM Powers (SS) to NRC, "Licensee Event Report No. 88-023-01" u
3. Letter, GO2-89-176, dated September 29, 1989, GC Sorensen (SS) to NRC, "Unreviewed Safety Question Regarding Standby Gas Treatment"
4. Letter, dated October 18, 1989, CM Powers (SS) to NRC, "Licensee Event Report No. 89-040"
5. Letter, GO2-89-216, dated November 30, 1989, GC Sorensen (SS) to NRC, "Unreviewed Safety Question Regarding Standby Gas Treatment (SGT) System"
6. Letter, GI2-90-009, dated January 3, 1990, RB Samworth (NRC) to GC Sorensen (SS), "Evaluation of JCO Regarding Standby Gas Treatment System Attainment of Secondary Containment Pressure"
7. Letter, GO2-90-027, dated February 16, 1990, GC Sorensen (SS) to NRC, "Standby Gas Treatment System (TAC No. 75048)"
8. Letter, GO2-90-155, dated September 25, 1990, GC Sorensen (SS) to NRC, "Standby Gas Treatment System (TAC No. 75048)"

9hi0230234 9hi0l5im PDR'ADOCK 05000397 P PDR',

  'I J

~I f

+ Page 2 REQUEST FOR AMENDMENTTO SECONDARY CONTAINMENTAND STANDBY GAS TREATMENT SYSTEM TECHNICAL SPECIFICATIONS

References:

9. Letter, GO2-92-076, dated March 31, 1992, JW Baker (SS) to NRC, (cont.) "Licensee Event Report No. 92-008-00"
10. Letter, GO2-92-268, dated December 22, 1992, GC Sorensen (SS) to NRC, "Standby Gas Treatment/Secondary Containment"
11. Letter, GI2-93-110, dated May 5, 1993, JW Clifford (NRC) to GC Sorensen (SS), "Standby Gas Treatment/Secondary Containment (TAC No. M75048)"
12. Letter, GO2-93-151, dated June 11, 1993, JV Parrish (SS) to NRC, "Licensee Event Report No. 92-008-01"
13. Letter, GI2-95-059, dated March 6, 1995, JW Clifford (NRC) to WPPSS, "Summary of Meeting on Post-Accident Containment Response"
14. Letter, GO2-96-170, dated August 21, 1996, DA Swank (SS) to NRC, "Additional Information Regarding the Justification for Continued Operation for the Standby Gas Treatment System"
15. Letter, GO2-95-265, dated December 8, 1995, JV Parrish (SS) to NRC, "Request for Amendment to Technical Specifications" In acc 0 rdance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, the Supply System hereby submits a request for amendment to the WNP-2 Technical Specifications. This proposed amendment modifies the Technical Specifications for secondary containment and the Standby Gas Treatment (SGT) system to reflect revised secondary containment drawdown and post-accident analyses results. Specifically, the proposed changes:

Enhance the secondary containment integrity surveillance requirements by establishing an acceptable operating region as a function of secondary containment differential pressure and SGT system flow. Revise the secondary containment and SGT systenr Technical Specification to more accurately reflect the existing design which consists of 2fllter trains and 4 divisional subsystems. Revise the SGT system surveillance requirements to reflect the change in system flow rate from 4457 cfm to 5000 cfm. (iv) Delete the existing requirement to maintain the secondary containment at ~ 0.25 inch of vacuum water gauge at all times (i.e., during normal operation with the nonsafety-related secondary containment ventilation system).

I

REQUEST FOR AMENDMENTTO SECONDARY CONTAINMENTAND STANDBY GAS TREATMENT SYSTEM,TECHNICAL SPECIFICATIONS provides a detailed discussion of the changes, including background information and the bases for the changes. Attachment 2'contains the figures and tables referenced in the discussion. Attachment 3 provides marked up copies of the secondary containment and SGT system Technical Specifications and the supporting Bases pages, indicating the proposed changes. Attachment 3A contains the markups of the current WNP-2 Technical Specifications (CTS) and Attachment 3B contains the markups of the Improved Technical Specifications (ITS). The Supply System has proposed (Reference 15) conversion to the ITS based on NUREG-1434, "Standard Technical Specifications, General Electric Plants, BWR-6," Revision 1, dated April 1995, and it is expected that approval for conversion to the ITS will precede approval of this amendment request. The indicated Bases changes are included in the markups of the Technical Specifications for information only. The Bases changes will be incorporated into the Technical Specifications by the Supply System when the Technical Specification amendment is issued for implementation. This proposed change resolves a long standing issue regarding the establishment of secondary containment vacuum under adverse environmental conditions. The issue was reported to the NRC in LERs 88-023, 88-023-01, and 89-040 (References 1, 2, and 4) and also as an unreviewed safety question (USQ) (Reference 3). As evidenced by the large number of docketed correspondence between the Supply System and the NRC staff (see References 1 - 14), the issue has received a significant amount of attention. The information provided in this Technical Specification amendment request is intended to justify the proposed changes as well as document the resolution of related issues identified in the justification for continued operation (JCO) for SGT system attainment of secondary containment pressure. The NRC staff reviewed Revision 0 of the JCO (Reference 3) and were provided with a copy of Revision 5 of the JCO, which contains the current design basis, at the February 6, 1995 meeting (Reference 13) and during a recent engineering inspection (IR 96-11 and Reference 14). Attachment 4 includes a copy of Revision 5 of the JCO and the associated closure information. The JCO closure information has been included to provide a clear documented record of the issues addressed by the JCO and their resolutions. The short term drawdown analysis was recently re-performed and some of the results vary slightly from those presented at the February 6, 1995 meeting due to more conservative assumptions for heat loading. Also, for consistency with the format and content requirements of the ITS, the proposed changes to the CTS are different than what was presented at the meeting. contains model element details and background information pertaining to the GOTHIC computer code. GOTHIC was used in the post-accident analyses which support the proposed changes to the Technical Specifications.

~ Page 4 REQUEST FOR AMENDMENTTO SECONDARY CONTAINMENTAND STANDBY GAS TREATMENT SYSTEM TECHNICAL SPECIFICATIONS Attachment 6 provides the No Significant Hazards Consideration and Environmental Considerations evaluations. The Supply System has concluded that the proposed changes to the WNP-2 Technical Specifications do not result in a significant hazards consideration. In addition, the changes meet the eligibility criteria for a categorical exclusion as set forth in 10 CFR 51.22(c)(9). Therefore, in accordance with 10 CFR 51.22(b), an environmental assessment of the changes is not required. This Technical Specification amendment request has been reviewed and approved by the WNP-2 Plant Operations Committee and the Supply System Corporate Nuclear Safety Review Board. In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter. It is also hereby requested that 30 days be allowed for implementation of this proposed amendment to accommodate completion of the required implementation actions. Should you have any questions or desire additional information regarding this matter, please call me or Ms. L. C. Fernandez at (509) 377-4147. Respectfully, P. R. Bemis

   ~   ~

Vice President Nuclear Operations Mail Drop PE23 Attachments:

1) Discussion and bases for changes
2) Figures and Tables 3A) CTS and Bases markup 3B) ITS and Bases markup
4) JCO (Revision 5) and closure summary
5) GOTHIC model comparison information
6) No Significant Hazards Consideration and Environmental Considerations evaluations CC: LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston & Strawn TG Colburn - NRR DL Williams - BPA/399 NRC Sr. Resident Inspector - 927N FS Adair - EFSEC

0

 ~,

STATE OF WASHINGTON )

Subject:

Amendment to Technical Specifications

                               )                              Secondary Containment and Standby Gas COUNTY OF BENTON                )                              Treatment System I, P. R. BEMIS, being duly sworn, subscribe to and say that I am the Vice President, Nuclear Operations for the WASHINGTONPUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

DATE 1> ItC , 1996 e Vic Presi ent, Nuclear Operations On this date personally appeared before me P. R. BEMIS, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned. GIVEN under my hand and seal this ~lday of 1996. Public in and for the STATE OF WASHINGTON Residing a My Commission Expires

g$ ~ ill 'lu QQ I eg J =l}}