| issue date = 09/08/1998 | | issue date = 09/08/1998 | ||
| title = Requests Rev to PVNGS Emergency Plan,Rev 19.Emergency Plan Revision Would Result in Two Less RP Positions Immediately Available During Emergencies.Revised Pages Encl | | title = Requests Rev to PVNGS Emergency Plan,Rev 19.Emergency Plan Revision Would Result in Two Less RP Positions Immediately Available During Emergencies.Revised Pages Encl | ||
| author name = | | author name = Levine J | ||
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR | | author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR | ||
| addressee name = | | addressee name = | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:'~CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS) | {{#Wiki_filter:' ~ | ||
NO FACIL~STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi AUTH.NAME AUTHOR AFFILIATION LEVINE,J;.M. | CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS) | ||
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME | ACCESSION NBR:9809150226 DOC.DATE: 98/09/08 NOTARIZED: NO DOCKET FACIL~STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION LEVINE,J;.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME . RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)i F~// g C | ||
.RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)i F~//g C | |||
==SUBJECT:== | ==SUBJECT:== | ||
Recpxests rev to PVNGS Emergency Plan rev 19.Emergency Plan revision would result in two less RP positions immediately A available during emergencies. | Recpxests rev to PVNGS Emergency Plan rev 19.Emergency Plan revision would result in two less RP positions immediately A available during emergencies. Revised pages encl. T DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR ENCL SIZE: | ||
Revised pages encl.T DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal: | TITLE: OR Submittal: Emergency Preparedness Plans, Implement'g Procedures, NOTES: STANDARDIZED PLANT 05000528@ | ||
Emergency Preparedness Plans, Implement'g Procedures, NOTES: STANDARDIZED PLANT Standardized plant.Standardized plant. | Standardized plant. 05000529 Standardized plant. 050005300 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL PD4-2 PD 1 1 FIELDS,M 1 1 INTERNAL: AEOD/HAGAN,D 1 1 L CENTER 01 2 2 NRR/DRPM/PERB 1 1 NUD 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 . 1 and N NOTE TO ALL "RIDS" RECIPIENTS: | ||
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DlSTRZBUTZON LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANZZATZON, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 | PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DlSTRZBUTZON LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANZZATZON, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 | ||
~~ | |||
~ | |||
r ~ | |||
James M. Levine TEL (602)393-5300 Mail Station 7602 Palo Verde Nuclear Senior Vice President FAX (602)393-6077 P.O. Box 52034 Generating Station Nuclear Phoenix, AZ 65072-2034 102-04178-JML/SAB/RKB September 8, 1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 | |||
==Dear Sirs:== | ==Dear Sirs:== | ||
==Subject:== | ==Subject:== | ||
Palo Verde Nuclear Generating Station (PVNGS)Units 1,2, and 3 Docket Nos.STN 50-528/629/630 Request for Revision to PVNGS Emergency Plan In accordance with the requirements of 10 CFR 50.54(q)and 10 CFR 50.4, Arizona Public Service Company (APS)hereby requests a revision to the PVNGS Emergency Plan, Revision 19.The requested revision addresses reducing the Radiation Protection (RP)related Emergency Plan on-shift staffing positions from the current ten individuals to eight individuals, while increasing the number of 60 to 120 minute augmentation positions from four to six.This proposed revision of the PVNGS Emergency Plan complies with the requirements of 10 CFR 50.47(b)(2), 10 CFR 50 Appendix E, and the staffing levels required per NUREG-0654, Table B-1,"Minimum Staffing Requirements For NRC Licensees For Nuclear Power Plant Emergencies." Since the requested Emergency Plan revision would result in two less RP positions immediately available during emergencies, APS believes the proposed revision constitutes a reduction in the overall effectiveness of the Emergency Plan from what currently exists.However, APS believes the reduction is minimal since the requested revision maintains compliance with the staffing levels required by NUREG-0654. | Palo Verde Nuclear Generating Station (PVNGS) | ||
APS proposes to reduce the RP-related Emergency Plan on-shift staffing positions from the current ten individuals to eight individuals and continue to maintain adequate staffing to perform all necessary Emergency Plan tasks.APS proposes to achieve this in three ways, 1)by re-assigning responsibility for tasks that do not require full RP Technician qualifications to RP task-qualified personnel already on-shift;2)by modifying the responsibilities of those personnel assigned Emergency Plan tasks which require full RP Technician'qualifications; and 3)by shifting two RP Technician Emergency Plan positions from being on-shift for immediate availability to being available within the 1 to 2 hour augmentation time.The description and justification of the changes proposed in the requested revision are provided in Enclosure 1.Enclosure 2 provides revised pages to the PVNGS Emergency Plan.9849i50226 980908 Fl | Units 1,2, and 3 Docket Nos. STN 50-528/629/630 Request for Revision to PVNGS Emergency Plan In accordance with the requirements of 10 CFR 50.54(q) and 10 CFR 50.4, Arizona Public Service Company (APS) hereby requests a revision to the PVNGS Emergency Plan, Revision 19. The requested revision addresses reducing the Radiation Protection (RP) related Emergency Plan on-shift staffing positions from the current ten individuals to eight individuals, while increasing the number of 60 to 120 minute augmentation positions from four to six. This proposed revision of the PVNGS Emergency Plan complies with the requirements of 10 CFR 50.47(b)(2), 10 CFR 50 Appendix E, and the staffing levels required per NUREG-0654, Table B-1, "Minimum Staffing Requirements For NRC Licensees For Nuclear Power Plant Emergencies." | ||
$665,000 in annual savings from the implementation of this Emergency Plan revision.Over the remaining life of the plant that savings is more than$16,652,000. | Since the requested Emergency Plan revision would result in two less RP positions immediately available during emergencies, APS believes the proposed revision constitutes a reduction in the overall effectiveness of the Emergency Plan from what currently exists. However, APS believes the reduction is minimal since the requested revision maintains compliance with the staffing levels required by NUREG-0654. | ||
The justification provided in Enclosure 1 strongly supports the approval of the proposed change as it demonstrates the PVNGS Emergency Plan would continue to comply with regulatory requirements. | APS proposes to reduce the RP-related Emergency Plan on-shift staffing positions from the current ten individuals to eight individuals and continue to maintain adequate staffing to perform all necessary Emergency Plan tasks. APS proposes to achieve this in three ways, 1) by re-assigning responsibility for tasks that do not require full RP Technician qualifications to RP task-qualified personnel already on-shift; 2) by modifying the responsibilities of those personnel assigned Emergency Plan tasks which require full RP Technician'qualifications; and 3) by shifting two RP Technician Emergency Plan positions from being on-shift for immediate availability to being available within the 1 to 2 hour augmentation time. The description and justification of the changes proposed in the requested revision are provided in Enclosure 1. Enclosure 2 provides revised pages to the PVNGS Emergency Plan. | ||
Based on the substantial cost.benefit of this change, APS requests NRC staff review and approval by February 28, 1999.To facilitate this, APS would welcome an opportunity to meet with the NRC staff regarding this Emergency Plan request.Please contact Mr.Scott Bauer at (602)393-5978 if you would like to schedule a meeting or if you have any questions. | 9849i50226 980908 Fl ADOCX,OSOOOSaS FOR F " ' PORE | ||
This letter does not make any commitments to the NRC.Sincerely, JML/SAB/RKB/rlh | |||
U.S. Nuclear Regula ory Commission ATTN: Document Control Desk Request for Revision to PVNGS Emergency Plan Page 2 By implementing the proposed revision to the PVNGS Emergency Plan, APS will continue to provide adequate Emergency Plan staffing to reasonably assure that the health and safety of the public will be adequately protected and yet gain significant operational flexibilityto manage personnel resources during off-normal hours. | |||
This request is being submitted for consideration under the provisions of NRC Administrative Letter 95-02: "Cost Beneficial Licensing Actions [CBLA]." APS expects to realize approximately $ 665,000 in annual savings from the implementation of this Emergency Plan revision. Over the remaining life of the plant that savings is more than $ 16,652,000. | |||
The justification provided in Enclosure 1 strongly supports the approval of the proposed change as it demonstrates the PVNGS Emergency Plan would continue to comply with regulatory requirements. Based on the substantial cost | |||
.benefit of this change, APS requests NRC staff review and approval by February 28, 1999. To facilitate this, APS would welcome an opportunity to meet with the NRC staff regarding this Emergency Plan request. Please contact Mr. Scott Bauer at (602) 393-5978 if you would like to schedule a meeting or if you have any questions. This letter does not make any commitments to the NRC. | |||
Sincerely, JML/SAB/RKB/rlh | |||
==Enclosures:== | ==Enclosures:== | ||
: 1. Description and Justification of Proposed Changes to the PVNGS Emergency Plan | |||
: 2. PVNGS Emergency Plan Revised Pages for Proposed Change cc: E. W. Merschoff M. B. Fields J. H. Moorman T. H. Andrews | |||
1 | Enclosure 1 Description and Justification of Proposed Changes to the PVNGS Emergency Plan | ||
==Background:== | ==Background:== | ||
NUREG-0654/FEMA-REP-1,"Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," Table B-1,"Minimum Staffing Requirements For NRC Licensees For Nuclear Power Plant Emergencies," specifies three response times for having sufficient qualified staff available. | NUREG-0654/FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," Table B-1, "Minimum Staffing Requirements For NRC Licensees For Nuclear Power Plant Emergencies," specifies three response times for having sufficient qualified staff available. These are 1) On-Shift, 2) 30 minute, and 3) 60 minute. Because of the site's remote location, PVNGS requested, in Revision 13 to the Emergency Plan (reference 1), to utilize up to a 120 minute augmentation response time in lieu of the 60 minute response time specified by NUREG-0654, during off-normal hours. To off set the delayed response of Emergency Plan augmentation personnel, APS committed to combining the first two response columns, "On-Shift" and "30 minute," to determine the minimum on-shift staffing requirements for PVNGS. NRC approval was granted for Revision 13 (reference 2). Subsequent revisions to the Emergency Plan have made only minor changes in the RP-related functions since Revision 13. | ||
These are 1)On-Shift, 2)30 minute, and 3)60 minute.Because of the site's remote location, PVNGS requested, in Revision 13 to the Emergency Plan (reference 1), to utilize up to a 120 minute augmentation response time in lieu of the 60 minute response time specified by NUREG-0654, during off-normal hours.To off set the delayed response of Emergency Plan augmentation personnel, APS committed to combining the first two response columns,"On-Shift" and"30 minute," to determine the minimum on-shift staffing requirements for PVNGS.NRC approval was granted for Revision 13 (reference 2).Subsequent revisions to the Emergency Plan have made only minor changes in the RP-related functions since Revision 13.Adequate on-shift staffing is verified per Station procedure 75RP-9RP10,"Conduct of RP Operations," Section 3.0, which requires that the Radiation Protection Section Leader ensure the number of on-shift Emergency Plan qualiTied RP-related personnel are logged into the Unit 2 RP Log.The minimum Health Physics-related Emergency Plan staffing requirements from Table B-1 of NUREG-0654 are provided in Attachment 1 to this enclosure. | Adequate on-shift staffing is verified per Station procedure 75RP-9RP10, "Conduct of RP Operations," Section 3.0, which requires that the Radiation Protection Section Leader ensure the number of on-shift Emergency Plan qualiTied RP-related personnel are logged into the Unit 2 RP Log. | ||
PVNGS'mergency Plan, Revision 19, requires ten Health Physics-related positions on-shift, and an additional four augmentation positions available within 60 to 120 minutes.The current PVNGS Health Physics-related Emergency Plan staffing is provided in Attachment 2.Additionally, Table B-1 of NUREG-0654 provides specific guidance for the required level of expertise of persons filling certain positions. | The minimum Health Physics-related Emergency Plan staffing requirements from Table B-1 of NUREG-0654 are provided in Attachment 1 to this enclosure. PVNGS'mergency Plan, Revision 19, requires ten Health Physics-related positions on-shift, and an additional four augmentation positions available within 60 to 120 minutes. The current PVNGS Health Physics-related Emergency Plan staffing is provided in Attachment 2. | ||
Specifically, Table B-1 requires the following: | Additionally, Table B-1 of NUREG-0654 provides specific guidance for the required level of expertise of persons filling certain positions. Specifically, Table B-1 requires the following: | ||
~Off-site dose assessment position to be filled by an individual possessing Senior Health Physics expertise. | ~ Off-site dose assessment position to be filled by an individual possessing Senior Health Physics expertise. | ||
~In-Plant surveys position to be filled by a qualified Health Physics Technician, and~Protective Actions (In-Plant) position to be filled by a qualified Health Physics Technician. | ~ In-Plant surveys position to be filled by a qualified Health Physics Technician, and | ||
The remaining Health Physics-related positions specified in NUREG-0654 have no specific requirements for level of expertise. | ~ Protective Actions (In-Plant) position to be filled by a qualified Health Physics Technician. | ||
NUREG/CR-5569,"Health Physics Positions Database," May 1992, HPPOS-238,"Health Physics Position on Task Qualification of HP technicians," was referenced for further guidance regarding the qualification requirements for individuals performing 1 | The remaining Health Physics-related positions specified in NUREG-0654 have no specific requirements for level of expertise. NUREG/CR-5569, "Health Physics Positions Database," May 1992, HPPOS-238, "Health Physics Position on Task Qualification of HP technicians," was referenced for further guidance regarding the qualification requirements for individuals performing 1 | ||
e independent Emergency Plan related Health Physics tasks.NUREG/CR-5569, HPPOS 238 states that"Health Physics Technicians (HP technicians) may independently perform specific tasks or job assignments if they meet the required prerequisites and complete the required task qualifications of their plant training programs." HPPOS-238 further states that"there are certain tasks and job assignments, however, that require in-depth knowledge and can only be performed by fully qualified ANSI technicians. | |||
The following are areas of Emergency Preparedness in which a non-fully qualified HP technician should not be authorized to perform (without supervision): | e independent Emergency Plan related Health Physics tasks. NUREG/CR-5569, HPPOS 238 states that "Health Physics Technicians (HP technicians) may independently perform specific tasks or job assignments if they meet the required prerequisites and complete the required task qualifications of their plant training programs." HPPOS-238 further states that "there are certain tasks and job assignments, however, that require in-depth knowledge and can only be performed by fully qualified ANSI technicians. The following are areas of Emergency Preparedness in which a non-fully qualified HP technician should not be authorized to perform (without supervision): 1) lead emergency search and rescue teams, 2) lead environmental monitoring teams, or 3) off-site dose assessment." This guidance provides additional bases for the justification of the changes described below. | ||
1)lead emergency search and rescue teams, 2)lead environmental monitoring teams, or 3)off-site dose assessment." This guidance provides additional bases for the justification of the changes described below.Proposed Change: The current Health Physics-related Emergency Plan on-shift staffing of ten positions exceeds the minimum staffing requirements presented in Table B-1 of NUREG-0654, for"On-shift" plus"30 minute" positions. | Proposed Change: | ||
APS proposes to revise the Emergency Plan staffing of Health Physics-related positions from ten to eight, while increasing the number of 60 to 120 minute augmentation positions from four to six, to allow greater operational flexibility in managing personnel resources during off-normal hours.The proposed changes maintain adequate staffing levels in compliance with NUREG-0654. | The current Health Physics-related Emergency Plan on-shift staffing of ten positions exceeds the minimum staffing requirements presented in Table B-1 of NUREG-0654, for "On-shift" plus "30 minute" positions. APS proposes to revise the Emergency Plan staffing of Health Physics-related positions from ten to eight, while increasing the number of 60 to 120 minute augmentation positions from four to six, to allow greater operational flexibility in managing personnel resources during off-normal hours. The proposed changes maintain adequate staffing levels in compliance with NUREG-0654. In addition, from Revision 13 of the Emergency Plan is maintained since the APS'ommitment excess personnel immediately available to response to an emergency by combining the on-shift plus 30 minute staffing levels, provides significant emergency response capability to off-set the additional response time for augmentation personnel to arrive. | ||
In addition, | APS proposes to revise the PVNGS Emergency Plan as follows: 1) Redefine the role of the Radiation Protection Monitor (RPM) position exclusively for off-site dose assessment; 2) Redefine the role of the current Radiation Monitoring Technician (RMT) position to perform the in-plant survey function; 3) Assign the second in-plant survey function to either a second RMT, task qualified to perform in-plant surveys, or a qualified RP Technician; 4) Establish an E-Plan Driver position to perform driving functions in support of off-site surveys; 5) | ||
Attachment 3 provides a comparison of current PVNGS Emergency Plan RP-related staffing and the proposed staffing changes versus NUREG-0654, Table B-1, requirements. | Reassign the on-site (Out of Plant) survey position to a task-qualified individual outside the RP organization, that is on-shift but does not currently have Emergency Plan responsibilities; and 6) Reassign the remaining two Radiation Protection Technician positions, which are over-compliment, from on-shift positions to 60 to 120 minute augmentation positions, bringing the total of 60 to 120 minute augmentation positions to six Radiation Protection Technicians. Attachment 3 provides a comparison of current PVNGS Emergency Plan RP-related staffing and the proposed staffing changes versus NUREG-0654, Table B-1, requirements. Attachment 4 provides the proposed changes to Table 1 of the PVNGS Emergency Plan. | ||
Attachment 4 provides the proposed changes to Table 1 of the PVNGS Emergency Plan., 2 Description/Justification: | , 2 | ||
Off-site Dose Assessment: | |||
The role of the RPM is redefined to focus on off-site dose assessment. | Description/Justification: | ||
Currently, the RPM and a RMT combine to fill the required position for the off-site dose assessment function.NUREG-0654 requires that this position have"Senior Health Physics (HP)expertise." NUREG/CR-5569, HPPOS-238,"Health Physics Position on Task Qualification of HP technicians," states"as examples in the area of Emergency Preparedness, a non-fully qualified HPT should not be authorized to:...3)perform offsite dose assessment." This change proposes reassigning this Emergency Plan task solely to the Radiation Protection Department. | Off-site Dose Assessment: The role of the RPM is redefined to focus on off-site dose assessment. Currently, the RPM and a RMT combine to fill the required position for the off-site dose assessment function. NUREG-0654 requires that this position have "Senior Health Physics (HP) expertise." NUREG/CR-5569, HPPOS-238, "Health Physics Position on Task Qualification of HP technicians," states "as examples in the area of Emergency Preparedness, a non-fully qualified HPT should not be authorized to: ...3) perform offsite dose assessment." This change proposes reassigning this Emergency Plan task solely to the Radiation Protection Department. The on-shift RPM will fill this position exclusively. The RPM is an ANSI 3.1 Senior Health Physics Technician who will be fully qualified to independently perform off-site dose assessment. | ||
The on-shift RPM will fill this position exclusively. | This functional assignment meets the requirements of NUREG-0654, Table B-1, PVNGS UFSAR Chapter 18.III.A, Table 2, "Minimum Staffing Requirements for NRC Licensees for Nuclear Power Plant Emergencies," and NUREG/CR-5569, HPPOS-238. This change modifies the PVNGS on-shift Emergency Plan organization by assigning the off-site dose assessment position exclusively to a fully qualified RP Technician with Senior Health Physics (HP) expertise. | ||
The RPM is an ANSI 3.1 Senior Health Physics Technician who will be fully qualified to independently perform off-site dose assessment. | IR:Th in-plant surveys | ||
This functional assignment meets the requirements of NUREG-0654, Table B-1, PVNGS UFSAR Chapter 18.III.A, Table 2,"Minimum Staffing Requirements for NRC Licensees for Nuclear Power Plant Emergencies," and NUREG/CR-5569, HPPOS-238. | << I I Itl ~ tdhi d I dt dll lth - hilt positions. The second on-shift in-plant survey position will be assigned to either one other task-qualified RMT or one fully qualiTied Radiation Protection Technician. | ||
This change modifies the PVNGS on-shift Emergency Plan organization by assigning the off-site dose assessment position exclusively to a fully qualified RP Technician with Senior Health Physics (HP)expertise. | Currently, RP Technicians 'fill both required on-shift in-plant surveys positions. | ||
IR:Th<<I I Itl~tdhi d I dt dll lth-hilt | NUREG/CR-5569, HPPOS-238, states "Health Physics Technicians [HPTs] are allowed to perform (without supervision) specific tasks or job assignments (i.e., | ||
The second on-shift in-plant survey position will be assigned to either one other task-qualified RMT or one fully qualiTied Radiation Protection Technician. | radiation surveys, swipe surveys, air samples, and survey meter calibrations) if they meet the required prerequisites and complete the required task qualifications of their plant training program." This change would identify these two positions to be filled by either two task-qualiTied RMTs or one task-qualiTied RMT and one fully qualiTied Radiation Protection Technician. | ||
Currently, RP Technicians | This change complies with NUREG-0654 and NUREG/CR-5569. Emergency response roles continue to be clearly defined and are staffed by personnel qualified to perform their functions independently. | ||
'fill both required on-shift in-plant surveys positions. | Off-Site Surve Team: Currently, the two NUREG-0654 required on-shift positions for off-site surveys responsibilities in the Radiological Field Assessment Team (RFAT) are filled by RP Technicians. Based on drills and actual events, experience has shown that only one RFAT team is needed to adequately perform this function during the first 120 minutes of an event. | ||
NUREG/CR-5569, HPPOS-238, states"Health Physics Technicians | |||
[HPTs]are allowed to perform (without supervision) specific tasks or job assignments (i.e., radiation surveys, swipe surveys, air samples, and survey meter calibrations) if they meet the required prerequisites and complete the required task qualifications of their plant training program." This change would identify these two positions to be filled by either two task-qualiTied RMTs or one task-qualiTied RMT and one fully qualiTied Radiation Protection Technician. | Since NUREG-0654 does not require specific expertise for these positions, and the guidance provided in NUREG/CR-5569, HPPOS 238, clarifies that only the off-site survey team leader needs to posses Health Physics expertise, APS proposes to establish an "E-Plan Driver" position. This change reassigns one position from the RP Department and clarifies that an off-site survey team will consist of one RP Technician and one E-Plan Driver. Note that the current Emergency Plan, Revision 19, Section 4.2.1.13, "Survey Team," states that "A Survey Team is formed upon request from the Radiation Protection Monitor. | ||
This change complies with NUREG-0654 and NUREG/CR-5569. | The team performs radiological monitoring activities. At least one member of the team is a Radiation Protection Technician. The Survey Team reports to the Radiation Protection Monitor." | ||
Emergency response roles continue to be clearly defined and are staffed by personnel qualified to perform their functions independently. | The E-Plan Driver position would be assigned from an available site organization that provides 24-hour on-site personnel and who are not currently assigned any Emergency Response staff functions. | ||
Off-Site Surve Team: Currently, the two NUREG-0654 required on-shift positions for off-site surveys responsibilities in the Radiological Field Assessment Team (RFAT)are filled by RP Technicians. | This emergency plan function replaces one RP Technician with a task qualified E-Plan Driver position, and therefore, maintains the overall on-shift off-site survey team staffing level at two positions; one E-Plan Driver and One RP Technician. This change complies with the requirements described in NUREG-0654 and NUREG/CR-5569. Emergency response roles continue to be clearly defined and are staffed by personnel properly qualified to perform their functions independently. | ||
Based on drills and actual events, experience has shown that only one RFAT team is needed to adequately perform this function during the first 120 minutes of an event. | On-site Outof Plant Surve s: Currently, a RP Technician fills the required on-shift position for the on-site (out of plant) surveys function. This position would be reassigned from the RP Department to a RP task-qualiTied person from another site organization. This proposal is consistent with regulatory guidance in that NUREG-0654 does not require that this position be filled by a RP Technician. Adopting this proposed change will permit future staffing flexibility while maintaining compliance with NUREG-0654 staffing requirements. | ||
Since NUREG-0654 does not require specific expertise for these positions, and the guidance provided in NUREG/CR-5569, HPPOS 238, clarifies that only the off-site survey team leader needs to posses Health Physics expertise, APS proposes to establish an"E-Plan Driver" position.This change reassigns one position from the RP Department and clarifies that an off-site survey team will consist of one RP Technician and one E-Plan Driver.Note that the current Emergency Plan, Revision 19, Section 4.2.1.13,"Survey Team," states that"A Survey Team is formed upon request from the Radiation Protection Monitor.The team performs radiological monitoring activities. | The individual assigned to the on-shift on-site (Out of Plant) surveys function will come from an available site organization that provides 24-hour on-site personnel and will be someone who is not currently assigned any Emergency Response staff functions. | ||
At least one member of the team is a Radiation Protection Technician. | Shiftin Two Radiation Protection Technicians from On-Shift Availabilit to 60 to 120 Minute Au mented Availabilit: This change will reduce by two, the number of RP-related positions required to be on-shift at all times for Emergency Plan purposes and will increase the number of RP Technicians required to be available for 60 to 120 minute Emergency Plan staff augmentation by two. Therefore, the overall number of RP-related positions required to be available to support emergencies is unchanged. Continuing to maintain personnel on-shift to fill the additional two RP-related positions exceeds Emergency Plan staffing requirements of NUREG-0654 and is not | ||
The Survey Team reports to the Radiation Protection Monitor." The E-Plan Driver position would be assigned from an available site organization that provides 24-hour on-site personnel and who are not currently assigned any Emergency Response staff functions. | |||
This emergency plan function replaces one RP Technician with a task qualified E-Plan Driver position, and therefore, maintains the overall on-shift off-site survey team staffing level at two positions; one E-Plan Driver and One RP Technician. | justified. APS'ommitment is to maintain on-shift Emergency Plan staffing at the "on-shift" plus "30 minute" staffing level from NUREG-0654. Shifting the PVNGS RP-related staffing positions from ten to eight on-shift positions, and from four to six 60 to 120 minute augmentation positions maintains an Emergency Plan staffing balance that allows for flexibility in managing personnel resources during off-normal hours and continues to satisfy the requirements of NUREG-0654, 10 CFR 50.47 and 10 CFR 50, Appendix E. | ||
This change complies with the requirements described in NUREG-0654 and NUREG/CR-5569. | |||
Emergency response roles continue to be clearly defined and are staffed by personnel properly qualified to perform their functions independently. | == | ||
On-site Outof Plant Surve s: Currently, a RP Technician fills the required on-shift position for the on-site (out of plant)surveys function.This position would be reassigned from the RP Department to a RP task-qualiTied person from another site organization. | Conclusion:== | ||
This proposal is consistent with regulatory guidance in that NUREG-0654 does not require that this position be filled by a RP Technician. | |||
Adopting this proposed change will permit future staffing flexibility while maintaining compliance with NUREG-0654 staffing requirements. | Implementing the proposed staffing changes to the PVNGS Emergency Plan, although a reduction in the overall number of RP-related Emergency Plan personnel immediately available in the event of a site emergency, will continue to provide reasonable assurance that the health and safety of the public will be adequately protected. This change maintains compliance with the staffing requirements of NUREG-0654, 10 CFR 50.47 and 10 CFR 50, Appendix E. In addition, the Emergency Plan, Revision 13, commitment to maintain on-shift Emergency Plan staffing at the "on-shift" plus "30 minute" staffing levels specified in NUREG-0654 is maintained. | ||
The individual assigned to the on-shift on-site (Out of Plant)surveys function will come from an available site organization that provides 24-hour on-site personnel and will be someone who is not currently assigned any Emergency Response staff functions. | Implementation of the proposed revision to the Emergency Plan will allow APS greater flexibility in managing its personnel resources during off-normal hours, while maintaining adequate staffing for immediate emergency response. On-shift Radiation Protection Emergency Plan staffing levels would meet, but no longer exceed, regulatory requirements. In addition, APS'ost benefits are substantial. | ||
Shiftin Two Radiation Protection Technicians from On-Shift Availabilit to 60 to 120 Minute Au mented Availabilit: | APS expects cost-savings in excess of $ 16,652,000 over the remaining operating life of the plant by implementing this proposed revision to the PVNGS Emergency Plan. | ||
This change will reduce by two, the number of RP-related positions required to be on-shift at all times for Emergency Plan purposes and will increase the number of RP Technicians required to be available for 60 to 120 minute Emergency Plan staff augmentation by two.Therefore, the overall number of RP-related positions required to be available to support emergencies is unchanged. | |||
Continuing to maintain personnel on-shift to fill the additional two RP-related positions exceeds Emergency Plan staffing requirements of NUREG-0654 and is not justified. | |||
APS'ommitment is to maintain on-shift Emergency Plan staffing at the"on-shift" plus"30 minute" staffing level from NUREG-0654. | |||
Shifting the PVNGS RP-related staffing positions from ten to eight on-shift positions, and from four to six 60 to 120 minute augmentation positions maintains an Emergency Plan staffing balance that allows for flexibility in managing personnel resources during off-normal hours and continues to satisfy the requirements of NUREG-0654, 10 CFR 50.47 and 10 CFR 50, Appendix E.Conclusion: | |||
Implementing the proposed staffing changes to the PVNGS Emergency Plan, although a reduction in the overall number of RP-related Emergency Plan personnel immediately available in the event of a site emergency, will continue to provide reasonable assurance that the health and safety of the public will be adequately protected. | |||
This change maintains compliance with the staffing requirements of NUREG-0654, 10 CFR 50.47 and 10 CFR 50, Appendix E.In addition, the Emergency Plan, Revision 13, commitment to maintain on-shift Emergency Plan staffing at the"on-shift" plus"30 minute" staffing levels specified in NUREG-0654 is maintained. | |||
Implementation of the proposed revision to the Emergency Plan will allow APS greater flexibility in managing its personnel resources during off-normal hours, while maintaining adequate staffing for immediate emergency response.On-shift Radiation Protection Emergency Plan staffing levels would meet, but no longer exceed, regulatory requirements. | |||
In addition, APS'ost benefits are substantial. | |||
APS expects cost-savings in excess of$16,652,000 over the remaining operating life of the plant by implementing this proposed revision to the PVNGS Emergency Plan. | |||
==References:== | ==References:== | ||
(1) Letter 102-02733, dated November 16, 1993, from W. F. | |||
Conway, APS, to USNRC. | |||
(2) Letter dated February 25, 1994, from R. J. Pate, USNRC, to W. F. Conway, APS. | |||
ATTACHMENT1 NUREG-0654 Tabme B-1 Core Data NUREG-0654, Table B-1 (Excerpt) | |||
= | |||
In Plant surveys Protective Actions (In-Plant) | Health Physics Related Tasks Major Functional Area Position Title or Expertise Capability for Additions On-Shift + 30 min 60 min Offsite dose assessment Senior health physics (HP) expertise 1 Off-site surveys 2 2 Onsite (out-of-plant) 1 1 In Plant surveys HP technicians 2 1 Protective Actions (In-Plant) HP technicians 2 (2**) 2 Radiation protection: | ||
a) Access control b) HP Coverage for repair, corrective actions, search and rescue first-aid, 8 fire-fighting c) Personnel monitoring d) Dosimetry Total May be provided by shift personnel assigned other functions. | |||
ATTACHMENT2 "CURRENT" PVNGS E-PLAN TABLE 1 Table 1- Minimum Staffing Requirements for PVNGS for Nuclear Power Plant Emer encies Notification of Unusual Event Alert, Site Area Emer en ~ General Emer en Personnel Time Personnel Time Control Room Control Room Shift Supervisor Immediately Shift Supervisor Immediately Control Room Supervisor Control Room Supervisor Control Room Operators Control Room Operators Auxilia Operators Auxilia 0 erators Operations Support Center Operations Support Center NIA Chemistry Technician 2 Immediately Electrical Technician 3* | |||
EMT Firefighting ail** | |||
18 C Technician 1 Mechanical Technician 2 Rad Waste Operator 1 Radiation Monitonng Tech 1: | |||
RP Technician 8 Securit All Offsite Fire Department All 45 minutes Offsite ambulance All RP Technician Normal hours: 1 hour Off hours 1-2 hours Satellite Technical Support Satellite Technical Support STSC Communicator Immediately STSC Communicator Immediately Emergency Coordinator Emergency Coordinator RP Monitor RP Monitor Shift Technical Advisor STA Shift Technical Advisor STA Technical Support Center Technical Support Center Security Director Immediately Securi Director Immediatel Emergency Coordinator Normal hours: 1 hour Reactor Analyst Off hours 1-2 hours Technical Support Electrical Technical Sup ort Mechanical Emergency Operations Facility Emergency Operations Facility N/A Emergency Operations Director Normal hours: 1 hour Government Liaison Off hours 1-2 hours Technical Anal sis Su ervisor NOTE: All time requirements are based on optimum response conditions. | |||
* - One Technician position may be provided by shift personnel assigned other functions. | |||
*' Fire Team assembles at the Building E Fire Department area for rapid response as needed. | |||
ATTACHMENT3 COMPARISON TABLE: | |||
CURRENT ON-SHIFT E-PLAN STAFFING AND PROPOSED CHANGES VERSUS NUREG-0664, TABLE 8-1. | |||
Major Functional Area NUREG4654 NUREG4654 Current Proposed Position Title or Table B-1 PVNGS PVNGS Expertise E-Plan Table 1 E-Plan Table 1 Onhift+ 30 min Onhift On-Shift Off-site dose assessment Senior Health Physics 2 1 (HP) expertise (1 RPM & 1 RMT) (1 RPM) | |||
Off-site surveys 2 2 (2 RP Techs)' (1 RP Tech 8 1E-Plan Driver)'* | |||
On-site (outzf-plant) surveys 1 (1 RP Tech) (1 Task Qualified)' | |||
In-Plant surveys HP Technicians 2 (2 RP Techs) (1 RMT8 1RPTech)>>' | |||
Protective Actions (In-Plant) HP Technicians 2(2 ) 3 (2 RP Techs) (2 RP Techs) | |||
Radiation protection: | Radiation protection: | ||
a | : a. Access control | ||
: b. HP Coverage for repair, corrective actions, search and rescue first-aid, | |||
& firefighting | |||
: c. Personnel monitoring | |||
: d. Doslmet TOTAL 10 Two additional positions may be provided by shift personnel assigned other functions. | |||
Note 1 Only 1 field team needed. | |||
Note 2- Survey task-qualified position to be filled by a RP Technician until task-qualification path is developed. | |||
Note 3- Driver Position to be filled by RP Technician until qualification path is developed Note 4- RMT A Task-Qualified Radiation Monitoring Technician from the Chemistry Department possessing radiation protection experience Note 5- In-plant survey positions may be filled by either a task-qualified RMT and a RP Technician or two task-qualified RMTs. | |||
Note 1 | ATTACHMENT4 "PROPOSED" PVNGS E-PLAN TABLE 1 Table 1- Minimum Staffin Re uirements for PVNGS for Nuclear Power Plant Emer encies Notification of Unusual Event Alert, Site Area Emer en , General Emer en Personnel Time Personnel Time Control Room Control Room Shift Supervisor Immediately Shift Supervisor Immediately Control Room Supervisor Control Room Supervisor Control Room Operators Control Room Operators Auxilia 0 erators Auxilia 0 erators Operations Support Center Operations Support Center N/A Chemistry Technician 2 Immediately Electrical Technician 34 EMT Firefighting ail"* | ||
Note 3-Driver Position to be filled by RP Technician until qualification path is developed Note 4-RMT | l8 C Technician 1 Mechanical Technician 2* | ||
Rad Waste Operator 1 Radiation Monitonng Tech RP Technician RM Tech or RP Tech E Plan Driver | |||
*-One Technician position may be provided by shift personnel assigned other functions. | ~Sutva Task Qualified Position Securi All Offsite Fire Department All 45 minutes Offsite ambulance All RP Technician Normal hours: 1 hour Off hours 1-2 hours Satellite Technical Support Satellite Technical Support STSC Communicator Immediately STSC Communicator Immediately Emergency Coordinator Emergency Coordinator RP Monitor RP Monitor Shift Technical Advisor STA Shift Technical Advisor STA Technical Support Center Technical Support Center Security Director Immediately Se curl Director Immediatel Emergency Coordinator Normal hours: 1 hour Reactor Analyst Off hours 1-2 hours Technical Support Electrical Technical Support Mechanical Emergency Operations Facility Emergency Operations Facility N/A Emergency Operations Director Normal hours: 1 hour Government Liaison Off hours 1-2 hours Technical Anal sis Su ervisor NOTE: All time requirements are based on optimum response conditions. | ||
*-Fire Team assembles at the Building E Fire Department area for rapid response as needed. | * - One Technician position may be provided by shift personnel assigned other functions. | ||
P GS EMKRGK~Cy Pg~Revision 19 Page 13 of 90 | * - Fire Team assembles at the Building E Fire Department area for rapid response as needed. | ||
~Provisio of protective action recommendations as necessary to offsite emergency managem t agencies~Subsequent classification of emergency events~Determination f the necessity for site evacuation | |||
~Authorization fo emergency workers to exceed 10CFR20 exposure limits~Initiate activation | P GS EMKRGK~Cy Pg~ Revision 19 Page 13 of 90 | ||
The team consists of Maintenance Technicians. | ~ Noti i ation of offsite emergency response agencies and offsite emergency organizations | ||
necessary, a Radiatio Protection Technician may also be assigned to the team.The Emergency epair Team rep s to the Emergency Coordinator. | ~ Provisio of protective action recommendations as necessary to offsite emergency managem t agencies | ||
4.2.1.4 Fire Team A Fire Team is maintained onsite at all times.Th epartment Leader, Fire Protection is responsible for ensuring that sufficient membe o e Fire Team are Emergency Medical Technician (EMT)qualified and available at 1 time The Fire Team reports to the Emergency Coordinator. | ~ Subsequent classification of emergency events | ||
4.2.1.5 Operations Shift Pers nnel The Operations Shift Personnel clear Operators) conduct t e safe and proper operation of the unit at all times, and respond to mergency conditions, as neces ary.Operations Shift Personnel report to the Assistant Shift S pervisor.4.2.1e6 Radiatio onitoring Technician The Radiation Monit ng Technician is a Unit Radiation Monitoring chnician.He reports to the OSC and then e ablishes a responsible area in the Radiation Monito g office.He conducts offsite dose calcu tions until relieved by the Dose Assessment Health Ph icist of the Offsite Emergency Or ization.He reports to the Emergency Coordinator. | ~ Determination f the necessity for site evacuation | ||
4.2.1e7 Radiation Protection Monitor The Ra'ation Protection Monitor is a Radiation Protection Technician. | ~ Authorization fo emergency workers to exceed 10CFR20 exposure limits | ||
He repo to the Emer ncy Coordinator and authorizes exposures up to 10CFR20 Limits, recomme ds pota ium iodide administration to the Emergency Coordinator, and directs inplant, site and o ite Survey Teams.He is relieved of these responsibilities by the Radiological Prot tion oordinator and Radiological Assessment Coordinator when activated. | ~ f Initiate activation onsite and offsite emergency response organizations for an ert or higher level emerge cy classification Prior to activation of the 0 ite Emergency Organization, the functions of th mergency qlgpuz~ | ||
.0 rv II 0'%gA ( | Coordinator, are performed at e Satellite TSC in the affected unit. | ||
PVNGS | Emergency Repa Team | ||
'.2.1.3 An Emergency Repair Team is forme ifemergency repair oper ions are necessary. The team consists of Maintenance Technicians. necessary, a Radiatio Protection Technician may also be assigned to the team. The Emergency epair Team rep s to the Emergency Coordinator. | |||
4.2.1.4 Fire Team A Fire Team is maintained onsite at all times. Th epartment Leader, Fire Protection is responsible for ensuring that sufficient membe o e Fire Team are Emergency Medical Technician (EMT) qualified and available at 1 time The Fire Team reports to the Emergency Coordinator. | |||
4.2.1.5 Operations Shift Pers nnel The Operations Shift Personnel clear Operators) conduct t e safe and proper operation of the unit at all times, and respond to mergency conditions, as neces ary. Operations Shift Personnel report to the Assistant Shift S pervisor. | |||
4.2.1e6 Radiatio onitoring Technician The Radiation Monit ng Technician is a Unit Radiation Monitoring chnician. He reports to the OSC and then e ablishes a responsible area in the Radiation Monito g office. He conducts offsite dose calcu tions until relieved by the Dose Assessment Health Ph icist of the Offsite Emergency Or ization. He reports to the Emergency Coordinator. | |||
4.2.1e7 Radiation Protection Monitor The Ra 'ation Protection Monitor is a Radiation Protection Technician. He repo to the Emer ncy Coordinator and authorizes exposures up to 10CFR20 Limits, recomme ds pota ium iodide administration to the Emergency Coordinator, and directs inplant, site and o ite Survey Teams. He is relieved of these responsibilities by the Radiological Prot tion oordinator and Radiological Assessment Coordinator when activated. | |||
.0 rv II 0' | |||
%gA ( | |||
PVNGS KMKRGKNCYPLAN Page 25 of 90 Notification of Unusual Event Alert, Site Area Emergency, General Emergency Personnel Time Personnel Time Control Room Control Room Shift Supervisor Immediately Shift Supervisor Immediately Control Room Supervisor Control Room Supervisor Control Room Operators Control Room Operators Auxiliary Operators Auxiliary Operators 0 erations Su ort Center 0 erations Su ort Center NA Chemistry Technician 2 Immediately Electrical Technician 3Q EMT Firefighting all** | |||
I&CTechnician 1 Mechanical Technician 2* | |||
Rad Waste Operator 1 Radiation Monitoring Tech 1 RP Technician 8 Security all Offsite Fire Department all 45 minutes Offsite ambulance all RP Technician Normal hours: | |||
immediately, Offhours: | |||
1-2 hours Satellite Technical Su ort Center Satellite Technical Su ort Center STSC Communicator 2 Immediately STSC Communicator 2 Immediately Emergency Coordinator 1 Emergency Coordinator 1 RP Monitor 1 RP Monitor 1 Shift Technical Advisor (STA) 3 Shift Technical Advisor (STA) 3 Technical Su ort Center Technical Su ort Center Security Director Immediately Security Director Immediately Emergency Coordinator 1 Normal hours: | |||
Reactor Analyst 1 1 hour, Technical Support Electrical 1 Offhours: | |||
Technical Support Mechanical 1 1-2 hours Emer enc 0 erations Facili Emer enc 0 erations Facili Normal hours: | |||
NA Emergency Operations Director 1 1 hour, Government Liaison 1 Offhours: | |||
Technical Analysis Supervisor 1 1-2 hours NOTE: Alltime requirements are based on optimum response conditions. | |||
One Technician position may be provided by shift personnel assigned other functions. | One Technician position may be provided by shift personnel assigned other functions. | ||
Fire Team assembles at the Building E Fire Department area for rapid response as needed.Table 1 Minimum Staffing Requirements for PVNGS for Nuclear Power Plant Emergencies}} | Fire Team assembles at the Building E Fire Department area for rapid response as needed. | ||
Table 1 Minimum Staffing Requirements for PVNGS for Nuclear Power Plant Emergencies}} |
Latest revision as of 02:25, 4 February 2020
ML17313A580 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 09/08/1998 |
From: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
Shared Package | |
ML17313A581 | List: |
References | |
102-04178-JML-S, 102-4178-JML-S, NUDOCS 9809150226 | |
Download: ML17313A580 (16) | |
Text
' ~
CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)
ACCESSION NBR:9809150226 DOC.DATE: 98/09/08 NOTARIZED: NO DOCKET FACIL~STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION LEVINE,J;.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME . RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)i F~// g C
SUBJECT:
Recpxests rev to PVNGS Emergency Plan rev 19.Emergency Plan revision would result in two less RP positions immediately A available during emergencies. Revised pages encl. T DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: Emergency Preparedness Plans, Implement'g Procedures, NOTES: STANDARDIZED PLANT 05000528@
Standardized plant. 05000529 Standardized plant. 050005300 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL PD4-2 PD 1 1 FIELDS,M 1 1 INTERNAL: AEOD/HAGAN,D 1 1 L CENTER 01 2 2 NRR/DRPM/PERB 1 1 NUD 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 . 1 and N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DlSTRZBUTZON LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANZZATZON, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9
~
r ~
James M. Levine TEL (602)393-5300 Mail Station 7602 Palo Verde Nuclear Senior Vice President FAX (602)393-6077 P.O. Box 52034 Generating Station Nuclear Phoenix, AZ 65072-2034 102-04178-JML/SAB/RKB September 8, 1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1,2, and 3 Docket Nos. STN 50-528/629/630 Request for Revision to PVNGS Emergency Plan In accordance with the requirements of 10 CFR 50.54(q) and 10 CFR 50.4, Arizona Public Service Company (APS) hereby requests a revision to the PVNGS Emergency Plan, Revision 19. The requested revision addresses reducing the Radiation Protection (RP) related Emergency Plan on-shift staffing positions from the current ten individuals to eight individuals, while increasing the number of 60 to 120 minute augmentation positions from four to six. This proposed revision of the PVNGS Emergency Plan complies with the requirements of 10 CFR 50.47(b)(2), 10 CFR 50 Appendix E, and the staffing levels required per NUREG-0654, Table B-1, "Minimum Staffing Requirements For NRC Licensees For Nuclear Power Plant Emergencies."
Since the requested Emergency Plan revision would result in two less RP positions immediately available during emergencies, APS believes the proposed revision constitutes a reduction in the overall effectiveness of the Emergency Plan from what currently exists. However, APS believes the reduction is minimal since the requested revision maintains compliance with the staffing levels required by NUREG-0654.
APS proposes to reduce the RP-related Emergency Plan on-shift staffing positions from the current ten individuals to eight individuals and continue to maintain adequate staffing to perform all necessary Emergency Plan tasks. APS proposes to achieve this in three ways, 1) by re-assigning responsibility for tasks that do not require full RP Technician qualifications to RP task-qualified personnel already on-shift; 2) by modifying the responsibilities of those personnel assigned Emergency Plan tasks which require full RP Technician'qualifications; and 3) by shifting two RP Technician Emergency Plan positions from being on-shift for immediate availability to being available within the 1 to 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> augmentation time. The description and justification of the changes proposed in the requested revision are provided in Enclosure 1. Enclosure 2 provides revised pages to the PVNGS Emergency Plan.
9849i50226 980908 Fl ADOCX,OSOOOSaS FOR F " ' PORE
U.S. Nuclear Regula ory Commission ATTN: Document Control Desk Request for Revision to PVNGS Emergency Plan Page 2 By implementing the proposed revision to the PVNGS Emergency Plan, APS will continue to provide adequate Emergency Plan staffing to reasonably assure that the health and safety of the public will be adequately protected and yet gain significant operational flexibilityto manage personnel resources during off-normal hours.
This request is being submitted for consideration under the provisions of NRC Administrative Letter 95-02: "Cost Beneficial Licensing Actions [CBLA]." APS expects to realize approximately $ 665,000 in annual savings from the implementation of this Emergency Plan revision. Over the remaining life of the plant that savings is more than $ 16,652,000.
The justification provided in Enclosure 1 strongly supports the approval of the proposed change as it demonstrates the PVNGS Emergency Plan would continue to comply with regulatory requirements. Based on the substantial cost
.benefit of this change, APS requests NRC staff review and approval by February 28, 1999. To facilitate this, APS would welcome an opportunity to meet with the NRC staff regarding this Emergency Plan request. Please contact Mr. Scott Bauer at (602) 393-5978 if you would like to schedule a meeting or if you have any questions. This letter does not make any commitments to the NRC.
Sincerely, JML/SAB/RKB/rlh
Enclosures:
- 1. Description and Justification of Proposed Changes to the PVNGS Emergency Plan
- 2. PVNGS Emergency Plan Revised Pages for Proposed Change cc: E. W. Merschoff M. B. Fields J. H. Moorman T. H. Andrews
Enclosure 1 Description and Justification of Proposed Changes to the PVNGS Emergency Plan
Background:
NUREG-0654/FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," Table B-1, "Minimum Staffing Requirements For NRC Licensees For Nuclear Power Plant Emergencies," specifies three response times for having sufficient qualified staff available. These are 1) On-Shift, 2) 30 minute, and 3) 60 minute. Because of the site's remote location, PVNGS requested, in Revision 13 to the Emergency Plan (reference 1), to utilize up to a 120 minute augmentation response time in lieu of the 60 minute response time specified by NUREG-0654, during off-normal hours. To off set the delayed response of Emergency Plan augmentation personnel, APS committed to combining the first two response columns, "On-Shift" and "30 minute," to determine the minimum on-shift staffing requirements for PVNGS. NRC approval was granted for Revision 13 (reference 2). Subsequent revisions to the Emergency Plan have made only minor changes in the RP-related functions since Revision 13.
Adequate on-shift staffing is verified per Station procedure 75RP-9RP10, "Conduct of RP Operations," Section 3.0, which requires that the Radiation Protection Section Leader ensure the number of on-shift Emergency Plan qualiTied RP-related personnel are logged into the Unit 2 RP Log.
The minimum Health Physics-related Emergency Plan staffing requirements from Table B-1 of NUREG-0654 are provided in Attachment 1 to this enclosure. PVNGS'mergency Plan, Revision 19, requires ten Health Physics-related positions on-shift, and an additional four augmentation positions available within 60 to 120 minutes. The current PVNGS Health Physics-related Emergency Plan staffing is provided in Attachment 2.
Additionally, Table B-1 of NUREG-0654 provides specific guidance for the required level of expertise of persons filling certain positions. Specifically, Table B-1 requires the following:
~ Off-site dose assessment position to be filled by an individual possessing Senior Health Physics expertise.
~ In-Plant surveys position to be filled by a qualified Health Physics Technician, and
~ Protective Actions (In-Plant) position to be filled by a qualified Health Physics Technician.
The remaining Health Physics-related positions specified in NUREG-0654 have no specific requirements for level of expertise. NUREG/CR-5569, "Health Physics Positions Database," May 1992, HPPOS-238, "Health Physics Position on Task Qualification of HP technicians," was referenced for further guidance regarding the qualification requirements for individuals performing 1
e independent Emergency Plan related Health Physics tasks. NUREG/CR-5569, HPPOS 238 states that "Health Physics Technicians (HP technicians) may independently perform specific tasks or job assignments if they meet the required prerequisites and complete the required task qualifications of their plant training programs." HPPOS-238 further states that "there are certain tasks and job assignments, however, that require in-depth knowledge and can only be performed by fully qualified ANSI technicians. The following are areas of Emergency Preparedness in which a non-fully qualified HP technician should not be authorized to perform (without supervision): 1) lead emergency search and rescue teams, 2) lead environmental monitoring teams, or 3) off-site dose assessment." This guidance provides additional bases for the justification of the changes described below.
Proposed Change:
The current Health Physics-related Emergency Plan on-shift staffing of ten positions exceeds the minimum staffing requirements presented in Table B-1 of NUREG-0654, for "On-shift" plus "30 minute" positions. APS proposes to revise the Emergency Plan staffing of Health Physics-related positions from ten to eight, while increasing the number of 60 to 120 minute augmentation positions from four to six, to allow greater operational flexibility in managing personnel resources during off-normal hours. The proposed changes maintain adequate staffing levels in compliance with NUREG-0654. In addition, from Revision 13 of the Emergency Plan is maintained since the APS'ommitment excess personnel immediately available to response to an emergency by combining the on-shift plus 30 minute staffing levels, provides significant emergency response capability to off-set the additional response time for augmentation personnel to arrive.
APS proposes to revise the PVNGS Emergency Plan as follows: 1) Redefine the role of the Radiation Protection Monitor (RPM) position exclusively for off-site dose assessment; 2) Redefine the role of the current Radiation Monitoring Technician (RMT) position to perform the in-plant survey function; 3) Assign the second in-plant survey function to either a second RMT, task qualified to perform in-plant surveys, or a qualified RP Technician; 4) Establish an E-Plan Driver position to perform driving functions in support of off-site surveys; 5)
Reassign the on-site (Out of Plant) survey position to a task-qualified individual outside the RP organization, that is on-shift but does not currently have Emergency Plan responsibilities; and 6) Reassign the remaining two Radiation Protection Technician positions, which are over-compliment, from on-shift positions to 60 to 120 minute augmentation positions, bringing the total of 60 to 120 minute augmentation positions to six Radiation Protection Technicians. Attachment 3 provides a comparison of current PVNGS Emergency Plan RP-related staffing and the proposed staffing changes versus NUREG-0654, Table B-1, requirements. Attachment 4 provides the proposed changes to Table 1 of the PVNGS Emergency Plan.
, 2
Description/Justification:
Off-site Dose Assessment: The role of the RPM is redefined to focus on off-site dose assessment. Currently, the RPM and a RMT combine to fill the required position for the off-site dose assessment function. NUREG-0654 requires that this position have "Senior Health Physics (HP) expertise." NUREG/CR-5569, HPPOS-238, "Health Physics Position on Task Qualification of HP technicians," states "as examples in the area of Emergency Preparedness, a non-fully qualified HPT should not be authorized to: ...3) perform offsite dose assessment." This change proposes reassigning this Emergency Plan task solely to the Radiation Protection Department. The on-shift RPM will fill this position exclusively. The RPM is an ANSI 3.1 Senior Health Physics Technician who will be fully qualified to independently perform off-site dose assessment.
This functional assignment meets the requirements of NUREG-0654, Table B-1, PVNGS UFSAR Chapter 18.III.A, Table 2, "Minimum Staffing Requirements for NRC Licensees for Nuclear Power Plant Emergencies," and NUREG/CR-5569, HPPOS-238. This change modifies the PVNGS on-shift Emergency Plan organization by assigning the off-site dose assessment position exclusively to a fully qualified RP Technician with Senior Health Physics (HP) expertise.
IR:Th in-plant surveys
<< I I Itl ~ tdhi d I dt dll lth - hilt positions. The second on-shift in-plant survey position will be assigned to either one other task-qualified RMT or one fully qualiTied Radiation Protection Technician.
Currently, RP Technicians 'fill both required on-shift in-plant surveys positions.
NUREG/CR-5569, HPPOS-238, states "Health Physics Technicians [HPTs] are allowed to perform (without supervision) specific tasks or job assignments (i.e.,
radiation surveys, swipe surveys, air samples, and survey meter calibrations) if they meet the required prerequisites and complete the required task qualifications of their plant training program." This change would identify these two positions to be filled by either two task-qualiTied RMTs or one task-qualiTied RMT and one fully qualiTied Radiation Protection Technician.
This change complies with NUREG-0654 and NUREG/CR-5569. Emergency response roles continue to be clearly defined and are staffed by personnel qualified to perform their functions independently.
Off-Site Surve Team: Currently, the two NUREG-0654 required on-shift positions for off-site surveys responsibilities in the Radiological Field Assessment Team (RFAT) are filled by RP Technicians. Based on drills and actual events, experience has shown that only one RFAT team is needed to adequately perform this function during the first 120 minutes of an event.
Since NUREG-0654 does not require specific expertise for these positions, and the guidance provided in NUREG/CR-5569, HPPOS 238, clarifies that only the off-site survey team leader needs to posses Health Physics expertise, APS proposes to establish an "E-Plan Driver" position. This change reassigns one position from the RP Department and clarifies that an off-site survey team will consist of one RP Technician and one E-Plan Driver. Note that the current Emergency Plan, Revision 19, Section 4.2.1.13, "Survey Team," states that "A Survey Team is formed upon request from the Radiation Protection Monitor.
The team performs radiological monitoring activities. At least one member of the team is a Radiation Protection Technician. The Survey Team reports to the Radiation Protection Monitor."
The E-Plan Driver position would be assigned from an available site organization that provides 24-hour on-site personnel and who are not currently assigned any Emergency Response staff functions.
This emergency plan function replaces one RP Technician with a task qualified E-Plan Driver position, and therefore, maintains the overall on-shift off-site survey team staffing level at two positions; one E-Plan Driver and One RP Technician. This change complies with the requirements described in NUREG-0654 and NUREG/CR-5569. Emergency response roles continue to be clearly defined and are staffed by personnel properly qualified to perform their functions independently.
On-site Outof Plant Surve s: Currently, a RP Technician fills the required on-shift position for the on-site (out of plant) surveys function. This position would be reassigned from the RP Department to a RP task-qualiTied person from another site organization. This proposal is consistent with regulatory guidance in that NUREG-0654 does not require that this position be filled by a RP Technician. Adopting this proposed change will permit future staffing flexibility while maintaining compliance with NUREG-0654 staffing requirements.
The individual assigned to the on-shift on-site (Out of Plant) surveys function will come from an available site organization that provides 24-hour on-site personnel and will be someone who is not currently assigned any Emergency Response staff functions.
Shiftin Two Radiation Protection Technicians from On-Shift Availabilit to 60 to 120 Minute Au mented Availabilit: This change will reduce by two, the number of RP-related positions required to be on-shift at all times for Emergency Plan purposes and will increase the number of RP Technicians required to be available for 60 to 120 minute Emergency Plan staff augmentation by two. Therefore, the overall number of RP-related positions required to be available to support emergencies is unchanged. Continuing to maintain personnel on-shift to fill the additional two RP-related positions exceeds Emergency Plan staffing requirements of NUREG-0654 and is not
justified. APS'ommitment is to maintain on-shift Emergency Plan staffing at the "on-shift" plus "30 minute" staffing level from NUREG-0654. Shifting the PVNGS RP-related staffing positions from ten to eight on-shift positions, and from four to six 60 to 120 minute augmentation positions maintains an Emergency Plan staffing balance that allows for flexibility in managing personnel resources during off-normal hours and continues to satisfy the requirements of NUREG-0654, 10 CFR 50.47 and 10 CFR 50, Appendix E.
==
Conclusion:==
Implementing the proposed staffing changes to the PVNGS Emergency Plan, although a reduction in the overall number of RP-related Emergency Plan personnel immediately available in the event of a site emergency, will continue to provide reasonable assurance that the health and safety of the public will be adequately protected. This change maintains compliance with the staffing requirements of NUREG-0654, 10 CFR 50.47 and 10 CFR 50, Appendix E. In addition, the Emergency Plan, Revision 13, commitment to maintain on-shift Emergency Plan staffing at the "on-shift" plus "30 minute" staffing levels specified in NUREG-0654 is maintained.
Implementation of the proposed revision to the Emergency Plan will allow APS greater flexibility in managing its personnel resources during off-normal hours, while maintaining adequate staffing for immediate emergency response. On-shift Radiation Protection Emergency Plan staffing levels would meet, but no longer exceed, regulatory requirements. In addition, APS'ost benefits are substantial.
APS expects cost-savings in excess of $ 16,652,000 over the remaining operating life of the plant by implementing this proposed revision to the PVNGS Emergency Plan.
References:
(1) Letter 102-02733, dated November 16, 1993, from W. F.
(2) Letter dated February 25, 1994, from R. J. Pate, USNRC, to W. F. Conway, APS.
ATTACHMENT1 NUREG-0654 Tabme B-1 Core Data NUREG-0654, Table B-1 (Excerpt)
=
Health Physics Related Tasks Major Functional Area Position Title or Expertise Capability for Additions On-Shift + 30 min 60 min Offsite dose assessment Senior health physics (HP) expertise 1 Off-site surveys 2 2 Onsite (out-of-plant) 1 1 In Plant surveys HP technicians 2 1 Protective Actions (In-Plant) HP technicians 2 (2**) 2 Radiation protection:
a) Access control b) HP Coverage for repair, corrective actions, search and rescue first-aid, 8 fire-fighting c) Personnel monitoring d) Dosimetry Total May be provided by shift personnel assigned other functions.
ATTACHMENT2 "CURRENT" PVNGS E-PLAN TABLE 1 Table 1- Minimum Staffing Requirements for PVNGS for Nuclear Power Plant Emer encies Notification of Unusual Event Alert, Site Area Emer en ~ General Emer en Personnel Time Personnel Time Control Room Control Room Shift Supervisor Immediately Shift Supervisor Immediately Control Room Supervisor Control Room Supervisor Control Room Operators Control Room Operators Auxilia Operators Auxilia 0 erators Operations Support Center Operations Support Center NIA Chemistry Technician 2 Immediately Electrical Technician 3*
EMT Firefighting ail**
18 C Technician 1 Mechanical Technician 2 Rad Waste Operator 1 Radiation Monitonng Tech 1:
RP Technician 8 Securit All Offsite Fire Department All 45 minutes Offsite ambulance All RP Technician Normal hours: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Off hours 1-2 hours Satellite Technical Support Satellite Technical Support STSC Communicator Immediately STSC Communicator Immediately Emergency Coordinator Emergency Coordinator RP Monitor RP Monitor Shift Technical Advisor STA Shift Technical Advisor STA Technical Support Center Technical Support Center Security Director Immediately Securi Director Immediatel Emergency Coordinator Normal hours: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Reactor Analyst Off hours 1-2 hours Technical Support Electrical Technical Sup ort Mechanical Emergency Operations Facility Emergency Operations Facility N/A Emergency Operations Director Normal hours: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Government Liaison Off hours 1-2 hours Technical Anal sis Su ervisor NOTE: All time requirements are based on optimum response conditions.
- - One Technician position may be provided by shift personnel assigned other functions.
- ' Fire Team assembles at the Building E Fire Department area for rapid response as needed.
ATTACHMENT3 COMPARISON TABLE:
CURRENT ON-SHIFT E-PLAN STAFFING AND PROPOSED CHANGES VERSUS NUREG-0664, TABLE 8-1.
Major Functional Area NUREG4654 NUREG4654 Current Proposed Position Title or Table B-1 PVNGS PVNGS Expertise E-Plan Table 1 E-Plan Table 1 Onhift+ 30 min Onhift On-Shift Off-site dose assessment Senior Health Physics 2 1 (HP) expertise (1 RPM & 1 RMT) (1 RPM)
Off-site surveys 2 2 (2 RP Techs)' (1 RP Tech 8 1E-Plan Driver)'*
On-site (outzf-plant) surveys 1 (1 RP Tech) (1 Task Qualified)'
In-Plant surveys HP Technicians 2 (2 RP Techs) (1 RMT8 1RPTech)>>'
Protective Actions (In-Plant) HP Technicians 2(2 ) 3 (2 RP Techs) (2 RP Techs)
Radiation protection:
- a. Access control
- b. HP Coverage for repair, corrective actions, search and rescue first-aid,
& firefighting
- c. Personnel monitoring
- d. Doslmet TOTAL 10 Two additional positions may be provided by shift personnel assigned other functions.
Note 1 Only 1 field team needed.
Note 2- Survey task-qualified position to be filled by a RP Technician until task-qualification path is developed.
Note 3- Driver Position to be filled by RP Technician until qualification path is developed Note 4- RMT A Task-Qualified Radiation Monitoring Technician from the Chemistry Department possessing radiation protection experience Note 5- In-plant survey positions may be filled by either a task-qualified RMT and a RP Technician or two task-qualified RMTs.
ATTACHMENT4 "PROPOSED" PVNGS E-PLAN TABLE 1 Table 1- Minimum Staffin Re uirements for PVNGS for Nuclear Power Plant Emer encies Notification of Unusual Event Alert, Site Area Emer en , General Emer en Personnel Time Personnel Time Control Room Control Room Shift Supervisor Immediately Shift Supervisor Immediately Control Room Supervisor Control Room Supervisor Control Room Operators Control Room Operators Auxilia 0 erators Auxilia 0 erators Operations Support Center Operations Support Center N/A Chemistry Technician 2 Immediately Electrical Technician 34 EMT Firefighting ail"*
l8 C Technician 1 Mechanical Technician 2*
Rad Waste Operator 1 Radiation Monitonng Tech RP Technician RM Tech or RP Tech E Plan Driver
~Sutva Task Qualified Position Securi All Offsite Fire Department All 45 minutes Offsite ambulance All RP Technician Normal hours: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Off hours 1-2 hours Satellite Technical Support Satellite Technical Support STSC Communicator Immediately STSC Communicator Immediately Emergency Coordinator Emergency Coordinator RP Monitor RP Monitor Shift Technical Advisor STA Shift Technical Advisor STA Technical Support Center Technical Support Center Security Director Immediately Se curl Director Immediatel Emergency Coordinator Normal hours: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Reactor Analyst Off hours 1-2 hours Technical Support Electrical Technical Support Mechanical Emergency Operations Facility Emergency Operations Facility N/A Emergency Operations Director Normal hours: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Government Liaison Off hours 1-2 hours Technical Anal sis Su ervisor NOTE: All time requirements are based on optimum response conditions.
- - One Technician position may be provided by shift personnel assigned other functions.
- - Fire Team assembles at the Building E Fire Department area for rapid response as needed.
P GS EMKRGK~Cy Pg~ Revision 19 Page 13 of 90
~ Noti i ation of offsite emergency response agencies and offsite emergency organizations
~ Provisio of protective action recommendations as necessary to offsite emergency managem t agencies
~ Subsequent classification of emergency events
~ Determination f the necessity for site evacuation
~ Authorization fo emergency workers to exceed 10CFR20 exposure limits
~ f Initiate activation onsite and offsite emergency response organizations for an ert or higher level emerge cy classification Prior to activation of the 0 ite Emergency Organization, the functions of th mergency qlgpuz~
Coordinator, are performed at e Satellite TSC in the affected unit.
Emergency Repa Team
'.2.1.3 An Emergency Repair Team is forme ifemergency repair oper ions are necessary. The team consists of Maintenance Technicians. necessary, a Radiatio Protection Technician may also be assigned to the team. The Emergency epair Team rep s to the Emergency Coordinator.
4.2.1.4 Fire Team A Fire Team is maintained onsite at all times. Th epartment Leader, Fire Protection is responsible for ensuring that sufficient membe o e Fire Team are Emergency Medical Technician (EMT) qualified and available at 1 time The Fire Team reports to the Emergency Coordinator.
4.2.1.5 Operations Shift Pers nnel The Operations Shift Personnel clear Operators) conduct t e safe and proper operation of the unit at all times, and respond to mergency conditions, as neces ary. Operations Shift Personnel report to the Assistant Shift S pervisor.
4.2.1e6 Radiatio onitoring Technician The Radiation Monit ng Technician is a Unit Radiation Monitoring chnician. He reports to the OSC and then e ablishes a responsible area in the Radiation Monito g office. He conducts offsite dose calcu tions until relieved by the Dose Assessment Health Ph icist of the Offsite Emergency Or ization. He reports to the Emergency Coordinator.
4.2.1e7 Radiation Protection Monitor The Ra 'ation Protection Monitor is a Radiation Protection Technician. He repo to the Emer ncy Coordinator and authorizes exposures up to 10CFR20 Limits, recomme ds pota ium iodide administration to the Emergency Coordinator, and directs inplant, site and o ite Survey Teams. He is relieved of these responsibilities by the Radiological Prot tion oordinator and Radiological Assessment Coordinator when activated.
.0 rv II 0'
%gA (
PVNGS KMKRGKNCYPLAN Page 25 of 90 Notification of Unusual Event Alert, Site Area Emergency, General Emergency Personnel Time Personnel Time Control Room Control Room Shift Supervisor Immediately Shift Supervisor Immediately Control Room Supervisor Control Room Supervisor Control Room Operators Control Room Operators Auxiliary Operators Auxiliary Operators 0 erations Su ort Center 0 erations Su ort Center NA Chemistry Technician 2 Immediately Electrical Technician 3Q EMT Firefighting all**
I&CTechnician 1 Mechanical Technician 2*
Rad Waste Operator 1 Radiation Monitoring Tech 1 RP Technician 8 Security all Offsite Fire Department all 45 minutes Offsite ambulance all RP Technician Normal hours:
immediately, Offhours:
1-2 hours Satellite Technical Su ort Center Satellite Technical Su ort Center STSC Communicator 2 Immediately STSC Communicator 2 Immediately Emergency Coordinator 1 Emergency Coordinator 1 RP Monitor 1 RP Monitor 1 Shift Technical Advisor (STA) 3 Shift Technical Advisor (STA) 3 Technical Su ort Center Technical Su ort Center Security Director Immediately Security Director Immediately Emergency Coordinator 1 Normal hours:
Reactor Analyst 1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, Technical Support Electrical 1 Offhours:
Technical Support Mechanical 1 1-2 hours Emer enc 0 erations Facili Emer enc 0 erations Facili Normal hours:
NA Emergency Operations Director 1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, Government Liaison 1 Offhours:
Technical Analysis Supervisor 1 1-2 hours NOTE: Alltime requirements are based on optimum response conditions.
One Technician position may be provided by shift personnel assigned other functions.
Fire Team assembles at the Building E Fire Department area for rapid response as needed.
Table 1 Minimum Staffing Requirements for PVNGS for Nuclear Power Plant Emergencies