ML18011A688: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 14: | Line 14: | ||
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS | | document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS | ||
| page count = 2 | | page count = 2 | ||
| project = | |||
| stage = Request | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:R.ICIER.I E'Y PACCELERATED RIDS PROCESSIX REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) | ||
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROBISON,W.R. | ACCESSION NBR:9411300259 DOC.DATE: 94/11/23 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROBISON,W.R. Carolina Power 6 Light Co. | ||
Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) | RECIP.NAME RECIPIENT AFFILIATION P Document Control Branch (Document Control Desk) | ||
Application for amend to license NPF-63 to TS re changes to l SIZE'+ | |||
==SUBJECT:== | ==SUBJECT:== | ||
ECCS evaluation model. | |||
PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2083)TO | DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution 3 ENCL 0 | ||
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 EMERGENCY CORE COOLING SYSTEM EUALUATION MODEL CHANGES Gentlemen: | NOTES:Application for permit renewal filed. 05000400 R | ||
The purpose of this letter is to submit information required pursuant to 10 CFR 50.46(a)(3)(ii) for the Shearon Harris Nuclear Power Plant (SHNPP)regarding the estimated effect of changes or errors in Emergency Core Cooling System (ECCS)evaluation models or in the application of the models.This submittal fulfills the requirements for a 30-day report.Westinghouse analyzed the SBLOCA event for the cycle 6 reload using the NOTRUMP Evaluation Model previously reviewed and approved by the NRC.The analysis indicated that the most limiting PCT resulting from a SBLOCA would be 2011'F (Reference CP&L's annual report dated June 9, 1994, NLS-94-046). | RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 6 6 FILE C NT 1 1 NRR/DE/EELB 1 1 N~RRDRCH/HICB 1 1 NRR/DRPW 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS 2 1 0 EXTERNAL'OAC 1 1 NRC PDR 1 1 C | ||
Westinghouse has informed CP&L of several model errors which result in a net reduction in margin to the PCT acceptance criteria.The new PCT for HNP is 2199'F.The calculated performance of the SHNPP ECCS continues to meet the performance acceptance criteria specified in 10 CFR 50.46(b)(1), i.e., the calculated maximum PCT is less than 2200'F.The enclosure to this letter provides a Margin Utilization Table for the SBLOCA analyses of record in a format consistent with past reports.Questions regarding this matter may be referred to Mr.R.W.Prunty at (919)362-2030.Yours very truly, SDC/sdc | u M'OTE TO ALL"RIDS" RECIPIENTS: | ||
PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIIiIINATEYOUR NA!iIE PROD! | |||
DISTRIBUTION LISTS I'OR DOCUMEN'I'S YOU DON "I'EED! | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 18 | |||
Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant NOV 2 3 >994 File: HO-941104 SERIAL: HNP-94-092 10 CFR 50.46 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 EMERGENCY CORE COOLING SYSTEM EUALUATION MODEL CHANGES Gentlemen: | |||
The purpose of this letter is to submit information required pursuant to 10 CFR 50.46(a)(3)(ii) for the Shearon Harris Nuclear Power Plant (SHNPP) regarding the estimated effect of changes or errors in Emergency Core Cooling System (ECCS) evaluation models or in the application of the models. This submittal fulfills the requirements for a 30-day report. | |||
Westinghouse analyzed the SBLOCA event for the cycle 6 reload using the NOTRUMP Evaluation Model previously reviewed and approved by the NRC. The analysis indicated that the most limiting PCT resulting from a SBLOCA would be 2011 'F (Reference CP&L's annual report dated June 9, 1994, NLS-94-046). | |||
Westinghouse has informed CP&L of several model errors which result in a net reduction in margin to the PCT acceptance criteria. The new PCT for HNP is 2199 'F. The calculated performance of the SHNPP ECCS continues to meet the performance acceptance criteria specified in 10 CFR 50.46(b)(1), i.e., the calculated maximum PCT is less than 2200'F. | |||
The enclosure to this letter provides a Margin Utilization Table for the SBLOCA analyses of record in a format consistent with past reports. | |||
Questions regarding this matter may be referred to Mr. R. W. Prunty at (919) 362-2030. | |||
Yours very truly, SDC/sdc | |||
==Enclosure:== | ==Enclosure:== | ||
cc: Mr.S.D.Ebneter Mr.S.A.Elrod Mr.N.B.Le | cc: Mr. S. D. Ebneter Mr. S. A. Elrod 9411300259 941123 Mr. N. B. Le PDR ADOCK 05000400 P PDR | ||
$ 80 ~ tr1 State Road 1134 New Hill NC Tel 919362-2502 Fax 919 362-6950}} |
Latest revision as of 20:56, 3 February 2020
ML18011A688 | |
Person / Time | |
---|---|
Site: | Harris ![]() |
Issue date: | 11/23/1994 |
From: | Robinson W CAROLINA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
Shared Package | |
ML18011A689 | List: |
References | |
HNP-94-092, HNP-94-92, HO-941104, NUDOCS 9411300259 | |
Download: ML18011A688 (2) | |
Text
R.ICIER.I E'Y PACCELERATED RIDS PROCESSIX REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9411300259 DOC.DATE: 94/11/23 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROBISON,W.R. Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION P Document Control Branch (Document Control Desk)
Application for amend to license NPF-63 to TS re changes to l SIZE'+
SUBJECT:
ECCS evaluation model.
DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution 3 ENCL 0
NOTES:Application for permit renewal filed. 05000400 R
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 6 6 FILE C NT 1 1 NRR/DE/EELB 1 1 N~RRDRCH/HICB 1 1 NRR/DRPW 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS 2 1 0 EXTERNAL'OAC 1 1 NRC PDR 1 1 C
u M'OTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIIiIINATEYOUR NA!iIE PROD!
DISTRIBUTION LISTS I'OR DOCUMEN'I'S YOU DON "I'EED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 18
Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant NOV 2 3 >994 File: HO-941104 SERIAL: HNP-94-092 10 CFR 50.46 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 EMERGENCY CORE COOLING SYSTEM EUALUATION MODEL CHANGES Gentlemen:
The purpose of this letter is to submit information required pursuant to 10 CFR 50.46(a)(3)(ii) for the Shearon Harris Nuclear Power Plant (SHNPP) regarding the estimated effect of changes or errors in Emergency Core Cooling System (ECCS) evaluation models or in the application of the models. This submittal fulfills the requirements for a 30-day report.
Westinghouse analyzed the SBLOCA event for the cycle 6 reload using the NOTRUMP Evaluation Model previously reviewed and approved by the NRC. The analysis indicated that the most limiting PCT resulting from a SBLOCA would be 2011 'F (Reference CP&L's annual report dated June 9, 1994, NLS-94-046).
Westinghouse has informed CP&L of several model errors which result in a net reduction in margin to the PCT acceptance criteria. The new PCT for HNP is 2199 'F. The calculated performance of the SHNPP ECCS continues to meet the performance acceptance criteria specified in 10 CFR 50.46(b)(1), i.e., the calculated maximum PCT is less than 2200'F.
The enclosure to this letter provides a Margin Utilization Table for the SBLOCA analyses of record in a format consistent with past reports.
Questions regarding this matter may be referred to Mr. R. W. Prunty at (919) 362-2030.
Yours very truly, SDC/sdc
Enclosure:
cc: Mr. S. D. Ebneter Mr. S. A. Elrod 9411300259 941123 Mr. N. B. Le PDR ADOCK 05000400 P PDR
$ 80 ~ tr1 State Road 1134 New Hill NC Tel 919362-2502 Fax 919 362-6950