ML18057B348: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:consumers
{{#Wiki_filter:consumers Power                                                    GB Slade General Manager POWERINli MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 November 1, 1991 Nuclear Regulatory Commission Document Control Desk
                                  *
* Power                                                    GB Slade General Manager POWERINli MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 November 1, 1991 Nuclear Regulatory Commission Document Control Desk
* Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
* Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
TECHNICAL SPECIFICATIONS CHANGE REQUEST - CYCLE 10 FUEL DESIGN AND SAFETY INJECTION BORON CONCENTRATION The enclosed proposed changes to the Technical Specifications are required for operation during cycle 10 and to facilitate operations. The changes, specific to cycle 10 operation are necessary as the result of changes to the fuel design (reload N) and the fuel management scheme for a low leakage core. The change in maximum boron concentration for the Safety Injection Tanks (SITs)
TECHNICAL SPECIFICATIONS CHANGE REQUEST - CYCLE 10 FUEL DESIGN AND SAFETY INJECTION BORON CONCENTRATION The enclosed proposed changes to the Technical Specifications are required for operation during cycle 10 and to facilitate operations. The changes, specific to cycle 10 operation are necessary as the result of changes to the fuel design (reload N) and the fuel management scheme for a low leakage core. The change in maximum boron concentration for the Safety Injection Tanks (SITs)
Line 32: Line 30:
                                             - ACMSENERGYCOMPANY
                                             - ACMSENERGYCOMPANY


                  *                            '
We request approval of this change before April 15, 1992 to support our planned late April or early May cycle 10 startup and that the change be made effective when the amendment is issued.~
* We request approval of this change before April 15, 1992 to support our planned late April or early May cycle 10 startup and that the change be made effective when the amendment is issued.~
;?~~~ /~
;?~~~ /~
Gerald B Slade    tl General Manager CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades}}
Gerald B Slade    tl General Manager CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades}}

Latest revision as of 11:22, 3 February 2020

Application for Amend to License DPR-20,changing TS for Operation During Cycle 10 as Results of Changes to Fuel Design (Reload N) & Fuel Mgt Scheme for Low Leakage Core. Siemens Repts EMF-91-176 & EMF-91-177 Encl
ML18057B348
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/01/1991
From: Hoffman D, Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18057B349 List:
References
NUDOCS 9111080142
Download: ML18057B348 (2)


Text

consumers Power GB Slade General Manager POWERINli MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 November 1, 1991 Nuclear Regulatory Commission Document Control Desk

TECHNICAL SPECIFICATIONS CHANGE REQUEST - CYCLE 10 FUEL DESIGN AND SAFETY INJECTION BORON CONCENTRATION The enclosed proposed changes to the Technical Specifications are required for operation during cycle 10 and to facilitate operations. The changes, specific to cycle 10 operation are necessary as the result of changes to the fuel design (reload N) and the fuel management scheme for a low leakage core. The change in maximum boron concentration for the Safety Injection Tanks (SITs)

. and Safety Injection and Refueling Water (SIRW) tank is to facilitate maintaining th~ required SIT and refueling cavity boron concentrations and to*

minimize the time the plant is operating under technical specifications limiting conditions for operation.

Attachment 1 contains proposed new Technical Specifications pages, Attachment 2 is the existing.Technical Specifications pages marked up to show the proposed changes, and Attachment 3 is.Siemens Nuclear Power report (EMF 176) "Palisades Cycle 10: Disposition and Analysis of Standard Review. Plan Chapter 15 Events" which is used as a basis of the safety evaluation for this change and as:a reference in the proposed new technical specific~tions pages.

Attachment 4 .js Siemens Nuclear Power report (EMF-91-177) "Palisades Large.

Break LOCA/ECCS Analysis with Increased Radial Peaking and Reduced ECCS Flow" which is also used as a basis of the safety evaluation for this change and as a reference in the proposed new pages. Attachment 5 is Consumers Power Company Engineering Analysis EA-PAH-91-04 which concludes the increase of boron concentration in the !SIRW Tank and SITs does not affect long term cooling. Attachment 6 is a graph which shows that boron solubility is maintained at the required minimum SIRW tank temperature of 40°F and the boron concentrations proposed by this change.

~\ \ \

- ACMSENERGYCOMPANY

We request approval of this change before April 15, 1992 to support our planned late April or early May cycle 10 startup and that the change be made effective when the amendment is issued.~

?~~~ /~

Gerald B Slade tl General Manager CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades