ML18059B123: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.,.,
{{#Wiki_filter:.,.,
    '"
  .
                                            *                                            *
                                                                                             . David W. Rogers
                                                                                             . David W. Rogers
                                                                                           *
                                                                                           *
Line 31: Line 28:
           *Specification Changes, Temporary Modifications, and other documents) processed in 1993. The listed Safety Evaluations were prepared in suppo~t of ongoing
           *Specification Changes, Temporary Modifications, and other documents) processed in 1993. The listed Safety Evaluations were prepared in suppo~t of ongoing
* design and approval processes~* All the listed items have not ~ecessarily been installed and declared operable .. When these changes are completed, they will be . included, if appropriate, as. part of a regular FSAR revision.
* design and approval processes~* All the listed items have not ~ecessarily been installed and declared operable .. When these changes are completed, they will be . included, if appropriate, as. part of a regular FSAR revision.
                                  . .                                              .  .              ..
Changes to the procedures are not itemized in this report because of the very large number and most were of little significance. Safety Evaluation~
Changes to the procedures are not itemized in this report because of the very large number and most were of little significance. Safety Evaluation~
* suppo~ting procedure changes are available on site for NRC review .
* suppo~ting procedure changes are available on site for NRC review .
Line 39: Line 35:
             *David W. Rogers
             *David W. Rogers
             '.Plant Safety and Licensing Director .
             '.Plant Safety and Licensing Director .
                                                    . .      .
CC    Administrator, Region III, NRC                      .
CC    Administrator, Region III, NRC                      .
NRC Resid~nt In~pector -.Palisades Attachment *
NRC Resid~nt In~pector -.Palisades Attachment *
*9408020136 940727 PDR ADOCK 05000255 R                                PDR A CM5 ENE'RGY COMPANY}}
*9408020136 940727 PDR ADOCK 05000255 R                                PDR A CM5 ENE'RGY COMPANY}}

Latest revision as of 10:53, 3 February 2020

Forwards 1993 Annual Rept of Facility Changes,Tests & Experiments. Listed SEs Prepared in Support of Ongoing Design & Approval Processes.Listed Items Not Necessarily Installed & Declared Operable
ML18059B123
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/27/1994
From: Rogers D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18059B125 List:
References
NUDOCS 9408020136
Download: ML18059B123 (1)


Text

.,.,

. David W. Rogers

  • Plant Safety and Licensing Director*

Palisades Nuclear Plant: 27780 Blue Star Memo~ial Highway, Covert, Ml '49043 July 27, *1994 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50~255 - LICENSE DPR-20 ~ PALISADES PLANT -

1993 ANNUAL REPORT OF FACILITY CHANGES,* TESTS AND EXPERIMENTS

. This letter provides the Palisades P1ant Anriual Report of Changes3~ Tests and

  • Experiments for calendar year 1993. This report is submitted in accordance with 10 CFR 50~59(b)(2). .

. Attached.is a listing o(thanges to the facility (Facilitj Chariges, *

  • Specification Changes, Temporary Modifications, and other documents) processed in 1993. The listed Safety Evaluations were prepared in suppo~t of ongoing
  • design and approval processes~* All the listed items have not ~ecessarily been installed and declared operable .. When these changes are completed, they will be . included, if appropriate, as. part of a regular FSAR revision.

Changes to the procedures are not itemized in this report because of the very large number and most were of little significance. Safety Evaluation~

  • suppo~ting procedure changes are available on site for NRC review .

. *In th~ context of 10CFR 50.59, none of the ~ctivities ~re classified as test or experiments .

. 'fl. f7 -CJ. . Q'?l.*.-~.~

'tft~l(- . . u ==

  • David W. Rogers

'.Plant Safety and Licensing Director .

CC Administrator, Region III, NRC .

NRC Resid~nt In~pector -.Palisades Attachment *

  • 9408020136 940727 PDR ADOCK 05000255 R PDR A CM5 ENE'RGY COMPANY