ML18067A663: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/29/1997
| issue date = 08/29/1997
| title = Forwards Special Rept on Palisades SG Tube ISI Completed on 961128
| title = Forwards Special Rept on Palisades SG Tube ISI Completed on 961128
| author name = BORDINE T C
| author name = Bordine T
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:(. I A CMS Energy Company August 29, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT
{{#Wiki_filter:*
* Thoma* t:. BordlaB Manager . Licensing SPECIAL REPORT ON 1996 INSERVICE INSPECTION OF STEAM GENERA TOR TUBES Enclosed is a Special Report on the Palisades steam generator tube inservice inspection which was completed on November 28, 1996. Palisades Technical Specification 6.6.9b requires that this report be submitted to the Nuclear Regulatory Commision within 12 months following completion.
A CMS Energy Company                                                                                     Thoma* t:. BordlaB Manager .
Our letter dated December 6, 1996, reported that four tubes were plugged in Steam Generator E-50A and no tubes were plugged in Steam Generator E-50B as a result of the inspection.  
Licensing August 29, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D~C 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT SPECIAL REPORT ON 1996 INSERVICE INSPECTION OF STEAM GENERATOR TUBES Enclosed is a Special Report on the Palisades steam generator tube inservice inspection which was completed on November 28, 1996. Palisades Technical Specification 6.6.9b requires that this report be submitted to the Nuclear Regulatory Commision within 12 months following completion.
Our letter dated December 6, 1996, reported that four tubes were plugged in Steam Generator E-50A and no tubes were plugged in Steam Generator E-50B as a result of the inspection.


==SUMMARY==
==SUMMARY==
OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.
OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.
Thomas C. Berdine Manager, Licensing cc Administrator, Region Ill, USNRC Project Manager, NRR,* USNRC NRG Resident Inspector  
h-~rY~
-Palisades  
Thomas C. Berdine Manager, Licensing cc     Administrator, Region Ill, USNRC Project Manager, NRR,* USNRC 1m11~fi l!fi 1 NRG Resident Inspector - Palisades
[ 1111m 1rn 1m1 11m !llD l!fi 1
[     1111m 1rn 1m1 11m !llD
:. y*rf1 -PDR ADOCK 05000255 ' .// ! G PDR I --ri111saaes Nuc1ear nant
(. En~~~~~50163 I
PDR ADOCK 05000255 '
G
                              -qj'Q02~;-:1 PDR
:. .//
I y*rf1
          -   ri111saaes Nuc1ear nant
* 27180 Blue St,ar Memorial Highway
* 27180 Blue St,ar Memorial Highway
* Covliil, Ml 49043
* Covliil, Ml 49043
* Tel: 616164 2913
* Tel: 616164 2913
* Fax: 616164 2490}}
* Fax: 616164 2490}}

Latest revision as of 11:03, 3 February 2020

Forwards Special Rept on Palisades SG Tube ISI Completed on 961128
ML18067A663
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/29/1997
From: Bordine T
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18067A664 List:
References
NUDOCS 9709050163
Download: ML18067A663 (1)


Text

A CMS Energy Company Thoma* t:. BordlaB Manager .

Licensing August 29, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D~C 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT SPECIAL REPORT ON 1996 INSERVICE INSPECTION OF STEAM GENERATOR TUBES Enclosed is a Special Report on the Palisades steam generator tube inservice inspection which was completed on November 28, 1996. Palisades Technical Specification 6.6.9b requires that this report be submitted to the Nuclear Regulatory Commision within 12 months following completion.

Our letter dated December 6, 1996, reported that four tubes were plugged in Steam Generator E-50A and no tubes were plugged in Steam Generator E-50B as a result of the inspection.

SUMMARY

OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.

h-~rY~

Thomas C. Berdine Manager, Licensing cc Administrator, Region Ill, USNRC Project Manager, NRR,* USNRC 1m11~fi l!fi 1 NRG Resident Inspector - Palisades

[ 1111m 1rn 1m1 11m !llD

(. En~~~~~50163 I

PDR ADOCK 05000255 '

G

-qj'Q02~;-:1 PDR

. .//

I y*rf1

- ri111saaes Nuc1ear nant

  • 27180 Blue St,ar Memorial Highway
  • Covliil, Ml 49043
  • Tel: 616164 2913
  • Fax: 616164 2490