ML18192A192: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/10/1975
| issue date = 10/10/1975
| title = Forwards Additional Information to Environmental Report, Supplement No. 6 Containing Revised Sections Which Have Been Revised to Include Southern California Edison Co. as a Participant in This Project
| title = Forwards Additional Information to Environmental Report, Supplement No. 6 Containing Revised Sections Which Have Been Revised to Include Southern California Edison Co. as a Participant in This Project
| author name = Van Brunt E E
| author name = Van Brunt E
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
| addressee name = Regan W H
| addressee name = Regan W
| addressee affiliation = NRC/NRR
| addressee affiliation = NRC/NRR
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
Line 13: Line 13:
| document type = Environmental Report, Letter
| document type = Environmental Report, Letter
| page count = 10
| page count = 10
| project =
| stage = Supplement
}}
}}


=Text=
=Text=
{{#Wiki_filter:NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)0:~Rz FII E: FROM..Arizona Pub1icI'Service Cc Phoenix,'Az.h unt 1r 10-10-75 10-11-75 DATE OF DOC DATE REC'D LTR TWX RPT OTHER TO: DL CLASS UNCL'ASS'PROP INFO, ORIG 3 signed.INPUT CC'OTHER NO,CYS REC'D 3 SENTNRC PDR SENT LOCAL PDR Xx'DOCKET NO: STN 50"528/529/530 DESCR IPTION: Ltr notarized 10-10-75....trans the following:
{{#Wiki_filter:NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM) 0:~Rz FII E:
DO NOT REMOV8, ACKNOWLEDGED PLANT NAME: Ariz Palo Verde 1-2-3 ENCLOSURES:
FROM..Arizona Pub1icI'Service Cc         DATE OF DOC            DATE REC'D            LTR            TWX    RPT          OTHER Phoenix, 'Az.
Suppl 8B to the ER: Consisting of revised secti 1.1, 1.2, 2.,3, 3.9, 4.2;'5.6,&10.9............
h   unt   1r           10-10-75               10-11-75 TO:                                            ORIG              CC  'OTHER                     SENTNRC PDR DL                           3  signed.                                              SENT LOCAL PDR                Xx CLASS       UNCL'ASS'     PROP INFO,           INPUT           NO,CYS REC'D                     'DOCKET NO:
whi'ch include,.S'outhern'Calif Edison Co as a participant in.'the" pro)ect......(w/ne''ol 8VII)......(200'ys encl rec'd)FOR ACTION/INFCRI'RATION 10-14-75 ehf~BUTLER (L)W/Copies CLARK (L)W/Copies'PARR (L)~W/l Copief'" KNIEL (L)W/Copies SCHWENCER (L')W/Copies STOLZ (L)W/Copies VASSALLO (L)W/Copies PURPLE (L)W/Copies ZIEMANN"(L)REGAN (E).REID(L)W/Copies W//CopiesŽW/COPIES DICKER (E)LEAR (L)W/Copies W/Copies KNIGHTON (E)SPIES'/Copies" W/Copies YOUNGB LOOD (E)LPM W/Copies*W/opuses INTERNAL DISTR I BUTION~RC PDR OGC, ROOM P-506A~GOSSI CK/STAF F~CASE GIAMBUSSO BOYD MOORE (L)~DEYOUNG (LW" SKOVHOLT (L)GOLLER (L)(Ltr)P.COL'LINS DENISE REG OPR FILE 5 REGION (2)HIPC TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO'TEDESCO~J,COLLINS LAI NAS BENAROYA VOLLMER DENTON MGRIMES~GAMMI LL'KASTNE R~BALLAR D~SPANGLER'NVI RO~MULLER~DICKER KNIG HTON YOUNG BLOOD REGAN PROJECT LDR~&~m~Hh&ESS-LIC ASST R., DI GGS (L)H.GEAR IN,(L)'.GOULBOURNE (L)P.KREUTZER (E)J.'LEE.(L)M.RUBHBROOK(L)
3                      STN 50 "528/529/530 DESCR IPTION:                                                   ENCLOSURES:
S.REED(E)M.SERVICE (L)S.'SH EPPAR D (L)M.SLATER (E)H.SMITH (L)S.TEETS (L)G.WILLIAMS (E)'.WILSON (L)>~R.INGR'~4 (L')H.DUNCAN A/T I ND~BRAITMAN SALTZMAN ME LTZ PLANS MCDONALD'HAPMAN..
Ltr notarized 10-10-75....trans the following:                     Suppl 8B to the ER: Consisting of revised secti 1.1, 1.2, 2.,3, 3.9, 4.2; '5.6, & 10.9............
DUBE (Ltr).E.COUPE PETERSON HARTFIELD (2)KLECKER EISENHUT WI GG INTON~,/.6 culS EXTF R N AL DISTR I BUTION 9-LOCAL PDR~~~<<~~~1-, TIC (ABERNATHY)
DO NOT REMOV8,                                        whi'ch include,.S'outhern'Calif Edison Co as a participant in         .'the"         pro)ect......(w/ne''ol 8VII)
+~10)-NATIONAL LABS AHL~1-NSIC (BUCHANAN).
                                                                    ......(200'ys         encl rec'd)
1-W.PENNINGTON,'m E-201 GT~1-AS LB 1-CONSULTANTS 1-Newton Anderson NEWMARK/BLUME/AG BABIAN-A.CRS HOLDING/SENT 1.-P D R-SAN/LA/N Y 1-BROOKHAVEN'NAT LAB~1-G..ULR IKSON'RNL f
ACKNOWLEDGED PLANT NAME: Ariz            Palo Verde 1-2-3 FOR ACTION/INFCRI'RATION                               10-14-75         ehf
~~~~~~~~~~~~~1~~.~~~H~\~~~~~~~~~~
~
a e p UQK3I I'D~BQ CKOKQIRQH'P P.O.BOX 2I666 PHOENIX, ARIZONA 85036 October 10, 1975 ANPP-3126 Director of Nuclear Reactor Regulation Attn: Mr.W.H.Regan, Jr., Chief Environmental Projects Branch 4 Division of Reactor Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555  
BUTLER (L)
W/ Copies CLARK (L)
SCHWENCER (L') ZIEMANN "(L)
W/ Copies STOLZ (L)
W/ Copies DICKER (E)
REGAN (E) .
W//Copies LEAR (L)
                                                                                                      '      REID(L)
W/ COPIES W/ Copies               W/ Copies          W/ Copies                   W/ Copies
  'PARR (L)                 VASSALLO (L)       KNIGHTON (E)                 SPIES
  ~ W/lCopief'"                W/ Copies              Copies"
                                                                                      '/
W/ Copies KNIEL (L)                PURPLE (L)          YOUNGB LOOD (E)               LPM W/ Copies               W/ Copies          W/ Copies
* W/ opuses INTERNAL DISTR I BUTION TECH REVIEW        DENTON                      -LIC ASST                            A/T I ND  ~
~RC         PDR               SCHROEDER        MGRIMES                    R., DI GGS (L)                          BRAITMAN OGC, ROOM P-506A
~GOSSI CK/STAF F~
CASE MACCARY KNIGHT PAWLICKI
                                              ' ~GAMMI KASTNE R
                                                ~BALLARD LL
                                                                        '.H.
P.
GEAR IN,(L)
GOULBOURNE (L)
KREUTZER               (E)
SALTZMAN ME LTZ GIAMBUSSO                SHAO            ~SPANGLER                    J. 'LEE.(L)                             PLANS BOYD                      STELLO                          'NVI M. RUBHBROOK(L)                         MCDONALD'HAPMAN..
MOORE (L)                HOUSTON                  RO                S. REED(E)
~DEYOUNG (LW"                NOVAK            ~MULLER~                  M. SERVICE (L)                           DUBE (Ltr).
SKOVHOLT (L)              ROSS                DICKER                  S. 'SH EPPAR D (L)                       E. COUPE GOLLER (L) (Ltr)          IPPOLITO            KNIGHTON                M. SLATER (E)                             PETERSON P. COL'LINS            'TEDESCO            YOUNG BLOOD H. SMITH (L)                                         HARTFIELD (2)
DENISE REG OPR
                          ~  J,COLLINS LAINAS REGAN PROJECT LDR S. TEETS G. WILLIAMS (L)                       KLECKER EISENHUT FILE 5 REGION (2)         BENAROYA          ~&  ~m~
Hh& ESS WILSON (L)>~
(E)'.
WI GG INTON HIPC                    VOLLMER                                      R. INGR'~4 (L')                     ~,/. 6 culS H. DUNCAN EXTF R N AL DISTR I BUTION 9   LOCAL PDR~~~<<
                                +~10)
                                  ~
~~1     , TIC (ABERNATHY)                   NATIONALLABS AHL                                        1.P D R-SAN/LA/NY
  ~1   NSIC (BUCHANAN).               1 W. PENNINGTON,'m E-201 GT                                 1 BROOKHAVEN'NAT LAB
  ~1   AS LB                           1 CONSULTANTS                                     ~1 G.. ULR IKSON'RNL 1 Newton Anderson                     NEWMARK/BLUME/AGBABIAN                                    f A.CRS HOLDING/SENT
 
                                                      ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ 1 ~             ~ . ~     ~   ~
H
                      ~ \ ~ ~ ~ ~
                                        ~ ~ ~ ~ ~ ~
 
a   e p                   UQK3I I'D P. O. BOX
                                              ~BQ 2I666 CKOKQIRQH'P PHOENIX, ARIZONA 85036 October 10, 1975 ANPP-3126 Director of Nuclear Reactor Regulation Attn: Mr. W. H. Regan, Jr., Chief Environmental Projects Branch 4 Division of Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555


==REFERENCE:==
==REFERENCE:==
Docket Nos. STN  50-528/529/530
==Dear Mr. Regan:==
We  are hereby submitting additional information to the Palo Verde Nuclear Generating Station Environmental Report.
Enclosed are three signed      originals of Supplement 86 .containing revised Sections 1.1, 1.2, 2.3, 3.9, 4.2, '5.6 .and 10.9, which have been revised to include Southern California Edison Company as a Participant in this Project.
Under separate cover, 197 additional copies of Supplement /l6 have been provided. An additional three-ring binder labeled Volume VII will be provided within two weeks.
Very  truly yours, 8
Edwin E. Van Brunt, Jr.
Vice President, Nuclear Services ANPP  Project Direct EEVBJr/WMP/pk gO Subscribed and sworn to this                              <<oc 9~day of October, 1975.                          Ot Notary Public My Gommission      Expires~M~MP    1-  7'4 Pg
              )
ll ll F
I                          C a
P 4
I P
4 I                p C
II  fh
                  ~ a P
P~g~
CC Arthur C. Gehr, Esq.
Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073 Carmine F. Cardamone, Jr.
1415 North Third Avenue Tucson, Arizona 85705 Barbara E. Fisher, Esq.
Arizona Public Law Advocates 201 North Stone Avenue Suite 210 Tucson, Arizona 85701
0 4 PVNGS-1,263 ER INSTRUCTION SHEET PVNGS ER  Supplement No. 6 presents information to define the effect of the replacement of Tuscon Gas and Electric Company (TGaE) by Southern California Edison Company (SCE) as a member of the Arizona Nuclear Power Project (ANPP). The bulk of the information is on the need for power and on a new transmission line to be added to the project by SCE. This consists of a new Chapter  1 and new  Sections S6-2.3.2, S6-3.9.1, S6-4.2, S6-5.6, and S6-10.9.1, and new Appendix 1D dealing only with SCE infor-mation. In addition to these, sections, there are some, pages and figures in the ER which must be changed to reflect the addition of SCE to ANPP. They are page 8.1-1, page 8.1-2, table 8.1-1, table 8.1-2, page 8.2-1, table 8.2-1, Appendix 8A title page, page 8A-l-, table 8A-1, page 8A-9, page 9.1-2, page 9.1-4, page 9.2-2, page 9.2-4, figure 9.2-2, figure 9.2-3, page 9.3-1, page 9.3-4, table 11.3-1, sheets 1 and 8, fig-ure 11.3-1, and responses to questions, 1, 2, 3 and 4 of Chapter 1 in Supplement No. 1.
This information is presented in three discrete packages. The first is the new Chapter 1, which will be substituted in its entirety with the original Chapter 1 in Volume I (see Chapter I Instructions). The second package contains the description of the SCE transmission line route. It is to be placed in Volume 7 as indicated by the transmission line instruction sheet. The third package contains the miscellaneous pages changed to reflect the addition of SCE to ANPP. It is to be inserted into Volume VII.
It is felt that these changes present the information pertinent to the definition of the need for power and environmental impact subsequent to the addition of SCE to ANPP. A prefix "S6" is used before  all sections, pages, and table and figure numbers for ease of  identification of pages related to SCE.
S6-i              Supplement No. 6 October 10, 1975
i PVN(3S 2&3 ER In  add ition to the SC',E informa    on, a revised description        of the co ol ingg water toirage resee    oi:r is presented as a new figure 2. 1- 2. Also, a revisedd      ection 5.1.3 is provided to reflec t the impact of'he stor        e reservoir      as  well  as to
, compil e  addd  itional information rovided  gaby  previous supplements.
All'thhese    r evised  pages should e inserted into Volume VII after the    SS CE  information.
Supplement No. 6 October 10, 1975


Docket Nos.STN 50-528/529/530
~  ~
PVNGS-1,263 ER Cha  ter 1 Instructions Remove  Chapter 1 pages 1-i through 1.4-3 from Volume I and replace  it with the Supplement VI revision of Chapter l.
Insert Appendix 1D after Appendix 1C in Volume I. Remove and destroy the Supplement 4 revision of Chapter I currently in Volume VI.
Supplement No. 6 October 10, 1975


==Dear Mr.Regan:==
Q~
We are hereby submitting additional information to the Palo Verde Nuclear Generating Station Environmental Report.Enclosed are three signed originals of Supplement 86.containing revised Sections 1.1, 1.2, 2.3, 3.9, 4.2,'5.6.and 10.9, which have been revised to include Southern California Edison Company as a Participant in this Project.Under separate cover, 197 additional copies of Supplement
i~   ~" ~
/l6 have been provided.An additional three-ring binder labeled Volume VII will be provided within two weeks.Very truly yours, 8 Edwin E.Van Brunt, Jr.Vice President, Nuclear Services ANPP Project Direct EEVBJr/WMP/pk Subscribed and sworn to this 9~day of October, 1975.Ot<<oc gO Notary Public My Gommission Expires~M~MP 1-7'4 Pg) ll ll!F I a P C I 4 P II fh I 4 p C'~a P P~g~
8}}
CC Arthur C.Gehr, Esq.Snell&Wilmer 3100 Valley Center Phoenix, Arizona 85073 Carmine F.Cardamone, Jr.1415 North Third Avenue Tucson, Arizona 85705 Barbara E.Fisher, Esq.Arizona Public Law Advocates 201 North Stone Avenue Suite 210 Tucson, Arizona 85701 0 4 PVNGS-1,263 ER INSTRUCTION SHEET PVNGS ER Supplement No.6 presents information to define the effect of the replacement of Tuscon Gas and Electric Company (TGaE)by Southern California Edison Company (SCE)as a member of the Arizona Nuclear Power Project (ANPP).The bulk of the information is on the need for power and on a new transmission line to be added to the project by SCE.This consists of a new Chapter 1 and new Sections S6-2.3.2, S6-3.9.1, S6-4.2, S6-5.6, and S6-10.9.1, and new Appendix 1D dealing only with SCE infor-mation.In addition to these, sections, there are some, pages and figures in the ER which must be changed to reflect the addition of SCE to ANPP.They are page 8.1-1, page 8.1-2, table 8.1-1, table 8.1-2, page 8.2-1, table 8.2-1, Appendix 8A title page, page 8A-l-, table 8A-1, page 8A-9, page 9.1-2, page 9.1-4, page 9.2-2, page 9.2-4, figure 9.2-2, figure 9.2-3, page 9.3-1, page 9.3-4, table 11.3-1, sheets 1 and 8, fig-ure 11.3-1, and responses to questions, 1, 2, 3 and 4 of Chapter 1 in Supplement No.1.This information is presented in three discrete packages.The first is the new Chapter 1, which will be substituted in its entirety with the original Chapter 1 in Volume I (see Chapter I Instructions).
The second package contains the description of the SCE transmission line route.It is to be placed in Volume 7 as indicated by the transmission line instruction sheet.The third package contains the miscellaneous pages changed to reflect the addition of SCE to ANPP.It is to be inserted into Volume VII.It is felt that these changes present the information pertinent to the definition of the need for power and environmental impact subsequent to the addition of SCE to ANPP.A prefix"S6" is used before all sections, pages, and table and figure numbers for ease of identification of pages related to SCE.S6-i Supplement No.6 October 10, 1975 PVN(3S 2&3 ER i In add the co ition ol ingg to the SC',E informa water toirage resee on, a revised description of oi:r is presented as a new f igure reflec , compil All'thh after 2.1-t the e addd ese r the SS 2.Also, a revisedd impact of'he stor itional information evised pages should CE information.
ection 5.1.3 is provided to e reservoir as well as to rovided gaby previous supplements.
e inserted into Volume VIISupplement No.6 October 10, 1975
~~PVNGS-1,263 ER Cha ter 1 Instructions Remove Chapter 1 pages 1-i through 1.4-3 from Volume I and replace it with the Supplement VI revision of Chapter l.Insert Appendix 1D after Appendix 1C in Volume I.Remove and destroy the Supplement 4 revision of Chapter I currently in Volume VI.Supplement No.6 October 10, 1975 Q~i~~"~8}}

Latest revision as of 21:28, 2 February 2020

Forwards Additional Information to Environmental Report, Supplement No. 6 Containing Revised Sections Which Have Been Revised to Include Southern California Edison Co. as a Participant in This Project
ML18192A192
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/10/1975
From: Van Brunt E
Arizona Public Service Co
To: Regan W
Office of Nuclear Reactor Regulation
References
ANPP-3126
Download: ML18192A192 (10)


Text

NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM) 0:~Rz FII E:

FROM..Arizona Pub1icI'Service Cc DATE OF DOC DATE REC'D LTR TWX RPT OTHER Phoenix, 'Az.

h unt 1r 10-10-75 10-11-75 TO: ORIG CC 'OTHER SENTNRC PDR DL 3 signed. SENT LOCAL PDR Xx CLASS UNCL'ASS' PROP INFO, INPUT NO,CYS REC'D 'DOCKET NO:

3 STN 50 "528/529/530 DESCR IPTION: ENCLOSURES:

Ltr notarized 10-10-75....trans the following: Suppl 8B to the ER: Consisting of revised secti 1.1, 1.2, 2.,3, 3.9, 4.2; '5.6, & 10.9............

DO NOT REMOV8, whi'ch include,.S'outhern'Calif Edison Co as a participant in .'the" pro)ect......(w/neol 8VII)

......(200'ys encl rec'd)

ACKNOWLEDGED PLANT NAME: Ariz Palo Verde 1-2-3 FOR ACTION/INFCRI'RATION 10-14-75 ehf

~

BUTLER (L)

W/ Copies CLARK (L)

SCHWENCER (L') ZIEMANN "(L)

W/ Copies STOLZ (L)

W/ Copies DICKER (E)

REGAN (E) .

W//Copies LEAR (L)

' REID(L)

W/ COPIES W/ Copies W/ Copies W/ Copies W/ Copies

'PARR (L) VASSALLO (L) KNIGHTON (E) SPIES

~ W/lCopief'" W/ Copies Copies"

'/

W/ Copies KNIEL (L) PURPLE (L) YOUNGB LOOD (E) LPM W/ Copies W/ Copies W/ Copies

  • W/ opuses INTERNAL DISTR I BUTION TECH REVIEW DENTON -LIC ASST A/T I ND ~

~RC PDR SCHROEDER MGRIMES R., DI GGS (L) BRAITMAN OGC, ROOM P-506A

~GOSSI CK/STAF F~

CASE MACCARY KNIGHT PAWLICKI

' ~GAMMI KASTNE R

~BALLARD LL

'.H.

P.

GEAR IN,(L)

GOULBOURNE (L)

KREUTZER (E)

SALTZMAN ME LTZ GIAMBUSSO SHAO ~SPANGLER J. 'LEE.(L) PLANS BOYD STELLO 'NVI M. RUBHBROOK(L) MCDONALD'HAPMAN..

MOORE (L) HOUSTON RO S. REED(E)

~DEYOUNG (LW" NOVAK ~MULLER~ M. SERVICE (L) DUBE (Ltr).

SKOVHOLT (L) ROSS DICKER S. 'SH EPPAR D (L) E. COUPE GOLLER (L) (Ltr) IPPOLITO KNIGHTON M. SLATER (E) PETERSON P. COL'LINS 'TEDESCO YOUNG BLOOD H. SMITH (L) HARTFIELD (2)

DENISE REG OPR

~ J,COLLINS LAINAS REGAN PROJECT LDR S. TEETS G. WILLIAMS (L) KLECKER EISENHUT FILE 5 REGION (2) BENAROYA ~& ~m~

Hh& ESS WILSON (L)>~

(E)'.

WI GG INTON HIPC VOLLMER R. INGR'~4 (L') ~,/. 6 culS H. DUNCAN EXTF R N AL DISTR I BUTION 9 LOCAL PDR~~~<<

+~10)

~

~~1 , TIC (ABERNATHY) NATIONALLABS AHL 1.P D R-SAN/LA/NY

~1 NSIC (BUCHANAN). 1 W. PENNINGTON,'m E-201 GT 1 BROOKHAVEN'NAT LAB

~1 AS LB 1 CONSULTANTS ~1 G.. ULR IKSON'RNL 1 Newton Anderson NEWMARK/BLUME/AGBABIAN f A.CRS HOLDING/SENT

~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ 1 ~ ~ . ~ ~ ~

H

~ \ ~ ~ ~ ~

~ ~ ~ ~ ~ ~

a e p UQK3I I'D P. O. BOX

~BQ 2I666 CKOKQIRQH'P PHOENIX, ARIZONA 85036 October 10, 1975 ANPP-3126 Director of Nuclear Reactor Regulation Attn: Mr. W. H. Regan, Jr., Chief Environmental Projects Branch 4 Division of Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

REFERENCE:

Docket Nos. STN 50-528/529/530

Dear Mr. Regan:

We are hereby submitting additional information to the Palo Verde Nuclear Generating Station Environmental Report.

Enclosed are three signed originals of Supplement 86 .containing revised Sections 1.1, 1.2, 2.3, 3.9, 4.2, '5.6 .and 10.9, which have been revised to include Southern California Edison Company as a Participant in this Project.

Under separate cover, 197 additional copies of Supplement /l6 have been provided. An additional three-ring binder labeled Volume VII will be provided within two weeks.

Very truly yours, 8

Edwin E. Van Brunt, Jr.

Vice President, Nuclear Services ANPP Project Direct EEVBJr/WMP/pk gO Subscribed and sworn to this <<oc 9~day of October, 1975. Ot Notary Public My Gommission Expires~M~MP 1- 7'4 Pg

)

ll ll F

I C a

P 4

I P

4 I p C

II fh

~ a P

P~g~

CC Arthur C. Gehr, Esq.

Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073 Carmine F. Cardamone, Jr.

1415 North Third Avenue Tucson, Arizona 85705 Barbara E. Fisher, Esq.

Arizona Public Law Advocates 201 North Stone Avenue Suite 210 Tucson, Arizona 85701

0 4 PVNGS-1,263 ER INSTRUCTION SHEET PVNGS ER Supplement No. 6 presents information to define the effect of the replacement of Tuscon Gas and Electric Company (TGaE) by Southern California Edison Company (SCE) as a member of the Arizona Nuclear Power Project (ANPP). The bulk of the information is on the need for power and on a new transmission line to be added to the project by SCE. This consists of a new Chapter 1 and new Sections S6-2.3.2, S6-3.9.1, S6-4.2, S6-5.6, and S6-10.9.1, and new Appendix 1D dealing only with SCE infor-mation. In addition to these, sections, there are some, pages and figures in the ER which must be changed to reflect the addition of SCE to ANPP. They are page 8.1-1, page 8.1-2, table 8.1-1, table 8.1-2, page 8.2-1, table 8.2-1, Appendix 8A title page, page 8A-l-, table 8A-1, page 8A-9, page 9.1-2, page 9.1-4, page 9.2-2, page 9.2-4, figure 9.2-2, figure 9.2-3, page 9.3-1, page 9.3-4, table 11.3-1, sheets 1 and 8, fig-ure 11.3-1, and responses to questions, 1, 2, 3 and 4 of Chapter 1 in Supplement No. 1.

This information is presented in three discrete packages. The first is the new Chapter 1, which will be substituted in its entirety with the original Chapter 1 in Volume I (see Chapter I Instructions). The second package contains the description of the SCE transmission line route. It is to be placed in Volume 7 as indicated by the transmission line instruction sheet. The third package contains the miscellaneous pages changed to reflect the addition of SCE to ANPP. It is to be inserted into Volume VII.

It is felt that these changes present the information pertinent to the definition of the need for power and environmental impact subsequent to the addition of SCE to ANPP. A prefix "S6" is used before all sections, pages, and table and figure numbers for ease of identification of pages related to SCE.

S6-i Supplement No. 6 October 10, 1975

i PVN(3S 2&3 ER In add ition to the SC',E informa on, a revised description of the co ol ingg water toirage resee oi:r is presented as a new figure 2. 1- 2. Also, a revisedd ection 5.1.3 is provided to reflec t the impact of'he stor e reservoir as well as to

, compil e addd itional information rovided gaby previous supplements.

All'thhese r evised pages should e inserted into Volume VII after the SS CE information.

Supplement No. 6 October 10, 1975

~ ~

PVNGS-1,263 ER Cha ter 1 Instructions Remove Chapter 1 pages 1-i through 1.4-3 from Volume I and replace it with the Supplement VI revision of Chapter l.

Insert Appendix 1D after Appendix 1C in Volume I. Remove and destroy the Supplement 4 revision of Chapter I currently in Volume VI.

Supplement No. 6 October 10, 1975

Q~

i~ ~" ~

8