{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM<RIDS)DISTRIBUTION FOR I'BECOMING MATERIAL 50-25 60/2 6 EC: NRC ORG: DEWEASE J G TN VALLEY AUTH DOCDATE: 01/01/01 DATE RCVD: 01/24/78 OCTYPE: LETTER NOTARI ZED: NO COPIES RECEIVED UBJECT: LTR 0 ENCL 1 QNTHLY REPT FOR DEC.1977 ON PLANT AND COMPONENT OPERABILITY AND AVAILABILITY OR SUBJECT FACILITY...
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM       < RIDS)
NOTE (USE FOR ALL MONTHLY REPTS INCL OPERATING REPTS REY BOOK INFO ETC).LANT NAME: BROWNS FERRY-UNIT 1 BROWNS FERRY-UNIT 2 BROWNS FERRY-UNIT 3 REVIEWER INITIAL: X JM DI STRIBUTER INITIAL:++4+++4++++4+++~
DISTRIBUTION FOR   I'BECOMING MATERIAL                     50-25     60/2 6 EC:                               ORG:   DEWEASE J G                   DOCDATE: 01/01/01 NRC                                TN VALLEY AUTH                    DATE RCVD: 01/24/78 OCTYPE:   LETTER     NOTARI ZED: NO                                       COPIES RECEIVED UBJECT:                                                                   LTR 0   ENCL 1 QNTHLY REPT FOR DEC.     1977 ON PLANT AND COMPONENT OPERABILITY AND AVAILABILITY OR   SUBJECT FACILITY... NOTE (USE FOR ALL MONTHLY REPTS INCL OPERATING REPTS REY BOOK INFO ETC).
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS NONTHLY OPERATING REPORT FQR GRAY BOOK PREPARATION.
LANT NAME: BROWNS FERRY UNIT 1                             REVIEWER   INITIAL: X JM BROWNS FERRY  UNIT 2                          DI STRIBUTER INITIAL:
(DISTRIBUTION CODE A003)FQR ACTION: INTERNAL: EXTERNAl: BRANCH CHIEF SCHWENCER44W/2 ENC REG FILE+4~WENC NIPC FQR ACTION++A/2 ENCL LPDR S ATHENS AL4+W/ENCL T I C++W/ENCL NSIC~~W/ENCL BNL(NATLAB>++W/ENCL ACRS CAT 8+4W/0 ENCL NRC PDR++W/ENCL 3ISTRIBUTIQN:
BROWNS FERRY  UNIT 3
LTR 10 ENCL 10 SIZE: fP+<P CONTROL NBR: 780250002 THE END+4++44++44+++4+++++++<++<<++<++<+++  
++4+++4++++4+++~ DISTRIBUTION       OF THIS MATERIAL IS AS FOLLOWS NONTHLY OPERATING REPORT FQR GRAY BOOK PREPARATION.
( DISTRIBUTION CODE A003)
FQR ACTION:       BRANCH CHIEF SCHWENCER44W/2 ENC INTERNAL:        REG FILE+4~WENC                     NRC PDR++W/ENCL NIPC FQR ACTION++A/2 ENCL EXTERNAl:        LPDR S ATHENS AL4+W/ENCL T I C++W/ENCL NSIC~~W/ENCL BNL(NATLAB>++W/ENCL ACRS     CAT 8+4W/0 ENCL 3ISTRIBUTIQN:     LTR 10       ENCL 10                       CONTROL NBR:      780250002 SIZE: fP+<P THE END   +4++44++44+++4+++++++<++<<++<++<+++


TENNESSEE YALLEY AUTHORITY~Browns Ferry Nuclear Plant P 0.Box 2000 Decatur, Alabama 35602 CD I~.'N JR[1 t 8 1978 Nuclear Regulatory Commission Office of Management Information and Program Contxol Washington, D.C.20555 Gentlemen:
TENNESSEE YALLEY AUTHORITY
Enclosed is the December 1977 report on plant and component operability and availability for Browns Ferry Nuclear Plant units lq 2p and 3~Very truly youxs, NNE EE VALLEY AUTHORITY.G.Dewease Plant Superintendent
                    ~
Browns Ferry Nuclear Plant P 0. Box 2000 Decatur, Alabama 35602             CD I ~ .'N JR[1 t 8 1978 Nuclear Regulatory Commission Office of     Management Information and Program Contxol Washington, D. C. 20555 Gentlemen:
Enclosed     is the December 1977 report on plant and component operability and availability for Browns Ferry Nuclear Plant units lq   2p and 3 ~
Very   truly youxs, NNE   EE VALLEY AUTHORITY
  . G. Dewease Plant Superintendent


==Enclosures:==
==Enclosures:==


CC: Director, Region II Nuclear Regulatory Commission Office of Inspection and Enforcement 230 Peachtree Street, NW Suite 818 Atlanta, GA 30303 (1 copy)Director, Office of Inspection
CC:   Director, Region   II Nuclear Regulatory Commission Office of Inspection and Enforcement 230 Peachtree Street, NW Suite 818 Atlanta,   GA   30303 (1 copy)
&Enforcement Nuclear Regulatory Commission Washington, D.C.20555.(10 copies)
Director, Office of Inspection     & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 .
~z~/~aci/~SC.~0~I~C~I fa 1~Re l an4 Progeaaa Coatroom~~)i~~Ruthimg~14 C>>20555 Sreees Perm@%eeiear P1eat m'~iIuIIIL'III'0IllKl'I.I:.
(10 copies)
KlPP'JANR41978~
EucXoeed i~o tha-bacceher 1971 mport ee yieat as'oeposmat eyeeahility aa6 mmfXability for Sxmew Pexxy IueXom Pleat~Lta1,2, mk3 Jo Co 3$%4$H PK:MC ihd CCs 5irector, Ro~XX S4 Cl~Office-of'Xuepectiea'and Rdorceseat 230 Peschtree Streat, Rf Sad.t>>SXB kthmta, CL 30303 (I eoyy3 director, Office cd'nepectfea 6 lb''orccaaeot 8~~SI955 Q.O copse)H Jo Greea~702~H~G Parr&~403 PM~G.8 Kfmeoas, Ql2A 9 C-K Codsia VilMaae, 830 PRS-C ,J P DeLoeg~X2N)CUSS-C 7302>PPP>
OPERATING STATUS OPERATING DATA REPORT DOCKET NO.ZL22~DATE 1Qli~COhtPLETED BY D~nreen TELEPHONE~~o-16 s Notes 1.Unit Name:.2.Reporting Period: 3.Licensed Thermal Power (EhlWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): ci et aiIWe: 7.Maximum Dependable Capa ty (N)S.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr:to-Date Cumulative 12 979.88 4046.8 0 r]g gi93 31'2 373.229 10 488 347 0 43.3 43.3 32.9 LL2fdl 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 17.Gross Electrisnt Energy Generated (htWH)19.Unit Service Factor 67 2 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)0 23.Unit Forced Outage Rate 0 4.6 24.Shutdowns Scheduled Over Next 6 Months (Type, Date;and Duration'of Each): 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status tPrior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPERATION UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.50-259 DATE 1 5 78 No.Date PI Oc g4~~Pp~CA$a Licensee Event Report 4 E~Cl Ep IA cn'C Cl O Q O O CJ Cause Ec Corrective Action to Prevent Recurrence 27 771201 S 720 F: Forced S: Scheduled (9/>>)Reason: A-Equipment Failure (Explain)II-Maintenance or Test C-Refueling D Regulatory Restriction E.Operator Training&.License Examination F.Administrative G-Operational Error (Ilxplaitt)
I I.Other (Explain)Method: I-Manual 2-Manual Scram.'-Automatic Scram.4.Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets lor Licensee Event Report (LER)File (NUREG-OI6I)Exhibit I-Sante Source
)AVERAGE DAILY UNIT POWER LE DATE COMPLETED BY MONTH December.DAY AVERAGE DAILY POWER LEVEL (M We-Net)DAY'AVERAGE DAILY POWER LEVEL (MWe-Net)17 3.&7&7-8-8-6 18 19 20 22<<7-8-6-6 w7 Io.11 12.13 14 15 16-6-8.-8-.8 24 25 26 27 28 29 30 31'-9-8-8-8 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the near~st whole megawat t.(9(77)
OPERATING STATUS OPERATING DATA REPORT DOCKET NO~0-260" DATE~~r COMPLETED BY D~~~~.TELEPHONE 2QZD~316 l.Unit Name:.2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): S.Design Electrical Rating (Net M We): 6.ltfaximum Dependab!e Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): Notes 8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe):.10.Reasons For Restrictions, If Any: This Month Yr.-to-Date Cumulative 6967 63-J4160-13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal.Energy Generated (MWH)N W~~0-19.Unit Service Factor 20.Unit Availability Factor 23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration'of Each): Refuelin Outa e 40.3 2S.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITIA I.ELECTRICITY COMMERCIAL OPERATION (9jr77)  


UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH COMPLETED BY l5ll1SB6-No.Date f Pi V 0 g)S~CA Licensee Event Report 4f Fe Cl V~n~Cr~e 0~u E~O Cause&Corrective Action to Prevent Rccurrcnce 36 37 38, 771201 771214 771218 r 331.4 B 18.9 B 11.5 H 3 The scram, discharge volume tank high water level-switches or piping was bumped causing switch contacts to operate.39 771231 B Derated for removal of each recirc.pump from service to inspect electrical penetratiogs.
Sreees  Perm@  %eeiear P1eat m'~iIuIIIL'III'0IllKl'I.I:.
F: Forced S: Schedule'd (9/77)Reason: A.Equipment Failure (Explain)B-Maintenance or Test C-Refueling D.Regulatory Restriction E.Operator Training&Liccnsc Examination F-Administrative G Operational Error (Explain)I I-Other (Explain)3 Method: I-Mapual 2.Manual Scram.3-Automatic Scram.4.Other (Explain)5 Exhibit G~Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-OI 61)Exhibit I-Sante Source AVERAGE DAlLY UNIT POWER.LEVE UNIT DATE COMPLETED BY TELEPHONE 5=MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net)-10-10 7 2 10 12 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)*17 18 19 20 21 22 23 24 25 26 27-28 13 14 15 16-9 108 29 30 31 INSTRUCTIONS On this format, list the average daily unit power level in MWe.Net for each day in the reporting month.Compute to the nearest whole megawatt..(9/77)
KlPP
~    z ~/~ aci/~SC.
                                            'JANR41978~
~
fa I      ~C~I 1~Re an4 Progeaaa Coatroom l
                                                ~0
                                                ~
                                                  ~)i ~~
Ruthimg~ 14 C>> 20555 EucXoeed i~o tha- bacceher 1971        mport ee yieat as'oeposmat eyeeahility      aa6  mmfXability for Sxmew Pexxy IueXom Pleat
~Lta1,2, mk3 Jo Co    3$ %4$
H PK:MC ihd CCs    5irector,   Ro~
S4    Cl~
XX Office-of 'Xuepectiea'and Rdorceseat 230 Peschtree Streat, Rf Sad.t>> SXB kthmta, CL 30303 H
(I Q.O eoyy3 copse)
Jo Greea~ 702
                        ~~
director, Office cd'nepectfea 8
                            ~
SI955 6 lb''orccaaeot H~ G   Parr&~ 403 PM~                                  7302>PPP>
G. 8    Kfmeoas, Ql2A 9 C-K Codsia VilMaae, 830 PRS-C
      ,J  P  DeLoeg~ X2N) CUSS-C


OPERATING DATA REPORT DOCKET NO.~O-EEE DATE~igZI COMPLETED BY TELEPHONE.
OPERATING DATA REPORT DOCKET NO. ZL22~
295Ll29 9316 OPERATING STATUS 1.Unit Name:.2.Reporti'ng Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.maximum Dependable Capacity (Gross MWe): Notes 8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr:to.Date Cumulative,.588.41 6499.31 6499.31 0'18 641,694 18,641,694 6 033'870 6 033,870 91.0 91 0 74.8 74.8 74.8 12, Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 0 16.Gross Thermal,Energy Generated (MWH)17.Gross Electrical Energy Generated (M WH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER iVet)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
DATE     1Qli~
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH December DATE COMPLETED BY No..Date C~CS hx a-PI C Q Cl u<~~C/)$a O Liccnsce Event Report 4 Ee El ro C5 Cause&, Corrective Action to Prevent Recurrence 43 771211 F 16 78 A Intercept valves fast clos'ure DUE to'oscillation in the Main Steam Line Pressure.45 771211 771222 F 10.57 A EHC Mal function Derated Due To'A'ecirc.Pump Trip.46 771226 B Deratr rl Due To MnI.ntenance To Rx F"r d Pumps I F: Forced S: Scheduled!, (9/77)1 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D.Regulatory Restriction E-Operator Training&, Liccnsc Examination F-Administrative G-Operational Error (Exitlain)
D~nreen COhtPLETED BY TELEPHONE     ~~o- 16  s OPERATING STATUS Notes
I I-Other (Explain)Method: I-II lanual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-016I)Exltibit I-San>c Source AVERAGE DAILY UNIT POWER LEV DOCKET NO.50-296'NIT COMPLETED BY Don Green TELEPHONE MONTH c ember 1977 DAY AVERAGE DAILY POWER LEVEL (M We-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 823 794 789 18 19 20 21 0 0 6 10 12 13 14 15" 16-6 998 22 24 25 26 27 29 30 31 1000 1026.9 8 INSTRUCTIONS On this format, list the average daily unit power level in Mme-Net for each day in the reporting tnuri th.Compute to the nearest whole megawatt.(9t77) 4}}
: 1. Unit Name:
. 2. Reporting Period:
: 3. Licensed Thermal Power (EhlWt):
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capa ci ty (Net aiIWe:  )
S. IfChanges  Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,   IfAny (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month           Yr:to-Date           Cumulative LL2fdl
: 12. Number Of Hours Reactor Was Critical 12 979.88
: 13. Reactor Reserve Shutdown Hours 4046.8
: 14. Hours Generator On-Line
: 15. Unit Reserve Shutdown Hours
: 17. Gross Electrisnt Energy Generated (htWH)
                                                                              ]g r  0 gi93  31'2            373.229 10 488 347
: 19. Unit Service Factor 0            67 2                  43.3
: 20. Unit Availability Factor 43.3
: 21. Unit Capacity Factor (Using MDC Net)                      0 32.9
: 23. Unit Forced Outage Rate                                  0             4.6
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date;and Duration'of Each):
: 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status tPrior to Commercial Operation):                      Forecast              Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
 
DOCKET NO.        50-259 UNIT SHUTDOWNS AND POWER REDUCTIONS DATE 1 5 78 REPORT MONTH
                                                      ~                                    C PI        g4                                      Cl Licensee  E~
Cl Ep                O O Cause  Ec Corrective
                                                  ~  Pp No.          Date                                          Event    IA                  Q                Action to Report 4  cn'                  O          Prevent Recurrence Oc  ~CA $                                    CJ a
27      771201      S      720 F: Forced        Reason:                                          Method:                            Exhibit G - Instructions S: Scheduled      A-Equipment Failure (Explain)                    I-Manual                            for Preparation of Data II-Maintenance or Test                          2-Manual                            Entry Sheets lor Licensee Scram. Event Report (LER) File (NUREG-Scram.'-Automatic C-Refueling D Regulatory Restriction                        4.Other (Explain)                  OI6I)
E.Operator Training &. License Examination F.Administrative G-Operational Error (Ilxplaitt)                                                      Exhibit I - Sante Source (9/>>)                I I.Other (Explain)
 
                                                                      )
AVERAGE DAILYUNIT POWER LE DATE COMPLETED BY MONTH      December
. DAY      AVERAGE DAILYPOWER LEVEL                            DAY      'AVERAGE DAILYPOWER LEVEL (MWe-Net)                                                    (MWe-Net) 17
                            &7                                  18                       <<7
                            &7                                  19
                                                                                          -8 3.
                            -8                                  20
                            -8                                                            -6 22                      -6
                            -6                                                          w7 24
                            -6                                  25
                                                                                        '-9 Io                                                            26                      -8 11                                                            27                      -8 12 .
                            -8                                  28 13
                            .-8                                  29                      -8 14                                                            30 15                                                            31 16
                            -.8 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the near~st whole megawat t.
(9(77)
 
OPERATING DATA REPORT DOCKET NO ~0-260 DATE    ~~r COMPLETED BY        D~~~~.
TELEPHONE 2QZD~316 OPERATING STATUS Notes
: l. Unit Name:
  . 2. Reporting Period:
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):
S. Design Electrical Rating (Net MWe):
: 6. ltfaximum Dependab!e Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted, IfAny (Net MWe):
. 10. Reasons For Restrictions, If Any:
This Month          Yr.-to-Date            Cumulative
                                                                            -J4160
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On-Line                                                6967 63
: 15. Unit Reserve Shutdown Hours
: 16. Gross Thermal. Energy Generated (MWH)
N    W      ~~0
: 19. Unit Service Factor
: 20. Unit Availability Factor                                                                      40.3
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration'of Each):
Refuelin Outa e 2S. IfShut  Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                      Forecast              Achieved INITIAL CRITICALITY INITIAI. ELECTRICITY COMMERCIAL OPERATION (9jr77)
 
UNITSHUTDOWNS AND POWER REDUCTIONS COMPLETED BY REPORT MONTH                                                        l5ll1SB6 fPi V                FeV        ~e
                                                                                  ~                    Cause  & Corrective 0
Licensee    Cl        0 u No.            Date                                        Event      ~ n                                  Action to g) S        Report 4f  ~ Cr      E~
O                    Prevent Rccurrcnce
                                              ~ CA 36        771201    r        331.4      B 37        771214              18.9    B        3 38,      771218              11.5    H                                                The scram, discharge volume tank high water level- switches or piping was bumped causing switch contacts to operate.
39        771231                        B                                                Derated  for  removal of each recirc. pump    from service to inspect electrical penetratiogs.
3 F: Forced          Reason:                                          Method:                            Exhibit G ~ Instructions S: Schedule'd      A.Equipment Failure (Explain)                      I-Mapual                          for Preparation of Data B-Maintenance or Test                            2.Manual Scram.                    Entry Sheets for Licensee C-Refueling                                      3-Automatic Scram.                Event Report (LER) File (NUREG-D.Regulatory Restriction                          4.Other (Explain)                  OI 61)
E.Operator Training & Liccnsc Examination F-Administrative                                                                5 G Operational Error (Explain)                                                        Exhibit I - Sante Source (9/77)                I I-Other (Explain)
 
AVERAGE DAlLYUNIT POWER. LEVE UNIT 5=
DATE COMPLETED BY TELEPHONE MONTH DAY      AVERAGE DAILYPOWER LEVEL                            DAY        AVERAGE DAILYPOWER
* LEVEL (MWe-Net)                                                    (MWe-Net)
                        -10                                    17 18 19 20 21
                        -10                                    22 7                                                              23 2                                    24 25 10                                                              26 27 12                                                            -28 13                      -9                                    29 14                                                              30 15                      108                                    31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe.Net for each day in the reporting month. Compute to the nearest whole megawatt.
                                                                                                                . (9/77)
 
OPERATING DATA REPORT DOCKET NO . ~O-EEE DATE  ~igZI COMPLETED BY TELEPHONE. 295Ll29      9316 OPERATING STATUS Notes
: 1. Unit Name:
. 2. Reporti'ng Period:
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
: 6. maximum Dependable Capacity (Gross MWe):
: 8. IfChanges  Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,  If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month            Yr:to.Date            Cumulative, .
12, Number Of Hours Reactor Was Critical
: 13. Reactor Reserve Shutdown Hours                                                               588.41
: 14. Hours Generator On-Line                                                 6499.31              6499. 31
: 15. Unit Reserve Shutdown Hours                           0                        0
: 16. Gross Thermal,Energy Generated (MWH)                                   18 641,694            18,641,694
: 17. Gross Electrical Energy Generated (MWH)                                 6 033 '870            6 033,870
: 18. Net Electrical Energy Generated (MWH)
: 19. Unit Service Factor
: 20. Unit Availability Factor                                               91 0                  91.0
: 21. Unit Capacity Factor (Using MDC Net)                                   74.8                  74.8
: 22. Unit Capacity Factor (Using DER iVet)                                   74.8
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration   of Each):
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                       Forecast               Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DATE COMPLETED BY REPORT MONTH December C  ~      PI C                Liccnsce  EeEl                            Cause &, Corrective Q
No.         . Date           CS                             Event                                          Action to hx a-         Cl u<   ~     Report  4  ro  C5                          Prevent Recurrence
                                                  ~ C/) $
a O
16 78       A                                             Intercept valves fast clos'ure 43      771211        F DUE to'oscillation in the             Main Steam Line Pressure.
10.57       A                                             EHC Mal function 771211      F 45      771222                                                                            Derated Due To       'A'ecirc.
Pump Trip.
B                                             Deratr rl Due To     MnI.ntenance 46      771226 To Rx F"r d   Pumps I                   1                                                                                4 F: Forced           Reason:                                          Method:                            Exhibit G - Instructions S: Scheduled       A-Equipment Failure (Explain)                     I -II lanual                      for Preparation of Data B-Maintenance or Test                             2-Manual Scram.                    Entry Sheets for Licensee C-Refueling                                       3-Automatic Scram.                Event Report (LER) File (NUREG-D.Regulatory Restriction                         4-Other (Explain)                  016I )
E-Operator Training &, Liccnsc Examination F-Administrative G-Operational Error (Exitlain)                                                       Exltibit I - San>c Source
!, (9/77)                 I I-Other (Explain)
 
AVERAGE DAILYUNIT POWER LEV DOCKET NO.         50-296
                                                                                                                    'NIT COMPLETED BY             Don Green TELEPHONE MONTH       c ember       1977 DAY       AVERAGE DAILYPOWER LEVEL                              DAY      AVERAGE DAILYPOWER LEVEL (MWe-Net)                                                   (MWe-Net) 17 823                                     18                   0 19 794                                      20 789                                      21                     0 6                                                             22 1000 24                1026 25 10                                                             26
                          -6                                    27 12                                                                               .9    8 13                                                             29 14                                                             30 15"                   998                                     31 16 INSTRUCTIONS On this format, list the average daily unit power level in Mme-Net for each day in the reporting tnuri th. Compute to the nearest whole megawatt.
(9t77)
 
4}}

Latest revision as of 17:42, 2 February 2020

December 1977 Monthly Operating Report
ML18283B213
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/13/1978
From: Dewease J
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML18283B213 (16)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM < RIDS)

DISTRIBUTION FOR I'BECOMING MATERIAL 50-25 60/2 6 EC: ORG: DEWEASE J G DOCDATE: 01/01/01 NRC TN VALLEY AUTH DATE RCVD: 01/24/78 OCTYPE: LETTER NOTARI ZED: NO COPIES RECEIVED UBJECT: LTR 0 ENCL 1 QNTHLY REPT FOR DEC. 1977 ON PLANT AND COMPONENT OPERABILITY AND AVAILABILITY OR SUBJECT FACILITY... NOTE (USE FOR ALL MONTHLY REPTS INCL OPERATING REPTS REY BOOK INFO ETC).

LANT NAME: BROWNS FERRY UNIT 1 REVIEWER INITIAL: X JM BROWNS FERRY UNIT 2 DI STRIBUTER INITIAL:

BROWNS FERRY UNIT 3

++4+++4++++4+++~ DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS NONTHLY OPERATING REPORT FQR GRAY BOOK PREPARATION.

( DISTRIBUTION CODE A003)

FQR ACTION: BRANCH CHIEF SCHWENCER44W/2 ENC INTERNAL: REG FILE+4~WENC NRC PDR++W/ENCL NIPC FQR ACTION++A/2 ENCL EXTERNAl: LPDR S ATHENS AL4+W/ENCL T I C++W/ENCL NSIC~~W/ENCL BNL(NATLAB>++W/ENCL ACRS CAT 8+4W/0 ENCL 3ISTRIBUTIQN: LTR 10 ENCL 10 CONTROL NBR: 780250002 SIZE: fP+<P THE END +4++44++44+++4+++++++<++<<++<++<+++

TENNESSEE YALLEY AUTHORITY

~

Browns Ferry Nuclear Plant P 0. Box 2000 Decatur, Alabama 35602 CD I ~ .'N JR[1 t 8 1978 Nuclear Regulatory Commission Office of Management Information and Program Contxol Washington, D. C. 20555 Gentlemen:

Enclosed is the December 1977 report on plant and component operability and availability for Browns Ferry Nuclear Plant units lq 2p and 3 ~

Very truly youxs, NNE EE VALLEY AUTHORITY

. G. Dewease Plant Superintendent

Enclosures:

CC: Director, Region II Nuclear Regulatory Commission Office of Inspection and Enforcement 230 Peachtree Street, NW Suite 818 Atlanta, GA 30303 (1 copy)

Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 .

(10 copies)

Sreees Perm@ %eeiear P1eat m'~iIuIIIL'III'0IllKl'I.I:.

KlPP

~ z ~/~ aci/~SC.

'JANR41978~

~

fa I ~C~I 1~Re an4 Progeaaa Coatroom l

~0

~

~)i ~~

Ruthimg~ 14 C>> 20555 EucXoeed i~o tha- bacceher 1971 mport ee yieat as'oeposmat eyeeahility aa6 mmfXability for Sxmew Pexxy IueXom Pleat

~Lta1,2, mk3 Jo Co 3$ %4$

H PK:MC ihd CCs 5irector, Ro~

S4 Cl~

XX Office-of 'Xuepectiea'and Rdorceseat 230 Peschtree Streat, Rf Sad.t>> SXB kthmta, CL 30303 H

(I Q.O eoyy3 copse)

Jo Greea~ 702

~~

director, Office cd'nepectfea 8

~

SI955 6 lborccaaeot H~ G Parr&~ 403 PM~ 7302>PPP>

G. 8 Kfmeoas, Ql2A 9 C-K Codsia VilMaae, 830 PRS-C

,J P DeLoeg~ X2N) CUSS-C

OPERATING DATA REPORT DOCKET NO. ZL22~

DATE 1Qli~

D~nreen COhtPLETED BY TELEPHONE ~~o- 16 s OPERATING STATUS Notes

1. Unit Name:

. 2. Reporting Period:

3. Licensed Thermal Power (EhlWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capa ci ty (Net aiIWe: )

S. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr:to-Date Cumulative LL2fdl

12. Number Of Hours Reactor Was Critical 12 979.88
13. Reactor Reserve Shutdown Hours 4046.8
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
17. Gross Electrisnt Energy Generated (htWH)

]g r 0 gi93 31'2 373.229 10 488 347

19. Unit Service Factor 0 67 2 43.3
20. Unit Availability Factor 43.3
21. Unit Capacity Factor (Using MDC Net) 0 32.9
23. Unit Forced Outage Rate 0 4.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date;and Duration'of Each):
25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status tPrior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50-259 UNIT SHUTDOWNS AND POWER REDUCTIONS DATE 1 5 78 REPORT MONTH

~ C PI g4 Cl Licensee E~

Cl Ep O O Cause Ec Corrective

~ Pp No. Date Event IA Q Action to Report 4 cn' O Prevent Recurrence Oc ~CA $ CJ a

27 771201 S 720 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data II-Maintenance or Test 2-Manual Entry Sheets lor Licensee Scram. Event Report (LER) File (NUREG-Scram.'-Automatic C-Refueling D Regulatory Restriction 4.Other (Explain) OI6I)

E.Operator Training &. License Examination F.Administrative G-Operational Error (Ilxplaitt) Exhibit I - Sante Source (9/>>) I I.Other (Explain)

)

AVERAGE DAILYUNIT POWER LE DATE COMPLETED BY MONTH December

. DAY AVERAGE DAILYPOWER LEVEL DAY 'AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 17

&7 18 <<7

&7 19

-8 3.

-8 20

-8 -6 22 -6

-6 w7 24

-6 25

'-9 Io 26 -8 11 27 -8 12 .

-8 28 13

.-8 29 -8 14 30 15 31 16

-.8 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the near~st whole megawat t.

(9(77)

OPERATING DATA REPORT DOCKET NO ~0-260 DATE ~~r COMPLETED BY D~~~~.

TELEPHONE 2QZD~316 OPERATING STATUS Notes

l. Unit Name:

. 2. Reporting Period:

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

S. Design Electrical Rating (Net MWe):

6. ltfaximum Dependab!e Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):

. 10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

-J4160

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 6967 63
15. Unit Reserve Shutdown Hours
16. Gross Thermal. Energy Generated (MWH)

N W ~~0

19. Unit Service Factor
20. Unit Availability Factor 40.3
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration'of Each):

Refuelin Outa e 2S. IfShut Down At End Of Report Period, Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAI. ELECTRICITY COMMERCIAL OPERATION (9jr77)

UNITSHUTDOWNS AND POWER REDUCTIONS COMPLETED BY REPORT MONTH l5ll1SB6 fPi V FeV ~e

~ Cause & Corrective 0

Licensee Cl 0 u No. Date Event ~ n Action to g) S Report 4f ~ Cr E~

O Prevent Rccurrcnce

~ CA 36 771201 r 331.4 B 37 771214 18.9 B 3 38, 771218 11.5 H The scram, discharge volume tank high water level- switches or piping was bumped causing switch contacts to operate.

39 771231 B Derated for removal of each recirc. pump from service to inspect electrical penetratiogs.

3 F: Forced Reason: Method: Exhibit G ~ Instructions S: Schedule'd A.Equipment Failure (Explain) I-Mapual for Preparation of Data B-Maintenance or Test 2.Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D.Regulatory Restriction 4.Other (Explain) OI 61)

E.Operator Training & Liccnsc Examination F-Administrative 5 G Operational Error (Explain) Exhibit I - Sante Source (9/77) I I-Other (Explain)

AVERAGE DAlLYUNIT POWER. LEVE UNIT 5=

DATE COMPLETED BY TELEPHONE MONTH DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER

  • LEVEL (MWe-Net) (MWe-Net)

-10 17 18 19 20 21

-10 22 7 23 2 24 25 10 26 27 12 -28 13 -9 29 14 30 15 108 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe.Net for each day in the reporting month. Compute to the nearest whole megawatt.

. (9/77)

OPERATING DATA REPORT DOCKET NO . ~O-EEE DATE ~igZI COMPLETED BY TELEPHONE. 295Ll29 9316 OPERATING STATUS Notes

1. Unit Name:

. 2. Reporti'ng Period:

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. maximum Dependable Capacity (Gross MWe):
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr:to.Date Cumulative, .

12, Number Of Hours Reactor Was Critical

13. Reactor Reserve Shutdown Hours 588.41
14. Hours Generator On-Line 6499.31 6499. 31
15. Unit Reserve Shutdown Hours 0 0
16. Gross Thermal,Energy Generated (MWH) 18 641,694 18,641,694
17. Gross Electrical Energy Generated (MWH) 6 033 '870 6 033,870
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor 91 0 91.0
21. Unit Capacity Factor (Using MDC Net) 74.8 74.8
22. Unit Capacity Factor (Using DER iVet) 74.8
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DATE COMPLETED BY REPORT MONTH December C ~ PI C Liccnsce EeEl Cause &, Corrective Q

No. . Date CS Event Action to hx a- Cl u< ~ Report 4 ro C5 Prevent Recurrence

~ C/) $

a O

16 78 A Intercept valves fast clos'ure 43 771211 F DUE to'oscillation in the Main Steam Line Pressure.

10.57 A EHC Mal function 771211 F 45 771222 Derated Due To 'A'ecirc.

Pump Trip.

B Deratr rl Due To MnI.ntenance 46 771226 To Rx F"r d Pumps I 1 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I -II lanual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D.Regulatory Restriction 4-Other (Explain) 016I )

E-Operator Training &, Liccnsc Examination F-Administrative G-Operational Error (Exitlain) Exltibit I - San>c Source

!, (9/77) I I-Other (Explain)

AVERAGE DAILYUNIT POWER LEV DOCKET NO. 50-296

'NIT COMPLETED BY Don Green TELEPHONE MONTH c ember 1977 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 17 823 18 0 19 794 20 789 21 0 6 22 1000 24 1026 25 10 26

-6 27 12 .9 8 13 29 14 30 15" 998 31 16 INSTRUCTIONS On this format, list the average daily unit power level in Mme-Net for each day in the reporting tnuri th. Compute to the nearest whole megawatt.