December 1975 Monthly Operating Report
ML18283B242
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/09/1976
From: Green H
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML18283B242 (13)


Text

MONTllLY RI';PORTS (FOR GRAY BOOk;.PREPARATION)

NRC DISTOUTION FOR PART260 DOC(<ET MO'R~IA (TEMPORARY FORM)

CONTROL NO 398 F I LF

~ MONTlfLY REPORT FILE ennessee a

ey u

or

Decatur, Alabama H.J.

Green NRC CLASS UNCLASS PROPINFO XXX 5ATE OF DOC

<;1-9-76 ORIG

-1 Signed INPUT DATE R EC'D 1-15-76 CC OTHER 0

NO CYS REC'D LTR,TWX RPT OTHE R XXX SENT AEC PDR SENT LOCAL PDR DOCKET NO:

DESCR IPTION:

Ltr trans the following:

PLANT NAMF BI own Feny 1

& 2 ENCLOSURES:

Monthly Repor t for Plant 6 Component Operability E Availability This Repor.t to be used in preparing Gray Boolc by Plans 6 Operations.

NUMBER OF COPIES REC'D:

FOR ACTION/INFORIViATION BUTLER (L)

W/ Copies CLARK (L)

W/ Copi s

PARR (L)

W/ Copies KNI EL (L)

W/ Copies SCHWENCER (L)

W/ Copies STOLZ (L)

W/ Copies VASS/aLLO (L)

W/

opies PLE (L)

W/ Copies ZIEMANN(L)

BEGAN {E),

W/ Copies W/ Copies +CK+OQ7QEDGED DICKER (E)

LEAR {L)

KNIGHTON {E)

SPELS DO NOT REMOVE W/ Copies W/. Copies YOUNGBLOOD (E)~ MIPC/PE W/ Copies W.'li Copies INTERNALDISTRIBUTION I=G FIL RC OGC, ROOM P-506A GOSSI CK/STAF F CASE BOYD MOORE (L)

DEYOUNG (L)

SI<OVHOLT (L)

GOLLER (L) (Ltr)

P. COLLINS DENISE BEG OPR FII.F 8( REGION (2)

STEI:-LE TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STE LLO HOUSTON NOVAI<

ROSS IPPOLITO TEDESCO J ~ COLLINS LAI NAS BENABOYA VOLLMER A/T IND

~

BRAITMAN SA LTZMiAN MELTZ DENTON G B I MES GAMM ILL l<ASTNER BALLARD

.SPANG LE R ENVIRO MULLER DICKER l<NIGHTON YOUNGBLOOD BEGAN PROJECT LDR PLANS

~ MCDONALD

~ CHAPMAN DUBE (Ltr)

E. COUPE PETERSON HART F I E LD (2)

KLECKER.

EISENHUT WIGGIN I ON HABLESS K. PARRISH L EXTERNAL DISTRI LIC ASST R. DIGGS (L)

H. GEARIN (L)

E. GOULBOURNE (L)

P ~ KREUTZER (E)

J. LEE (L)

M. RUSllBROOZ (L)

S. RL=EI) (E)

M.SE VICE(L)

~.

I~EPPARD (L)

M. SLATER (E)

H. SMilTH (L)

S. TEETS (L)

G. WILLIAMS(E)

V. WILSON (L)

R. INGRAM (L)

M DUNClili (E BUTION LOCA( FOR Athens 'labama

~1 -. TIC (ADERNATI1Y)

(I)(2)(IO) NATIONALLASS 1 PDR-SAN/LA/NY

~1 NSIC (BUCI-IANAN)

M/. PI.NNINGTON, Rm E-20'I GT 1 BROOKHAVEN NAT LAB 1 ASLB 1

CONSULTANTS 1 G. ULBIKSON, ORNI 1 NeIvloi1 Ailcferson NEWJ(tIARf</8LUME/AGBABIAN

'l AGMED (0 UTI I GUSSMAN)

ACBS HOLI)I IUG/SENT B m 8-127 GT J. D. RUNKLES, Rm E-201 GT

I

~0t.VT!Qy O

rn 1))6 19qro l ~

.a I

l NESS EE VALLEY.AUTHORt.

Browns Ferry Nuclear Plant P. 0. Box 2000

Decatur, Alabama 35601 January 9, 1976, ocrom lt

~~g g7.6>

gC>>

Nuclear Regulatory Commission Office of Management Information and Program Control Washington, D. C.

20545 Gentlemen:

Enclosed is the December 1975 report on plant and component operability and availability for Brogans Ferry Nuclear Plant units 1 and 2.

Very truly yours, TENNESSEE VALLEY AUTHORITY I.

reen Plant: Superintendent

Enclosures:

2 CC:

Nuclear Regulatory Commission Office of Inspection and Enforcement 230 Peachtree Street:,

NW Atlanta, Georgia 30303

+ 'o r

Ip~

'0'~~ ~

V'n Equal Opportunity Employer 398

0 0

'll

/

t kl(

OPER ATINJ STATUS:

UNJT:ID-'sr.

pp~hp.'i s Hpp't' DATE 1-,6-76 COVETED BY:

Harold Walls.

1 REPORTING PERIOD:

0ooo751201

'P 2400751231

~

/44 GROSS HOURS IN REPORTING PERIOD.

2 ~

CUPJKNTLY AUTHORIZED PO'iTER.LEVEL MWt

. 3293.

Kv'e-tiET 1065 3 ~

POWER LEVEL TO WEllCH >RESTRICT..D (IF ANY):

NIA 4i REASONS FOR RESTRICTIONS

( IF AsiY):,

5.

6.

REACTOR RESERVE SHUTDOWN HOURS.......,.. ~.

7 HOURS 'GEi~TOR ON-LIITE

~

~

~ ~

'8.

Ul IT RESmVE SHZ"DOWlr HOURS..............

0 9~

GROSS THiRISG -PO~>>

GKfERATED (l4HH)......

)(5)

REACTOR AVAILABILITYFACTOR (1) 0 13.

UNIT USE FACTOR (2)...............

0 0

, 1.4.

UNIT CAPACXTY FACTOR (3)........'.........

3.)

FORCED Ob'."'.GE RATE (4) ~

100 16;.

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE DURATXON OF EACH):

CUMULATIVE YR-TO DATE TO DATE 0 07 339.10

'1 535.98 0

526.10

~ 9 282.80 0

1 347 943 18.2 17.5 14.4 82.1 TYPE~ DATE AND 6 834 1

2 50.9 47.9

33. 9 47.9 4,280,616 22,036,392 1,416,650..

7 091 510

'7.

.3.8.

XF-SHUTDOlPif AT END OF REPORT PERIOD~ ESTMCTZD DATi'OF STOUP Undetermined PLANTS. XN TEST STATUS (PRIOR TO COE2-RCIAL OPERATION) REPORT THE FOLLOl'ING:

DATE I&T DATE.

)s R~MON FOR FORECAST ACHIEVED DIFFERENCE XNITIALCRITICALITY (I

INITIALELECTRICAL POWER GENERATION

. CQQERCXAL OPERATION 1

s

~"

~

(2)

(3)

(4)

REACTOR AVAXLABILITYFACTOR HOURS R+'sCTOR HAS CRITICAL

  • 100 GROSS HOURS IN REPORTING PERIOD s

UNIV USE FACTOR HOURS GE'sSER sTOR ON LINE

+100 i

~.GROSS HOURS IN REPORTING PERIOD UNIT CAPACITY FACTOR - NET ELECTRICAL POWER GENsE..RATED CURRENTLY LICENSED PO!'ER I'"'VEL-" ROSS UOURS IN REPOPTING PERIOD FORCED OUTAGE RATE - FORCFD OUTAGE HOURS

  • 100 HOURS GEhVIVLTOR ON LINE + FORCED OUTAGE llOURS (5)

DOES NOT INCLUDE AUXILIARYDIESEL GENER'sTION

~

BQ".RY:

Unit.remained in cold shutdown for repair of control cables.

QROtklS FERRY I DATE 1-6-76 COMPLETED BY Harold Mails REPORT MONTH DECEMBER PLANT SHUTDOWNS NO.

5.

751201 TYPE F-FORCED S -SC}1EDULED DURATION 110URS 744 REASON l B

HETHOD OP SHUTTING DOMN T11E REACTOR 2

B CO~a1MENTS (l) RL'ASON:..

(2)

'-EQUIPMEtQ FAILURE (EXPIhIN)

B"hh~INT, OR TEST C."REFUELING D<<REGULATORY RESTRICTION E OPERATOR TRAINING AND LICENSING EXAMINATION F-A DMINISTRATIVL G "OPERATIONAL ERROR (EXPLAIN)

)ET!10D:

A-1'NQA B-N'51!9 C"ciV 0'GR:~

0

~

~

I'

~

unXT

~l.

1-6>>76 COHPLZTED BY DAILY UNFIT PO'KR OUTPUT MONTH DECENBER 7

AVERAGE DAILY

-4.4

-3. 1

,.<<2. 0

-2.4

-1. 9

-2.1

-1. 8

-1. 8

-2.1 NFe-net 25 26 27

'8 29 30 31 A~j; GE DAILYÃJe-net

-5. 1

~

-5.3

='i'0 12

" 13 14 15 16 18 19 20 21 23

-1.8

-1.6

-1.7

-1. 2

-2.1

-1. 2

-2. 0

-1.7

-0. 8

-.2. 7

~ -l. 8

-1;8

-1.8

-2.0 Note:

Negative values indicate station use when unit is off line.

r

~

OPERATXHG STATUS:

1 o REPORTING PERIOD:

0000751201 GROSS HOURS IN REPORTXNG PERIOD:

UrrxT '.rÃrF: rlrrrrl.".'li".p, 7'r DA'ZE 1-6-76

.COH PLEiED BY:

infold a

~TO 2400751231 744 2,

CURREtG'LY AUTHORIZED POWER LEVEL K)t 3293 MNe-ti~T 1065 3 ~

POWER LEVEL TO WkiICkk gESTRXCTED (IP ANY):

N/A 4.

REASONS FoR RESTRICTxoNS

( IF ANY):

54 6.

HOURS %ACTOR WAS CRITICAL...............

~

RZACTOR RESERVE SHUTDOWh'OURS...........

THIS r0'UMULATXVE YR.-TO DATE To DATE 1.4

~

r ~

~

~

a<or~

7 o 8.

9-10.llo l6.

17.

l8.

..0 4 474 080 8 259 696 1,465,200 1,374,133 32.6 30.4 19.9 68.7

~ r PLANTS. IN TEST STATUS (PRIOR TO Cok~o~RCXAL'PERATION) REPORT THE FOLLOHING:

DATE LAST DATE..

RE&ON FOR FORECAST ACHIEVED DIFFERENCE INITIALCRITICALITY fi INITIALELECTRICAL POKER GENERATION

, COtQKRCIAL OPERATION HOURS GENITOR ON LINE...................'

1 578.92 3 578.08 UtkXT RESERVE SHUTDO',Pit HOURS 0

GROSS TH".UCQ PotJER GDfr~TED (MWH)......

GROSS ELECTRICAL PO~

G ~m (mZ)(5)

NET ~+CTRICP~ PO~r GE!KPJKZ) (HWH).....

5'~44 REACTOR AVAILABILITYFACTOR(1) 0

18. 0 UNIT USE FACTOR (2) o ~ ~ o o o oo oooo oooo ~ o ~

o'oo'NIT CAPACITY FACTOR (3) 0 14.7 FORCED OUTAGE RATE (4) ~

~

~

~

~

SHUTDOWNS SCH-DULED To BEGIN IN NEXZ 6 MONTHS (STATE TYPE~

DATE AND DURATION OF EACH):

I.

(4)

RECTOR AVAILABXLITYFACTOR - 110URS REACTOR WAS CRITICAL, *100 GROSS HOURS IN REPORTING PERXOD I

lSxx'SE FACTOR <<kloURS GENERATOR ON-LINE

  • 100

, GROSS kioURS IN REPORTING PERIOD UNIT CAPACXTY FACTOR - NET ELECTRICAL POWER GENERATED CURRENTLY LICENSED 'POWi'R LEVEL+GROSS kkolPM IN REPORTING PERIOD FORCED OUTAGE RATE " FORCED OUTAGE HOURS

  • 100 110URS GENL'RATOR ON LINE + FORCED Ol TAGE 110URS DOES NOT XNCI.UDE AUXILIARYDIESEL GENEF~STION

~

Unit remained in cold shutdown, for repair of control cables.

1-6-76 CO~~

LETED.gY Harold Walls REPORT MONTH PLANT SHUTDOWNS NO.

DATE 9

751201 TYPE F-FORCED S-SCHEDULED-DURATION HOURS 744 REASON I KTHOD OF SIIUTTING DOWN TIIE REACTOR 2

COIIIIENTS

~ 1 f

V I

~

6&

4'

~

~

~

(1) REASON:

A-EQUIPMENT FAILURE (EXPLAIN) 9>>1IAINT, OR TEST C-RE1'UELING D>>REGULATORY RESTRICTION E"OPI'.RATOR TRAINING AND LICENS ING EXAisIINATION

. F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

(2) >IETHOD:

A-TLSNUA 3" ~QUA CRA C-AUTO.'I SCRA

~

~

f~

EBfXT 2

~ 7 DATE 1-6-76 COMPLETED B'Z DAILY U'.lIT PO'r.'ER OUTPUT MOlH;!k D ECE."JEER DAY 3

4 5'

7 9

10 11 12 13 14 15

.16 17 18 19 20 21 22 23

~ 24 AVEP~KGE DAILY

-10. 0

-5.6

-8.5

-8.6

-9. 6

-8.5

-8. 6

-8.6

-8.3

-8.5

'-8 I

-8. 7

-8. 0

-8.4

-7.5

-5.5

-5.8

-8 1

-7.5

-8.3

-7.5

-7.7

-7.2 Yh7e-ne t DAY 25 26 27 28 29 30 31 AVENGE DAILY ".~ale-net

-3.7

-4. 2

-3. 9

-4.5 Hote:

Negative values indicate station use when unit is off line