FROM:
Tennessee Valley Authority.
Deca toe, Alabama I I J
Green DATE OF DOCUMLNT TO:
N ~
RE C
DATE flECEIVEO 0
3HfLETTEA PLAID!NnL
.Q COPY
~
QNOTOAIZED
@UNCLASSIFIED NUMOEfl OF COPIES AECEIVEO One signed INPUT FOAM PAOP DESCAIPTION LETTER TRANS TllE FOLLOWING:
ENCLOSUfle MONTHLY REPORT FOR JIII.Y 76 PLANT 6c COMPONENT OPEI&BILITY6 AVAILABILITY
~
THIS REPORT TO BE
~ USFD.IN PREPARING GRAY BOOK BY PLANS 6 OPERATION"
~ s g
~
~ ~
~
~
~ ~
~ L~
ZCKNO%'LE>>~D O NOT g,ZMOV~
PLANT NAME:
(1-P)
IIrowns Ferry 1-2-3
~....----FOR ACTION/INFORMATION 8
10 76
!.KJL MIPC
-CYS FOR ACT ON e
INTERNALD ISTRI BUTION
"~..r r!
N~PD OMLP Schwencer BRANCH CHIEF L She ard CONTROL NUMBER EXTERNAL DISTRIBUTION NIIC FOIIM 106 V.S. NVCLEAAfIEOVLAToflVCOMM~!ION DOCKL'T NUM I'l fIII'IC DISTRIBUTION Fon PAfIT 50 DOCKET NIATEBIAL MONTlll.Y RlPORT
if
~o~tlO+
@4o e
yl 0
m 076-1916 t
~
~6&<>.+ /C TENNESSEE VALLEY
..Y Browns Perry Nuc
'lant P.
O.
Box 0 0 August 6, 1976
@84~ ~+>>
AUG%0 1976~
Nuclear Regulatory Commission Office of 5fanagement Information and Program Contxol Washington, D.
C.
20545
~
I V,Sz l4JQEAA rACLMYOLY COA4IIAUH lAdl r>>err@>>
Gentlemen:
Enclosed is the July 1976 report on plant and component operability and availability for Browns Ferry Nuclear Plant units 1 and 2.
Very truly yours, TENNESSEE VALLEY AUTHORITY J.
Green Plant Superintendent Enclosures CC:
Director, Region II Nuclear Regulatory Commission Office of Inspection and Enforcement 230 Peachtree
- Street, NW Suite 818
- Atlanta, GA 30303 (1 copy)
Director,'ffice of Inspection 6 Enforcement Nuclear Regulatoxy Commission Washington, D. C.
20555 (10 copies) hn Cqunl Opportuntty t:.mptoyor 8'.L%.5
t E,K I
C 1
I%
1
'pJ~
. ~
UNzT N~~E ms i:err' sam "
COMPLETED BY:
Don Green TELEPHONE
'29-6202 to 2400760731 MWe-net 1065 This Month Yr-To-Date OPERATINC STATUS:
1.
Reporting Period:
0000760701 Gross Hours in Reporting Period:
744 2.
Currently Authorized Power Level MVt 3293 Max. Depend.
capacity (HMe-net) 1065 3.
Power Level to which restricted (if any):
4.
Reasons for restrictions (if any):
Cumulative
'o Date 5.
Hours Reactor Has Critical 6.
Reactor Reserve Shutdown Hours 0
744 0
1,848 9,870.02 3,820.9 7 ~
8.
Hours Generator On-Line Unit Reserve Shutdown Hours 0
0 9,,282.8 9.
Gross Thermal Power Generated (Ndi) 10.
Gross Electrical Power Generated (MK) 11.
Net Electrical Power Generated (1ÃH) 12.
Reactor Service Factor.
- 13. 'eactor Available Factor
- 14. 'nit Service Factor 0
0 100 0
0 0
0 0
36.2 0
22,036,392 7,091,570 6,864,764
- 40. 3 55.9 37.9 15.
16.
17.
18.
19.
20.
21.
0 0
0 Initial Criticality Initial Electrical Power Generation Commercial Operatlon Unit Availability Factor Unit Capacity Factor (using MDC)
Unit Capacity Factor (using Design M<e)
Forced Outage Rate Shutdowns scheduled to begin in next 6
months (state type, date and duration of each):
None If shutdown at end of report period, estimated date of startup: 'ndetermined Plants in Test Status (prior to commercial operation)
Report the Following:
Forecast Achieved 37.9 26.3 26.3 58.3
O.
KCV.RY:
UNIT
~~~ yo'.
Browns Ferry I DATE 8/4/76 Unit remained in cold shutdown.
COMPLETED BY Don Green REPORT HONTH PLANT SHUTDOt&iS NO ~
DATE TYPE F"FORCED S"SCHEDULED DURATION HOURS REASON 1
1u THOD OF SHUTTING DOWN THE REACTOR 2
COI&SNTS 1
760601 I ~
FS'9.25 664.75 Operating License delayed pending results of public hearing (l) REASON:
(2)
A-EQUIP>KNT FAILURE (EXPLAIN)
B-1EINT, OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSING EXi~HINATION F-ADi1INISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)
C-AUTC
-'CR.-'2'
C ~
DATE 8/4/76 gppo LETED gY Don Green MONTH July DAILY UNIT POLJER OUTPUT DAY 10 12 13 14 15 16 17 18 19 20 21 22 23 24 AVERAGE DAILY NJe-net
-7.9
-8.2
-8.2
-8.0
-7. 9
'12.2
-7.6 P
-5. 1
'.-7 2
-7.7
-7.5
-7.6
-7.3
-8.8
-8.0
-7.8
-9.1
-8. 3
-8. 1
-7.9
-8.0
-7.8 25 26 27 28 29 30 31 AVERAGE DAILY bafle-net
-7.6
-8.. 0
-7. 9
-'8. 5
-8. 5
-7. 5
-8.2 Note:
Nc"ative values inJicatc station ucc when unit is oif line.
OPERATING STATUS:
UNIT NAME l)rot Ferry II DATE -'/4/76 COMPLETED DY., Don Creen TELEPHONE 729-6202 0000760701 1.
Reporting Period:
Gross Hours in Reporting Period:
'44 2.
Currently Authorized Power Level ?Wt 3293 Max. Depend.
capacity
(."We-net) 1065 2400760731 MWe-net 1065
'5.
6.
Hours Reactor Was Critical Reactor Reserve Shutdown Hour 7.
Hours Generator On-Line 3.
Power Level to which restricted (if any):
4.
Reasons for restrictions (if any):
N/A This Month 0
744 Yr-To-Date 0
Cumula tive
'o Date 3,841.49 10,499.39 3,578.08 8.
9.
Unit Reserve Shutdown Hours Gross Thermal Power Generated (Mt%)
0 0
0 0
8,259,696 12.
Net Electrical Power Generated (MfH)
Reactor Service Factor 13.
Reactor Available Factor 14.
Unit Service Factor 10.
Gross Electrical Power Generated
(~LWH) 0 100 0
0 0
100 0
2,629,890 2,543,462 22.7 84.9 21.2 15.
16; 17.
18.
Unit Availability Factor Unit Capacity Factor (using MDC)
I Unit Capacity Factor (using Design M<e)
Forced Outage Rate 0.
0
100
- 21. 2 14.1 14.1 76.9 19.
20.
21.
Shutdowns scheduled to begin in next 6
months (state type, date and duration of each):
None If shutdown at end of report period, estimated date of startup:
Undetermined Plants in Test Status (prior to commercial operation)
Report the Following:
Forecast Achieved Initial Criticality Initial Electrical Power Generation Commercial Operation
PiCL'.RY:
UNIT NAOS Browns Ferrv II Unit remaining in cold shutdown.
DATE COMPLETED 'BY 8/4/76 REPORT MOÃZH PLANT SHUTDOlPiiS DATE TYPE F"FORCED S-SCHEDULED DURATION HOURS REASON 1
liETHOD OF SHUTTING DOWN THE REACTOR 2
CO~i~i-NTS 1
60601 744 Operating license delayed pending results of public hearing.
(1) REASON:
(2-)
A-EQUIPS KNT FAILUl~ (EXPLAIN)~.
B-I'AINT, OP. TEST C-REFUELING D"REGULATORY RESTRICTION
=E"OPERATOR TRAINING AND LICENSING EXAMINATION F-AD:lINISTRATIVE G-OPERATIONAL ERROR (EXPLAIiN) l'2 I,t-'OD-A-~".'i:AL B-..
$ g ~ %t
~ ~
s '4A 'h~
Q WQ ~ '1 ~
arly W
4 C-ALiC:-".T SCRRI
~
~
~
UH E'J'ATE, COMPLETED BY 8/4/76 Don Green MONTII July DAILY UNIT POKER OUTPUT DAY 10 12 13 I
14 15 16 17 18 19 20 21 22 23 24 AVERAGE
~J DAIIY
-6.4,
-5.3
-5.7
-5.8
-5.8
-5.8
-6. 4
-5.9
-5.8
-5.9
-5.8
-6.9
-5.0
-6.7
-5.9
-6.0
-6.0
-5.8
-7. 0
-6.0
-4.1
-3.9
-5.7"
-5.3 Mde-net DAY 27 28 29 30 31 AVERAGE DAILY I"1;1e-net
-5.4
-6.0
-6. 3
-6. 4
-6.0 5 ~ 2
-5.7 Note:
Negative values indicate station usc when unit is off Line.
~
0