ML18283B235

From kanterella
Jump to navigation Jump to search
July 1976 Monthly Operating Report
ML18283B235
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/06/1976
From: Green H
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML18283B235 (14)


Text

FROM:

Tennessee Valley Authority.

Deca toe, Alabama I I J

Green DATE OF DOCUMLNT TO:

N ~

RE C

DATE flECEIVEO 0

3HfLETTEA PLAID!NnL

.Q COPY

~

QNOTOAIZED

@UNCLASSIFIED NUMOEfl OF COPIES AECEIVEO One signed INPUT FOAM PAOP DESCAIPTION LETTER TRANS TllE FOLLOWING:

ENCLOSUfle MONTHLY REPORT FOR JIII.Y 76 PLANT 6c COMPONENT OPEI&BILITY6 AVAILABILITY

~

THIS REPORT TO BE

~ USFD.IN PREPARING GRAY BOOK BY PLANS 6 OPERATION"

~ s g

~

~ ~

~

~

~ ~

~ L~

ZCKNO%'LE>>~D O NOT g,ZMOV~

PLANT NAME:

(1-P)

IIrowns Ferry 1-2-3

~....----FOR ACTION/INFORMATION 8

10 76

!.KJL MIPC

-CYS FOR ACT ON e

INTERNALD ISTRI BUTION

"~..r r!

N~PD OMLP Schwencer BRANCH CHIEF L She ard CONTROL NUMBER EXTERNAL DISTRIBUTION NIIC FOIIM 106 V.S. NVCLEAAfIEOVLAToflVCOMM~!ION DOCKL'T NUM I'l fIII'IC DISTRIBUTION Fon PAfIT 50 DOCKET NIATEBIAL MONTlll.Y RlPORT

if

~o~tlO+

@4o e

yl 0

m 076-1916 t

~

~6&<>.+ /C TENNESSEE VALLEY

..Y Browns Perry Nuc

'lant P.

O.

Box 0 0 August 6, 1976

@84~ ~+>>

AUG%0 1976~

Nuclear Regulatory Commission Office of 5fanagement Information and Program Contxol Washington, D.

C.

20545

~

I V,Sz l4JQEAA rACLMYOLY COA4IIAUH lAdl r>>err@>>

Gentlemen:

Enclosed is the July 1976 report on plant and component operability and availability for Browns Ferry Nuclear Plant units 1 and 2.

Very truly yours, TENNESSEE VALLEY AUTHORITY J.

Green Plant Superintendent Enclosures CC:

Director, Region II Nuclear Regulatory Commission Office of Inspection and Enforcement 230 Peachtree

Street, NW Suite 818
Atlanta, GA 30303 (1 copy)

Director,'ffice of Inspection 6 Enforcement Nuclear Regulatoxy Commission Washington, D. C.

20555 (10 copies) hn Cqunl Opportuntty t:.mptoyor 8'.L%.5

t E,K I

C 1

I%

1

'pJ~

. ~

UNzT N~~E ms i:err' sam "

COMPLETED BY:

Don Green TELEPHONE

'29-6202 to 2400760731 MWe-net 1065 This Month Yr-To-Date OPERATINC STATUS:

1.

Reporting Period:

0000760701 Gross Hours in Reporting Period:

744 2.

Currently Authorized Power Level MVt 3293 Max. Depend.

capacity (HMe-net) 1065 3.

Power Level to which restricted (if any):

4.

Reasons for restrictions (if any):

Cumulative

'o Date 5.

Hours Reactor Has Critical 6.

Reactor Reserve Shutdown Hours 0

744 0

1,848 9,870.02 3,820.9 7 ~

8.

Hours Generator On-Line Unit Reserve Shutdown Hours 0

0 9,,282.8 9.

Gross Thermal Power Generated (Ndi) 10.

Gross Electrical Power Generated (MK) 11.

Net Electrical Power Generated (1ÃH) 12.

Reactor Service Factor.

13. 'eactor Available Factor
14. 'nit Service Factor 0

0 100 0

0 0

0 0

36.2 0

22,036,392 7,091,570 6,864,764

40. 3 55.9 37.9 15.

16.

17.

18.

19.

20.

21.

0 0

0 Initial Criticality Initial Electrical Power Generation Commercial Operatlon Unit Availability Factor Unit Capacity Factor (using MDC)

Unit Capacity Factor (using Design M<e)

Forced Outage Rate Shutdowns scheduled to begin in next 6

months (state type, date and duration of each):

None If shutdown at end of report period, estimated date of startup: 'ndetermined Plants in Test Status (prior to commercial operation)

Report the Following:

Forecast Achieved 37.9 26.3 26.3 58.3

O.

KCV.RY:

UNIT

~~~ yo'.

Browns Ferry I DATE 8/4/76 Unit remained in cold shutdown.

COMPLETED BY Don Green REPORT HONTH PLANT SHUTDOt&iS NO ~

DATE TYPE F"FORCED S"SCHEDULED DURATION HOURS REASON 1

1u THOD OF SHUTTING DOWN THE REACTOR 2

COI&SNTS 1

760601 I ~

FS'9.25 664.75 Operating License delayed pending results of public hearing (l) REASON:

(2)

A-EQUIP>KNT FAILURE (EXPLAIN)

B-1EINT, OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSING EXi~HINATION F-ADi1INISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

C-AUTC

-'CR.-'2'

C ~

DATE 8/4/76 gppo LETED gY Don Green MONTH July DAILY UNIT POLJER OUTPUT DAY 10 12 13 14 15 16 17 18 19 20 21 22 23 24 AVERAGE DAILY NJe-net

-7.9

-8.2

-8.2

-8.0

-7. 9

'12.2

-7.6 P

-5. 1

'.-7 2

-7.7

-7.5

-7.6

-7.3

-8.8

-8.0

-7.8

-9.1

-8. 3

-8. 1

-7.9

-8.0

-7.8 25 26 27 28 29 30 31 AVERAGE DAILY bafle-net

-7.6

-8.. 0

-7. 9

-'8. 5

-8. 5

-7. 5

-8.2 Note:

Nc"ative values inJicatc station ucc when unit is oif line.

OPERATING STATUS:

UNIT NAME l)rot Ferry II DATE -'/4/76 COMPLETED DY., Don Creen TELEPHONE 729-6202 0000760701 1.

Reporting Period:

Gross Hours in Reporting Period:

'44 2.

Currently Authorized Power Level ?Wt 3293 Max. Depend.

capacity

(."We-net) 1065 2400760731 MWe-net 1065

'5.

6.

Hours Reactor Was Critical Reactor Reserve Shutdown Hour 7.

Hours Generator On-Line 3.

Power Level to which restricted (if any):

4.

Reasons for restrictions (if any):

N/A This Month 0

744 Yr-To-Date 0

Cumula tive

'o Date 3,841.49 10,499.39 3,578.08 8.

9.

Unit Reserve Shutdown Hours Gross Thermal Power Generated (Mt%)

0 0

0 0

8,259,696 12.

Net Electrical Power Generated (MfH)

Reactor Service Factor 13.

Reactor Available Factor 14.

Unit Service Factor 10.

Gross Electrical Power Generated

(~LWH) 0 100 0

0 0

100 0

2,629,890 2,543,462 22.7 84.9 21.2 15.

16; 17.

18.

Unit Availability Factor Unit Capacity Factor (using MDC)

I Unit Capacity Factor (using Design M<e)

Forced Outage Rate 0.

0

100

21. 2 14.1 14.1 76.9 19.

20.

21.

Shutdowns scheduled to begin in next 6

months (state type, date and duration of each):

None If shutdown at end of report period, estimated date of startup:

Undetermined Plants in Test Status (prior to commercial operation)

Report the Following:

Forecast Achieved Initial Criticality Initial Electrical Power Generation Commercial Operation

PiCL'.RY:

UNIT NAOS Browns Ferrv II Unit remaining in cold shutdown.

DATE COMPLETED 'BY 8/4/76 REPORT MOÃZH PLANT SHUTDOlPiiS DATE TYPE F"FORCED S-SCHEDULED DURATION HOURS REASON 1

liETHOD OF SHUTTING DOWN THE REACTOR 2

CO~i~i-NTS 1

60601 744 Operating license delayed pending results of public hearing.

(1) REASON:

(2-)

A-EQUIPS KNT FAILUl~ (EXPLAIN)~.

B-I'AINT, OP. TEST C-REFUELING D"REGULATORY RESTRICTION

=E"OPERATOR TRAINING AND LICENSING EXAMINATION F-AD:lINISTRATIVE G-OPERATIONAL ERROR (EXPLAIiN) l'2 I,t-'OD-A-~".'i:AL B-..

$ g ~ %t

~ ~

s '4A 'h~

Q WQ ~ '1 ~

arly W

4 C-ALiC:-".T SCRRI

~

~

~

UH E'J'ATE, COMPLETED BY 8/4/76 Don Green MONTII July DAILY UNIT POKER OUTPUT DAY 10 12 13 I

14 15 16 17 18 19 20 21 22 23 24 AVERAGE

~J DAIIY

-6.4,

-5.3

-5.7

-5.8

-5.8

-5.8

-6. 4

-5.9

-5.8

-5.9

-5.8

-6.9

-5.0

-6.7

-5.9

-6.0

-6.0

-5.8

-7. 0

-6.0

-4.1

-3.9

-5.7"

-5.3 Mde-net DAY 27 28 29 30 31 AVERAGE DAILY I"1;1e-net

-5.4

-6.0

-6. 3

-6. 4

-6.0 5 ~ 2

-5.7 Note:

Negative values indicate station usc when unit is off Line.

~

0