December 1977 Monthly Operating Report
ML18283B213
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/13/1978
From: Dewease J
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML18283B213 (16)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM

< RIDS)

DISTRIBUTION FOR I'BECOMING MATERIAL 50-25 60/2 6

EC:

NRC ORG:

DEWEASE J G

TN VALLEY AUTH DOCDATE: 01/01/01 DATE RCVD: 01/24/78 OCTYPE:

LETTER NOTARIZED:

NO COPIES RECEIVED UBJECT:

LTR 0 ENCL 1

QNTHLY REPT FOR DEC.

1977 ON PLANT AND COMPONENT OPERABILITY AND AVAILABILITY OR SUBJECT FACILITY...NOTE (USE FOR ALL MONTHLY REPTS INCL OPERATING REPTS REY BOOK INFO ETC).

LANT NAME: BROWNS FERRY UNIT 1

BROWNS FERRY UNIT 2 BROWNS FERRY UNIT 3 REVIEWER INITIAL:

XJM DISTRIBUTER INITIAL:

++4+++4++++4+++~ DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS NONTHLY OPERATING REPORT FQR GRAY BOOK PREPARATION.

( DISTRIBUTION CODE A003)

FQR ACTION:

INTERNAL:

EXTERNAl:

BRANCH CHIEF SCHWENCER44W/2 ENC REG FILE+4~WENC NIPC FQR ACTION++A/2 ENCL LPDR S ATHENS AL4+W/ENCL TIC++W/ENCL NSIC~~W/ENCL BNL(NATLAB>++W/ENCL ACRS CAT 8+4W/0 ENCL NRC PDR++W/ENCL 3ISTRIBUTIQN:

LTR 10 ENCL 10 SIZE:

fP+<P CONTROL NBR:

780250002 THE END

+4++44++44+++4+++++++<++<<++<++<+++

TENNESSEE YALLEY AUTHORITY

~

Browns Ferry Nuclear Plant P

0. Box 2000
Decatur, Alabama 35602 CD I

~.'N JR[1 t 8 1978 Nuclear Regulatory Commission Office of Management Information and Program Contxol Washington, D. C.

20555 Gentlemen:

Enclosed is the December 1977 report on plant and component operability and availability for Browns Ferry Nuclear Plant units lq 2p and 3 ~

Very truly youxs, NNE EE VALLEY AUTHORITY G. Dewease Plant Superintendent

Enclosures:

CC:

Director, Region II Nuclear Regulatory Commission Office of Inspection and Enforcement 230 Peachtree

Street, NW Suite 818
Atlanta, GA 30303 (1 copy)

Director, Office of Inspection

& Enforcement Nuclear Regulatory Commission Washington, D. C.

20555 (10 copies)

~ z ~/~ aci/~SC.

~0

~

I ~C~I fa 1~Re l

an4 Progeaaa Coatroom

~ ~)i ~~

Ruthimg~ 14 C>>

20555 Sreees Perm@ %eeiear P1eat m'~iIuIIIL'III'0IllKl'I.I:.

KlPP

'JANR41978~

EucXoeed i~o tha-bacceher 1971 mport ee yieat as'oeposmat eyeeahility aa6 mmfXability for Sxmew Pexxy IueXom Pleat

~Lta1,2, mk3 Jo Co 3$%4$

H PK:MC ihd CCs 5irector, Ro~ XX S4 Cl~

Office-of'Xuepectiea'and Rdorceseat 230 Peschtree Streat, Rf Sad.t>>

SXB kthmta, CL 30303 (I eoyy3 director, Office cd'nepectfea 6 lborccaaeot 8~~

SI955 Q.O copse)

H Jo Greea~

702 ~

H~

G Parr&~ 403 PM~

G. 8 Kfmeoas, Ql2A 9 C-K Codsia VilMaae, 830 PRS-C

,J P

DeLoeg~

X2N) CUSS-C 7302>PPP>

OPERATING STATUS OPERATING DATAREPORT DOCKET NO. ZL22~

DATE 1Qli~

COhtPLETED BY D~nreen TELEPHONE ~~o-16 s

Notes

1. Unit Name:

. 2. Reporting Period:

3. Licensed Thermal Power (EhlWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

ci et aiIWe:

7. Maximum Dependable Capa ty (N

)

S. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr:to-Date Cumulative 12 979.88 4046.8 0

r

]g gi93 31'2 373.229 10 488 347 0

43.3 43.3 32.9 LL2fdl

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
17. Gross Electrisnt Energy Generated (htWH)
19. Unit Service Factor 67 2
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net) 0
23. Unit Forced Outage Rate 0

4.6

24. Shutdowns Scheduled Over Next 6 Months (Type, Date;and Duration'of Each):
25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status tPrior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.

50-259 DATE 1 5 78 No.

Date PI Oc g4 ~

~

Pp

~CA $

a Licensee Event Report 4 E~

Cl Ep IA cn' C

Cl O

Q O

O CJ Cause Ec Corrective Action to Prevent Recurrence 27 771201 S

720 F: Forced S: Scheduled (9/>>)

Reason:

A-Equipment Failure (Explain)

II-Maintenance or Test C-Refueling D Regulatory Restriction E.Operator Training &. License Examination F.Administrative G-Operational Error (Ilxplaitt)

II.Other (Explain)

Method:

I-Manual 2-Manual Scram.'-Automatic Scram.

4.Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets lor Licensee Event Report (LER) File (NUREG-OI6I)

Exhibit I - Sante Source

)

AVERAGE DAILYUNITPOWER LE DATE COMPLETED BY MONTH December

. DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)

DAY

'AVERAGE DAILYPOWER LEVEL (MWe-Net) 17 3.

&7

&7

-8

-8

-6 18 19 20 22

<<7

-8

-6

-6 w7 Io.

11 12 13 14 15 16

-6

-8

.-8

-.8 24 25 26 27 28 29 30 31

'-9

-8

-8

-8 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the near~st whole megawat t.

(9(77)

OPERATING STATUS OPERATING DATAREPORT DOCKET NO

~0-260 DATE ~~r COMPLETED BY D~~~~.

TELEPHONE 2QZD~316

l. Unit Name:

. 2. Reporting Period:

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

S. Design Electrical Rating (Net MWe):

6. ltfaximum Dependab!e Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

Notes

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):

. 10. Reasons For Restrictions, IfAny:

This Month Yr.-to-Date Cumulative 6967 63

-J4160

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal. Energy Generated (MWH)

N W

~~0

19. Unit Service Factor
20. Unit AvailabilityFactor
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration'of Each):

Refuelin Outa e

40.3 2S. IfShut Down At End Of Report Period, Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAI. ELECTRICITY COMMERCIALOPERATION (9jr77)

UNITSHUTDOWNS ANDPOWER REDUCTIONS REPORT MONTH COMPLETED BY l5ll1SB6 No.

Date fPi V

0 g) S

~ CA Licensee Event Report 4f Fe Cl V

~n~ Cr

~e 0~ u E~

O Cause &Corrective Action to Prevent Rccurrcnce 36 37 38, 771201 771214 771218 r

331.4 B

18.9 B

11.5 H

3 The scram, discharge volume tank high water level-switches or piping was bumped causing switch contacts to operate.

39 771231 B

Derated for removal of each recirc.

pump from service to inspect electrical penetratiogs.

F: Forced S: Schedule'd (9/77)

Reason:

A.Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D.Regulatory Restriction E.Operator Training & Liccnsc Examination F-Administrative G Operational Error (Explain)

II-Other (Explain) 3 Method:

I-Mapual 2.Manual Scram.

3-Automatic Scram.

4.Other (Explain) 5 Exhibit G ~ Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-OI 61)

Exhibit I - Sante Source

AVERAGE DAlLYUNITPOWER. LEVE UNIT DATE COMPLETED BY TELEPHONE 5=

MONTH DAY AVERAGEDAILYPOWER LEVEL (MWe-Net)

-10

-10 7

2 10 12 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 17 18 19 20 21 22 23 24 25 26 27

-28 13 14 15 16

-9 108 29 30 31 INSTRUCTIONS On this format, list the average daily unit power level in MWe.Net for each day in the reporting month. Compute to the nearest whole megawatt.

. (9/77)

OPERATING DATAREPORT DOCKET NO

. ~O-EEE DATE ~igZI COMPLETED BY TELEPHONE. 295Ll29 9316 OPERATING STATUS

1. Unit Name:

. 2. Reporti'ng Period:

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. maximum Dependable Capacity (Gross MWe):

Notes

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr:to.Date Cumulative, 588.41 6499. 31 6499.31 0

18 641,694 18,641,694 6 033 '870 6 033,870 91.0 91 0 74.8 74.8 74.8 12, Number Of Hours Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours 0
16. Gross Thermal,Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER iVet)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTH December DATE COMPLETED BY No.

. Date C ~

CShx a-PICQ Cl u< ~

~ C/) $aO Liccnsce Event Report 4 EeEl ro C5 Cause &, Corrective Action to Prevent Recurrence 43 771211 F

16 78 A

Intercept valves fast clos'ure DUE to'oscillation in the Main Steam Line Pressure.

45 771211 771222 F

10.57 A

EHC Malfunction Derated Due To 'A'ecirc.

Pump Trip.

46 771226 B

Deratr rl Due To MnI.ntenance To Rx F"r d Pumps I

F: Forced S: Scheduled (9/77) 1 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D.Regulatory Restriction E-Operator Training &, Liccnsc Examination F-Administrative G-Operational Error (Exitlain)

I I-Other (Explain)

Method:

I -IIlanual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-016I )

Exltibit I - San>c Source

AVERAGE DAILYUNITPOWER LEV DOCKET NO.

50-296

'NIT COMPLETED BY Don Green TELEPHONE MONTH c ember 1977 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)

DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 17 823 794 789 18 19 20 21 0

0 6

10 12 13 14 15" 16

-6 998 22 24 25 26 27 29 30 31 1000 1026

.9 8 INSTRUCTIONS On this format, list the average daily unit power level in Mme-Net for each day in the reporting tnuri th. Compute to the nearest whole megawatt.

(9t77)

4