ML18283B213: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM      < RIDS)
DISTRIBUTION FOR    I'BECOMING  MATERIAL                      50-25    60/2  6 EC:                              ORG:  DEWEASE J G                    DOCDATE: 01/01/01 NRC                                TN VALLEY AUTH                    DATE RCVD: 01/24/78 OCTYPE:  LETTER    NOTARI ZED: NO                                      COPIES RECEIVED UBJECT:                                                                  LTR 0    ENCL 1 QNTHLY REPT FOR DEC.      1977 ON PLANT AND COMPONENT OPERABILITY AND AVAILABILITY OR  SUBJECT  FACILITY... NOTE (USE FOR ALL MONTHLY REPTS INCL OPERATING REPTS REY BOOK INFO ETC).
LANT NAME: BROWNS FERRY  UNIT 1                            REVIEWER    INITIAL: X JM BROWNS FERRY  UNIT 2                          DI STRIBUTER INITIAL:
BROWNS FERRY  UNIT 3
++4+++4++++4+++~ DISTRIBUTION        OF  THIS MATERIAL IS AS FOLLOWS NONTHLY OPERATING REPORT FQR GRAY BOOK PREPARATION.
( DISTRIBUTION CODE A003)
FQR ACTION:      BRANCH CHIEF SCHWENCER44W/2 ENC INTERNAL:        REG FILE+4~WENC                      NRC PDR++W/ENCL NIPC FQR ACTION++A/2 ENCL EXTERNAl:        LPDR S ATHENS AL4+W/ENCL T I C++W/ENCL NSIC~~W/ENCL BNL(NATLAB>++W/ENCL ACRS    CAT 8+4W/0 ENCL 3ISTRIBUTIQN:      LTR 10      ENCL 10                        CONTROL NBR:      780250002 SIZE: fP+<P THE END  +4++44++44+++4+++++++<++<<++<++<+++
 
TENNESSEE YALLEY AUTHORITY
                    ~
Browns Ferry Nuclear Plant P 0. Box 2000 Decatur, Alabama 35602            CD I ~ .'N JR[1  t  8 1978 Nuclear Regulatory Commission Office of    Management Information and Program Contxol Washington, D. C. 20555 Gentlemen:
Enclosed    is the December 1977 report on plant and component operability and availability for Browns Ferry Nuclear Plant units lq    2p and 3 ~
Very    truly youxs, NNE    EE VALLEY AUTHORITY
  . G. Dewease Plant Superintendent
 
==Enclosures:==
 
CC:    Director, Region    II Nuclear Regulatory Commission Office of Inspection and Enforcement 230 Peachtree Street, NW Suite  818 Atlanta,  GA  30303 (1 copy)
Director, Office of Inspection    & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 .
(10 copies)
 
Sreees  Perm@  %eeiear P1eat m'~iIuIIIL'III'0IllKl'I.I:.
KlPP
~    z ~/~ aci/~SC.
                                            'JANR41978~
~
fa I      ~C~I 1~Re an4 Progeaaa Coatroom l
                                                ~0
                                                ~
                                                  ~)i ~~
Ruthimg~ 14 C>> 20555 EucXoeed i~o tha- bacceher 1971        mport ee yieat as'oeposmat eyeeahility      aa6  mmfXability for Sxmew Pexxy IueXom Pleat
~Lta1,2, mk3 Jo Co    3$ %4$
H PK:MC ihd CCs    5irector,    Ro~
S4    Cl~
XX Office-of 'Xuepectiea'and Rdorceseat 230 Peschtree Streat, Rf Sad.t>> SXB kthmta, CL 30303 H
(I Q.O eoyy3 copse)
Jo Greea~ 702
                        ~~
director, Office cd'nepectfea 8
                            ~
SI955 6 lb''orccaaeot H~ G  Parr&~ 403 PM~                                  7302>PPP>
G. 8    Kfmeoas, Ql2A 9 C-K Codsia VilMaae, 830 PRS-C
      ,J  P  DeLoeg~ X2N) CUSS-C
 
OPERATING DATA REPORT DOCKET NO. ZL22~
DATE    1Qli~
D~nreen COhtPLETED BY TELEPHONE    ~~o- 16  s OPERATING STATUS Notes
: 1. Unit Name:
. 2. Reporting Period:
: 3. Licensed Thermal Power (EhlWt):
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capa ci ty (Net aiIWe:  )
S. IfChanges  Occur  in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,  IfAny (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month            Yr:to-Date            Cumulative LL2fdl
: 12. Number Of Hours Reactor Was Critical 12 979.88
: 13. Reactor Reserve Shutdown Hours 4046.8
: 14. Hours Generator On-Line
: 15. Unit Reserve Shutdown Hours
: 17. Gross Electrisnt Energy Generated (htWH)
                                                                              ]g r  0 gi93  31'2            373.229 10 488 347
: 19. Unit Service Factor 0            67 2                  43.3
: 20. Unit Availability Factor 43.3
: 21. Unit Capacity Factor (Using MDC Net)                      0 32.9
: 23. Unit Forced Outage Rate                                  0            4.6
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date;and Duration'of Each):
: 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status tPrior to Commercial Operation):                      Forecast              Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
 
DOCKET NO.        50-259 UNIT SHUTDOWNS AND POWER REDUCTIONS DATE 1 5 78 REPORT MONTH
                                                      ~                                    C PI        g4                                      Cl Licensee  E~
Cl Ep                O O Cause  Ec Corrective
                                                  ~  Pp No.          Date                                          Event    IA                  Q                Action to Report 4  cn'                  O          Prevent Recurrence Oc  ~CA $                                    CJ a
27      771201      S      720 F: Forced        Reason:                                          Method:                            Exhibit G - Instructions S: Scheduled      A-Equipment Failure (Explain)                    I-Manual                            for Preparation of Data II-Maintenance or Test                          2-Manual                            Entry Sheets lor Licensee Scram. Event Report (LER) File (NUREG-Scram.'-Automatic C-Refueling D Regulatory Restriction                        4.Other (Explain)                  OI6I)
E.Operator Training &. License Examination F.Administrative G-Operational Error (Ilxplaitt)                                                      Exhibit I - Sante Source (9/>>)                I I.Other (Explain)
 
                                                                      )
AVERAGE DAILYUNIT POWER LE DATE COMPLETED BY MONTH      December
. DAY      AVERAGE DAILYPOWER LEVEL                            DAY      'AVERAGE DAILYPOWER LEVEL (MWe-Net)                                                    (MWe-Net) 17
                            &7                                  18                      <<7
                            &7                                  19
                                                                                          -8 3.
                            -8                                  20
                            -8                                                            -6 22                      -6
                            -6                                                          w7 24
                            -6                                  25
                                                                                        '-9 Io                                                            26                      -8 11                                                            27                      -8 12 .
                            -8                                  28 13
                            .-8                                  29                      -8 14                                                            30 15                                                            31 16
                            -.8 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the near~st whole megawat t.
(9(77)
 
OPERATING DATA REPORT DOCKET NO ~0-260 DATE    ~~r COMPLETED BY        D~~~~.
TELEPHONE 2QZD~316 OPERATING STATUS Notes
: l. Unit Name:
  . 2. Reporting Period:
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):
S. Design Electrical Rating (Net MWe):
: 6. ltfaximum Dependab!e Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted, IfAny (Net MWe):
. 10. Reasons For Restrictions, If Any:
This Month          Yr.-to-Date            Cumulative
                                                                            -J4160
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On-Line                                                6967 63
: 15. Unit Reserve Shutdown Hours
: 16. Gross Thermal. Energy Generated (MWH)
N    W      ~~0
: 19. Unit Service Factor
: 20. Unit Availability Factor                                                                      40.3
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration'of Each):
Refuelin Outa e 2S. IfShut  Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                      Forecast              Achieved INITIAL CRITICALITY INITIAI. ELECTRICITY COMMERCIAL OPERATION (9jr77)
 
UNITSHUTDOWNS AND POWER REDUCTIONS COMPLETED BY REPORT MONTH                                                        l5ll1SB6 fPi V                FeV        ~e
                                                                                  ~                    Cause  & Corrective 0
Licensee    Cl        0 u No.            Date                                        Event      ~ n                                  Action to g) S        Report 4f  ~ Cr      E~
O                    Prevent Rccurrcnce
                                              ~ CA 36        771201    r        331.4      B 37        771214              18.9    B        3 38,      771218              11.5    H                                                The scram, discharge volume tank high water level- switches or piping was bumped causing switch contacts to operate.
39        771231                        B                                                Derated  for  removal of each recirc. pump    from service to inspect electrical penetratiogs.
3 F: Forced          Reason:                                          Method:                            Exhibit G ~ Instructions S: Schedule'd      A.Equipment Failure (Explain)                      I-Mapual                          for Preparation of Data B-Maintenance or Test                            2.Manual Scram.                    Entry Sheets for Licensee C-Refueling                                      3-Automatic Scram.                Event Report (LER) File (NUREG-D.Regulatory Restriction                          4.Other (Explain)                  OI 61)
E.Operator Training & Liccnsc Examination F-Administrative                                                                5 G Operational Error (Explain)                                                        Exhibit I - Sante Source (9/77)                I I-Other (Explain)
 
AVERAGE DAlLYUNIT POWER. LEVE UNIT 5=
DATE COMPLETED BY TELEPHONE MONTH DAY      AVERAGE DAILYPOWER LEVEL                            DAY        AVERAGE DAILYPOWER
* LEVEL (MWe-Net)                                                    (MWe-Net)
                        -10                                    17 18 19 20 21
                        -10                                    22 7                                                              23 2                                    24 25 10                                                              26 27 12                                                            -28 13                      -9                                    29 14                                                              30 15                      108                                    31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe.Net for each day in the reporting month. Compute to the nearest whole megawatt.
                                                                                                                . (9/77)
 
OPERATING DATA REPORT DOCKET NO . ~O-EEE DATE  ~igZI COMPLETED BY TELEPHONE. 295Ll29      9316 OPERATING STATUS Notes
: 1. Unit Name:
. 2. Reporti'ng Period:
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
: 6. maximum Dependable Capacity (Gross MWe):
: 8. IfChanges  Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,  If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month            Yr:to.Date            Cumulative, .
12, Number Of Hours Reactor Was Critical
: 13. Reactor Reserve Shutdown Hours                                                                588.41
: 14. Hours Generator On-Line                                                6499.31              6499. 31
: 15. Unit Reserve Shutdown Hours                          0                        0
: 16. Gross Thermal,Energy Generated (MWH)                                    18 641,694            18,641,694
: 17. Gross Electrical Energy Generated (MWH)                                6 033 '870            6 033,870
: 18. Net Electrical Energy Generated (MWH)
: 19. Unit Service Factor
: 20. Unit Availability Factor                                                91 0                  91.0
: 21. Unit Capacity Factor (Using MDC Net)                                    74.8                  74.8
: 22. Unit Capacity Factor (Using DER iVet)                                  74.8
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration    of Each):
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                      Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DATE COMPLETED BY REPORT MONTH December C  ~      PI C                Liccnsce  EeEl                            Cause &, Corrective Q
No.        . Date            CS                            Event                                          Action to hx a-          Cl u<  ~      Report  4  ro  C5                          Prevent Recurrence
                                                  ~ C/) $
a O
16 78        A                                              Intercept valves fast clos'ure 43      771211        F DUE  to'oscillation in the            Main Steam Line Pressure.
10.57        A                                              EHC  Mal function 771211      F 45      771222                                                                            Derated Due To        'A'ecirc.
Pump  Trip.
B                                              Deratr rl Due To    MnI.ntenance 46      771226 To Rx  F"r d  Pumps I                    1                                                                                4 F: Forced          Reason:                                          Method:                            Exhibit G - Instructions S: Scheduled        A-Equipment Failure (Explain)                    I -II lanual                      for Preparation of Data B-Maintenance or Test                            2-Manual Scram.                    Entry Sheets for Licensee C-Refueling                                      3-Automatic Scram.                Event Report (LER) File (NUREG-D.Regulatory Restriction                          4-Other (Explain)                  016I )
E-Operator Training &, Liccnsc Examination F-Administrative G-Operational Error (Exitlain)                                                      Exltibit I - San>c Source
!, (9/77)                I I-Other (Explain)
 
AVERAGE DAILYUNIT POWER LEV DOCKET NO.          50-296
                                                                                                                    'NIT COMPLETED BY              Don Green TELEPHONE MONTH        c ember        1977 DAY      AVERAGE DAILYPOWER LEVEL                              DAY      AVERAGE DAILYPOWER LEVEL (MWe-Net)                                                    (MWe-Net) 17 823                                      18                  0 19 794                                      20 789                                      21                    0 6                                                              22 1000 24                1026 25 10                                                              26
                          -6                                    27 12                                                                              .9    8 13                                                              29 14                                                              30 15"                    998                                      31 16 INSTRUCTIONS On this format, list the average daily unit power level in Mme-Net for each day in the reporting tnuri th. Compute to the nearest whole megawatt.
(9t77)
 
4}}

Latest revision as of 17:42, 2 February 2020

December 1977 Monthly Operating Report
ML18283B213
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/13/1978
From: Dewease J
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML18283B213 (16)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM < RIDS)

DISTRIBUTION FOR I'BECOMING MATERIAL 50-25 60/2 6 EC: ORG: DEWEASE J G DOCDATE: 01/01/01 NRC TN VALLEY AUTH DATE RCVD: 01/24/78 OCTYPE: LETTER NOTARI ZED: NO COPIES RECEIVED UBJECT: LTR 0 ENCL 1 QNTHLY REPT FOR DEC. 1977 ON PLANT AND COMPONENT OPERABILITY AND AVAILABILITY OR SUBJECT FACILITY... NOTE (USE FOR ALL MONTHLY REPTS INCL OPERATING REPTS REY BOOK INFO ETC).

LANT NAME: BROWNS FERRY UNIT 1 REVIEWER INITIAL: X JM BROWNS FERRY UNIT 2 DI STRIBUTER INITIAL:

BROWNS FERRY UNIT 3

++4+++4++++4+++~ DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS NONTHLY OPERATING REPORT FQR GRAY BOOK PREPARATION.

( DISTRIBUTION CODE A003)

FQR ACTION: BRANCH CHIEF SCHWENCER44W/2 ENC INTERNAL: REG FILE+4~WENC NRC PDR++W/ENCL NIPC FQR ACTION++A/2 ENCL EXTERNAl: LPDR S ATHENS AL4+W/ENCL T I C++W/ENCL NSIC~~W/ENCL BNL(NATLAB>++W/ENCL ACRS CAT 8+4W/0 ENCL 3ISTRIBUTIQN: LTR 10 ENCL 10 CONTROL NBR: 780250002 SIZE: fP+<P THE END +4++44++44+++4+++++++<++<<++<++<+++

TENNESSEE YALLEY AUTHORITY

~

Browns Ferry Nuclear Plant P 0. Box 2000 Decatur, Alabama 35602 CD I ~ .'N JR[1 t 8 1978 Nuclear Regulatory Commission Office of Management Information and Program Contxol Washington, D. C. 20555 Gentlemen:

Enclosed is the December 1977 report on plant and component operability and availability for Browns Ferry Nuclear Plant units lq 2p and 3 ~

Very truly youxs, NNE EE VALLEY AUTHORITY

. G. Dewease Plant Superintendent

Enclosures:

CC: Director, Region II Nuclear Regulatory Commission Office of Inspection and Enforcement 230 Peachtree Street, NW Suite 818 Atlanta, GA 30303 (1 copy)

Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 .

(10 copies)

Sreees Perm@ %eeiear P1eat m'~iIuIIIL'III'0IllKl'I.I:.

KlPP

~ z ~/~ aci/~SC.

'JANR41978~

~

fa I ~C~I 1~Re an4 Progeaaa Coatroom l

~0

~

~)i ~~

Ruthimg~ 14 C>> 20555 EucXoeed i~o tha- bacceher 1971 mport ee yieat as'oeposmat eyeeahility aa6 mmfXability for Sxmew Pexxy IueXom Pleat

~Lta1,2, mk3 Jo Co 3$ %4$

H PK:MC ihd CCs 5irector, Ro~

S4 Cl~

XX Office-of 'Xuepectiea'and Rdorceseat 230 Peschtree Streat, Rf Sad.t>> SXB kthmta, CL 30303 H

(I Q.O eoyy3 copse)

Jo Greea~ 702

~~

director, Office cd'nepectfea 8

~

SI955 6 lborccaaeot H~ G Parr&~ 403 PM~ 7302>PPP>

G. 8 Kfmeoas, Ql2A 9 C-K Codsia VilMaae, 830 PRS-C

,J P DeLoeg~ X2N) CUSS-C

OPERATING DATA REPORT DOCKET NO. ZL22~

DATE 1Qli~

D~nreen COhtPLETED BY TELEPHONE ~~o- 16 s OPERATING STATUS Notes

1. Unit Name:

. 2. Reporting Period:

3. Licensed Thermal Power (EhlWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capa ci ty (Net aiIWe: )

S. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr:to-Date Cumulative LL2fdl

12. Number Of Hours Reactor Was Critical 12 979.88
13. Reactor Reserve Shutdown Hours 4046.8
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
17. Gross Electrisnt Energy Generated (htWH)

]g r 0 gi93 31'2 373.229 10 488 347

19. Unit Service Factor 0 67 2 43.3
20. Unit Availability Factor 43.3
21. Unit Capacity Factor (Using MDC Net) 0 32.9
23. Unit Forced Outage Rate 0 4.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date;and Duration'of Each):
25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status tPrior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50-259 UNIT SHUTDOWNS AND POWER REDUCTIONS DATE 1 5 78 REPORT MONTH

~ C PI g4 Cl Licensee E~

Cl Ep O O Cause Ec Corrective

~ Pp No. Date Event IA Q Action to Report 4 cn' O Prevent Recurrence Oc ~CA $ CJ a

27 771201 S 720 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data II-Maintenance or Test 2-Manual Entry Sheets lor Licensee Scram. Event Report (LER) File (NUREG-Scram.'-Automatic C-Refueling D Regulatory Restriction 4.Other (Explain) OI6I)

E.Operator Training &. License Examination F.Administrative G-Operational Error (Ilxplaitt) Exhibit I - Sante Source (9/>>) I I.Other (Explain)

)

AVERAGE DAILYUNIT POWER LE DATE COMPLETED BY MONTH December

. DAY AVERAGE DAILYPOWER LEVEL DAY 'AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 17

&7 18 <<7

&7 19

-8 3.

-8 20

-8 -6 22 -6

-6 w7 24

-6 25

'-9 Io 26 -8 11 27 -8 12 .

-8 28 13

.-8 29 -8 14 30 15 31 16

-.8 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the near~st whole megawat t.

(9(77)

OPERATING DATA REPORT DOCKET NO ~0-260 DATE ~~r COMPLETED BY D~~~~.

TELEPHONE 2QZD~316 OPERATING STATUS Notes

l. Unit Name:

. 2. Reporting Period:

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

S. Design Electrical Rating (Net MWe):

6. ltfaximum Dependab!e Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):

. 10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

-J4160

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 6967 63
15. Unit Reserve Shutdown Hours
16. Gross Thermal. Energy Generated (MWH)

N W ~~0

19. Unit Service Factor
20. Unit Availability Factor 40.3
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration'of Each):

Refuelin Outa e 2S. IfShut Down At End Of Report Period, Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAI. ELECTRICITY COMMERCIAL OPERATION (9jr77)

UNITSHUTDOWNS AND POWER REDUCTIONS COMPLETED BY REPORT MONTH l5ll1SB6 fPi V FeV ~e

~ Cause & Corrective 0

Licensee Cl 0 u No. Date Event ~ n Action to g) S Report 4f ~ Cr E~

O Prevent Rccurrcnce

~ CA 36 771201 r 331.4 B 37 771214 18.9 B 3 38, 771218 11.5 H The scram, discharge volume tank high water level- switches or piping was bumped causing switch contacts to operate.

39 771231 B Derated for removal of each recirc. pump from service to inspect electrical penetratiogs.

3 F: Forced Reason: Method: Exhibit G ~ Instructions S: Schedule'd A.Equipment Failure (Explain) I-Mapual for Preparation of Data B-Maintenance or Test 2.Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D.Regulatory Restriction 4.Other (Explain) OI 61)

E.Operator Training & Liccnsc Examination F-Administrative 5 G Operational Error (Explain) Exhibit I - Sante Source (9/77) I I-Other (Explain)

AVERAGE DAlLYUNIT POWER. LEVE UNIT 5=

DATE COMPLETED BY TELEPHONE MONTH DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER

  • LEVEL (MWe-Net) (MWe-Net)

-10 17 18 19 20 21

-10 22 7 23 2 24 25 10 26 27 12 -28 13 -9 29 14 30 15 108 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe.Net for each day in the reporting month. Compute to the nearest whole megawatt.

. (9/77)

OPERATING DATA REPORT DOCKET NO . ~O-EEE DATE ~igZI COMPLETED BY TELEPHONE. 295Ll29 9316 OPERATING STATUS Notes

1. Unit Name:

. 2. Reporti'ng Period:

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. maximum Dependable Capacity (Gross MWe):
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr:to.Date Cumulative, .

12, Number Of Hours Reactor Was Critical

13. Reactor Reserve Shutdown Hours 588.41
14. Hours Generator On-Line 6499.31 6499. 31
15. Unit Reserve Shutdown Hours 0 0
16. Gross Thermal,Energy Generated (MWH) 18 641,694 18,641,694
17. Gross Electrical Energy Generated (MWH) 6 033 '870 6 033,870
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor 91 0 91.0
21. Unit Capacity Factor (Using MDC Net) 74.8 74.8
22. Unit Capacity Factor (Using DER iVet) 74.8
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DATE COMPLETED BY REPORT MONTH December C ~ PI C Liccnsce EeEl Cause &, Corrective Q

No. . Date CS Event Action to hx a- Cl u< ~ Report 4 ro C5 Prevent Recurrence

~ C/) $

a O

16 78 A Intercept valves fast clos'ure 43 771211 F DUE to'oscillation in the Main Steam Line Pressure.

10.57 A EHC Mal function 771211 F 45 771222 Derated Due To 'A'ecirc.

Pump Trip.

B Deratr rl Due To MnI.ntenance 46 771226 To Rx F"r d Pumps I 1 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I -II lanual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D.Regulatory Restriction 4-Other (Explain) 016I )

E-Operator Training &, Liccnsc Examination F-Administrative G-Operational Error (Exitlain) Exltibit I - San>c Source

!, (9/77) I I-Other (Explain)

AVERAGE DAILYUNIT POWER LEV DOCKET NO. 50-296

'NIT COMPLETED BY Don Green TELEPHONE MONTH c ember 1977 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 17 823 18 0 19 794 20 789 21 0 6 22 1000 24 1026 25 10 26

-6 27 12 .9 8 13 29 14 30 15" 998 31 16 INSTRUCTIONS On this format, list the average daily unit power level in Mme-Net for each day in the reporting tnuri th. Compute to the nearest whole megawatt.

(9t77)