ML19044A669: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name =  
| author name =  
| author affiliation = NRC/ADM/AMD
| author affiliation = NRC/ADM/AMD
| addressee name = McElwain M
| addressee name = Mcelwain M
| addressee affiliation = Oasis Systems, LLC
| addressee affiliation = Oasis Systems, LLC
| docket =  
| docket =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:___________(x)NRC-HQ-60-14-T-0001 x GS06F0641Zcopies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each  
{{#Wiki_filter:1. CONTRACT ID CODE                              PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1                5
: 2. AMENDMENT/MODIFICATION NO.                                  3. EFFECTIVE DATE                        4. REQUISITION/PURCHASE REQ. NO.                    5. PROJECT NO. (If applicable)
M0017                                                          02/20/2019                              RES-19-0051
: 6. ISSUED BY                                            CODE  NRCHQ                                    7. ADMINISTERED BY (If other than Item 6)        CODE US NRC - HQ ACQUISITION MANAGEMENT DIVISION MAIL STOP TWFN-5E03 WASHINGTON DC 20555-0001
: 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
(x) 9A. AMENDMENT OF SOLICITATION NO.
OASIS SYSTEMS LLC ATTN MICHAEL MCELWAIN                                                                                        9B. DATED (SEE ITEM 11) 24 HARTWELL                      AVENUE LEXINGTON MA 024213160 x 10A. MODIFICATION OF CONTRACT/ORDER NO.
GS06F0641Z NRC-HQ-60-14-T-0001 10B. DATED (SEE ITEM 13)
CODE                                                            FACILITY CODE                                02/26/2014 176018810
: 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers                            is extended,    is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning          ___________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
: 12. ACCOUNTING AND APPROPRIATION DATA (If required)                                              Net Increase:
See Schedule
: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE        A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
X            FAR 52.217-9 Option to extend the term of the contract E. IMPORTANT:          Contractor                  x is not      is required to sign this document and return  __________________ copies to the issuing office.
: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this modification is the following:
: 1) Exercise Option Year 5 and extend the period of performance to 02/20/2020, 2) Obligate funds in the amount of                                                  3) Increase the task order's ceiling by                                                              ) Attach WAFs.
See continuation pages for more details.


letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
==SUMMARY==
See Schedule 176018810 OASIS SYSTEMS LLC NRCHQ WASHINGTON DC 20555-0001 MAIL STOP TWFN-5E03 ACQUISITION MANAGEMENT DIVISION US NRC - HQ RES-19-0051 02/20/2019 M0017 5 113. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.
OBLIGATION:                                              (changed)
is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completingThe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONSFACILITY CODE CODE 10B. DATED (SEE ITEM 13)10A. MODIFICATION OF CONTRACT/ORDER NO.9B. DATED (SEE ITEM 11)9A. AMENDMENT OF SOLICITATION NO.
EXERCISE CEILING: $                                                (changed)
CODE 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)7. ADMINISTERED BY (If other than Item 6)
Continued ...
CODE 6. ISSUED BYPAGE  OF  PAGES
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
: 4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION  NO. 5. PROJECT NO. (If applicable)1. CONTRACT ID CODEAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 02/26/2014 ATTN MICHAEL MCELWAIN 24 HARTWELL  AVENUE LEXINGTON MA 024213160 Net Increase:
15A. NAME AND TITLE OF SIGNER (Type or print)                                                             16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
CHECK ONEA. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACTB. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
J 15B. CONTRACTOR/OFFEROR                                                          15C. DATE SIGNED          16                                                            16C. DATE SIGNED 02/13/2019 (Signature of person authorized to sign)
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).E. IMPORTANT:
Previous edition unusable                                                                                                                                STANDARD FORM 30 (REV. 11/2016)
Contractor is not is required to sign this document and return    __________________
Prescribed by GSA FAR (48 CFR) 53.243
copies to the issuing office. ORDER NO. IN ITEM 10A.
FAR 52.217-9 Option to extend the term of the contract x14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
)X The purpose of this modification is the following:
: 1) Exercise Option Year 5 and extend the period of


performance to 02/20/2020, 2) Obligate funds in
REFERENCE NO. OF DOCUMENT BEING CONTINUED                                      PAGE      OF CONTINUATION SHEET GS06F0641Z/NRC-HQ-60-14-T-0001/M0017                                            2          5 NAME OF OFFEROR OR CONTRACTOR OASIS SYSTEMS LLC ITEM NO.                              SUPPLIES/SERVICES            QUANTITY UNIT UNIT PRICE                  AMOUNT (A)                                        (B)                    (C)    (D)    (E)                          (F)
OVERALL CEILING:                        (unchanged)
Period of Performance: 02/26/2014 to 02/20/2020 NSN 7540-01-152-8067                                                                          OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110


the amount of  
GS06F0641Z NRC-HQ-60-14-T-0001 Modification 17 Page 3 of 5 Unilaterally, FAR 52.217-9 -- Option to Extend the Term, this modification shall:
: 3) Increase the task order's ceiling by ) Attach WAFs.
1.) Exercise Option Year 5: 02/21/2019 - 02/20/2020 Per FAR 52.217-9 -- Option to Extend the Term of the Contract, NRC provided a Notice of Intent to the Contractor on November 20, 2018 which was acknowledged by the Contractor on November 20, 2018.
See continuation pages for more details.
2.) Option year 5 ceiling (CLIN 50001) at $138,655.85 shall be divided between the CLINS as follows:
CLIN 01010, is increased by the following:
The Task Orders new total exercised ceiling shall be The Task Orders total ceiling shall remain the same at $
3.) Under Option Year 5, this modification authorizes LH and FFP performance under WAF(s) WAF 01010-004C, WAF 01010-005A, WAF 01010-006, WAF 01010-007, WAF 01010-008, WAF 01010-009 (see attachment(s)). Attachment(s) shall be incorporated as Task Order Attachment(s) as follows:
Attachment 21 - WAF 01010-004C Attachment 22 - WAF 01010-005A Attachment 23 - WAF 01010-006 Attachment 24 - WAF 01010-007 Attachment 25- WAF 01010-008 Attachment 26- WAF 01010-009 4.) CLIN 01010 Obligations are added as follows:
WAF 01010-004C: Total is $            4 (LH)
Fully funded at Requisition: RES-19-0051


==SUMMARY==
GS06F0641Z NRC-HQ-60-14-T-0001 Modification 17 Page 4 of 5 Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001 This is fully funded.
: OBLIGATION: (changed)EXERCISE CEILING: $(changed)Continued ...16A. NAME  AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)15C. DATE SIGNED 1615B. CONTRACTOR/OFFEROR16C. DATE SIGNED (Signature of person authorized to sign)
WAF 01010-005A: Total is This is to extend the period of performance.
JSTANDARD FORM 30 (REV. 11/2016)Prescribed by GSA FAR (48 CFR) 53.243 Previous edition unusableExcept as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
WAF 01010-006: Total is $            (FFP)
02/13/2019 ITEM NO.SUPPLIES/SERVICES QUANTITYUNITUNIT PRICE AMOUNTNAME OF OFFEROR OR CONTRACTOR 2  5CONTINUATION SHEETREFERENCE NO. OF DOCUMENT BEING CONTINUEDPAGEOF OASIS SYSTEMS LLC (A)(B)(C)(D)(E)(F)GS06F0641Z/NRC-HQ-60-14-T-0001/M0017 OVERALL CEILING: (unchanged)
Fully funded at $        3 Requisition: RES-19-0051 Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001 This is fully funded.
Period of Performance: 02/26/2014 to 02/20/2020 NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
WAF 01010-007: Total is                (FFP)
Sponsored by GSA
Fully funded at Requisition: RES-19-0051 Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001 This is fully funded.
WAF 01010-008: Total is $              (FFP)
Incrementally Funded at $
Requisition: RES-19-0051 Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001 This is fully funded.
WAF 01010-009: Total is                (FFP)
Incrementally Funded at $
Requisition: RES-19-0051 Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001 This is fully funded.
Therefore, the Total CLIN 01010 Obligations shall be increased as follows:
From:
By: $
To:


FAR (48 CFR) 53.110 GS06F0641Z NRC-HQ-60-14-T-0001Modification 17 Page 3 of 5Unilaterally, FAR 52.217-9 -- Option to Extend the Term, this modification shall:1.)Exercise Option Year 5: 02/21/2019 - 02/20/2020Per FAR 52.217-9 -- Option to Extend the Term of the Contract, NRC provided a Notice of Intent to the Contractor on November 20, 2018 which was acknowledged by the Contractor on November 20, 2018.2.)Option year 5 ceiling (CLIN 50001) at $138,655.85 shall be divided between the CLINS as follows:CLIN 01010, is increased by the following:The Task Order's new total exercised ceiling shall be The Task Order's total ceiling shall remain the same at $3.)Under Option Year 5, this modification authorizes LH and FFP performance under WAF(s)
GS06F0641Z NRC-HQ-60-14-T-0001 Modification 17 Page 5 of 5 As a result of the ceiling and obligations changes, CLIN 01010 has a ceiling of and a total obligation of $         , therefore             remains unfunded and available to fund under the CLIN 01010 ceiling.
WAF 01010-004C, WAF 01010-005A, WAF 01010-006, WAF 01010-007, WAF 01010-008, WAF 01010-009 (see attachment(s)). Attachment(s) shall be incorporated as Task Order Attachment(s) as follows:Attachment 21 - WAF 01010-004CAttachment 22 - WAF 01010-005AAttachment 23 - WAF 01010-006Attachment 24 - WAF 01010-007Attachment 25- WAF 01010-008Attachment 26- WAF 01010-0094.)CLIN 01010 Obligations are added as follows:
5.) The Task Orders Total Obligations have therefore been modified as:
WAF 01010-004C: Total is $4 (LH) Fully funded at Requisition: RES-19-0051 GS06F0641Z NRC-HQ-60-14-T-0001Modification 17 Page 4 of 5Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001This is fully funded.WAF 01010-005A: Total is  This is to extend the period of performance.
From:
WAF 01010-006: Total is $(FFP) Fully funded at $3Requisition: RES-19-0051Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001This is fully funded.WAF 01010-007: Total is  (FFP) Fully funded at Requisition: RES-19-0051Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001This is fully funded.WAF 01010-008: Total is $ (FFP) Incrementally Funded at $ Requisition: RES-19-0051Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001This is fully funded.WAF 01010-009: Total is (FFP) Incrementally Funded at $Requisition: RES-19-0051Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001This is fully funded.Therefore, the Total CLIN 01010 Obligations shall be increased as follows:
To:
From: By: $To:
All other terms and conditions remain the same.}}
GS06F0641Z NRC-HQ-60-14-T-0001Modification 17 Page 5 of 5As a result of the ceiling and obligations changes, CLIN 01010 has a ceiling of and a total obligation of $, therefore remains unfunded and available to fund under the CLIN 01010 ceiling. 5.)The Task Order's Total Obligations have therefore been modified as:
From: To: All other terms and conditions remain the same.}}

Latest revision as of 11:38, 2 February 2020

Modification No. 017 to Task Order No. NRC-HQ-60-14-T-0001 Under Contract No. GS06F0641Z
ML19044A669
Person / Time
Issue date: 02/13/2019
From:
Acquisition Management Division
To: Mcelwain M
Oasis Systems
References
GS06F0641Z
Download: ML19044A669 (5)


Text

1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 5

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

M0017 02/20/2019 RES-19-0051

6. ISSUED BY CODE NRCHQ 7. ADMINISTERED BY (If other than Item 6) CODE US NRC - HQ ACQUISITION MANAGEMENT DIVISION MAIL STOP TWFN-5E03 WASHINGTON DC 20555-0001
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

(x) 9A. AMENDMENT OF SOLICITATION NO.

OASIS SYSTEMS LLC ATTN MICHAEL MCELWAIN 9B. DATED (SEE ITEM 11) 24 HARTWELL AVENUE LEXINGTON MA 024213160 x 10A. MODIFICATION OF CONTRACT/ORDER NO.

GS06F0641Z NRC-HQ-60-14-T-0001 10B. DATED (SEE ITEM 13)

CODE FACILITY CODE 02/26/2014 176018810

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning ___________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) Net Increase:

See Schedule

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

X FAR 52.217-9 Option to extend the term of the contract E. IMPORTANT: Contractor x is not is required to sign this document and return __________________ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this modification is the following:

1) Exercise Option Year 5 and extend the period of performance to 02/20/2020, 2) Obligate funds in the amount of 3) Increase the task order's ceiling by ) Attach WAFs.

See continuation pages for more details.

SUMMARY

OBLIGATION: (changed)

EXERCISE CEILING: $ (changed)

Continued ...

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

J 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16 16C. DATE SIGNED 02/13/2019 (Signature of person authorized to sign)

Previous edition unusable STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF CONTINUATION SHEET GS06F0641Z/NRC-HQ-60-14-T-0001/M0017 2 5 NAME OF OFFEROR OR CONTRACTOR OASIS SYSTEMS LLC ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F)

OVERALL CEILING: (unchanged)

Period of Performance: 02/26/2014 to 02/20/2020 NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

GS06F0641Z NRC-HQ-60-14-T-0001 Modification 17 Page 3 of 5 Unilaterally, FAR 52.217-9 -- Option to Extend the Term, this modification shall:

1.) Exercise Option Year 5: 02/21/2019 - 02/20/2020 Per FAR 52.217-9 -- Option to Extend the Term of the Contract, NRC provided a Notice of Intent to the Contractor on November 20, 2018 which was acknowledged by the Contractor on November 20, 2018.

2.) Option year 5 ceiling (CLIN 50001) at $138,655.85 shall be divided between the CLINS as follows:

CLIN 01010, is increased by the following:

The Task Orders new total exercised ceiling shall be The Task Orders total ceiling shall remain the same at $

3.) Under Option Year 5, this modification authorizes LH and FFP performance under WAF(s) WAF 01010-004C, WAF 01010-005A, WAF 01010-006, WAF 01010-007, WAF 01010-008, WAF 01010-009 (see attachment(s)). Attachment(s) shall be incorporated as Task Order Attachment(s) as follows:

Attachment 21 - WAF 01010-004C Attachment 22 - WAF 01010-005A Attachment 23 - WAF 01010-006 Attachment 24 - WAF 01010-007 Attachment 25- WAF 01010-008 Attachment 26- WAF 01010-009 4.) CLIN 01010 Obligations are added as follows:

WAF 01010-004C: Total is $ 4 (LH)

Fully funded at Requisition: RES-19-0051

GS06F0641Z NRC-HQ-60-14-T-0001 Modification 17 Page 4 of 5 Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001 This is fully funded.

WAF 01010-005A: Total is This is to extend the period of performance.

WAF 01010-006: Total is $ (FFP)

Fully funded at $ 3 Requisition: RES-19-0051 Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001 This is fully funded.

WAF 01010-007: Total is (FFP)

Fully funded at Requisition: RES-19-0051 Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001 This is fully funded.

WAF 01010-008: Total is $ (FFP)

Incrementally Funded at $

Requisition: RES-19-0051 Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001 This is fully funded.

WAF 01010-009: Total is (FFP)

Incrementally Funded at $

Requisition: RES-19-0051 Accounting Code: 2019-X0200-FEEBASED-60-60D099-60B991-6001-11-6-156-2574-11-6-156-6001 This is fully funded.

Therefore, the Total CLIN 01010 Obligations shall be increased as follows:

From:

By: $

To:

GS06F0641Z NRC-HQ-60-14-T-0001 Modification 17 Page 5 of 5 As a result of the ceiling and obligations changes, CLIN 01010 has a ceiling of and a total obligation of $ , therefore remains unfunded and available to fund under the CLIN 01010 ceiling.

5.) The Task Orders Total Obligations have therefore been modified as:

From:

To:

All other terms and conditions remain the same.