APPENDIX A Change 1: Facility Data Section a.) Revise Itera No. 11, Corporate Address, to read: "1671 Worcester Rd. | APPENDIX A Change 1: Facility Data Section a.) Revise Itera No. 11, Corporate Address, to read: "1671 Worcester Rd. | ||
Framingham, Mass. 01701" b.1 Revise Item No. 12, Corporate Contact, to read: "L.D. Marsolais Project Manager" Change'2: Operating Status Section a.) Revise Item No. 2 Utility Contact, to read: "F.J. Burger (802) 257-7711" | Framingham, Mass. 01701" b.1 Revise Item No. 12, Corporate Contact, to read: "L.D. Marsolais Project Manager" Change'2: Operating Status Section a.) Revise Item No. 2 Utility Contact, to read: "F.J. Burger (802) 257-7711" 8105150 | ||
8105150 | |||
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 81-04 FOR THE MONTH OF APRIL,1981 I | |||
I | I | ||
OPERATING DATA REPORT DOCKET NO, 50-271 DATE 810508 COMPLETED BY F.J. Burmer TELEPHONE (802)257-7711 Ext. 137 OPERATING STATUS Notes | OPERATING DATA REPORT DOCKET NO, 50-271 DATE 810508 COMPLETED BY F.J. Burmer TELEPHONE (802)257-7711 Ext. 137 OPERATING STATUS Notes | ||
: 1. Unit Name: vermont Yankee | : 1. Unit Name: vermont Yankee | ||
Line 48: | Line 30: | ||
: 3. Licensed Thermal Power (Wt): 1 sot | : 3. Licensed Thermal Power (Wt): 1 sot | ||
: 4. Nameplate Rating (Gross We): 540 | : 4. Nameplate Rating (Gross We): 540 | ||
: 5. Design Electrical Rating (Net We):514 fonen) 504(closed) | : 5. Design Electrical Rating (Net We):514 fonen) 504(closed) | ||
: 6. Maximum Dependable Capacity (Gross We): 535 | : 6. Maximum Dependable Capacity (Gross We): 535 | ||
: 7. Nav4=a= Dependable Capacity (Net We): 504 | : 7. Nav4=a= Dependable Capacity (Net We): 504 | ||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reason | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reason | ||
: 9. Power Level to Which Restricted,If Any(Net W e): | : 9. Power Level to Which Restricted,If Any(Net W e): | ||
: 10. Reasons For Restrictions, If Any: | : 10. Reasons For Restrictions, If Any: | ||
Line 77: | Line 57: | ||
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup: | : 25. If Shut Down At End Of Report Period, Estimated Date of Startup: | ||
: 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | : 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | ||
i | i | ||
+ | + | ||
g . | g . | ||
AVERAGE DAILY UNIT TOWER LEVEL DOCKET NO. 50-271 UNIT vehont Yantrae DA!E 81050A COMPLETED BY F.J. Burner TELEPHONE (802)257-7711. Ext.137 MONTE April DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) | |||
AVERAGE DAILY UNIT TOWER LEVEL DOCKET NO. 50-271 UNIT vehont Yantrae | |||
: 1. 522 17. 521 | : 1. 522 17. 521 | ||
: 2. 521 18. 520 | : 2. 521 18. 520 | ||
: 3. 521 19. 512 | : 3. 521 19. 512 | ||
: 4. 522 20. 522 | : 4. 522 20. 522 | ||
: 5. 504 21. 320 | : 5. 504 21. 320 | ||
: 6. 519 22. 521 | : 6. 519 22. 521 | ||
Line 97: | Line 72: | ||
< 9. 520 25, 521 | < 9. 520 25, 521 | ||
: 10. 520 26. 491 | : 10. 520 26. 491 | ||
: 11. 520 27, 521 | : 11. 520 27, 521 511 * ~' | ||
12; 28. ? 526 * . | 12; 28. ? 526 * . | ||
: 13. 519 29. 520 14, 520 30. 520 | : 13. 519 29. 520 14, 520 30. 520 | ||
Line 104: | Line 78: | ||
: 16. 520 INSTRUCTIONS: | : 16. 520 INSTRUCTIONS: | ||
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. -- - - | On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. -- - - | ||
0 | 0 | ||
J H | J H | ||
' Z O 2 | ' Z O 2 | ||
Line 124: | Line 95: | ||
o e o em Reason 2 | o e o em Reason 2 | ||
wwnn E amb D 9* b = Q 5 EE$EEn wn O a | wwnn E amb D 9* b = Q 5 EE$EEn wn O a | ||
Method of m | |||
S o en 4n a n m- aa Shutting 3 m o a | S o en 4n a n m- aa Shutting 3 m o a | ||
~ vn nn Down Reactor @ | ~ vn nn Down Reactor @ | ||
FC 2 % | FC 2 % | ||
, na ,k d | , na ,k d U | ||
W 8 | |||
U | |||
W | |||
8 | |||
= | = | ||
$ F | $ F | ||
Line 147: | Line 113: | ||
E 1 | E 1 | ||
* 2 8 w | * 2 8 w | ||
b, | b, o3gE nc> Compongnt Code f"EE | ||
o3gE nc> Compongnt Code f"EE | |||
,g.. WW WWmnn | ,g.. WW WWmnn | ||
=,n | =,n | ||
Line 155: | Line 119: | ||
-n 3 D mg% e | -n 3 D mg% e | ||
#3 r* 2 m m E | #3 r* 2 m m E | ||
gog=s | gog=s "5MIE e | ||
? | ? | ||
w 27FFF ennna | w 27FFF ennna | ||
>E G RE4 ms g"" , < w< w o.m2; nee | >E G RE4 ms g"" , < w< w o.m2; nee | ||
==n E L a "? | ==n E L a "? | ||
1 | |||
" o== a o 5 u . E' "B | " o== a o 5 u . E' "B | ||
-nn. * ? | -nn. * ? | ||
i E3 Ee4a 44 n i v n to n H . n n 4 | i E3 Ee4a 44 n i v n to n H . n n 4 | ||
^%oa,MF th O " y , , | ^%oa,MF th O " y , , | ||
Line 176: | Line 135: | ||
n >@ b o n >* D M D G @ ED b et w | n >@ b o n >* D M D G @ ED b et w | ||
R e | R e | ||
DOCKET NO. 50-271 . | DOCKET NO. 50-271 . | ||
e UNIT ver=nne v nha, | e UNIT ver=nne v nha, DATE At Mna 2,OHPLETED BY F.J. Burger TELEPHONE (802) 257-7711 | ||
._SAFET1 SLATED H\INTENANCE NATURE OF MAbUNCTION OR O GE EQUIPMENT MAINTENANCE NUMBER CAUSS RESULT CORRECTIVE ACTION Pre:. cure Switch,PS-2 'il-2C, Corrective N/A Dirt Switch Stuck in Disassembled and Cet -C" Main Steam Reliet MR 81-366 Closed Position Cleaned Switch Valve Discharge Line Nitrogen Inerting Valve Corrective N/A Aged Components Failed Solenoid Replaced Solinoid V 16-20-20 MR 81-436 Main Steam Radiation Corrective N/A Aged Componenets Relay Hot Replaced Components Monitor Relay 16A-K44D MR 81-472 "B" Diesel Temperature Corrective N/A Dirt, Loose Indicators Not Cleaned and Re-soldered Indicators, #1 & #4 MR 81-476 Connections Functioning Connections Reactor Pressure Transmitt- Corrective N/A Worn Seat Leakage Replaced Valve ing PT 6-53A, Test Valve MR 81-506 O | |||
DATE At Mna 2,OHPLETED BY F.J. Burger TELEPHONE (802) 257-7711 | |||
._SAFET1 SLATED H\INTENANCE NATURE OF MAbUNCTION OR O GE EQUIPMENT MAINTENANCE NUMBER CAUSS RESULT CORRECTIVE ACTION Pre:. cure Switch,PS-2 'il-2C, Corrective N/A Dirt Switch Stuck in Disassembled and Cet -C" Main Steam Reliet MR 81-366 Closed Position Cleaned Switch Valve Discharge Line Nitrogen Inerting Valve Corrective N/A Aged Components Failed Solenoid Replaced Solinoid V 16-20-20 MR 81-436 | |||
Main Steam Radiation Corrective N/A Aged Componenets Relay Hot Replaced Components | |||
Monitor Relay 16A-K44D MR 81-472 | |||
O | |||
DOCKET NO. 50-771 UNIT Vermont Yankee DATE 810508 COMPLETED BY F.J. Burger TELEPHONE (802)257-7711 Ext.137 RE*0RT MONTH April | |||
DOCKET NO. 50-771 | |||
==SUMMARY== | ==SUMMARY== | ||
OF C?IRATING ZXPERIENCES Hiah11thes Vermonc Yankee operated at 99.58% of rated thermal power for the month. | OF C?IRATING ZXPERIENCES Hiah11thes Vermonc Yankee operated at 99.58% of rated thermal power for the month. | ||
Cross electrical generation was 388,974 MWH, or100.18%of design electrical capacity. | Cross electrical generation was 388,974 MWH, or100.18%of design electrical capacity. | ||
Operatina Summary The following is a chronological description of plant operations including other pertinent itema of interest for the month: | |||
Operatina Summary The following is a chronological description of plant operations including | |||
other pertinent itema of interest for the month: | |||
4/1/81 At the beginning of the reporting period the plant was operating at 99.8% of rated thermal power. | 4/1/81 At the beginning of the reporting period the plant was operating at 99.8% of rated thermal power. | ||
4/30/81 At the end of the reporting period the plant was operating at 99.8% of rated thermal power. | 4/30/81 At the end of the reporting period the plant was operating at 99.8% of rated thermal power. | ||
Operations for the month produced the highest thermal capacity factor to date-(.99.6%). | Operations for the month produced the highest thermal capacity factor to date-(.99.6%). | ||
1 | |||
- , _ -- --}} | - , _ -- --}} |
Revision as of 01:53, 31 January 2020
ML19347F050 | |
Person / Time | |
---|---|
Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
Issue date: | 05/08/1981 |
From: | Burger F VERMONT YANKEE NUCLEAR POWER CORP. |
To: | |
Shared Package | |
ML19347F047 | List: |
References | |
NUDOCS 8105150135 | |
Download: ML19347F050 (7) | |
Text
APPENDIX A Change 1: Facility Data Section a.) Revise Itera No. 11, Corporate Address, to read: "1671 Worcester Rd.
Framingham, Mass. 01701" b.1 Revise Item No. 12, Corporate Contact, to read: "L.D. Marsolais Project Manager" Change'2: Operating Status Section a.) Revise Item No. 2 Utility Contact, to read: "F.J. Burger (802) 257-7711" 8105150
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 81-04 FOR THE MONTH OF APRIL,1981 I
I
OPERATING DATA REPORT DOCKET NO, 50-271 DATE 810508 COMPLETED BY F.J. Burmer TELEPHONE (802)257-7711 Ext. 137 OPERATING STATUS Notes
- 1. Unit Name: vermont Yankee
- 2. Reporting Period: April 1981
- 3. Licensed Thermal Power (Wt): 1 sot
- 4. Nameplate Rating (Gross We): 540
- 5. Design Electrical Rating (Net We):514 fonen) 504(closed)
- 6. Maximum Dependable Capacity (Gross We): 535
- 7. Nav4=a= Dependable Capacity (Net We): 504
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reason
- 9. Power Level to Which Restricted,If Any(Net W e):
- 10. Reasons For Restrictions, If Any:
-: .This Month Tr :to-Date Cumulative
- 11. Hours In Reporting Period 719.00 2.879.00 ---
- 12. Number Of Hours Reactor Was Critical 719.00 2,879.00 60,414.78
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 719.00 2,829.60 58,431.18 ,
- 15. Unit Reserte Shutdown Hours 0.00 0.00 0.00 i
- 16. Gross Thermal Energy Generated (WR) 12 140.623.50 4,310,482.50 82,913,999.50
- 17. Cross Electrical Energy Generated (WH) 388,974.00 1.462.687.00- -
th575.534.00
- 18. Net Electrical Energy Generated (WH) 373.238.00 1,403.738.00 26,151,317.00
- 19. Unit Service Fdetor '
100.00 98.28 77.43
- 20. Unit Availability Factor inn.nn 98.28 77.43
- 21. Unit Capacity Factor (Using MDC Net) 103.00 96.74 68.76
- 22. Unit Capacity Factor (Using DER Net) 100.99 _ 94.86 67.42
- 23. Unit Forced Outage Rate 0.00 1.72 7.05
- 24. Shutdowns Scheduled Over Next C Months (Type, Date, and Duration of Each):
Refueline outane scheduled to start October 24, 1981 and continue for six weeks.
4
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
i
+
g .
AVERAGE DAILY UNIT TOWER LEVEL DOCKET NO. 50-271 UNIT vehont Yantrae DA!E 81050A COMPLETED BY F.J. Burner TELEPHONE (802)257-7711. Ext.137 MONTE April DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)
- 1. 522 17. 521
- 2. 521 18. 520
- 3. 521 19. 512
- 4. 522 20. 522
- 5. 504 21. 320
- 6. 519 22. 521
- 7. 520 23. 521
- 8. 520 24. s?1
< 9. 520 25, 521
- 10. 520 26. 491
- 11. 520 27, 521 511 * ~'
12; 28. ? 526 * .
- 13. 519 29. 520 14, 520 30. 520
- 15. 520 31. -
- 16. 520 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. -- - -
0
J H
' Z O 2
$ .Y .* E ,o l mm no
.~. n en C. @
c c.
~ ~
c C.
e m
n a
N
cmmona>
i i ii Typed 1
oe> o =e i=xmoe ie El ,3 $ E b-@ E Duration E nE -nuea1 E 2 f 5 E * ?. e (Hours) 5 n* mon-mm a E E E " EcE $a %
o e o em Reason 2
wwnn E amb D 9* b = Q 5 EE$EEn wn O a
Method of m
S o en 4n a n m- aa Shutting 3 m o a
~ vn nn Down Reactor @
FC 2 %
, na ,k d U
W 8
=
$ F
- =m-E : a e!2 0 D 1
- E
=
m nna .
a M "
g "% e
- _ e g 4 n w Systeg -
Code @
E 1
- 2 8 w
b, o3gE nc> Compongnt Code f"EE
,g.. WW WWmnn
=,n
- n 2 n
-n 3 D mg% e
- 3 r* 2 m m E
gog=s "5MIE e
?
w 27FFF ennna
>E G RE4 ms g"" , < w< w o.m2; nee
==n E L a "?
1
" o== a o 5 u . E' "B
-nn. * ?
i E3 Ee4a 44 n i v n to n H . n n 4
^%oa,MF th O " y , ,
g 3
- w M 3
. RE"; w w 2 # ~
m Bra 5 W 8 mXe; "
n >@ b o n >* D M D G @ ED b et w
R e
DOCKET NO. 50-271 .
e UNIT ver=nne v nha, DATE At Mna 2,OHPLETED BY F.J. Burger TELEPHONE (802) 257-7711
._SAFET1 SLATED H\INTENANCE NATURE OF MAbUNCTION OR O GE EQUIPMENT MAINTENANCE NUMBER CAUSS RESULT CORRECTIVE ACTION Pre:. cure Switch,PS-2 'il-2C, Corrective N/A Dirt Switch Stuck in Disassembled and Cet -C" Main Steam Reliet MR 81-366 Closed Position Cleaned Switch Valve Discharge Line Nitrogen Inerting Valve Corrective N/A Aged Components Failed Solenoid Replaced Solinoid V 16-20-20 MR 81-436 Main Steam Radiation Corrective N/A Aged Componenets Relay Hot Replaced Components Monitor Relay 16A-K44D MR 81-472 "B" Diesel Temperature Corrective N/A Dirt, Loose Indicators Not Cleaned and Re-soldered Indicators, #1 & #4 MR 81-476 Connections Functioning Connections Reactor Pressure Transmitt- Corrective N/A Worn Seat Leakage Replaced Valve ing PT 6-53A, Test Valve MR 81-506 O
DOCKET NO. 50-771 UNIT Vermont Yankee DATE 810508 COMPLETED BY F.J. Burger TELEPHONE (802)257-7711 Ext.137 RE*0RT MONTH April
SUMMARY
OF C?IRATING ZXPERIENCES Hiah11thes Vermonc Yankee operated at 99.58% of rated thermal power for the month.
Cross electrical generation was 388,974 MWH, or100.18%of design electrical capacity.
Operatina Summary The following is a chronological description of plant operations including other pertinent itema of interest for the month:
4/1/81 At the beginning of the reporting period the plant was operating at 99.8% of rated thermal power.
4/30/81 At the end of the reporting period the plant was operating at 99.8% of rated thermal power.
Operations for the month produced the highest thermal capacity factor to date-(.99.6%).
1
- , _ -- --