{{#Wiki_filter:September 12, 2016
{{#Wiki_filter:UNITED STATES ber 12, 2016


==SUBJECT:==
==SUBJECT:==
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC INITIAL LICENSE EXAMINATION REPORT 05000 315/20 16 301; 05000 316/20 16 301
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC INITIAL LICENSE EXAMINATION REPORT 05000315/2016301; 05000316/2016301


==Dear Mr. Gebbie:==
==Dear Mr. Gebbie:==
On July 29, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Donald C. Cook Nuclear Power Plant.
On July 29, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Donald C. Cook Nuclear Power Plant. The enclosed report documents the results of those examinations. Preliminary observations noted during the examination process were discussed on July 22, 2016, with you and other members of your staff. An exit meeting was conducted by telephone on August 2, 2016, between Mr. B. Evans, Operations Training Manager, of your staff and Mr. R. Baker, Operations Engineer, to review the proposed final grading of the written examination for the license applicants. During the telephone conversation, the NRC confirmed that the station had no post-examination comments that required resolution.


The enclosed report documents the results of those examination s. Preliminary observations noted during the examination process were discussed on July 22, 2016, with you and other members of your staff
The NRC examiners administered an initial license examination operating test during the weeks of July 11 and July 18, 2016. The written examination was administered by Donald C. Cook training department personnel on July 22, 2016. The 9 Senior Reactor Operator and the 7 Reactor Operator applicants were administered license examinations.
. An exit meeting was conducted by telephone on August 2, 2016
, between Mr. B. Evans, Operations Training Manager, of your staff and Mr. R. Baker, Operations Engineer, to review the proposed final grading of the written examination for the license applicants.


During the telephone conversation, the NRC confirmed that the station had no post-examination comments that required resolution.
The results of the examinations were finalized on August 15, 2016. All 16 applicants passed all sections of their respective examinations and were issued applicable operator licenses.


The NRC examiners administered an initial license examination operating test during the wee ks of July 11 and July 18, 2016. The written examination was administered by Donald C. Cook training department personnel on July 22, 2016. The 9 Senior Reactor Operator and the 7 Reactor Operator applicants were administered license examinations. The results of the examinations were finalized on August 15, 2016. All 16 applicants passed all sections of their respective examinations and were issued applicable operator licenses
The written examination and operating tests, as well as other related written examination and operating tests outlines and documentation, will be withheld from public disclosure for 24 months per your request.
. The written examination and operating tests, as well as other related written examination and operating tests outlines and documentation
 
, will be withheld from public disclosure for 24 months per your request
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
 
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,
Sincerely,
/RA/ Robert J. Orlikowski , Chief Operations Branch Division of Reactor Safety Docket No s. 50-315; 50-316 License No s. DPR-58; DPR-74 Enclosure s: 1. OL Examination Report 05000 315/20 16 301; 05000316/2016 301 2. Simulation Facility Fidelity Report cc: Distribution via LISTSERV D. Emery, Training Manager, Donald C. Cook Nuclear Power Plant
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74


Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION
===Enclosures:===
1. OL Examination Report 05000315/2016301; 05000316/2016301 2. Simulation Facility Fidelity Report


==REGION III==
REGION III==
Docket No s: 5 0-315; 50-316 License N o s: DPR-58; DPR-74 Report No:
Docket Nos: 50-315; 50-316 License Nos: DPR-58; DPR-74 Report No: 05000315/2016301; 05000316/2016301 Licensee: Indiana Michigan Power Company Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Dates: July 11 - July 29, 2016 Inspectors: R. Baker, Operations Engineer M. Bielby, Senior Operations Engineer N. Valos, Senior Reactor Analyst J. Seymour, Operations Engineer Approved by: R. Orlikowski, Chief Operations Branch Division of Reactor Safety Enclosure 1
05000315/2016301
; 05000316/2016301 Licensee: Indiana Michigan Power Company Facilit y: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Dates: July 11 - July 29, 2016 Inspectors:
R. Baker, Operations Engineer M. Bielby, Senior Operations Engineer N. Valos, Senior Reactor Analyst J. Seymour, Operations Engineer Approved by:
R. Orlikowski, Chief Operations Branch Division of Reactor Safety 2


=SUMMARY=
=SUMMARY=
Examination  
Examination Report 05000315/2016301; 05000316/2016301; 07/11/2016 - 07/29/2016;
 
Report 05000315/201 6 301; 0 50 00316/2016301; 07/11/2016
- 07/29/2016
; Indiana Michigan Power Company, Donald C. Cook Nuclear Power Plant, Units 1 and 2; Initial License Examination Report.


The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG
Indiana Michigan Power Company, Donald C. Cook Nuclear Power Plant, Units 1 and 2;
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. Examination Summary The sixteen applicants passed all sections of their respective examinations, of which nine applicants were issued senior operator licenses and seven applicants were issued operator licenses.
Initial License Examination Report.


(Section 4OA5.1).
The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, Revision 10.


3
Examination Summary The sixteen applicants passed all sections of their respective examinations, of which nine applicants were issued senior operator licenses and seven applicants were issued operator licenses. (Section 4OA5.1).


=REPORT DETAILS=
=REPORT DETAILS=
Line 71: Line 66:


====a. Examination Scope====
====a. Examination Scope====
The U.S. Nuclear Regulatory Commission (NRC) examiners and members of the facility licensee's staff used the guidance prescribed in NUREG
The U.S. Nuclear Regulatory Commission (NRC) examiners and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensees staff prepared the outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of June 6, 2016, with the assistance of members of the facility licensees staff.
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensee's staff prepared the outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of June 6, 2016, with the assistance of members of the facility licensee's staff. During the onsite validation week, the examiners audited a sample (two Senior Reactor Operator - Upgrade, two Senior Reactor Operator
 
- Instant, and two Reactor Operator) of license applicatio ns for accuracy. The NRC examiners, with the assistance of members of the facility licensee's staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of July 11 through July 21, 2016. The facility licensee administered the written examination on July 22, 2016.
During the onsite validation week, the examiners audited a sample (two Senior Reactor Operator - Upgrade, two Senior Reactor Operator - Instant, and two Reactor Operator)of license applications for accuracy. The NRC examiners, with the assistance of members of the facility licensees staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of July 11 through July 21, 2016. The facility licensee administered the written examination on July 22, 2016.


====b. Findings====
====b. Findings====
Line 80: Line 75:
Less than 20 percent of the proposed examination questions were determined to be unsatisfactory and required modification or replacement.
Less than 20 percent of the proposed examination questions were determined to be unsatisfactory and required modification or replacement.


All changes made to the proposed written examination, were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," and documented on Form ES 9, "Written Examination Review Worksheet
All changes made to the proposed written examination, were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, and documented on Form ES-401-9, Written Examination Review Worksheet. The Form ES-401-9, the written examination outlines (ES-401-2 and ES-401-3), and both the proposed and final written examinations, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS) in 24 months.
.The Form ES-401-9, the written examination outlines (ES-401-2 and ES-401-3), and both the proposed and final written examination s , will be available electronicall y in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS) in 24 months. (ADAMS Accession Numbers ML15274A375 and ML15274A376)
 
On July 29, 2016, the licensee submitted documentation noting that there were no post-examination commen ts for consideration by the NRC examiners when grading the written examination.
      (ADAMS Accession Numbers ML15274A375 and ML15274A376)
On July 29, 2016, the licensee submitted documentation noting that there were no post-examination comments for consideration by the NRC examiners when grading the written examination.


The NRC examiners graded the written examination on August 2, 2016, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
The NRC examiners graded the written examination on August 2, 2016, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
4
: (2) Operating Test The NRC examiners determined that the operating test, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination.
: (2) Operating Test The NRC examiners determined that the operating test, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination.


Changes made to the operating test were documented in a document titled, "Operating Test Comments
Changes made to the operating test were documented in a document titled, Operating Test Comments. The Operating Test Comments document, the operating test outlines (ES-301-1 and ES-301-2), and both the proposed and final operating tests, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's ADAMS in 24 months. (ADAMS Accession Numbers ML15274A375, and ML15274A376)
.The "Operating Test Comments" document, the operating test outlines (ES 1 and ES-301-2), and both the proposed and final operating tests, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's ADAMS in 24 months. (ADAMS Accession Numbers ML15274A375, and ML15274A376)
The NRC examiners completed operating test grading on August 8, 2016.
The NRC examiners completed operating test grading on August 8, 2016
.
: (3) Examination Results The nine applicants at the Senior Reactor Operator level and the seven applicants at the Reactor Operator level were administered written examinations and operating tests. All sixteen applicants passed all portions of their examinations and were issued their respective operating licenses on August 15, 2016.
: (3) Examination Results The nine applicants at the Senior Reactor Operator level and the seven applicants at the Reactor Operator level were administered written examinations and operating tests. All sixteen applicants passed all portions of their examinations and were issued their respective operating licenses on August 15, 2016.


Line 98: Line 90:


====a. Scope====
====a. Scope====
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title 10 of the Code of Federal Regulations, Section 55.49, "Integrity of Examinations and Tests.
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Section 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.
 
The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors ," to determine acceptability of the licensee
's examination security activities.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.
 
{{a|4OA6}}
{{a|4OA6}}
==4OA6 Management Meetings==
==4OA6 Management Meetings==


===.1 Debrief The chief examiner presented the examination team's preliminary observations and findings on===
===.1 Debrief===


July 22, 2016, to Mr. J. Gebbie, Senior Vice President and Chief Nuclear Officer, and other members of the Donald C. Cook Operations and Training Department staff.
The chief examiner presented the examination team's preliminary observations and findings on July 22, 2016, to Mr. J. Gebbie, Senior Vice President and Chief Nuclear Officer, and other members of the Donald C. Cook Operations and Training Department staff.


===.2 Exit Meeting===
===.2 Exit Meeting===


The chief examiner conducted an exit meeting on August 2, 2016
The chief examiner conducted an exit meeting on August 2, 2016, with Mr. B. Evans, Operations Training Manager, by telephone. The NRC confirmed there were no post-examination comments. The chief examiner asked whether any of the material used to develop or administer the examination should be considered proprietary.
, with Mr. B. Evans, Operations Training Manager, by telephone. The NRC confirmed there were no post-examination comments
. The chief examiner asked whether any of the material used to develop or administer the examination should be considered proprietary.
 
5 No proprietary or sensitive information was identified during the examination or debrief/exit meetings.


It was also confirmed that the written examination, operating tests, and other related written examination and operating tests outlines and documentation, will be withheld from public disclosure for 24 months per your request.
No proprietary or sensitive information was identified during the examination or debrief/exit meetings. It was also confirmed that the written examination, operating tests, and other related written examination and operating tests outlines and documentation, will be withheld from public disclosure for 24 months per your request.


ATTACHMENT:
ATTACHMENT:  


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


SUPPLEMENTAL INFORMATION KEY POINTS OF CONTAC
SUPPLEMENTAL INFORMATION
T Licensee  
KEY POINTS OF CONTACT
Licensee
: [[contact::J. Gebbie]], Senior Vice President and Chief Nuclear Officer
: [[contact::J. Gebbie]], Senior Vice President and Chief Nuclear Officer
: [[contact::Q. Lies]], Site Vice President
: [[contact::Q. Lies]], Site Vice President
Line 138: Line 123:
: [[contact::K. Harper]], Nuclear Regulatory Affairs
: [[contact::K. Harper]], Nuclear Regulatory Affairs
U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission
: [[contact::J. Ell egood]], Senior Resident Inspector
: [[contact::J. Ellegood]], Senior Resident Inspector
: [[contact::T. Taylor]], Resident Inspector
: [[contact::T. Taylor]], Resident Inspector
: [[contact::R. Baker]], Chief Examiner
: [[contact::R. Baker]], Chief Examiner
: [[contact::M. Bielby]], Examiner
: [[contact::M. Bielby]], Examiner
: [[contact::N. Valos]], Examiner
: [[contact::N. Valos]], Examiner
ITEMS OPENED, CLOSED, AND DISCU
ITEMS OPENED, CLOSED, AND DISCUSSED
SSED Opened, Closed, and Discussed
Opened, Closed, and Discussed
None LIST OF ACRONYMS USE
None
D ADAMS Agencywide Document Access and Management System
LIST OF ACRONYMS USED
NRC U.S. Nuclear Regulatory Commission
ADAMS           Agencywide Document Access and Management System
PARS Publicly Available Records System
NRC             U.S. Nuclear Regulatory Commission
 
PARS           Publicly Available Records System
SIMULATION FACILITY
SIMULATION FACILITY FIDELITY REPORT
FIDELITY REPORT Facility Licensee:
Facility Licensee:                     Donald C. Cook Nuclear Power Plant
Donald C. Cook Nuclear Power Plant
Facility Docket Nos:                   50-315; 50-316
Facility Docket No
Operating Tests Administered:           July 11 - July 21, 2016
s:   50-315; 50-316 Operating Tests Administered:
The following documents observations made by the NRC examination team during the initial
July 11 - July 21, 2016
operator license examination. These observations do not constitute audit or inspection findings
The following documents observations made by the NRC examination team during the initial operator license examination. These observations do not constitute audit or inspection findings and are not, without further verification and review, indicative of no
and are not, without further verification and review, indicative of non-compliance with Title 10 of
n-compliance with Title 10 of the Code of Federal Regulations, Section
the Code of Federal Regulations, Section 55.45(b). These observations do not affect NRC
55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information which may be used in future evaluations. No licensee action is required in response to these observations.
certification or approval of the simulation facility other than to provide information which may be
During the conduct of the simulator portion of the operating tests, the following items were observed: ITEM DESCRIPTION
used in future evaluations. No licensee action is required in response to these observations.
None None
During the conduct of the simulator portion of the operating tests, the following items were
J. Gebbie     -2- inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
observed:
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
ITEM                                         DESCRIPTION
-rm/adams.html
None                                               None
(the Public Electronic Reading Room).
J. Gebbie                                                                 -2-
Sincerely,
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
/RA/   Robert  
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
: [[contact::J. Orlikowski]], Chief Operations Branch
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
                                                                          /RA/
Robert  
: [[contact::J. Orlikowski]], Chief
Operations Branch
Division of Reactor Safety
Division of Reactor Safety
Docket No s. 50-315; 50-316 License No
Docket Nos. 50-315; 50-316
s. DPR-58; DPR-74 Enclosure s: 1. OL Examination Report 05000315/2016301;
License Nos. DPR-58; DPR-74
Enclosures:
1. OL Examination Report 05000315/2016301;
05000316/2016301
05000316/2016301
2. Simulation Facility Fidelity Report
2. Simulation Facility Fidelity Report
cc: Distribution via LISTSERV  
cc: Distribution via LISTSERV
: [[contact::D. Emery]], Training Manager,   Donald C. Cook Nuclear Power Plant
: [[contact::D. Emery]], Training Manager,
DISTRIBUTION
Donald C. Cook Nuclear Power Plant
: Jeremy Bowen
 
RidsNrrDorlLpl3
-1 Resource
RidsNrrPMDCCook Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Darrell Roberts
Richard Skokowski
Allan Barker
Carole Ariano
Linda Linn
DRPIII DRSIII Maurin Scheetz
ADAMS Accession Number:  ML16256A771
Publicly Available
Non-Publicly Available
Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII  RIII  RIII  RIII  NAME RBaker:cl:jw ROrlikowski
DATE 09/09/16 09/12/16  OFFICIAL RECORD COPY
}}
}}

Latest revision as of 19:11, 19 December 2019

NRC Initial License Examination Report 05000315/2016301; 05000316/2016301
ML16256A771
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/12/2016
From: Robert Orlikowski
Operations Branch III
To: Gebbie J
Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co)
References
2016301
Download: ML16256A771 (10)


Text

UNITED STATES ber 12, 2016

SUBJECT:

DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC INITIAL LICENSE EXAMINATION REPORT 05000315/2016301; 05000316/2016301

Dear Mr. Gebbie:

On July 29, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Donald C. Cook Nuclear Power Plant. The enclosed report documents the results of those examinations. Preliminary observations noted during the examination process were discussed on July 22, 2016, with you and other members of your staff. An exit meeting was conducted by telephone on August 2, 2016, between Mr. B. Evans, Operations Training Manager, of your staff and Mr. R. Baker, Operations Engineer, to review the proposed final grading of the written examination for the license applicants. During the telephone conversation, the NRC confirmed that the station had no post-examination comments that required resolution.

The NRC examiners administered an initial license examination operating test during the weeks of July 11 and July 18, 2016. The written examination was administered by Donald C. Cook training department personnel on July 22, 2016. The 9 Senior Reactor Operator and the 7 Reactor Operator applicants were administered license examinations.

The results of the examinations were finalized on August 15, 2016. All 16 applicants passed all sections of their respective examinations and were issued applicable operator licenses.

The written examination and operating tests, as well as other related written examination and operating tests outlines and documentation, will be withheld from public disclosure for 24 months per your request.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosures:

1. OL Examination Report 05000315/2016301; 05000316/2016301 2. Simulation Facility Fidelity Report

REGION III==

Docket Nos: 50-315; 50-316 License Nos: DPR-58; DPR-74 Report No: 05000315/2016301; 05000316/2016301 Licensee: Indiana Michigan Power Company Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Dates: July 11 - July 29, 2016 Inspectors: R. Baker, Operations Engineer M. Bielby, Senior Operations Engineer N. Valos, Senior Reactor Analyst J. Seymour, Operations Engineer Approved by: R. Orlikowski, Chief Operations Branch Division of Reactor Safety Enclosure 1

SUMMARY

Examination Report 05000315/2016301; 05000316/2016301; 07/11/2016 - 07/29/2016;

Indiana Michigan Power Company, Donald C. Cook Nuclear Power Plant, Units 1 and 2;

Initial License Examination Report.

The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021,

Operator Licensing Examination Standards for Power Reactors, Revision 10.

Examination Summary The sixteen applicants passed all sections of their respective examinations, of which nine applicants were issued senior operator licenses and seven applicants were issued operator licenses. (Section 4OA5.1).

REPORT DETAILS

4OA5 Other Activities

.1 Initial Licensing Examinations

a. Examination Scope

The U.S. Nuclear Regulatory Commission (NRC) examiners and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensees staff prepared the outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of June 6, 2016, with the assistance of members of the facility licensees staff.

During the onsite validation week, the examiners audited a sample (two Senior Reactor Operator - Upgrade, two Senior Reactor Operator - Instant, and two Reactor Operator)of license applications for accuracy. The NRC examiners, with the assistance of members of the facility licensees staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of July 11 through July 21, 2016. The facility licensee administered the written examination on July 22, 2016.

b. Findings

(1) Written Examination The NRC examiners determined that the written examination, as proposed by the licensee, was within the range of acceptability expected for a proposed examination.

Less than 20 percent of the proposed examination questions were determined to be unsatisfactory and required modification or replacement.

All changes made to the proposed written examination, were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, and documented on Form ES-401-9, Written Examination Review Worksheet. The Form ES-401-9, the written examination outlines (ES-401-2 and ES-401-3), and both the proposed and final written examinations, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS) in 24 months.

(ADAMS Accession Numbers ML15274A375 and ML15274A376)

On July 29, 2016, the licensee submitted documentation noting that there were no post-examination comments for consideration by the NRC examiners when grading the written examination.

The NRC examiners graded the written examination on August 2, 2016, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.

(2) Operating Test The NRC examiners determined that the operating test, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination.

Changes made to the operating test were documented in a document titled, Operating Test Comments. The Operating Test Comments document, the operating test outlines (ES-301-1 and ES-301-2), and both the proposed and final operating tests, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's ADAMS in 24 months. (ADAMS Accession Numbers ML15274A375, and ML15274A376)

The NRC examiners completed operating test grading on August 8, 2016.

(3) Examination Results The nine applicants at the Senior Reactor Operator level and the seven applicants at the Reactor Operator level were administered written examinations and operating tests. All sixteen applicants passed all portions of their examinations and were issued their respective operating licenses on August 15, 2016.

.2 Examination Security

a. Scope

The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Section 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.

b. Findings

No findings were identified.

4OA6 Management Meetings

.1 Debrief

The chief examiner presented the examination team's preliminary observations and findings on July 22, 2016, to Mr. J. Gebbie, Senior Vice President and Chief Nuclear Officer, and other members of the Donald C. Cook Operations and Training Department staff.

.2 Exit Meeting

The chief examiner conducted an exit meeting on August 2, 2016, with Mr. B. Evans, Operations Training Manager, by telephone. The NRC confirmed there were no post-examination comments. The chief examiner asked whether any of the material used to develop or administer the examination should be considered proprietary.

No proprietary or sensitive information was identified during the examination or debrief/exit meetings. It was also confirmed that the written examination, operating tests, and other related written examination and operating tests outlines and documentation, will be withheld from public disclosure for 24 months per your request.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

J. Gebbie, Senior Vice President and Chief Nuclear Officer
Q. Lies, Site Vice President
D. Emery, Plant Training Manager
B. Evans, Operations Training Manger
I. Fleetwood, Initial License Training Supervisor
K. Ferneau, Operations Director
M. Scarpello, Manager, Nuclear Regulatory Affairs
K. Harper, Nuclear Regulatory Affairs

U.S. Nuclear Regulatory Commission

J. Ellegood, Senior Resident Inspector
T. Taylor, Resident Inspector
R. Baker, Chief Examiner
M. Bielby, Examiner
N. Valos, Examiner

ITEMS OPENED, CLOSED, AND DISCUSSED

Opened, Closed, and Discussed

None

LIST OF ACRONYMS USED

ADAMS Agencywide Document Access and Management System

NRC U.S. Nuclear Regulatory Commission

PARS Publicly Available Records System

SIMULATION FACILITY FIDELITY REPORT

Facility Licensee: Donald C. Cook Nuclear Power Plant

Facility Docket Nos: 50-315; 50-316

Operating Tests Administered: July 11 - July 21, 2016

The following documents observations made by the NRC examination team during the initial

operator license examination. These observations do not constitute audit or inspection findings

and are not, without further verification and review, indicative of non-compliance with Title 10 of

the Code of Federal Regulations, Section 55.45(b). These observations do not affect NRC

certification or approval of the simulation facility other than to provide information which may be

used in future evaluations. No licensee action is required in response to these observations.

During the conduct of the simulator portion of the operating tests, the following items were

observed:

ITEM DESCRIPTION

None None

J. Gebbie -2-

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Robert

J. Orlikowski, Chief

Operations Branch

Division of Reactor Safety

Docket Nos. 50-315; 50-316

License Nos. DPR-58; DPR-74

Enclosures:

1. OL Examination Report 05000315/2016301;

05000316/2016301

2. Simulation Facility Fidelity Report