ML070610190: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML070610190
| number = ML070610190
| issue date = 03/01/2007
| issue date = 03/01/2007
| title = 2007/02/28-Letter Submitted by Wedge Bramhall on Proposed Rule Pr 73, Design Basis Threat
| title = Letter Submitted by Wedge Bramhall on Proposed Rule Pr 73, Design Basis Threat
| author name = Bramhall W
| author name = Bramhall W
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation

Latest revision as of 13:51, 7 December 2019

Letter Submitted by Wedge Bramhall on Proposed Rule Pr 73, Design Basis Threat
ML070610190
Person / Time
Site: Pilgrim
Issue date: 03/01/2007
From: Bramhall W
- No Known Affiliation
To:
NRC/SECY
SECY RAS
References
70FR67380, PR-73
Download: ML070610190 (4)


Text

PR 73 (70FR67380)

I've never been a fan of the Pilgrim Nuclear Plant. Since 911 I've become more concerned than ever. I know with this license renewal process we DOCKETED aren't allowed to debate the lack of evacuation USNRC planning, the vulnerability of the spent fuel pool March 1, 2007 (2:32pm) from an aerial attack, or the fact that the South Shore has now become a nuclear waste dump, but OFFICE OF SECRETARY times have changed since these relicensing rules RULEMAKINGS AND ADJUDICATIONS STAFF were made. Because times have changed, I believe that the rules should change. When the NRC developed these perimeters of discussion with a license renewal, everyone thought that the high-level waste would have been moved to a permanent repository. Because no repository has been licensed and there are no sites planned in the distant future, the 900 tons of high-level nuclear waste that has accumulated at Pilgrim will be stranded here for many years to come. This new license will enable Entergy to make another 600 tons of high-level nuclear waste in the next 20 years that will now have to be stored in Plymouth, also new information. Nuclear Plants are high on the terrorist's list of targets. Terrorists flying jets laden with fuel into structures is new information.

Entergy has done nothing to protect that vulnerable spent fuel pool from the air. Entergy can station all the National Guard they can get around that plant but they won't protect it from the air. Terrorists will only become more sophisticated as time goes by. Our local evacuation plan that is supposed to be an ongoing process is a fairytale. Anyone that believes in this plan must work for the industry or is out of touch with reality. The population has exploded on the South Shore and the chances of escaping a nuclear event are slim, also new information. Recent reports suggesting that even low doses of radiation cause cancer is new information. Better monitoring is needed at and around the Pilgrim Plant before it gets relicensed. As one terrorism expert recently said, Entergy may run the plant well but as far as security goes that's another subject. Let's all work to change the process of relicensing nuclear power plants so that the communities that live with them can feel at least a little bit more secure. I don't know where our local politicians stand on this

'FemPA_+;f= SO-Wol~

issue other than the fact that they want to get more money from Entergy. It's time for them to take a stand. There are other alternatives for that site on Rocky Hill Road. Plymouth has way too much going for it to become a nuclear waste dump.

SECY - Comment on Design Basis Threat rulemakirg Page 1 From: Carol Gallagher To: SECY Date: Thu, Mar 1, 2007 11:33 AM

Subject:

Comment on Design Basis Threat rulemaking Attached for docketing is a comment letter on the above noted proposed rule from Wedge Bramhall that I received via the rulemaking website on February 28, 2007.

Carol

Page 1 Ic\temp\GW}OOOO1 .TMP I'cAteMp\GWJ00001.TMFý- *PFage.. 1"11 Mail Envelope Properties (45E70039.D38: 5: 35764)

Subject:

Comment on Design Basis Threat rulemaking Creation Date Thu, Mar 1, 2007 11:32 AM From: Carol Gallagher Created By: CAG@nrc.gov Recipients nrc.gov TWGWPO02.HQGWDOO1 SECY (SECY)

Post Office Route TWGWPO02.HQGWDOO1 nrc.gov Files Size Date & Time MESSAGE 575 Thursday, March 1, 2007 11:32 AM TEXT.htrn 444 1636-0117.doc 22016 Thursday, March 1, 2007 10:04 AM Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled