ML092150679: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML092150679
| number = ML092150679
| issue date = 06/22/2009
| issue date = 06/22/2009
| title = 2009/06/22 Indian Point Lr Hearing - FW: Confirmation Needed
| title = Lr Hearing - FW: Confirmation Needed
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 IPRenewal NPEmails From:STROUD, MICHAEL D [MSTROUD@entergy.com]
{{#Wiki_filter:IPRenewal NPEmails From:                         STROUD, MICHAEL D [MSTROUD@entergy.com]
Sent: Monday, June 22, 2009 12:22 PM To: Green, Kimberly
Sent:                         Monday, June 22, 2009 12:22 PM To:                           Green, Kimberly


==Subject:==
==Subject:==
FW: Confirmation needed From: STROUD, MICHAEL D Sent: Monday, June 22, 2009 9:17 AM To: Green, Kimberly  
FW: Confirmation needed From: STROUD, MICHAEL D Sent: Monday, June 22, 2009 9:17 AM To: Green, Kimberly


==Subject:==
==Subject:==
RE: Confirmation needed Kim,               The LRA Table 3.3.2-18-IP2 should be just like the LRA Table 3.3.2-18-IP3 for valve body with gray cast iron in air-indoor (int). The aging effect should be Loss of Material and the AMP should be External Surfaces Monitoring. The rest of the table is correct.
RE: Confirmation needed
: Kim, The LRA Table 3.3.2-18-IP2 should be just like the LRA Table 3.3.2-18-IP3 for valve body with gray cast iron in air-indoor (int). The aging effect should be Loss of Material and the AMP should be External Surfaces Monitoring. The rest of the table is correct.
Thanks Mike From: Green, Kimberly [mailto:Kimberly.Green@nrc.gov]
Thanks Mike From: Green, Kimberly [mailto:Kimberly.Green@nrc.gov]
Sent: Friday, June 19, 2009 10:10 AM To: STROUD, MICHAEL D  
Sent: Friday, June 19, 2009 10:10 AM To: STROUD, MICHAEL D


==Subject:==
==Subject:==
Confirmation needed Hi Mike,  
Confirmation needed Hi Mike, Could you please confirm if the following two entries (from May 15, 2009) letter are accurate?
 
From LRA Table 3.3.2-18-IP2 Valve body             Pressure         Gray cast iron  Air - indoor   None                None              V.A-19     3.2.1-32 boundary                          (int)                                                (E-29)
Could you please confirm if the following two entries (from May 15, 2009) letter are accurate?  
From LRA Table 3.3.2-18-IP3 Valve body            Pressure          Gray cast iron  Air - indoor  Loss of material    External          V.A-19    3.2.1-32 boundary                          (int)                              Surfaces          (E-29)
 
Monitoring I would think that the two entries should be the same, but am not sure which one Entergy meant to use.
From LRA Table 3.3.2-18-IP2 Valve body Pressure boundary Gray cast ironAir - indoor (int) NoneNone V.A-19 (E-29) 3.2.1-32 From LRA Table 3.3.2-18-IP3  
Also, don't forget to ask about the changes to LRA Section 2.3.3.12 for IP2 regarding the deletion of the CO2 references.
: Thanks, Kim 1


Valve body Pressure boundary Gray cast ironAir - indoor (int) Loss of material External Surfaces Monitoring V.A-19 (E-29) 3.2.1-32  I would think that the two entries should be the same, but am not sure which one Entergy meant to use.
Hearing Identifier:   IndianPointUnits2and3NonPublic_EX Email Number:         1485 Mail Envelope Properties   (A79A58994C541C48BBCFB319610763CB0578E905)
 
Also, don't forget to ask about the changes to LRA Section 2.3.3.12 for IP2 regarding the deletion of the CO2 references.
: Thanks, Kim Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 1485   Mail Envelope Properties   (A79A58994C541C48BBCFB319610763CB0578E905)


==Subject:==
==Subject:==
FW: Confirmation needed Sent Date:   6/22/2009 12:21:43 PM Received Date: 6/22/2009 12:22:02 PM From:   STROUD, MICHAEL D Created By:   MSTROUD@entergy.com Recipients:     "Green, Kimberly" <Kimberly.Green@nrc.gov>
FW: Confirmation needed Sent Date:           6/22/2009 12:21:43 PM Received Date:       6/22/2009 12:22:02 PM From:                 STROUD, MICHAEL D Created By:           MSTROUD@entergy.com Recipients:
Tracking Status: None  
"Green, Kimberly" <Kimberly.Green@nrc.gov>
 
Tracking Status: None Post Office:         LITEXETSP002.etrsouth.corp.entergy.com Files                         Size                 Date & Time MESSAGE                       1376                 6/22/2009 12:22:02 PM Options Priority:                     Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Post Office:   LITEXETSP002.etrsouth.corp.entergy.com Files     Size     Date & Time MESSAGE   1376     6/22/2009 12:22:02 PM
Recipients Received:}}
 
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}

Latest revision as of 00:57, 7 December 2019

Lr Hearing - FW: Confirmation Needed
ML092150679
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 06/22/2009
From:
- No Known Affiliation
To:
Division of License Renewal
References
Download: ML092150679 (2)


Text

IPRenewal NPEmails From: STROUD, MICHAEL D [MSTROUD@entergy.com]

Sent: Monday, June 22, 2009 12:22 PM To: Green, Kimberly

Subject:

FW: Confirmation needed From: STROUD, MICHAEL D Sent: Monday, June 22, 2009 9:17 AM To: Green, Kimberly

Subject:

RE: Confirmation needed

Kim, The LRA Table 3.3.2-18-IP2 should be just like the LRA Table 3.3.2-18-IP3 for valve body with gray cast iron in air-indoor (int). The aging effect should be Loss of Material and the AMP should be External Surfaces Monitoring. The rest of the table is correct.

Thanks Mike From: Green, Kimberly [1]

Sent: Friday, June 19, 2009 10:10 AM To: STROUD, MICHAEL D

Subject:

Confirmation needed Hi Mike, Could you please confirm if the following two entries (from May 15, 2009) letter are accurate?

From LRA Table 3.3.2-18-IP2 Valve body Pressure Gray cast iron Air - indoor None None V.A-19 3.2.1-32 boundary (int) (E-29)

From LRA Table 3.3.2-18-IP3 Valve body Pressure Gray cast iron Air - indoor Loss of material External V.A-19 3.2.1-32 boundary (int) Surfaces (E-29)

Monitoring I would think that the two entries should be the same, but am not sure which one Entergy meant to use.

Also, don't forget to ask about the changes to LRA Section 2.3.3.12 for IP2 regarding the deletion of the CO2 references.

Thanks, Kim 1

Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 1485 Mail Envelope Properties (A79A58994C541C48BBCFB319610763CB0578E905)

Subject:

FW: Confirmation needed Sent Date: 6/22/2009 12:21:43 PM Received Date: 6/22/2009 12:22:02 PM From: STROUD, MICHAEL D Created By: MSTROUD@entergy.com Recipients:

"Green, Kimberly" <Kimberly.Green@nrc.gov>

Tracking Status: None Post Office: LITEXETSP002.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 1376 6/22/2009 12:22:02 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: