(One intermediate revision by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML13140A087 | | | number = ML13140A087 |
| | issue date = 05/20/2013 | | | issue date = 05/20/2013 |
| | title = MF1481- Duane Arnold Acceptance Review Relief Request for 4th ISI- 2nd Period Limited Weld Examinations - LIC-109 Acceptance Review Results | | | title = NRR E-mail Capture - MF1481- Duane Arnold Acceptance Review Relief Request for 4th ISI- 2nd Period Limited Weld Examinations - LIC-109 Acceptance Review Results |
| | author name = Feintuch K | | | author name = Feintuch K |
| | author affiliation = NRC/NRR/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/DORL/LPLIII-1 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1 NRR-PMDAPEm Resource From:Feintuch, Karl Sent: Monday, May 20, 2013 7:48 AM To: Byrne, Thomas Cc: Faria-Ocasio, Carolyn | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Feintuch, Karl Sent: Monday, May 20, 2013 7:48 AM To: Byrne, Thomas Cc: Faria-Ocasio, Carolyn |
|
| |
|
| ==Subject:== | | ==Subject:== |
| MF1481- Duane Arnold Acceptance Review Relie f Request for 4th ISI- 2nd Period Limited Weld Examinations - LIC-109 Acceptance Review Results | | MF1481- Duane Arnold Acceptance Review Relief Request for 4th ISI- 2nd Period Limited Weld Examinations - LIC-109 Acceptance Review Results |
|
| |
|
| ==Dear Mr. Byrne:== | | ==Dear Mr. Byrne:== |
| By letter dated April 12, 2013 (ADAMS Accession No. ML13106A147), NextEra Energy Duane Ar nold, LLC, (the licensee) requested relief for the Fourth 10-Year Interval of the DAEC Inservice Inspection Program from IWB-2500 of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI, to allow for the performance of limited examinations of various welds at the Duane Arnold Energy Center (DAEC). The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
| |
|
| |
| The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
| |
|
| |
|
| | By letter dated April 12, 2013 (ADAMS Accession No. ML13106A147), NextEra Energy Duane Arnold, LLC, (the licensee) requested relief for the Fourth 10-Year Interval of the DAEC Inservice Inspection Program from IWB-2500 of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI, to allow for the performance of limited examinations of various welds at the Duane Arnold Energy Center (DAEC). The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. |
| If you have any questions, please contact Carolyn Faría at 301-415-4050. | | If you have any questions, please contact Carolyn Faría at 301-415-4050. |
| In accordance with our process as described in LIC-109, "Acceptance Review Procedures," I am placing a copy of this email in ADAMS as a publicly-available, official agency record. | | In accordance with our process as described in LIC-109, "Acceptance Review Procedures," I am placing a copy of this email in ADAMS as a publicly-available, official agency record. |
| | Karl Feintuch, Project Manager Carolyn Faria-Ocasio, Project Manager LPL3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation USNRC 1 |
|
| |
|
| Karl Feintuch, Project Manager Carolyn Faria-Ocasio, Project Manager LPL3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation USNRC Hearing Identifier: NRR_PMDA Email Number: 701 Mail Envelope Properties (Karl.Feintuch@nrc.gov20130520074700)
| | Hearing Identifier: NRR_PMDA Email Number: 701 Mail Envelope Properties (Karl.Feintuch@nrc.gov20130520074700) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| MF1481- Duane Arnold Acceptance Review Relief Request for 4th ISI- 2nd Period Limited Weld Examinations - LIC-109 Acceptance Review Results Sent Date: 5/20/2013 7:47:37 AM Received Date: 5/20/2013 7:47:00 AM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients: "Faria-Ocasio, Carolyn" <Carolyn.Faria-Ocasio@nrc.gov> Tracking Status: None "Byrne, Thomas" <Thomas.Byrne@nexteraenergy.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2235 5/20/2013 7:47:00 AM | | MF1481- Duane Arnold Acceptance Review Relief Request for 4th ISI- 2nd Period Limited Weld Examinations - LIC-109 Acceptance Review Results Sent Date: 5/20/2013 7:47:37 AM Received Date: 5/20/2013 7:47:00 AM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients: |
| | | "Faria-Ocasio, Carolyn" <Carolyn.Faria-Ocasio@nrc.gov> |
| Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:}} | | Tracking Status: None "Byrne, Thomas" <Thomas.Byrne@nexteraenergy.com> |
| | Tracking Status: None Post Office: |
| | Files Size Date & Time MESSAGE 2235 5/20/2013 7:47:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:E-Mail
MONTHYEARML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML22067A0922022-03-0303 March 2022 State Consultation - Duane Arnold ISFSI-Only EP License Amendment ML22040A1162022-02-0808 February 2022 Email to G. Van Noordennen Zion and La Crosse Review Schedule Changes ML22027A3582022-01-26026 January 2022 DAEC: CY2022 Inspection Plan, Docket No: 05000331, License No: DPR-49 ML22007A3102022-01-0505 January 2022 State Consultation - Draft No Significant Hazards Determination Regarding a LAR for NextEra Energy Duane Arnold, LLC, Duane Arnold Energy Center ISFSI in Palo, Iowa ML22005A0992022-01-0404 January 2022 Email from a Snyder to a Leek Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo, Iowa ML22005A0862022-01-0404 January 2022 1-4-2022 Email Communication to Duane Arnold Regarding Its ISFSI Related Exemption Request on Supplemental Information Needed ML22005A1012022-01-0404 January 2022 Email from a Leek to a Snyder Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo Iowa ML22004A0122022-01-0303 January 2022 E-mail from M. Davis, NextEra, to A. Snyder, NRC, - Duane Arnold Energy Center - Supplement Information to Technical Specification Amendment Application ML21354A6722021-12-17017 December 2021 Email to State of Iowa - Draft EA on Duane Arnold Exemption ML21214A0502021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Physical Security Plan ML21214A0482021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Emergency Plan ML21165A1212021-06-10010 June 2021 E-mail from M. Davis, Duane Arnold, to M. Doell and R. Edwards, NRC - Duane Arnold Defueled Emergency Plan Implementation Confirmation ML21117A2752021-04-26026 April 2021 Acceptance of Updated Spent Fuel Management Plan ML21089A2092021-03-19019 March 2021 Spent Fuel Pattern Procedure ML21068A3352021-03-0707 March 2021 Acceptance of License Amendment Request to Adopt ISFSI-Only Technical Specifications ML21056A2172021-02-17017 February 2021 Acceptance of License Amendment Request to Revise the Physical Security Plan Requirements ML21032A1852021-02-0101 February 2021 Daec_ CY2021 Inspection Plan ML21006A4052021-01-0606 January 2021 NRR E-mail Capture - Final RAI - Duane Arnold - Post-Shutdown Decommissioning Activities Report ML20338A0032020-12-0101 December 2020 Letter from EPRI to Mr. Scott Wall, BWRVIP 2020-100, 288 Surveillance Capsule Test Results Report ML20316A0212020-11-10010 November 2020 NRR E-mail Capture - Final RAI - Duane Arnold - Duane Arnold Amendment for Proposed Defueled EP and EAL Scheme ML20289A3522020-10-14014 October 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Requested Licensing Action, One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic (EPID No. L-2020-LLE-01 ML20153A3772020-05-28028 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center Quality Assurance Topical Report (FPL-3) - EPID L-2020-LLQ-0002) ML20154K6202020-05-27027 May 2020 COVID-19 Preparedness Assessments for FEMA Region VII Duane Arnold Energy Center (DAEC) and Quad Cities Generating Station (Qcgs) ML20141L8132020-05-19019 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center (DAEC) - Exemption Request for Security Training Requirements Due to COVID-19 Pandemic - EPID L-2020-LLE-0042 to 45, L-2020-LLE-0051 ML20129J8282020-05-0606 May 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from Portions of 10 CFR 50.47 and Appendix E - EPID L-2020-LLE-0023 ML20127H8662020-05-0505 May 2020 NRR E-mail Capture - Duane Arnold Energy Center (DAEC) - Request for Additional Information (RAI) - Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20122A1152020-04-30030 April 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Post-Shutdown Decommissioning Activities Report ML20087F2872020-03-26026 March 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20129J8322020-03-19019 March 2020 NRR E-mail Capture - (External_Sender) Teleconference with Nextra Energy - Duane Arnold Physical Security Plan LIC-109 Review Status ML20022A3602020-01-22022 January 2020 NRR E-mail Capture - Duane Arnold Energy Center - Acceptance of Requested Licensing Action, Proposed Partial Exemption from Record Retention Requirements ML19352G6872019-12-11011 December 2019 12-11-19 Email to FEMA: Response to FEMA Questions on Proposed DAEC Emergency Plan ML19302G9732019-10-29029 October 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186): Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19302G3212019-10-29029 October 2019 LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186) - Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19280A0352019-10-0404 October 2019 NRR E-mail Capture - Final - RAI Related to License Amendment Request (TSCR-182) for Proposed Changes to the Emergency Plan for Permanently Defueled Conditions at Duane Arnold Energy Center (DAEC) - L-2019-LLA-0075 ML19206A2182019-07-25025 July 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-183) - Application to Revise Operating License and TS for Permanently Defueled Condition - EPID L-2019-LLA-0130 ML19183A0172019-06-26026 June 2019 NRR E-mail Capture - LIC-109 Acceptance of Request for Change in the BWRVIP Integrated Surveillance Program Test Schedule to Accommodate Early Closure of the Duane Arnold Energy Center - EPID L-2019-LRO-0042 ML19122A4882019-04-29029 April 2019 NRR E-mail Capture - LIC-109 Acceptance of License Amendment Request (TSCR-182) for Duane Arnold Energy Center (DAEC) - Proposed Changes to the Emergency Plan for Permanently Defueled Condition - EPID L-2019-LLA-0075 ML19086A3502019-03-27027 March 2019 NRR E-mail Capture - LIC-109 Acceptance of the Request for Exemption from 10 CFR 73.55(p)(1)(I) and 10 CFR 73.55(p)(1)(ii) for Duane Arnold Energy Center - EPID L-2019-LLE-0003 ML19064A2032019-03-0404 March 2019 NRR E-mail Capture - Results of LIC-109 Acceptance Review - Duane Arnold Energy Center - Request for Approval of Certified Fuel Handler Training Program, EPID L-2019-LLL-0003 ML18283B0522018-10-0909 October 2018 NRR E-mail Capture - Final Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18255A2922018-09-11011 September 2018 NRR E-mail Capture - Draft Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18166A2982018-06-15015 June 2018 NRR E-mail Capture - Draft Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18108A3102018-04-12012 April 2018 NRR E-mail Capture - Audit at NextEra Headquarters, Juno Beach, Florida - April 24, 2018 Through April 26, 2018 - 50.69 LARs for Duane Arnold Energy Center (Daec), and Point Beach Nuclear Plant (Pbnp), Units 1 and 2 - EPIDs L-2017-LLA-0283/ ML18088A0102018-03-28028 March 2018 NRR E-mail Capture - Final RAI for Duane Arnold (DAEC) 5th-10 Year ISI (RR-05) ML18037B0032018-02-0606 February 2018 NRR E-mail Capture - Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288 ML18025A2362018-01-24024 January 2018 NRR E-mail Capture - Resent - LIC-109 Acceptance - Duane Arnold LAR (TSCR-166) - Adoption of Emergency Action Level (EAL) Scheme Pursuant to NEI 99-01, Revision 6, Development of EALs for Non-Passive Reactors ML18023A0752018-01-22022 January 2018 NRR E-mail Capture - LIC-109 Acceptance - Duane Arnold License Amendment Request (LAR) (TSCR-179) - Application to Add Technical Specification 3.2.3, Linear Heat Generation Rate - EPID: L-2017-LLA-0436 2024-09-04
[Table view] |
Text
NRR-PMDAPEm Resource From: Feintuch, Karl Sent: Monday, May 20, 2013 7:48 AM To: Byrne, Thomas Cc: Faria-Ocasio, Carolyn
Subject:
MF1481- Duane Arnold Acceptance Review Relief Request for 4th ISI- 2nd Period Limited Weld Examinations - LIC-109 Acceptance Review Results
Dear Mr. Byrne:
By letter dated April 12, 2013 (ADAMS Accession No. ML13106A147), NextEra Energy Duane Arnold, LLC, (the licensee) requested relief for the Fourth 10-Year Interval of the DAEC Inservice Inspection Program from IWB-2500 of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, to allow for the performance of limited examinations of various welds at the Duane Arnold Energy Center (DAEC). The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact Carolyn Faría at 301-415-4050.
In accordance with our process as described in LIC-109, "Acceptance Review Procedures," I am placing a copy of this email in ADAMS as a publicly-available, official agency record.
Karl Feintuch, Project Manager Carolyn Faria-Ocasio, Project Manager LPL3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation USNRC 1
Hearing Identifier: NRR_PMDA Email Number: 701 Mail Envelope Properties (Karl.Feintuch@nrc.gov20130520074700)
Subject:
MF1481- Duane Arnold Acceptance Review Relief Request for 4th ISI- 2nd Period Limited Weld Examinations - LIC-109 Acceptance Review Results Sent Date: 5/20/2013 7:47:37 AM Received Date: 5/20/2013 7:47:00 AM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients:
"Faria-Ocasio, Carolyn" <Carolyn.Faria-Ocasio@nrc.gov>
Tracking Status: None "Byrne, Thomas" <Thomas.Byrne@nexteraenergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2235 5/20/2013 7:47:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: