ML13169A244: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/17/2013
| issue date = 06/17/2013
| title = Memorandum S. Wastler Technical Assistant Request - Review the Prairie Island Nuclear Generating Plant Independent Spent Fuel Storage Installation Request for Exemption from Physical Security Requirements (TAC L24750)
| title = Memorandum S. Wastler Technical Assistant Request - Review the Prairie Island Nuclear Generating Plant Independent Spent Fuel Storage Installation Request for Exemption from Physical Security Requirements (TAC L24750)
| author name = Sampson M M
| author name = Sampson M
| author affiliation = NRC/NMSS/SFST/LID/LB
| author affiliation = NRC/NMSS/SFST/LID/LB
| addressee name = Wastler S
| addressee name = Wastler S
Line 9: Line 9:
| docket = 05000282, 05000306, 07200010
| docket = 05000282, 05000306, 07200010
| license number = DPR-042, DPR-060, SNM-2506
| license number = DPR-042, DPR-060, SNM-2506
| contact person = Sampson M M
| contact person = Sampson M
| case reference number = TAC L24750
| case reference number = TAC L24750
| document type = Memoranda
| document type = Memoranda
| page count = 3
| page count = 3
| project =  
| project = TAC:L24750
| stage = Approval
| stage = Approval
}}
}}


=Text=
=Text=
{{#Wiki_filter:June 17, 2013 MEMORANDUM TO: Sandra Wastler, Chief Materials, Waste, and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM: Michele Sampson, Acting Chief   /RA/   K. L. Banovac for Licensing Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards  
{{#Wiki_filter:June 17, 2013 MEMORANDUM TO:           Sandra Wastler, Chief Materials, Waste, and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM:                     Michele Sampson, Acting Chief /RA/ K. L. Banovac for Licensing Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards


==SUBJECT:==
==SUBJECT:==
TECHNICAL ASSISTANCE REQUEST - REVIEW THE PRAIRIE ISLAND NUCLEAR GENERATING PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION REQUEST FOR EXEMPTION  
TECHNICAL ASSISTANCE REQUEST - REVIEW THE PRAIRIE ISLAND NUCLEAR GENERATING PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION REQUEST FOR EXEMPTION FROM PHYSICAL SECURITY REQUIREMENTS (TAC NO. L24750)
The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project:
PROJECT: Security Evaluation of the Prairie Island Nuclear Generating Plant (PINGP)
Independent Spent Fuel Storage Installation (ISFSI) Request for Exemption from Physical Security Requirements. The ADAMS Accession Number for the package is ML131400116.
DOCKET NOS.:              72-10; 50-282; 50-306 TAC NO:                  L24750 LICENSE NOS.:            SNM-2506; DPR-42; DPR-60 REQUESTED ACTION: NMSS/SFST requests that NSIR/DSP review PINGPs request for exemption from physical security requirements. Based on the results of your review, prepare a Security Evaluation documenting the staffs reasons for approving or denying the proposed changes.
To facilitate this request, we ask that you respond by June 23, 2013. Should any additional information be needed from the applicant to support your review, we ask that you transmit a draft request for additional information to us by September 17, 2013. The applicant will normally be allowed two months to provide a response. The SFST project manager will keep your staff informed of any schedule changes.


FROM PHYSICAL SECURITY REQUIREMENTS (TAC NO. L24750)
S. Wastler                                  Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.
The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security
Name of NSIR/DSP assigned Reviewer: _____________________________
NSIR/DSP Project Completion Date: ________________________________
NSIR/DSP Branch Chief Signature: _________________________________


Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project:
==Contact:==
Pamela Longmire, Ph.D. (301) 287-0829 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.


PROJECT:  Security Evaluation of the Prairie Island Nuclear Generating Plant (PINGP) Independent Spent Fuel Storage Installation (ISFSI) Request for Exemption from Physical Security Requirements. The ADAMS Accession Number for the package is ML131400116.  
S. Wastler                                      Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.
Name of NSIR/DSP assigned Reviewer: _____________________________
NSIR/DSP Project Completion Date: ________________________________
NSIR/DSP Branch Chief Signature: _________________________________


DOCKET NOS.:  72-10; 50-282; 50-306 TAC NO:  L24750 LICENSE NOS.:  SNM-2506; DPR-42; DPR-60
==Contact:==
 
Pamela Longmire, Ph.D. (301) 287-0829 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.
REQUESTED ACTION:  NMSS/SFST requests that NSIR/DSP review PINGP's request for exemption from physical security requirements. Based on the results of your review, prepare a Security Evaluation documenting the staff's reasons for approving or denying the proposed changes.
G:\SFST\Prairie Island\PSP\TAR - L24750.docx ADAMS P8 Accession No.: ML13169A244 OFC             SFST         E         SFST               SFST NAME             PLongmire             WWheatley         KBanovac for MSampson DATE           6/12/2013             6/13/2013           6/17/2013 C=Without attachment/enclosure E=With attachment/enclosure N=No copy OFFICIAL RECORD COPY}}
 
To facilitate this request, we ask that you respond by June 23, 2013. Should any additional information be needed from the applicant to support your review, we ask that you transmit a draft request for additional information to us by September 17, 2013. The applicant will normally be allowed two months to provide a response. The SFST project manager will keep your staff informed of any schedule changes.
 
S. Wastler                                                        Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.
 
Name of NSIR/DSP assigned Reviewer: ___________
__________________ NSIR/DSP Project Completion Date: __________________
______________ NSIR/DSP Branch Chief Signature: ___________________________
______ Contact: Pamela Longmire, Ph.D. (301) 287-0829 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.
Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.
 
Name of NSIR/DSP assigned Reviewer: ___________
__________________ NSIR/DSP Project Completion Date: __________________
______________ NSIR/DSP Branch Chief Signature: ___________________________
______ Contact: Pamela Longmire, Ph.D. (301) 287-0829 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.
G:\SFST\Prairie Island\PSP\TAR - L24750.docx ADAMS P8 Accession No.: ML13169A244 OFC SFST E SFST SFST NAME PLongmire WWheatley KBanovac for MSampson DATE 6/12/2013 6/13/2013 6/17/2013 C=Without attachment/enclosure E=With attachment/enclosure N=No copy OFFICIAL RECORD COPY}}

Latest revision as of 13:11, 5 December 2019

Memorandum S. Wastler Technical Assistant Request - Review the Prairie Island Nuclear Generating Plant Independent Spent Fuel Storage Installation Request for Exemption from Physical Security Requirements (TAC L24750)
ML13169A244
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/17/2013
From: Michele Sampson
NRC/NMSS/SFST/LID/LB
To: Wastler S
Division of Security Policy
Sampson M
References
TAC L24750
Download: ML13169A244 (3)


Text

June 17, 2013 MEMORANDUM TO: Sandra Wastler, Chief Materials, Waste, and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM: Michele Sampson, Acting Chief /RA/ K. L. Banovac for Licensing Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards

SUBJECT:

TECHNICAL ASSISTANCE REQUEST - REVIEW THE PRAIRIE ISLAND NUCLEAR GENERATING PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION REQUEST FOR EXEMPTION FROM PHYSICAL SECURITY REQUIREMENTS (TAC NO. L24750)

The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project:

PROJECT: Security Evaluation of the Prairie Island Nuclear Generating Plant (PINGP)

Independent Spent Fuel Storage Installation (ISFSI) Request for Exemption from Physical Security Requirements. The ADAMS Accession Number for the package is ML131400116.

DOCKET NOS.: 72-10; 50-282; 50-306 TAC NO: L24750 LICENSE NOS.: SNM-2506; DPR-42; DPR-60 REQUESTED ACTION: NMSS/SFST requests that NSIR/DSP review PINGPs request for exemption from physical security requirements. Based on the results of your review, prepare a Security Evaluation documenting the staffs reasons for approving or denying the proposed changes.

To facilitate this request, we ask that you respond by June 23, 2013. Should any additional information be needed from the applicant to support your review, we ask that you transmit a draft request for additional information to us by September 17, 2013. The applicant will normally be allowed two months to provide a response. The SFST project manager will keep your staff informed of any schedule changes.

S. Wastler Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.

Name of NSIR/DSP assigned Reviewer: _____________________________

NSIR/DSP Project Completion Date: ________________________________

NSIR/DSP Branch Chief Signature: _________________________________

Contact:

Pamela Longmire, Ph.D. (301) 287-0829 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.

S. Wastler Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.

Name of NSIR/DSP assigned Reviewer: _____________________________

NSIR/DSP Project Completion Date: ________________________________

NSIR/DSP Branch Chief Signature: _________________________________

Contact:

Pamela Longmire, Ph.D. (301) 287-0829 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.

G:\SFST\Prairie Island\PSP\TAR - L24750.docx ADAMS P8 Accession No.: ML13169A244 OFC SFST E SFST SFST NAME PLongmire WWheatley KBanovac for MSampson DATE 6/12/2013 6/13/2013 6/17/2013 C=Without attachment/enclosure E=With attachment/enclosure N=No copy OFFICIAL RECORD COPY