ML16252A204: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 09/09/2016 | | issue date = 09/09/2016 | ||
| title = Memo Ico Staff Review of Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revision 20 (Ns113989) for Verification of ASM Order EA-14-044 Implementation (Cac# L25130) | | title = Memo Ico Staff Review of Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revision 20 (Ns113989) for Verification of ASM Order EA-14-044 Implementation (Cac# L25130) | ||
| author name = Mossman T | | author name = Mossman T | ||
| author affiliation = NRC/NSIR/DSP | | author affiliation = NRC/NSIR/DSP | ||
| addressee name = Silva P | | addressee name = Silva P | ||
| addressee affiliation = NRC/NMSS/DSFM/IOB | | addressee affiliation = NRC/NMSS/DSFM/IOB | ||
| docket = 05000390, 05000391 | | docket = 05000390, 05000391 | ||
Line 13: | Line 13: | ||
| document type = Memoranda | | document type = Memoranda | ||
| page count = 2 | | page count = 2 | ||
| project = | | project = CAC:L25130 | ||
| stage = | | stage = Approval | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:September 09, 2016 MEMORANDUM TO: Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Timothy Mossman, Chief /RA/ | ||
Materials Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response | |||
==SUBJECT:== | ==SUBJECT:== | ||
STAFF REVIEW OF WATTS BAR NUCLEAR PLANT SECURITY PLAN REVISION 20 FOR THE VERFICATION OF ASM | STAFF REVIEW OF WATTS BAR NUCLEAR PLANT SECURITY PLAN REVISION 20 FOR THE VERFICATION OF ASM (EA-14-044) IMPLEMENTATION CAC NO. L25130) | ||
The staff has completed its review of the Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (PSP) Revision 20 which was submitted by the Tennessee Valley Authority (TVA) to the NRC by letter dated June 29, 2016. | The staff has completed its review of the Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (PSP) Revision 20 which was submitted by the Tennessee Valley Authority (TVA) to the NRC by letter dated June 29, 2016. | ||
Based on our review, we find the submitted PSP to be acceptable and the Watts Bar Nuclear Plant has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, and the Additional Security Measures (ASMs) imposed by NRC Order EA-14-044. | |||
A physical security inspection (IRs 05000390, 391/2016403 and 07201048/2016401) (ADAMS Accession No. ML16223A870) was completed on July 14, 2016 which verified the PSP successfully meets the objectives outlined in IP 81311. Based on staffs review, the Watts Bar PSP (Rev.20) has met the performance objectives and general requirements outlined in 10 CFR, Section 73.55 and the ASMs imposed by the NRC. | |||
Docket Nos. 50-390, 72-1048 If you have any questions, please contact Douglas Garner, at 301-287-0929, douglas.garner@nrc.gov CONTACT: Doug Garner, NSIR/DSP 301-287-0929 | |||
September 09, 2016 MEMORANDUM TO: Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Timothy Mossman, Chief /RA/ | |||
Materials Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response | |||
September 09, 2016 | |||
==SUBJECT:== | ==SUBJECT:== | ||
STAFF REVIEW OF WATTS BAR NUCLEAR PLANT SECURITY PLAN REVISION 20 FOR THE VERFICATION OF ASM | STAFF REVIEW OF WATTS BAR NUCLEAR PLANT SECURITY PLAN REVISION 20 FOR THE VERFICATION OF ASM (EA-14-044) IMPLEMENTATION CAC NO. L25130) | ||
The staff has completed its review of the Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (PSP) Revision 20 which was submitted by the Tennessee Valley Authority (TVA) to the NRC by letter dated June 29, 2016. | |||
The staff has completed its review of the Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (PSP) Revision 20 which was submitted by the Tennessee Valley Authority (TVA) to the NRC by letter dated June 29, 2016. | Based on our review, we find the submitted PSP to be acceptable and the Watts Bar Nuclear Plant has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, and the Additional Security Measures (ASMs) imposed by NRC Order EA-14-044. | ||
A physical security inspection (IRs 05000390, 391/2016403 and 07201048/2016401) (ADAMS Accession No. ML16223A870) was completed on July 14, 2016 which verified the PSP successfully meets the objectives outlined in IP 81311. Based on staffs review, the Watts Bar PSP (Rev.20) has met the performance objectives and general requirements outlined in 10 CFR, Section 73.55 and the ASMs imposed by the NRC. | |||
Based on our review, we find the submitted PSP to be acceptable and the Watts Bar Nuclear Plant has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, and the Additional Security Measures (ASMs) imposed by NRC Order EA-14-044. | Docket Nos. 50-390, 72-1048 If you have any questions, please contact Douglas Garner, at 301-287-0929, douglas.garner@nrc.gov CONTACT: Doug Garner, NSIR/DSP 301-287-0929 DISTRIBUTION: | ||
DSP r/f ADAMS Accession No. ML16252A204 OFFICE DSP/MWSB MWSB/BC NAME D. Garner T. Mossman DATE 09/08/16 09/09/16}} | |||
A physical security inspection (IRs 05000390, 391/2016403 and 07201048/2016401) (ADAMS Accession No. ML16223A870) was completed on July 14, 2016 which verified the PSP | |||
Docket Nos. 50-390, 72-1048 If you have any questions, please contact Douglas Garner, at 301-287-0929, douglas.garner@nrc.gov CONTACT: | |||
ADAMS Accession No. ML16252A204 OFFICE DSP/MWSB MWSB/BC NAME D. Garner T. Mossman | |||
}} |
Latest revision as of 13:13, 4 December 2019
ML16252A204 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 09/09/2016 |
From: | Tim Mossman Division of Security Policy |
To: | Patricia Silva NRC/NMSS/DSFM/IOB |
Doug, Garner | |
References | |
CAC L25130, EA-14-044 | |
Download: ML16252A204 (2) | |
Text
September 09, 2016 MEMORANDUM TO: Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Timothy Mossman, Chief /RA/
Materials Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response
SUBJECT:
STAFF REVIEW OF WATTS BAR NUCLEAR PLANT SECURITY PLAN REVISION 20 FOR THE VERFICATION OF ASM (EA-14-044) IMPLEMENTATION CAC NO. L25130)
The staff has completed its review of the Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (PSP) Revision 20 which was submitted by the Tennessee Valley Authority (TVA) to the NRC by letter dated June 29, 2016.
Based on our review, we find the submitted PSP to be acceptable and the Watts Bar Nuclear Plant has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, and the Additional Security Measures (ASMs) imposed by NRC Order EA-14-044.
A physical security inspection (IRs 05000390, 391/2016403 and 07201048/2016401) (ADAMS Accession No. ML16223A870) was completed on July 14, 2016 which verified the PSP successfully meets the objectives outlined in IP 81311. Based on staffs review, the Watts Bar PSP (Rev.20) has met the performance objectives and general requirements outlined in 10 CFR, Section 73.55 and the ASMs imposed by the NRC.
Docket Nos. 50-390, 72-1048 If you have any questions, please contact Douglas Garner, at 301-287-0929, douglas.garner@nrc.gov CONTACT: Doug Garner, NSIR/DSP 301-287-0929
September 09, 2016 MEMORANDUM TO: Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Timothy Mossman, Chief /RA/
Materials Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response
SUBJECT:
STAFF REVIEW OF WATTS BAR NUCLEAR PLANT SECURITY PLAN REVISION 20 FOR THE VERFICATION OF ASM (EA-14-044) IMPLEMENTATION CAC NO. L25130)
The staff has completed its review of the Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (PSP) Revision 20 which was submitted by the Tennessee Valley Authority (TVA) to the NRC by letter dated June 29, 2016.
Based on our review, we find the submitted PSP to be acceptable and the Watts Bar Nuclear Plant has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, and the Additional Security Measures (ASMs) imposed by NRC Order EA-14-044.
A physical security inspection (IRs 05000390, 391/2016403 and 07201048/2016401) (ADAMS Accession No. ML16223A870) was completed on July 14, 2016 which verified the PSP successfully meets the objectives outlined in IP 81311. Based on staffs review, the Watts Bar PSP (Rev.20) has met the performance objectives and general requirements outlined in 10 CFR, Section 73.55 and the ASMs imposed by the NRC.
Docket Nos. 50-390, 72-1048 If you have any questions, please contact Douglas Garner, at 301-287-0929, douglas.garner@nrc.gov CONTACT: Doug Garner, NSIR/DSP 301-287-0929 DISTRIBUTION:
DSP r/f ADAMS Accession No. ML16252A204 OFFICE DSP/MWSB MWSB/BC NAME D. Garner T. Mossman DATE 09/08/16 09/09/16