ML18037B003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18037B003
| number = ML18037B003
| issue date = 02/06/2018
| issue date = 02/06/2018
| title = 2018/02/06 NRR E-mail Capture - Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288
| title = NRR E-mail Capture - Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288
| author name = Chawla M L
| author name = Chawla M
| author affiliation = NRC/NRR/DORL/LPLIII
| author affiliation = NRC/NRR/DORL/LPLIII
| addressee name = Davis J M
| addressee name = Davis J
| addressee affiliation = NextEra Energy Duane Arnold, LLC
| addressee affiliation = NextEra Energy Duane Arnold, LLC
| docket = 05000331
| docket = 05000331
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1NRR-DMPSPEm Resource From:Chawla, Mahesh Sent:Tuesday, February 06, 2018 9:18 AM To:Davis, J.Michael (J.Michael
{{#Wiki_filter:NRR-DMPSPEm Resource From:                             Chawla, Mahesh Sent:                             Tuesday, February 06, 2018 9:18 AM To:                               Davis, J.Michael (J.Michael.Davis@nexteraenergy.com);
.Davis@nexteraenergy.com);
laura.swenzinski@nexteraenergy.com; Murrell, Bob (Bob.Murrell@nexteraenergy.com);
laura.swenzinski@nexteraenergy.com; Murrell, Bob (Bob.Murrell@nexteraenergy.com); 'Weaver, Tracy'; 'Probst, Jim' Cc:Catron, Steve (Steve.Catron@fpl.com); Kilby, Gary
                                  'Weaver, Tracy'; 'Probst, Jim' Cc:                               Catron, Steve (Steve.Catron@fpl.com); Kilby, Gary


==Subject:==
==Subject:==
Draft Request for Additional Information  
Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) -
- Duane Arnold Energy Center (DAEC) -
License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288
License Amendment Request (TSCR-170), Revisi on to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288


==Dear Mr. Davis:==
==Dear Mr. Davis:==


By letter dated September 5, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17248A284), NextEra Energy Duane Arnold, LLC (NextEra), the licensee for Duane Arnold Energy Center (DAEC), has requested an amendment to DAEC Technical Specifications (TS). The proposed amendment would revise the DAEC TS 3.5.1, "ECCS - Operating" to decrease the nitrogen supply requirement for the Automatic Depressurization System (ADS) in Surveillance Requirement (SR) 3.5.1.3 from 100 days to 30 days. The U.S. Nuclear Regulatory Commission staff has reviewed the licensee's submittal and determined that additional information is required in order to complete the review.
By letter dated September 5, 2017 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17248A284), NextEra Energy Duane Arnold, LLC (NextEra), the licensee for Duane Arnold Energy Center (DAEC), has requested an amendment to DAEC Technical Specifications (TS). The proposed amendment would revise the DAEC TS 3.5.1, "ECCS - Operating" to decrease the nitrogen supply requirement for the Automatic Depressurization System (ADS) in Surveillance Requirement (SR) 3.5.1.3 from 100 days to 30 days. The U.S. Nuclear Regulatory Commission staff has reviewed the licensees submittal and determined that additional information is required in order to complete the review.
REQUEST FOR ADDITIONAL INFORMATION (RAI)
REQUEST FOR ADDITIONAL INFORMATION (RAI)
RAI - 1 Regulatory Basis: 10 CFR Part 50.36 ''Technical specifications," establishes the surveillance requirements related to the content of the TS.
RAI - 1 Regulatory Basis: 10 CFR Part 50.36 ''Technical specifications," establishes the surveillance requirements related to the content of the TS.
10 CFR Part 50.46, "Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors," requires an ECCS system that meets the criteria in 10 CFR 50.46(b) for cooling performance following a LOCA.  
10 CFR Part 50.46, Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors, requires an ECCS system that meets the criteria in 10 CFR 50.46(b) for cooling performance following a LOCA.
 
It was stated in Section 2.3 of the license amendment request (LAR),
It was stated in Section 2.3 of the license amendment request (LAR),
Review of the DAEC accident analyses has shown that the worst-case DAEC accident scenario will require the use of ADS for 3 days post-accident. Reducing the duration of time from 100 days to 30 days still provides ample conservativism for the DAEC accident analyses and allows for an increase in accumulator margin.
 
Please provide the following additional information:
Review of the DAEC accident analyses has shown that the worst-case DAEC accident scenario will require the use of ADS for 3 days post-accident. Reducing the duration of time from 100 days to 30 days still provides ample conservativism for the DAEC accident analyses and allows for an increase in accumulator margin.  
 
Please provide the following additional information:  
 
a) Describe the worst-case event, including the number of times the valves are required to cycle open over the 3 day post-accident period, and whether the ADS valves have adequate capacity available to cycle during that period.
a) Describe the worst-case event, including the number of times the valves are required to cycle open over the 3 day post-accident period, and whether the ADS valves have adequate capacity available to cycle during that period.
b) Confirm that the capacity to cycle the ADS valves open at least five times at design pressures will still remain available during the proposed 30 days period, as stated in NUREG-0737, "Clarification of TMI Action Plan Requirements," Item II.K.3.28, "Verify Qualifications of Accumulators on Automatic Depressurization System Valves."
b) Confirm that the capacity to cycle the ADS valves open at least five times at design pressures will still remain available during the proposed 30 days period, as stated in NUREG-0737, Clarification of TMI Action Plan Requirements, Item II.K.3.28, "Verify Qualifications of Accumulators on Automatic Depressurization System Valves."
Please arrange a teleconference with the NRC staff to discuss the above information. Thanks
Please arrange a teleconference with the NRC staff to discuss the above information. Thanks 1


2Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov
Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov 2


Hearing Identifier: NRR_DMPS Email Number: 147   Mail Envelope Properties   (MW2PR0901MB2442A1DEDE49AEFB1FA71527F1FD0)
Hearing Identifier:     NRR_DMPS Email Number:           147 Mail Envelope Properties       (MW2PR0901MB2442A1DEDE49AEFB1FA71527F1FD0)


==Subject:==
==Subject:==
Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288 Sent Date:   2/6/2018 9:17:33 AM Received Date: 2/6/2018 9:17:00 AM From:   Chawla, Mahesh Created By:   Mahesh.Chawla@nrc.gov  
Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) -
 
License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating -
Recipients:     "Catron, Steve (Steve.Catron@fpl.com)" <Steve.Catron@fpl.com> Tracking Status: None "Kilby, Gary" <Gary.Kilby@fpl.com> Tracking Status: None "Davis, J.Michael (J.Michael.Davis@nexteraenergy.com)" <J.Michael.Davis@nexteraenergy.com> Tracking Status: None "laura.swenzinski@nexteraenergy.com" <laura.swenzinski@nexteraenergy.com> Tracking Status: None "Murrell, Bob (Bob.Murrell@nexteraenergy.com)" <Bob.Murrell@nexteraenergy.com> Tracking Status: None
EPID L-2017-LLA-0288 Sent Date:               2/6/2018 9:17:33 AM Received Date:           2/6/2018 9:17:00 AM From:                   Chawla, Mahesh Created By:             Mahesh.Chawla@nrc.gov Recipients:
"'Weaver, Tracy'" <Tracy.Weaver@nexteraenergy.com> Tracking Status: None "'Probst, Jim'" <Jim.Probst@nexteraenergy.com> Tracking Status: None Post Office:   MW2PR0901MB2442.namprd09.prod.outlook.com Files     Size     Date & Time MESSAGE   2388     2/6/2018 9:17:00 AM
"Catron, Steve (Steve.Catron@fpl.com)" <Steve.Catron@fpl.com>
 
Tracking Status: None "Kilby, Gary" <Gary.Kilby@fpl.com>
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "Davis, J.Michael (J.Michael.Davis@nexteraenergy.com)" <J.Michael.Davis@nexteraenergy.com>
Tracking Status: None "laura.swenzinski@nexteraenergy.com" <laura.swenzinski@nexteraenergy.com>
Tracking Status: None "Murrell, Bob (Bob.Murrell@nexteraenergy.com)" <Bob.Murrell@nexteraenergy.com>
Tracking Status: None
"'Weaver, Tracy'" <Tracy.Weaver@nexteraenergy.com>
Tracking Status: None
"'Probst, Jim'" <Jim.Probst@nexteraenergy.com>
Tracking Status: None Post Office:             MW2PR0901MB2442.namprd09.prod.outlook.com Files                           Size                       Date & Time MESSAGE                         2388                       2/6/2018 9:17:00 AM Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:}}

Latest revision as of 13:58, 2 December 2019

NRR E-mail Capture - Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288
ML18037B003
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/06/2018
From: Mahesh Chawla
Plant Licensing Branch III
To: Jennifer Davis
NextEra Energy Duane Arnold
References
L-2017-LLA-0288
Download: ML18037B003 (3)


Text

NRR-DMPSPEm Resource From: Chawla, Mahesh Sent: Tuesday, February 06, 2018 9:18 AM To: Davis, J.Michael (J.Michael.Davis@nexteraenergy.com);

laura.swenzinski@nexteraenergy.com; Murrell, Bob (Bob.Murrell@nexteraenergy.com);

'Weaver, Tracy'; 'Probst, Jim' Cc: Catron, Steve (Steve.Catron@fpl.com); Kilby, Gary

Subject:

Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) -

License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288

Dear Mr. Davis:

By letter dated September 5, 2017 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML17248A284), NextEra Energy Duane Arnold, LLC (NextEra), the licensee for Duane Arnold Energy Center (DAEC), has requested an amendment to DAEC Technical Specifications (TS). The proposed amendment would revise the DAEC TS 3.5.1, "ECCS - Operating" to decrease the nitrogen supply requirement for the Automatic Depressurization System (ADS) in Surveillance Requirement (SR) 3.5.1.3 from 100 days to 30 days. The U.S. Nuclear Regulatory Commission staff has reviewed the licensees submittal and determined that additional information is required in order to complete the review.

REQUEST FOR ADDITIONAL INFORMATION (RAI)

RAI - 1 Regulatory Basis: 10 CFR Part 50.36 Technical specifications," establishes the surveillance requirements related to the content of the TS.

10 CFR Part 50.46, Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors, requires an ECCS system that meets the criteria in 10 CFR 50.46(b) for cooling performance following a LOCA.

It was stated in Section 2.3 of the license amendment request (LAR),

Review of the DAEC accident analyses has shown that the worst-case DAEC accident scenario will require the use of ADS for 3 days post-accident. Reducing the duration of time from 100 days to 30 days still provides ample conservativism for the DAEC accident analyses and allows for an increase in accumulator margin.

Please provide the following additional information:

a) Describe the worst-case event, including the number of times the valves are required to cycle open over the 3 day post-accident period, and whether the ADS valves have adequate capacity available to cycle during that period.

b) Confirm that the capacity to cycle the ADS valves open at least five times at design pressures will still remain available during the proposed 30 days period, as stated in NUREG-0737, Clarification of TMI Action Plan Requirements, Item II.K.3.28, "Verify Qualifications of Accumulators on Automatic Depressurization System Valves."

Please arrange a teleconference with the NRC staff to discuss the above information. Thanks 1

Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov 2

Hearing Identifier: NRR_DMPS Email Number: 147 Mail Envelope Properties (MW2PR0901MB2442A1DEDE49AEFB1FA71527F1FD0)

Subject:

Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) -

License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating -

EPID L-2017-LLA-0288 Sent Date: 2/6/2018 9:17:33 AM Received Date: 2/6/2018 9:17:00 AM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients:

"Catron, Steve (Steve.Catron@fpl.com)" <Steve.Catron@fpl.com>

Tracking Status: None "Kilby, Gary" <Gary.Kilby@fpl.com>

Tracking Status: None "Davis, J.Michael (J.Michael.Davis@nexteraenergy.com)" <J.Michael.Davis@nexteraenergy.com>

Tracking Status: None "laura.swenzinski@nexteraenergy.com" <laura.swenzinski@nexteraenergy.com>

Tracking Status: None "Murrell, Bob (Bob.Murrell@nexteraenergy.com)" <Bob.Murrell@nexteraenergy.com>

Tracking Status: None

"'Weaver, Tracy'" <Tracy.Weaver@nexteraenergy.com>

Tracking Status: None

"'Probst, Jim'" <Jim.Probst@nexteraenergy.com>

Tracking Status: None Post Office: MW2PR0901MB2442.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2388 2/6/2018 9:17:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: