ML18066A699: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(10 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18066A699
| number = ML18066A699
| issue date = 03/07/2018
| issue date = 03/07/2018
| title = 2018/03/07 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Withdrawal of Relief Request 50 Proposing Alternative ASME Section Xi Requirements for Pressure Retaining Boundary During System Leakage Tests
| title = NRR E-mail Capture - Palo Verde 1, 2, and 3 - Withdrawal of Relief Request 50 Proposing Alternative ASME Section XI Requirements for Pressure Retaining Boundary During System Leakage Tests
| author name = Lingam S P
| author name = Lingam S
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Cox M, Dilorenzo M
| addressee name = Cox M, Dilorenzo M
Line 13: Line 13:
| document type = E-Mail
| document type = E-Mail
| page count = 2
| page count = 2
| project =
| stage = Withdrawal
}}
}}


=Text=
=Text=
{{#Wiki_filter:1NRR-DMPSPEm ResourceFrom:Lingam, SivaSent:Wednesday, March 07, 2018 2:31 PMTo:Michael.Dilorenzo@aps.com; Matthew.Cox@aps.comCc:Pascarelli, Robert; Alley, David; Min, Seung; Thomas.N.Weber@aps.com
{{#Wiki_filter:NRR-DMPSPEm Resource From:                             Lingam, Siva Sent:                             Wednesday, March 07, 2018 2:31 PM To:                               Michael.Dilorenzo@aps.com; Matthew.Cox@aps.com Cc:                               Pascarelli, Robert; Alley, David; Min, Seung; Thomas.N.Weber@aps.com


==Subject:==
==Subject:==
Palo Verde 1, 2, and 3 - Withdrawal of Relief Request 50 Proposing Alternative ASME Section XI Requirements for Pressure Retaining Boundary During System Leakage TestsBy letter dated January 12, 2018 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML18016A172), Arizona Public Service Company (APS) submitted a relief request for Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3. The proposed relief request would have allowed the APS to perform the examination of selected Class 1 piping and valves at plant conditions other than those required by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code), Section XI, "Rules for Inservice Inspection [ISI] of Nuclear Power Plant Components," IWB-5222(b) by using the alternative boundaries and pressures permitted by ASME Code Cases N-798, "Alternative Pressure Testing Requirements for Class 1 Piping Between the First and Second Vent, Drain, and Test Isolation Devices, Section XI, Division 1" and N-800, "Alternative Pressure Testing Requirements for Class 1 Piping Between the First and Second Injection Valves, Section XI, Division 1," prior to the end of the third ISI interval for PVNGS, Units 1, 2, and 3. Subsequently, by letter dated March 6, 2018 (ADAMS Accession No. ML18066A108), APS withdrew the relief request based on the completion of rulemaking to adopt Regulatory Guide 1.147, Revision 18 into Title 10 of the Code of Federal Regulations, Section 50.55a. This rulemaking became effective on February 16, 2018, and eliminated the need for Relief Request 50.
Palo Verde 1, 2, and 3 - Withdrawal of Relief Request 50 Proposing Alternative ASME Section XI Requirements for Pressure Retaining Boundary During System Leakage Tests By letter dated January 12, 2018 (Agencywide Documents and Access Management System (ADAMS)
Accession No. ML18016A172), Arizona Public Service Company (APS) submitted a relief request for Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3. The proposed relief request would have allowed the APS to perform the examination of selected Class 1 piping and valves at plant conditions other than those required by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code), Section XI, Rules for Inservice Inspection [ISI] of Nuclear Power Plant Components, IWB-5222(b) by using the alternative boundaries and pressures permitted by ASME Code Cases N-798, Alternative Pressure Testing Requirements for Class 1 Piping Between the First and Second Vent, Drain, and Test Isolation Devices, Section XI, Division 1 and N-800, Alternative Pressure Testing Requirements for Class 1 Piping Between the First and Second Injection Valves, Section XI, Division 1, prior to the end of the third ISI interval for PVNGS, Units 1, 2, and 3. Subsequently, by letter dated March 6, 2018 (ADAMS Accession No. ML18066A108), APS withdrew the relief request based on the completion of rulemaking to adopt Regulatory Guide 1.147, Revision 18 into Title 10 of the Code of Federal Regulations, Section 50.55a. This rulemaking became effective on February 16, 2018, and eliminated the need for Relief Request 50.
By this email, we acknowledge your withdrawal letter.
By this email, we acknowledge your withdrawal letter.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4)
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4)
Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Grand Gulf Nuclear Station, Unit 1 Location: O9-H10; Mail Stop: O9-E3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov Hearing Identifier: NRR_DMPS Email Number: 226   Mail Envelope Properties   (Siva.Lingam@nrc.gov20180307143000)  
Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Grand Gulf Nuclear Station, Unit 1 Location: O9-H10; Mail Stop: O9-E3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1
 
Hearing Identifier:     NRR_DMPS Email Number:           226 Mail Envelope Properties     (Siva.Lingam@nrc.gov20180307143000)


==Subject:==
==Subject:==
Palo Verde 1, 2, and 3 - Withdrawal of Relief Request 50 Proposing Alternative ASME Section XI Requirements for Pressure Retaining Boundary During System Leakage Tests Sent Date:   3/7/2018 2:30:48 PM Received Date: 3/7/2018 2:30:00 PM From:   Lingam, Siva Created By:   Siva.Lingam@nrc.gov Recipients:     "Pascarelli, Robert" <Robert.Pascarelli@nrc.gov> Tracking Status: None "Alley, David" <David.Alley@nrc.gov> Tracking Status: None "Min, Seung" <Seung.Min@nrc.gov>
Palo Verde 1, 2, and 3 - Withdrawal of Relief Request 50 Proposing Alternative ASME Section XI Requirements for Pressure Retaining Boundary During System Leakage Tests Sent Date:               3/7/2018 2:30:48 PM Received Date:           3/7/2018 2:30:00 PM From:                   Lingam, Siva Created By:             Siva.Lingam@nrc.gov Recipients:
Tracking Status: None "Thomas.N.Weber@aps.com" <Thomas.N.Weber@aps.com> Tracking Status: None "Michael.Dilorenzo@aps.com" <Michael.Dilorenzo@aps.com> Tracking Status: None "Matthew.Cox@aps.com" <Matthew.Cox@aps.com>
"Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>
Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   1846     3/7/2018 2:30:00 PM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:      
Tracking Status: None "Alley, David" <David.Alley@nrc.gov>
}}
Tracking Status: None "Min, Seung" <Seung.Min@nrc.gov>
Tracking Status: None "Thomas.N.Weber@aps.com" <Thomas.N.Weber@aps.com>
Tracking Status: None "Michael.Dilorenzo@aps.com" <Michael.Dilorenzo@aps.com>
Tracking Status: None "Matthew.Cox@aps.com" <Matthew.Cox@aps.com>
Tracking Status: None Post Office:
Files                           Size                     Date & Time MESSAGE                         1846                     3/7/2018 2:30:00 PM Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:}}

Latest revision as of 11:40, 2 December 2019

NRR E-mail Capture - Palo Verde 1, 2, and 3 - Withdrawal of Relief Request 50 Proposing Alternative ASME Section XI Requirements for Pressure Retaining Boundary During System Leakage Tests
ML18066A699
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/07/2018
From: Siva Lingam
Plant Licensing Branch IV
To: Cox M, Dilorenzo M
Arizona Public Service Co
References
L-2018-LLR-0000
Download: ML18066A699 (2)


Text

NRR-DMPSPEm Resource From: Lingam, Siva Sent: Wednesday, March 07, 2018 2:31 PM To: Michael.Dilorenzo@aps.com; Matthew.Cox@aps.com Cc: Pascarelli, Robert; Alley, David; Min, Seung; Thomas.N.Weber@aps.com

Subject:

Palo Verde 1, 2, and 3 - Withdrawal of Relief Request 50 Proposing Alternative ASME Section XI Requirements for Pressure Retaining Boundary During System Leakage Tests By letter dated January 12, 2018 (Agencywide Documents and Access Management System (ADAMS)

Accession No. ML18016A172), Arizona Public Service Company (APS) submitted a relief request for Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3. The proposed relief request would have allowed the APS to perform the examination of selected Class 1 piping and valves at plant conditions other than those required by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code),Section XI, Rules for Inservice Inspection [ISI] of Nuclear Power Plant Components, IWB-5222(b) by using the alternative boundaries and pressures permitted by ASME Code Cases N-798, Alternative Pressure Testing Requirements for Class 1 Piping Between the First and Second Vent, Drain, and Test Isolation Devices,Section XI, Division 1 and N-800, Alternative Pressure Testing Requirements for Class 1 Piping Between the First and Second Injection Valves,Section XI, Division 1, prior to the end of the third ISI interval for PVNGS, Units 1, 2, and 3. Subsequently, by letter dated March 6, 2018 (ADAMS Accession No. ML18066A108), APS withdrew the relief request based on the completion of rulemaking to adopt Regulatory Guide 1.147, Revision 18 into Title 10 of the Code of Federal Regulations, Section 50.55a. This rulemaking became effective on February 16, 2018, and eliminated the need for Relief Request 50.

By this email, we acknowledge your withdrawal letter.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4)

Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Grand Gulf Nuclear Station, Unit 1 Location: O9-H10; Mail Stop: O9-E3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1

Hearing Identifier: NRR_DMPS Email Number: 226 Mail Envelope Properties (Siva.Lingam@nrc.gov20180307143000)

Subject:

Palo Verde 1, 2, and 3 - Withdrawal of Relief Request 50 Proposing Alternative ASME Section XI Requirements for Pressure Retaining Boundary During System Leakage Tests Sent Date: 3/7/2018 2:30:48 PM Received Date: 3/7/2018 2:30:00 PM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:

"Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>

Tracking Status: None "Alley, David" <David.Alley@nrc.gov>

Tracking Status: None "Min, Seung" <Seung.Min@nrc.gov>

Tracking Status: None "Thomas.N.Weber@aps.com" <Thomas.N.Weber@aps.com>

Tracking Status: None "Michael.Dilorenzo@aps.com" <Michael.Dilorenzo@aps.com>

Tracking Status: None "Matthew.Cox@aps.com" <Matthew.Cox@aps.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1846 3/7/2018 2:30:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: