{{#Wiki_filter:JPM- ANO-2-JPM-NRC-PZR02   PAGE 1 OF   6 JOB PERFORMANCE MEASURE UNIT:         2               REV #:           8 DATE:
{{#Wiki_filter:JPM- ANO-2-JPM-NRC-PZR02                                                           PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT:   2                     REV #:     8                 DATE:
SYSTEM/DUTY AREA
SYSTEM/DUTY AREA: Pressurizer Pressure Control System TASK:   Equalize RCS and PZR Boron JTA#: 20105030401 KA VALUE   RO:       3.7     SRO:     3.5       KA  
: Pressurizer Pressure Control System TASK:     Equalize RCS and PZR Boron JTA#:   20105030401 KA VALUE     RO:
3.7 SRO:
3.5 KA  


==REFERENCE:==
==REFERENCE:==
 
010 A4.01 APPROVED FOR ADMINISTRATION TO: RO:             X     SRO:       X TASK LOCATION: INSIDE CR:       X         OUTSIDE CR:           BOTH:
010 A4.01 APPROVED FOR ADMINISTRATION TO
: RO:         X SRO:
X TASK LOCATION
: INSIDE CR:
X OUTSIDE CR:  
 
BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE
PLANT SITE:               SIMULATOR:     Perform         LAB:
:
POSITION EVALUATED:       RO:               SRO:
SIMULATOR:
ACTUAL TESTING ENVIRONMENT: SIMULATOR:             X   PLANT SITE:           LAB:
Perform LAB:
TESTING METHOD: SIMULATE:                   PERFORM:     X APPROXIMATE COMPLETION TIME IN MINUTES: 6 Minutes REFERENCE(S):   OP 2103.005 Rev 027-02-0 and AOP 2203.028 EXAMINEE'S NAME:                                     SSN:     -     -
POSITION EVALUATED
EVALUATOR'S NAME:
:     RO:  
 
SRO:  
 
ACTUAL TESTING ENVIRONMENT
: SIMULATOR:
X PLANT SITE:  
 
LAB:
TESTING METHOD
: SIMULATE:
 
PERFORM:
X APPROXIMATE COMPLETION TIME IN MINUTES
:   6 Minutes REFERENCE(S):
OP 2103.005 Rev 027-02-0 and AOP 2203.028 EXAMINEE'S NAME
:
SSN:           -         -
EVALUATOR'S NAME:
 
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN HIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN HIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
SATISFACTORY:                     UNSATISFACTORY:
 
UNSATISFACTORY:
 
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time                      Stop Time                      Total Time SIGNED__________________________________ DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


Start Time
JPM- ANO-2-JPM-NRC-PZR02                                                                           PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
Stop Time
JPM INITIAL TASK CONDITIONS: 100% Power Operation. A power escalation has been completed.
 
Total Time SIGNED__________________________________
DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-PZR02   PAGE 2 OF   6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.JPM INITIAL TASK CONDITIONS
:   100% Power Operation.
A power escalation has been completed.
Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.
Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.
TASK STANDARD
TASK STANDARD:           Spray Valve (2CV-4651)isolated. THIS IS AN ALTERNATE SUCCESS PATH JPM.
:     Spray Valve (2CV-4651)isolated.
TASK PERFORMANCE AIDS:                 OP 2103.005 section 7.0 and AOP 2203.028.
THIS IS AN ALTERNATE SUCCESS PATH JPM.
SIMULATOR SETUP: Run CASE FILE JPM03. This will open A spray valve 100% and trip the breaker when the valve indicates intermediate position.
 
TASK PERFORMANCE AIDS
:     OP 2103.005 section 7.0 and AOP 2203.028.                                                
 
SIMULATOR SETUP
: Run CASE FILE JPM03. This will open 'A' spray valve 100% and trip the breaker when the valve indicates intermediate position.
The following malfunctions/overrides need to be triggered (case file JPM03 will do all of them):
The following malfunctions/overrides need to be triggered (case file JPM03 will do all of them):
Set T5 file to sprayvlv this will trigger T5 when 2CV-4651 red light is energized.
Set T5 file to sprayvlv this will trigger T5 when 2CV-4651 red light is energized.
T5 2CV-4651_
T5 2CV-4651_a value = 1.0 T5 2HS-4651-3 false (green light)
value = 1.0 T5 2HS-4651-3 false (green light)
T5 2 HS-4651-5 false (red light)
T5 2 HS-4651-5 false (red light)
JPM- ANO-2-JPM-NRC-PZR02    PAGE  3  OF  6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP 'A' spray valve, 2CV-4651." CRITICAL ELEMENTS (C)
:    2, 3, 4, 5 PERFORMANCE CHECKLIST STANDARDS (Circle One) 1.Verify spray valve, 2CV
-4651, isolation valves 2CV
-4655 AND 2CV-4656 are OPEN.
On panel 2C04 verified red lights ON, green lights OFF for 2CV
-4655 and 2CV-4656. N/A  SAT  UNSAT (C)2.Place RCP 'A' spray valve MAN/AUTO select switch


(2HS-4651B) to MANUAL.On panel 2C04, rotated 2HS
JPM- ANO-2-JPM-NRC-PZR02                                                                                PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
-4651B in the CCW direction to MANUAL. N/A  SAT  UNSAT (C)3.Energize all available Backup Heaters.On panel 2C04 placed the following handswitches to ON:
The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."
Place 2HS-4643 to ON
CRITICAL ELEMENTS (C):          2, 3, 4, 5 PERFORMANCE CHECKLIST                                    STANDARDS                        (Circle One)
: 1. Verify spray valve, 2CV-4651,        On panel 2C04 verified red lights      N/A SAT UNSAT isolation valves 2CV-4655 AND        ON, green lights OFF for 2CV-4655 2CV-4656 are OPEN.                    and 2CV-4656.
(C)     2. Place RCP A spray valve            On panel 2C04, rotated 2HS-4651B       N/A SAT UNSAT MAN/AUTO select switch                in the CCW direction to MANUAL.
(2HS-4651B) to MANUAL.
(C)     3. Energize all available Backup         On panel 2C04 placed the following     N/A SAT UNSAT Heaters.                              handswitches to ON:
Place 2HS-4643 to ON Place 2HS-4644 to ON Place 2HS-4645 to ON Place 2HS-4646 to ON AND Observed the red light ON and green light OFF above each of the above backup heater handswitches.
EXAMINERS NOTE:
When 2CV-4651 is taken to open, the valve will open 100% and then trip the breaker.
(C)      4. Open 2CV-4651, RCP A spray          On panel 2C04 WHEN RCS pressure        N/A SAT UNSAT valve partially.                      starts increasing, throttled 2CV-4651 to the open position.
EXAMINERS NOTE:
The following step may be completed after entering the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM.


Place 2HS-4644 to ON
JPM- ANO-2-JPM-NRC-PZR02                                                            PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                            STANDARDS                (Circle One)
(C)    5. Close PZR Spray Block Valves. On panel 2C04, placed handswitch N/A SAT UNSAT for 2CV-4655 and 2CV-4656 to "CLOSE".
Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-4656.
END


Place 2HS-4645 to ON
JPM- ANO-2-JPM-NRC-PZR02                         PAGE 5 OF 6 JOB PERFORMANCE MEASURE QUESTION:
 
ANSWER:
Place 2HS-4646 to ON
 
AND Observed the red light ON and green light OFF above each of the
 
above backup heater handswitches.
N/A  SAT  UNSAT EXAMINER'S NOTE:
When 2CV-4651 is taken to open, the valve will open 100% and then trip the breaker.(C)4.Open 2CV-4651, RCP 'A' spray valve partially.
On panel 2C04 WHEN RCS pressure starts increasing, throttled 2CV
-4651 to the open position.
N/A  SAT  UNSAT EXAMINER'S NOTE:
The following step may be completed after entering the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM.
JPM- ANO-2-JPM-NRC-PZR02   PAGE OF   6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)(C)5.Close PZR Spray Block Valves.
On panel 2C04, placed handswitch for 2CV-4655 and 2CV-4656 to "CLOSE".Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-


4656. N/A  SAT  UNSAT END JPM- ANO-2-JPM-NRC-PZR02    PAGE  5  OF  6 JOB PERFORMANCE MEASURE QUESTION: ANSWER:
JPM- ANO-2-JPM-NRC-PZR02                                                             PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
JPM- ANO-2-JPM-NRC-PZR02   PAGE 6 OF   6 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.
100% Power Operation.
A power escalation has been completed. Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.
INITIATING CUE:
INITIATING CUE:
The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP 'A' spray valve, 2CV-4651
The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."}}
."}}

Latest revision as of 06:43, 24 November 2019

Init EXAM-4-2000-Draft JPM PZR02 - Equalize RCS and Pzr Boron
ML003716758
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/24/2000
From:
NRC Region 4
To:
References
-RFPFR
Download: ML003716758 (6)


Text

JPM- ANO-2-JPM-NRC-PZR02 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 8 DATE:

SYSTEM/DUTY AREA: Pressurizer Pressure Control System TASK: Equalize RCS and PZR Boron JTA#: 20105030401 KA VALUE RO: 3.7 SRO: 3.5 KA

REFERENCE:

010 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 6 Minutes REFERENCE(S): OP 2103.005 Rev 027-02-0 and AOP 2203.028 EXAMINEE'S NAME: SSN: - -

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN HIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED__________________________________ DATE: _____________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-PZR02 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: 100% Power Operation. A power escalation has been completed.

Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.

TASK STANDARD: Spray Valve (2CV-4651)isolated. THIS IS AN ALTERNATE SUCCESS PATH JPM.

TASK PERFORMANCE AIDS: OP 2103.005 section 7.0 and AOP 2203.028.

SIMULATOR SETUP: Run CASE FILE JPM03. This will open A spray valve 100% and trip the breaker when the valve indicates intermediate position.

The following malfunctions/overrides need to be triggered (case file JPM03 will do all of them):

Set T5 file to sprayvlv this will trigger T5 when 2CV-4651 red light is energized.

T5 2CV-4651_a value = 1.0 T5 2HS-4651-3 false (green light)

T5 2 HS-4651-5 false (red light)

JPM- ANO-2-JPM-NRC-PZR02 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."

CRITICAL ELEMENTS (C): 2, 3, 4, 5 PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify spray valve, 2CV-4651, On panel 2C04 verified red lights N/A SAT UNSAT isolation valves 2CV-4655 AND ON, green lights OFF for 2CV-4655 2CV-4656 are OPEN. and 2CV-4656.

(C) 2. Place RCP A spray valve On panel 2C04, rotated 2HS-4651B N/A SAT UNSAT MAN/AUTO select switch in the CCW direction to MANUAL.

(2HS-4651B) to MANUAL.

(C) 3. Energize all available Backup On panel 2C04 placed the following N/A SAT UNSAT Heaters. handswitches to ON:

Place 2HS-4643 to ON Place 2HS-4644 to ON Place 2HS-4645 to ON Place 2HS-4646 to ON AND Observed the red light ON and green light OFF above each of the above backup heater handswitches.

EXAMINERS NOTE:

When 2CV-4651 is taken to open, the valve will open 100% and then trip the breaker.

(C) 4. Open 2CV-4651, RCP A spray On panel 2C04 WHEN RCS pressure N/A SAT UNSAT valve partially. starts increasing, throttled 2CV-4651 to the open position.

EXAMINERS NOTE:

The following step may be completed after entering the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM.

JPM- ANO-2-JPM-NRC-PZR02 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 5. Close PZR Spray Block Valves. On panel 2C04, placed handswitch N/A SAT UNSAT for 2CV-4655 and 2CV-4656 to "CLOSE".

Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-4656.

END

JPM- ANO-2-JPM-NRC-PZR02 PAGE 5 OF 6 JOB PERFORMANCE MEASURE QUESTION:

ANSWER:

JPM- ANO-2-JPM-NRC-PZR02 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.

INITIATING CUE:

The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."