{{#Wiki_filter:JOB PERFORMANCE MEASURE JPM-#-   ANO-2-JPM-NRC-SWCSP REV. 00   PAGE   1   of   6 SYSTEM/DUTY AREA:
{{#Wiki_filter:JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP                           REV. 00                                     PAGE 1 of 6 SYSTEM/DUTY AREA: Stator Water Cooling System TASK: Shift Stator Water Cooling Pumps JTA #:   None KA VALUE         RO:       3.9           SRO:       3.4             KA  
Stator Water Cooling System
 
TASK:   Shift Stator Water Cooling Pumps
 
JTA #:     None    
 
KA VALUE RO:       3.9 SRO:       3.4 KA  


==REFERENCE:==
==REFERENCE:==
 
045 2.1.30 APPROVED FOR ADMINISTRATION TO: NLO:                   X       RO:     X       SRO:       X TASK LOCATION:             INSIDE CR:               OUTSIDE CR:       X       BOTH:
045 2.1.30
SUGGESTED TESTING ENVIRONMENT AND METHOD                     (PERFORM OR SIMULATE):
 
PLANT SITE: Simulate             SIMULATOR:                         LAB:
APPROVED FOR ADMINISTRATION TO:
POSITION EVALUATED: NLO:                             RO:             SRO:
NLO:       X RO:        X SRO:         X         TASK LOCATION:
ACTUAL TESTING ENVIRONMENT:               SIMULATOR:                 PLANT SITE:         X       LAB:
INSIDE CR:
TESTING METHOD:                   SIMULATE:         X                         PERFORM:
 
APPROXIMATE COMPLETION TIME IN MINUTES: 5 minutes REFERENCE(S): OP 2106.004 Rev.012-01-0 EXAMINEES NAME:                                                       SSN:                       -         -
OUTSIDE CR:
EVALUATORS NAME:                                                     DATE:
X BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
Simulate SIMULATOR:
 
LAB:
POSITION EVALUATED:
NLO:
RO:
SRO:
ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
 
PLANT SITE:
X LAB:
TESTING METHOD:
SIMULATE:         X PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:
5 minutes
 
REFERENCE(S):
OP 2106.004 Rev.012-01-0 EXAMINEE'S NAME:
 
SSN:                    
                -            
  -            
 
EVALUATOR'S NAME:
 
DATE:                
 
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
SATISFACTORY:                                       UNSATISFACTORY:
 
UNSATISFACTORY:
 
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
__________Start Time              __________ Stop Time              __________ Total Time Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
SIGNED:                                                                DATE:


__________
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP                         REV. 00                                 PAGE 2 of 6 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
Start Time
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
__________
JPM INITIAL TASK CONDITIONS: Predictive maintenance would like to take vibration readings on B stator water cooling pump (2P-25B). 2P-25A is running.
Stop Time__________
TASK STANDARD:         2P-25A has been started and 2P-25B has been secured.
Total Time Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
TASK PERFORMANCE AIDS:             OP 2106.004, Section 7.2
SIGNED:
DATE:               
 
JOB PERFORMANCE MEASURE JPM-#-   ANO-2-JPM-NRC-SWCSP REV. 00   PAGE   2   of   6 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.JPM INITIAL TASK CONDITIONS:
Predictive maintenance would like to take vibration readings on "B" stator water cooling pump (2P-25B). 2P-25A is running.
 
TASK STANDARD:
2P-25A has been started and 2P
-25B has been secured.
 
TASK PERFORMANCE AIDS:
OP 2106.004, Section 7.2
 
JOB PERFORMANCE MEASURE JPM-#-  ANO-2-JPM-NRC-SWCSP REV. 00  PAGE    3  of  6 INITIATING CUE:
The SS/CRS directs, "Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2."
 
CRITICAL ELEMENTS (C):
1, 2                 
 
START TIME:


PERFORMANCE CHECKLIST STANDARDS (Circle One)(C)1.Place 2P-25A/B select switch (2HS-9784) to B-RUN A-RES.
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP                            REV. 00                                  PAGE 3 of 6 INITIATING CUE:
POSITIVE CUE
The SS/CRS directs, Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2.
: For 2P-25B, red light on; green light off.
CRITICAL ELEMENTS (C):          1, 2 START TIME:
PERFORMANCE CHECKLIST                                     STANDARDS                     (Circle One)
(C)     1. Place 2P-25A/B select switch           On panel 2C140, rotated 2HS-9784    N/A SAT UNSAT (2HS-9784) to B-RUN A-RES.            CCW to B-RUN A-RES.
Observed 2P-25B pump indication POSITIVE CUE:                          red light on; green light off.
For 2P-25B, red light on; green light off.
NEGATIVE CUE:
NEGATIVE CUE:
For 2P-25B, green light on; red light off.
For 2P-25B, green light on; red light off.
On panel 2C140, rotated 2HS
(C)    2. Push the Reserve Coolant Pump          At panel 2C140, pushed the Reserve  N/A SAT UNSAT Cutout pushbutton.                     Coolant Pump Cutout pushbutton.
-9784 CCW to  "B-RUN A-RES".
POSITIVE CUE:
Observed 2P
For 2P-25A, green light on; red       Observed the 2P-25A pump running light off.                            status lights.
-25B pump indication red light on; green light off.
N/A SAT UNSAT (C)2.Push the Reserve Coolant Pump Cutout pushbutton.
POSITIVE CUE
: For 2P-25A, green light on; red light off.
NEGATIVE CUE:
NEGATIVE CUE:
For 2P-25A, red light on; green light off.
For 2P-25A, red light on; green light off.
At panel 2C140, pushed the Reserve Coolant Pump Cutout pushbutton.
: 3. Verify the following readings are      Verified pressures and flow to be    N/A SAT UNSAT normal:                               normal.
Observed the 2P
                  - Pump discharge pressure (2PI-9799)
-25A pump running status lights.
                  - Stator Inlet Flow (2FIS-9722)
N/A SAT UNSAT 3.Verify the following readings are normal: - Pump discharge pressure (2PI-9799) - Stator Inlet Flow (2FIS-9722) - Stator Inlet Pressure (2PI-9798)
                  - Stator Inlet Pressure (2PI-9798)
POSITIVE CUE:
POSITIVE CUE:
2PI-9799 shows 120 psig.
2PI-9799 shows 120 psig.
2FIS-9722 shows between 510 and 525 gpm.2PI-9798 shows 60 psig.
2FIS-9722 shows between 510 and 525 gpm.
Verified pressures and flow to be normal. N/A  SAT  UNSAT JOB PERFORMANCE MEASURE JPM-#-   ANO-2-JPM-NRC-SWCSP REV. 00   PAGE   4   of   6 PERFORMANCE CHECKLIST STANDARDS (Circle One) 4.Notify control room of pump shift and pump status.
2PI-9798 shows 60 psig.
Using the plant telephone, notified the control room that 2P
 
-25B is running. N/A  SAT  UNSAT END STOP TIME:
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP                     REV. 00                               PAGE 4 of 6 PERFORMANCE CHECKLIST                               STANDARDS                   (Circle One)
: 4. Notify control room of pump shift   Using the plant telephone, notified N/A SAT UNSAT and pump status.                    the control room that 2P-25B is running.
END STOP TIME:
 
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP    REV. 00        PAGE 5 of 6 Question:
Answer:


JOB PERFORMANCE MEASURE JPM-#-   ANO-2-JPM-NRC-SWCSP REV. 00   PAGE   5  of  6 Question: Answer:
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP                             REV. 00                                     PAGE 6 of 6 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
JOB PERFORMANCE MEASURE JPM-#-  ANO-2-JPM-NRC-SWCSP REV. 00  PAGE    6   of   6 EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Predictive maintenance would like to take vibration readings on B stator water cooling pump (2P-25B). 2P-25A is running.
Predictive maintenance would like to take vibration readings on "B" stator water cooling pump (2P-25B). 2P-25A is running.
INITIATING CUE:
INITIATING CUE:
The SS/CRS directs, "Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2."}}
The SS/CRS directs, Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2.}}

Latest revision as of 06:43, 24 November 2019

Init EXAM-4-2000-Draft JPM Swcsp - Shift Stator Water Cooling Pumps
ML003716762
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/24/2000
From:
NRC Region 4
To:
References
-RFPFR
Download: ML003716762 (6)


Text

JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 1 of 6 SYSTEM/DUTY AREA: Stator Water Cooling System TASK: Shift Stator Water Cooling Pumps JTA #: None KA VALUE RO: 3.9 SRO: 3.4 KA

REFERENCE:

045 2.1.30 APPROVED FOR ADMINISTRATION TO: NLO: X RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: NLO: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: X LAB:

TESTING METHOD: SIMULATE: X PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 5 minutes REFERENCE(S): OP 2106.004 Rev.012-01-0 EXAMINEES NAME: SSN: - -

EVALUATORS NAME: DATE:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

__________Start Time __________ Stop Time __________ Total Time Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

SIGNED: DATE:

JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 2 of 6 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Predictive maintenance would like to take vibration readings on B stator water cooling pump (2P-25B). 2P-25A is running.

TASK STANDARD: 2P-25A has been started and 2P-25B has been secured.

TASK PERFORMANCE AIDS: OP 2106.004, Section 7.2

JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 3 of 6 INITIATING CUE:

The SS/CRS directs, Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2.

CRITICAL ELEMENTS (C): 1, 2 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 1. Place 2P-25A/B select switch On panel 2C140, rotated 2HS-9784 N/A SAT UNSAT (2HS-9784) to B-RUN A-RES. CCW to B-RUN A-RES.

Observed 2P-25B pump indication POSITIVE CUE: red light on; green light off.

For 2P-25B, red light on; green light off.

NEGATIVE CUE:

For 2P-25B, green light on; red light off.

(C) 2. Push the Reserve Coolant Pump At panel 2C140, pushed the Reserve N/A SAT UNSAT Cutout pushbutton. Coolant Pump Cutout pushbutton.

POSITIVE CUE:

For 2P-25A, green light on; red Observed the 2P-25A pump running light off. status lights.

NEGATIVE CUE:

For 2P-25A, red light on; green light off.

3. Verify the following readings are Verified pressures and flow to be N/A SAT UNSAT normal: normal.

- Pump discharge pressure (2PI-9799)

- Stator Inlet Flow (2FIS-9722)

- Stator Inlet Pressure (2PI-9798)

POSITIVE CUE:

2PI-9799 shows 120 psig.

2FIS-9722 shows between 510 and 525 gpm.

2PI-9798 shows 60 psig.

JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 4 of 6 PERFORMANCE CHECKLIST STANDARDS (Circle One)

4. Notify control room of pump shift Using the plant telephone, notified N/A SAT UNSAT and pump status. the control room that 2P-25B is running.

END STOP TIME:

JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 5 of 6 Question:

Answer:

JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 6 of 6 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Predictive maintenance would like to take vibration readings on B stator water cooling pump (2P-25B). 2P-25A is running.

INITIATING CUE:

The SS/CRS directs, Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2.