{{#Wiki_filter:JOB PERFORMANCE MEASURE JPM-#- | {{#Wiki_filter:JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 1 of 6 SYSTEM/DUTY AREA: Stator Water Cooling System TASK: Shift Stator Water Cooling Pumps JTA #: None KA VALUE RO: 3.9 SRO: 3.4 KA | ||
Stator Water Cooling System | |||
TASK: | |||
JTA #: | |||
KA VALUE RO: | |||
==REFERENCE:== | ==REFERENCE:== | ||
045 2.1.30 APPROVED FOR ADMINISTRATION TO: NLO: X RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH: | |||
045 2.1.30 | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
PLANT SITE: Simulate SIMULATOR: LAB: | |||
APPROVED FOR ADMINISTRATION TO: | POSITION EVALUATED: NLO: RO: SRO: | ||
NLO: | ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: X LAB: | ||
INSIDE CR: | TESTING METHOD: SIMULATE: X PERFORM: | ||
APPROXIMATE COMPLETION TIME IN MINUTES: 5 minutes REFERENCE(S): OP 2106.004 Rev.012-01-0 EXAMINEES NAME: SSN: - - | |||
OUTSIDE CR: | EVALUATORS NAME: DATE: | ||
X BOTH: | |||
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | |||
PLANT SITE: | |||
Simulate SIMULATOR: | |||
LAB: | |||
POSITION EVALUATED: | |||
NLO: | |||
RO: | |||
SRO: | |||
ACTUAL TESTING ENVIRONMENT: | |||
SIMULATOR: | |||
PLANT SITE: | |||
X LAB: | |||
TESTING METHOD: | |||
SIMULATE: | |||
APPROXIMATE COMPLETION TIME IN MINUTES: | |||
5 minutes | |||
REFERENCE(S): | |||
OP 2106.004 Rev.012-01-0 | |||
SSN: | |||
DATE: | |||
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
SATISFACTORY: | SATISFACTORY: UNSATISFACTORY: | ||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
__________Start Time __________ Stop Time __________ Total Time Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision. | |||
SIGNED: DATE: | |||
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 2 of 6 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | |||
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | |||
JPM INITIAL TASK CONDITIONS: Predictive maintenance would like to take vibration readings on B stator water cooling pump (2P-25B). 2P-25A is running. | |||
TASK STANDARD: 2P-25A has been started and 2P-25B has been secured. | |||
TASK PERFORMANCE AIDS: OP 2106.004, Section 7.2 | |||
JOB PERFORMANCE MEASURE JPM-#- | |||
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.JPM INITIAL TASK CONDITIONS: | |||
Predictive maintenance would like to take vibration readings on | |||
TASK STANDARD: | |||
2P-25A has been started and 2P | |||
-25B has been secured. | |||
TASK PERFORMANCE AIDS: | |||
OP 2106.004, Section 7.2 | |||
PERFORMANCE CHECKLIST STANDARDS (Circle One)(C)1.Place 2P-25A/B select switch (2HS-9784) to B-RUN A-RES. | JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 3 of 6 INITIATING CUE: | ||
POSITIVE CUE | The SS/CRS directs, Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2. | ||
CRITICAL ELEMENTS (C): 1, 2 START TIME: | |||
PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
(C) 1. Place 2P-25A/B select switch On panel 2C140, rotated 2HS-9784 N/A SAT UNSAT (2HS-9784) to B-RUN A-RES. CCW to B-RUN A-RES. | |||
Observed 2P-25B pump indication POSITIVE CUE: red light on; green light off. | |||
For 2P-25B, red light on; green light off. | |||
NEGATIVE CUE: | NEGATIVE CUE: | ||
For 2P-25B, green light on; red light off. | For 2P-25B, green light on; red light off. | ||
(C) 2. Push the Reserve Coolant Pump At panel 2C140, pushed the Reserve N/A SAT UNSAT Cutout pushbutton. Coolant Pump Cutout pushbutton. | |||
POSITIVE CUE: | |||
For 2P-25A, green light on; red Observed the 2P-25A pump running light off. status lights. | |||
N/A | |||
POSITIVE CUE | |||
NEGATIVE CUE: | NEGATIVE CUE: | ||
For 2P-25A, red light on; green light off. | For 2P-25A, red light on; green light off. | ||
: 3. Verify the following readings are Verified pressures and flow to be N/A SAT UNSAT normal: normal. | |||
- Pump discharge pressure (2PI-9799) | |||
- Stator Inlet Flow (2FIS-9722) | |||
N/A | - Stator Inlet Pressure (2PI-9798) | ||
POSITIVE CUE: | POSITIVE CUE: | ||
2PI-9799 shows 120 psig. | 2PI-9799 shows 120 psig. | ||
2FIS-9722 shows between 510 and 525 gpm.2PI-9798 shows 60 psig. | 2FIS-9722 shows between 510 and 525 gpm. | ||
2PI-9798 shows 60 psig. | |||
Using the plant telephone, notified the control room that 2P | |||
-25B is running. | JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 4 of 6 PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
: 4. Notify control room of pump shift Using the plant telephone, notified N/A SAT UNSAT and pump status. the control room that 2P-25B is running. | |||
END STOP TIME: | |||
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 5 of 6 Question: | |||
Answer: | |||
JOB PERFORMANCE MEASURE JPM-#- | JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 6 of 6 EXAMINEES COPY JPM INITIAL TASK CONDITIONS: | ||
Predictive maintenance would like to take vibration readings on B stator water cooling pump (2P-25B). 2P-25A is running. | |||
Predictive maintenance would like to take vibration readings on | |||
INITIATING CUE: | INITIATING CUE: | ||
The SS/CRS directs, | The SS/CRS directs, Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2.}} |
Latest revision as of 06:43, 24 November 2019
ML003716762 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 04/24/2000 |
From: | NRC Region 4 |
To: | |
References | |
-RFPFR | |
Download: ML003716762 (6) | |
Text
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 1 of 6 SYSTEM/DUTY AREA: Stator Water Cooling System TASK: Shift Stator Water Cooling Pumps JTA #: None KA VALUE RO: 3.9 SRO: 3.4 KA
REFERENCE:
045 2.1.30 APPROVED FOR ADMINISTRATION TO: NLO: X RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: Simulate SIMULATOR: LAB:
POSITION EVALUATED: NLO: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: X LAB:
TESTING METHOD: SIMULATE: X PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 5 minutes REFERENCE(S): OP 2106.004 Rev.012-01-0 EXAMINEES NAME: SSN: - -
EVALUATORS NAME: DATE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
__________Start Time __________ Stop Time __________ Total Time Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
SIGNED: DATE:
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 2 of 6 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: Predictive maintenance would like to take vibration readings on B stator water cooling pump (2P-25B). 2P-25A is running.
TASK STANDARD: 2P-25A has been started and 2P-25B has been secured.
TASK PERFORMANCE AIDS: OP 2106.004, Section 7.2
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 3 of 6 INITIATING CUE:
The SS/CRS directs, Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2.
CRITICAL ELEMENTS (C): 1, 2 START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 1. Place 2P-25A/B select switch On panel 2C140, rotated 2HS-9784 N/A SAT UNSAT (2HS-9784) to B-RUN A-RES. CCW to B-RUN A-RES.
Observed 2P-25B pump indication POSITIVE CUE: red light on; green light off.
For 2P-25B, red light on; green light off.
NEGATIVE CUE:
For 2P-25B, green light on; red light off.
(C) 2. Push the Reserve Coolant Pump At panel 2C140, pushed the Reserve N/A SAT UNSAT Cutout pushbutton. Coolant Pump Cutout pushbutton.
POSITIVE CUE:
For 2P-25A, green light on; red Observed the 2P-25A pump running light off. status lights.
NEGATIVE CUE:
For 2P-25A, red light on; green light off.
- 3. Verify the following readings are Verified pressures and flow to be N/A SAT UNSAT normal: normal.
- Pump discharge pressure (2PI-9799)
- Stator Inlet Flow (2FIS-9722)
- Stator Inlet Pressure (2PI-9798)
POSITIVE CUE:
2PI-9799 shows 120 psig.
2FIS-9722 shows between 510 and 525 gpm.
2PI-9798 shows 60 psig.
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 4 of 6 PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 4. Notify control room of pump shift Using the plant telephone, notified N/A SAT UNSAT and pump status. the control room that 2P-25B is running.
END STOP TIME:
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 5 of 6 Question:
Answer:
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 6 of 6 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Predictive maintenance would like to take vibration readings on B stator water cooling pump (2P-25B). 2P-25A is running.
INITIATING CUE:
The SS/CRS directs, Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2.