| issue date = 07/03/2002
| issue date = 07/03/2002
| title = NRC Regulatory Issue Summary (RIS) 2002-09 - Preparation and Scheduling of Operator Licensing Examinations for Watts Bar Nuclear Plant
| title = NRC Regulatory Issue Summary (RIS) 2002-09 - Preparation and Scheduling of Operator Licensing Examinations for Watts Bar Nuclear Plant
| author name = Pace P L
| author name = Pace P
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::RIS 2002-09]]


=Text=
=Text=
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000JU L 0 3 200210 CFR 55.40U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:In the Matter of Tennessee Valley Authority) )Docket No. 50-390WATTS BAR NUCLEAR PLANT (WBN) -NRC REGULATORY ISSUE SUMMARY (RIS) 2002-09 -PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS RIS 2002-09 was released by NRC on June 6, 2002, and requested information regarding WBN's projected operator licensing examination schedules and the estimated number of applicants. The information requested by NRC was defined on Form 536. The enclosure to this letter addresses NRC's request and provides an estimate of the examination requirements for WB Should you require additional information regarding this matter, please contact me at (423) 365-182
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 10 CFR 55.40 JU L 0 3 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of                                               )                     Docket No. 50-390 Tennessee Valley Authority                                    )
WATTS BAR NUCLEAR PLANT (WBN) - NRC REGULATORY ISSUE  


Sincerely,Manager, Site Licensing and Industry AffairsEnclosure cc: See page 2Pnted on recycled paper/'4o)c,2:
==SUMMARY==
U.S. Nuclear Regulatory Commission Page 2 JUL 0 3 2002 cc (Enclosure): NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. L. Mark Padovan, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Enclosure Operator Licensing Examination Data (Data as defined on NRC Form 536) FACILITY NRC REGION WATTS BAR NUCLEAR PLANT II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY03 CY04 CY05 CY06 ESTIMATED NUMBER OF LICENSEE PREPARED 0 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC PREPARED 0 1 1 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY03 CY04 CY05 CY06 NUMBER OF REACTOR 0 4 4 0 OPERATORS NUMBER OF SENIOR REACTOR 0 2 2 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 2 2 0 OPERATORS -UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS -LIMITED PROPOSED DATES 05/03 -05/07 10/09 -10/13 PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULEPROPOSED NUMBER CY03 CY04 FIRST SECOND THIRD FIRST SECOND THIRD ESTIMATED NUMBER OF 0 4 0 0 0 4 CANDIDATES
 
}}
(RIS) 2002 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS RIS 2002-09 was released by NRC on June 6, 2002, and requested information regarding WBN's projected operator licensing examination schedules and the estimated number of applicants. The information requested by NRC was defined on Form 536. The enclosure to this letter addresses NRC's request and provides an estimate of the examination requirements for WBN.
Should you require additional information regarding this matter, please contact me at (423) 365-1824.
Sincerely, Manager, Site Licensing and Industry Affairs Enclosure cc: See page 2 Pnted on recycled paper
                                                                                                      /'4o)c,2:
 
U.S. Nuclear Regulatory Commission Page 2 JUL 0 3 2002 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. L. Mark Padovan, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
 
Enclosure Operator Licensing Examination Data (Data as defined on NRC Form 536)
FACILITY                                                                 NRC REGION WATTS BAR NUCLEAR PLANT                                     II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER             CY03             CY04         CY05           CY06 ESTIMATED NUMBER OF 0               0           0               0 LICENSEE PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0               1             1             0 NRC PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER           CY03             CY04         CY05           CY06 NUMBER OF REACTOR             0               4           4               0 OPERATORS NUMBER OF SENIOR REACTOR           0               2           2               0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR           0               2             2             0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR           0               0             0 OPERATORS - LIMITED PROPOSED DATES                         05/03 - 05/07 10/09 - 10/13 PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY03                         CY04 PROPOSED NUMBER FIRST     SECOND     THIRD   FIRST     SECOND     THIRD ESTIMATED NUMBER OF           0         4         0       0         0         4 CANDIDATES}}

Latest revision as of 05:16, 24 November 2019

NRC Regulatory Issue Summary (RIS) 2002-09 - Preparation and Scheduling of Operator Licensing Examinations for Watts Bar Nuclear Plant
ML021900069
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 07/03/2002
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-02-009
Download: ML021900069 (3)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 10 CFR 55.40 JU L 0 3 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket No. 50-390 Tennessee Valley Authority )

WATTS BAR NUCLEAR PLANT (WBN) - NRC REGULATORY ISSUE

SUMMARY

(RIS) 2002 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS RIS 2002-09 was released by NRC on June 6, 2002, and requested information regarding WBN's projected operator licensing examination schedules and the estimated number of applicants. The information requested by NRC was defined on Form 536. The enclosure to this letter addresses NRC's request and provides an estimate of the examination requirements for WBN.

Should you require additional information regarding this matter, please contact me at (423) 365-1824.

Sincerely, Manager, Site Licensing and Industry Affairs Enclosure cc: See page 2 Pnted on recycled paper

/'4o)c,2:

U.S. Nuclear Regulatory Commission Page 2 JUL 0 3 2002 cc (Enclosure):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. L. Mark Padovan, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

Enclosure Operator Licensing Examination Data (Data as defined on NRC Form 536)

FACILITY NRC REGION WATTS BAR NUCLEAR PLANT II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY03 CY04 CY05 CY06 ESTIMATED NUMBER OF 0 0 0 0 LICENSEE PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 1 1 0 NRC PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY03 CY04 CY05 CY06 NUMBER OF REACTOR 0 4 4 0 OPERATORS NUMBER OF SENIOR REACTOR 0 2 2 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 2 2 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED PROPOSED DATES 05/03 - 05/07 10/09 - 10/13 PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY03 CY04 PROPOSED NUMBER FIRST SECOND THIRD FIRST SECOND THIRD ESTIMATED NUMBER OF 0 4 0 0 0 4 CANDIDATES