| issue date = 09/29/2003
| issue date = 09/29/2003
| title = NRC Regulatory Issue Summary (RIS) 2003-14 - Preparation and Scheduling of Operator Licensing Examinations
| title = NRC Regulatory Issue Summary (RIS) 2003-14 - Preparation and Scheduling of Operator Licensing Examinations
| author name = Pace P L
| author name = Pace P
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::RIS 2003-14]]


=Text=
=Text=
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000SEP 2 9 200310 CFR 55.40U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, D.C. 20555Gentlemen:In the Matter of ) Docket No. 50-390Tennessee Valley Authority )WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 -NRC REGULATORY ISSUESUMMARY (RIS) 2003-14 -PREPARATION AND SCHEDULING OF OPERATORLICENSING EXAMINATIONSRIS 2003-14 was released by NRC on August 27, 2003, and requested information regardingWBN's projected operator licensing examination schedules and the estimated number ofapplicants. The information requested by NRC was defined on Form 536. The enclosure tothis letter addresses NRC's request and provides an estimate of the examination requirementsfor WBN.There are no regulatory commitments in this submittal and should there be questionsregarding this letter, please telephone me at (423) 365-1824.
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 SEP 2 9 2003 10 CFR 55.40 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of                                                         )         Docket No. 50-390 Tennessee Valley Authority                                               )
WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 - NRC REGULATORY ISSUE


Sincerely,P. L. PaceManager, Site Licensingand Industry AffairsEnclosurecc: See page2 2C aU.S. Nuclear Regulatory CommissionPage 2SEP Z 9 2003cc (Enclosure):NRC Resident InspectorWatts Bar Nuclear Plant1260 Nuclear Plant RoadSpring City, Tennessee 37381Ms. M. H. Chernoff, Project ManagerU.S. Nuclear Regulatory CommissionMS 08G9One White Flint North11555 Rockville PikeRockville, Maryland 20852-2738U.S. Nuclear Regulatory Commission, Region IIATTN: Mr. Michael E. ErnstesChief, Operator Licensing and Human Performance BranchSam Nunn Atlanta Federal Center61 Forsyth St., Suite 23T85Atlanta, Georgia 30303 EnclosureOperator Licensing Examination Data(Data as defined on NRC Form 536)FACITY NRC REGIONWATTS BAR NUCLEAR PLANT IIA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY04 CY05 CY06 CY07ESTIMATED NUMBER OFLICENSEE PREPARED 1 0 0 0EXAMINATIONSESTIMATED NUMBER OFNRC PREPARED 0 0 1 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY04 CY05 CY06 CY07NUMBER OF REACTOR 4 0 8 0OPERATORSNUMBER OF SENIOR REACTOR 3 0 5 0OPERATORS -INSTANTNUMBER OF SENIOR REACTOR 2 0 3 0OPERATORS -UPGRADENUMBER OF SENIOR REACTOR 0 0 0 0OPERATORS -LIMITEDPROPOSED DATES 7t26 -7/30 6/11 -6/15PRIMARY DATEALTERNATE DATEC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULEPROPOSED CY04CY05NUMBER Jne Sepember December Mac June September DecemberESTIMATED o o o O 0 13 0 0NUMBER OFCANDIDATES
==SUMMARY==
}}
(RIS) 2003 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS RIS 2003-14 was released by NRC on August 27, 2003, and requested information regarding WBN's projected operator licensing examination schedules and the estimated number of applicants. The information requested by NRC was defined on Form 536. The enclosure to this letter addresses NRC's request and provides an estimate of the examination requirements for WBN.
There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.
Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc: See page22C
 
a U.S. Nuclear Regulatory Commission Page 2 SEP Z 9 2003 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Ms. M. H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission, Region II ATTN: Mr. Michael E. Ernstes Chief, Operator Licensing and Human Performance Branch Sam Nunn Atlanta Federal Center 61 Forsyth St., Suite 23T85 Atlanta, Georgia 30303
 
Enclosure Operator Licensing Examination Data (Data as defined on NRC Form 536)
FACITY                                                                     NRC REGION WATTS BAR NUCLEAR PLANT                                         II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER             CY04           CY05         CY06               CY07 ESTIMATED NUMBER OF LICENSEE PREPARED             1               0           0                   0 EXAMINATIONS ESTIMATED NUMBER OF NRC PREPARED             0                 0           1                   0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER             CY04           CY05         CY06               CY07 NUMBER OF REACTOR             4                 0           8                   0 OPERATORS NUMBER OF SENIOR REACTOR         3                 0           5                   0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR         2                 0           3                   0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR         0                 0           0                   0 OPERATORS - LIMITED PROPOSED DATES         7t26 - 7/30                 6/11 - 6/15 PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED                  CY04CY05 NUMBER              Jne     Sepember December   Mac   June     September   December ESTIMATED          o   o         o       O       0     13           0            0 NUMBER OF CANDIDATES}}

Latest revision as of 02:37, 24 November 2019

NRC Regulatory Issue Summary (RIS) 2003-14 - Preparation and Scheduling of Operator Licensing Examinations
ML032751627
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/29/2003
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-03-014
Download: ML032751627 (3)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 SEP 2 9 2003 10 CFR 55.40 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket No. 50-390 Tennessee Valley Authority )

WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 - NRC REGULATORY ISSUE

SUMMARY

(RIS) 2003 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS RIS 2003-14 was released by NRC on August 27, 2003, and requested information regarding WBN's projected operator licensing examination schedules and the estimated number of applicants. The information requested by NRC was defined on Form 536. The enclosure to this letter addresses NRC's request and provides an estimate of the examination requirements for WBN.

There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.

Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc: See page22C

a U.S. Nuclear Regulatory Commission Page 2 SEP Z 9 2003 cc (Enclosure):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Ms. M. H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission, Region II ATTN: Mr. Michael E. Ernstes Chief, Operator Licensing and Human Performance Branch Sam Nunn Atlanta Federal Center 61 Forsyth St., Suite 23T85 Atlanta, Georgia 30303

Enclosure Operator Licensing Examination Data (Data as defined on NRC Form 536)

FACITY NRC REGION WATTS BAR NUCLEAR PLANT II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY04 CY05 CY06 CY07 ESTIMATED NUMBER OF LICENSEE PREPARED 1 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC PREPARED 0 0 1 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY04 CY05 CY06 CY07 NUMBER OF REACTOR 4 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 3 0 5 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2 0 3 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES 7t26 - 7/30 6/11 - 6/15 PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY04CY05 NUMBER Jne Sepember December Mac June September December ESTIMATED o o o O 0 13 0 0 NUMBER OF CANDIDATES