{{#Wiki_filter:Guidance for COL Applicants on Design Implementation of Digital Instrumentation and Control Systems in Nuclear Power Plants ,*pIR Regret 00 NEI 04-01 Public Meeting April 7, 2005 Attachment 3
{{#Wiki_filter:Guidance for COL Applicants on Design Implementation of Digital Instrumentation and Control Systems in Nuclear Power Plants
Implementation of DACIITAAC* To confirm that the as-built computer-based plant instrumentation and control systems (I&C systems) conforms to the certified design, the design acceptance criteria (DAC) is verified as part of the l&C system ITAAC.* The COL applicant is to develop the procedures and test programs necessary to demonstrate that the requirements for the ITAAC for DAC are met during the digital system design implementation.
                      ,*pIR Regret 00 NEI 04-01 Public Meeting April 7, 2005 Attachment 3
 
Implementation of DACIITAAC
* To confirm that the as-built computer-based plant instrumentation and control systems (I&C systems) conforms to the certified design, the design acceptance criteria (DAC) is verified as part of the l&C system ITAAC.
* The COL applicant is to develop the procedures and test programs necessary to demonstrate that the requirements for the ITAAC for DAC are met during the digital system design implementation.
* The ITAAC will be performed by the COL applicant and reviewed by the NRC throughout the system lifecycle including implementation, installation and operation.
* The ITAAC will be performed by the COL applicant and reviewed by the NRC throughout the system lifecycle including implementation, installation and operation.
The applicant and NRC will establish agreed upon review points in the system design development process. See Figures land 2 for system and software lifecycle stages.Through the system design activities, system requirements are allocated to components and give rise to hardware and software requirements.
The applicant and NRC will establish agreed upon review points in the system design development process. See Figures land 2 for system and software lifecycle stages.
Software development activities proceed in parallel with hardware development and become integrated with hardware activities during the system validation stage. Software is validated against software requirements, integrated with hardware, and the complete system is validated against system requirements.
Through the system design activities, system requirements are allocated to components and give rise to hardware and software requirements. Software development activities proceed in parallel with hardware development and become integrated with hardware activities during the system validation stage. Software is validated against software requirements, integrated with hardware, and the complete system is validated against system requirements.
2 knsMce with'S Syste n Reviews Interace with Environmental 4 Ousl~ifation Review-Interface with ouary Assurance Review GP.O~ DOl O*4 DO Renewal 0- .4 CL N OUCL Amendments
2
___'< Topical Rapods*The so** at OUVIL amendment av topical reviews is vaille.Fligure 7A.02. Relationship lietwee Development UW Cyde Stages, Review Type, and SRP Sectons 3 Figure 2: Software Life Cycle Lie Cyceb Activity Groups Pbannng Activites Requirements Actities Design Actities Implementation Activibes Integration Activities Valdtidon Activities Instation Activities Operatons  
 
&Maintenance Acbvities-________ _________
knsMce with                                             Interace with Environmental
___________  
'S   Syste Reviews n                               4                   Ousl~ifation Review
--__________  
                                            -       Interface with ouary Assurance Review DOl                                                         O
--if Software Management Men Software Development Men Software GA Plan integration Plan Instloation plan Mantenance plan Training plan Operations Men Software Safety Plan Software V&V Men Software CM PMn Requirements Specifications Design Specificatons Hardware &Software Architecture Code Listings System Build Documentation Operations Manuals Instalaton Configuration Tables Maintenance Manuals Tranfing Manuals ,Q:J Requirements Safety Analysis V&V Requirements Analysis Report CM Requirements Analysis Report Design Safety Analysis V&V Design Analysis Report CM Design Report Code Safety Analysis V&V Implementation Analysis & Test Report CM Implementation Report Integration Safety Analysis V&V Integration Analysis & Test Report CM Integration Report ValWatfon Safety Analysis V&V Vaidation
  *4                   DOGP.O~
&Test Report CM Vaidation Report Instabaton Safety Analysis V&V Vaidatfon
Renewal                         0-   .4                       CL                               N OUCL Amendments         ___
&Test Report CM Instalaton Report Change Safety Analysis V&V Change Report CM Change Report Note: A separate document is not required for each topic identified, however, project documentation should encompass al the topics.Mrocess 11 I Atandn~g 11 I l ig : ]Process 11 IIp netdn1 4}}
'<                                                     Topical Rapods
                                                                                              *The so** at OUVIL amendment av topical reviews is vaille.
Fligure 7A.02. Relationship lietwee Development UW Cyde Stages, Review Type, and SRP Sectons 3
 
Figure 2: Software Life Cycle Lie           Pbannng   Requirements       Design Actities Implementation       Integration     Valdtidon   Instation       Operatons &
Cyceb        Activites    Actities                          Activibes            Activities    Activities  Activities      Maintenance Activity                                                                                                                          Acbvities Groups
  -           ________     _________         ___________                     -- __________       -           -             if Software     Requirements      Design          Code Listings      System Build                  Operations Management     Specifications    Specificatons                      Documentation                Manuals Men                                                                                                                               ,Q:J Software                         Hardware &                                                        Instalaton Development                       Software                                                          Configuration Men                               Architecture                                                      Tables Software GA Plan integration Plan Instloation plan Mantenance                                                                                         Maintenance plan                                                                                               Manuals Training plan                                                                                     Tranfing Manuals Operations Men Software     Requirements       Design Safety    Code Safety       Integration      ValWatfon    Instabaton      Change Safety Safety Plan  Safety            Analysis         Analysis           Safety Analysis Safety      Safety           Analysis Analysis                                                                Analysis    Analysis Software      V&V                V&V Design     V&V               V&V              V&V         V&V              V&V Change V&V Men      Requirements      Analysis Report Implementation    Integration      Vaidation & Vaidatfon &      Report Analysis                           Analysis & Test    Analysis & Test Test Report  Test Report Report                              Report             Report Software CM  CM                  CM Design      CM                CM Integration  CM          CM              CM Change PMn          Requirements      Report          Implementation    Report            Vaidation  Instalaton       Report Analysis                           Report                              Report      Report Report Note: A separate document is not required for each topic identified, however, project documentation should encompass al the topics.
11 Mrocess I Atandn~g 11Il ig: ]                         Process 11 IIp netdn1 4}}

Latest revision as of 00:31, 24 November 2019

Attachment 3 - Guidance for COL Applicants on Design Implementation of Digital Instrumentation and Control Systems in Nuclear Power Plants
ML050960503
Person / Time
Site: Nuclear Energy Institute
Issue date: 04/07/2005
From: Joseph Colaccino
NRC/NRR/DRIP/RNRP
To:
Nuclear Energy Institute
Colaccino,Joseph,NRR/DRIP/RNRP,415-2753
References
NEI 04-01
Download: ML050960503 (4)


Text

Guidance for COL Applicants on Design Implementation of Digital Instrumentation and Control Systems in Nuclear Power Plants

,*pIR Regret 00 NEI 04-01 Public Meeting April 7, 2005 Attachment 3

Implementation of DACIITAAC

  • To confirm that the as-built computer-based plant instrumentation and control systems (I&C systems) conforms to the certified design, the design acceptance criteria (DAC) is verified as part of the l&C system ITAAC.
  • The COL applicant is to develop the procedures and test programs necessary to demonstrate that the requirements for the ITAAC for DAC are met during the digital system design implementation.
  • The ITAAC will be performed by the COL applicant and reviewed by the NRC throughout the system lifecycle including implementation, installation and operation.

The applicant and NRC will establish agreed upon review points in the system design development process. See Figures land 2 for system and software lifecycle stages.

Through the system design activities, system requirements are allocated to components and give rise to hardware and software requirements. Software development activities proceed in parallel with hardware development and become integrated with hardware activities during the system validation stage. Software is validated against software requirements, integrated with hardware, and the complete system is validated against system requirements.

2

knsMce with Interace with Environmental

'S Syste Reviews n 4 Ousl~ifation Review

- Interface with ouary Assurance Review DOl O

  • 4 DOGP.O~

Renewal 0- .4 CL N OUCL Amendments ___

'< Topical Rapods

  • The so** at OUVIL amendment av topical reviews is vaille.

Fligure 7A.02. Relationship lietwee Development UW Cyde Stages, Review Type, and SRP Sectons 3

Figure 2: Software Life Cycle Lie Pbannng Requirements Design Actities Implementation Integration Valdtidon Instation Operatons &

Cyceb Activites Actities Activibes Activities Activities Activities Maintenance Activity Acbvities Groups

- ________ _________ ___________ -- __________ - - if Software Requirements Design Code Listings System Build Operations Management Specifications Specificatons Documentation Manuals Men ,Q:J Software Hardware & Instalaton Development Software Configuration Men Architecture Tables Software GA Plan integration Plan Instloation plan Mantenance Maintenance plan Manuals Training plan Tranfing Manuals Operations Men Software Requirements Design Safety Code Safety Integration ValWatfon Instabaton Change Safety Safety Plan Safety Analysis Analysis Safety Analysis Safety Safety Analysis Analysis Analysis Analysis Software V&V V&V Design V&V V&V V&V V&V V&V Change V&V Men Requirements Analysis Report Implementation Integration Vaidation & Vaidatfon & Report Analysis Analysis & Test Analysis & Test Test Report Test Report Report Report Report Software CM CM CM Design CM CM Integration CM CM CM Change PMn Requirements Report Implementation Report Vaidation Instalaton Report Analysis Report Report Report Report Note: A separate document is not required for each topic identified, however, project documentation should encompass al the topics.

11 Mrocess I Atandn~g 11Il ig: ] Process 11 IIp netdn1 4