| | author name = Gurdziel T | | | author name = Gurdziel T |
| | author affiliation = - No Known Affiliation | | | author affiliation = - No Known Affiliation |
| | addressee name = Caldwell J L | | | addressee name = Caldwell J |
| | addressee affiliation = NRC/RGN-III/ORA | | | addressee affiliation = NRC/RGN-III/ORA |
| | docket = 05000440 | | | docket = 05000440 |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:9 Twin Orchard Drive Oswego, NY 13 126 August 14,2005 James L. Caldwell Regional Administrator USNRC Region 111 2443 Warrenville Road, Suite 210 Lisle, E 60532-4352 | | {{#Wiki_filter:9 Twin Orchard Drive Oswego, NY 13 126 August 14,2005 James L. Caldwell Regional Administrator USNRC Region 111 2443 Warrenville Road, Suite 210 Lisle, E 60532-4352 |
|
| |
|
| ==Dear Mr. James L. Caldwell:== | | ==Dear Mr. James L. Caldwell:== |
|
| |
|
| I have read a letter dated August 8,2005 providing the FENOC response to IR 05000440/2005003. | | I have read a letter dated August 8,2005 providing the FENOC response to IR 05000440/2005003. I have some comments. |
| I have some comments. | | I guess the first comment would have to be that the Perry Performance Improvement Initiative was not hlly a success if it needs a (previously unannounced) Phase 2. |
| I guess the first comment would have to be that the Perry Performance Improvement Initiative was not hlly a success if it needs a (previously unannounced) Phase | | My next comment is a prediction that Phase 2 will not be successfi~l(and that a Phase 3 will be offered). I feel Phase 2 is aimed at the wrong root cause. They seem to think that their programs are in need of improvement. Actually, I dont think their programs matter much. Their need is for workers with technical knowledge and judgment that are both empowered to work properly in their assigned functional area and held accountable if they dont. |
| : 2. My next comment is a prediction that Phase 2 will not be successfi~l (and that a Phase 3 will be offered).
| | Presently, I dont see this happening. In fact, how could anybody conclude Perry workers are being held accountable if they can make the same mistake about 100 times in 6 years just installing fasteners? |
| I feel Phase 2 is aimed at the wrong root cause. They seem to think that their programs are in need of improvement. Actually, I don't think their programs matter much. Their need is for workers with technical knowledge and judgment that are both empowered to work properly in their assigned functional area and held accountable if they don't. Presently, I don't see this happening. | | Here is what I think needs to be done. First, get somebody that can run a BWR to specify the jobs that need to be done and the necessary skill levels of the people assigned to each job. (Perhaps EntergyFitzPatrick would be a choice based on their recent handling of a primary containment breach). Next, check each site assigned person against the specified job requirements. |
| In fact, how could anybody conclude Perry workers are being held accountable if they can make the same mistake about 100 times in 6 years just installing fasteners? | | Note that this can be done at zero percent power. And, it could be done under a 0350 committee. In fact, I request that it be done at zero power under a 0350 committee. |
| Here is what I think needs to be done. First, get somebody that can run a BWR to specify the jobs that need to be done and the necessary skill levels of the people assigned to each job. (Perhaps EntergyFitzPatrick would be a choice based on their recent handling of a primary containment breach). | | This is Letter 3. I need no reply. |
| Next, check each site assigned person against the specified job requirements. | | Copy: D. Lochbaum GUG 1 9 2001 |
| Note that this can be done at zero percent power. And, it could be done under a 0350 committee. | | |
| In fact, I request that it be done at zero power under a 0350 committee. | | 0 |
| This is Letter 3. I need no reply. Copy: D. Lochbaum GUG 1 9 2001 0 / i i}} | | / |
| | i i}} |
Similar Documents at Perry |
---|
Category:Letter
MONTHYEARL-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 L-24-168, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 L-24-155, Reactor Water Clean Up Leak Detection Loss of Safety Function2024-06-27027 June 2024 Reactor Water Clean Up Leak Detection Loss of Safety Function L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 L-24-140, Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition2024-06-20020 June 2024 Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24095A3282024-04-19019 April 2024 License Renewal Revised Schedule Letter L-24-066, Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency2024-04-15015 April 2024 Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency L-24-083, Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification2024-04-15015 April 2024 Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification ML24088A1922024-03-28028 March 2024 Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 2024-09-09
[Table view] |
Text
9 Twin Orchard Drive Oswego, NY 13 126 August 14,2005 James L. Caldwell Regional Administrator USNRC Region 111 2443 Warrenville Road, Suite 210 Lisle, E 60532-4352
Dear Mr. James L. Caldwell:
I have read a letter dated August 8,2005 providing the FENOC response to IR 05000440/2005003. I have some comments.
I guess the first comment would have to be that the Perry Performance Improvement Initiative was not hlly a success if it needs a (previously unannounced) Phase 2.
My next comment is a prediction that Phase 2 will not be successfi~l(and that a Phase 3 will be offered). I feel Phase 2 is aimed at the wrong root cause. They seem to think that their programs are in need of improvement. Actually, I dont think their programs matter much. Their need is for workers with technical knowledge and judgment that are both empowered to work properly in their assigned functional area and held accountable if they dont.
Presently, I dont see this happening. In fact, how could anybody conclude Perry workers are being held accountable if they can make the same mistake about 100 times in 6 years just installing fasteners?
Here is what I think needs to be done. First, get somebody that can run a BWR to specify the jobs that need to be done and the necessary skill levels of the people assigned to each job. (Perhaps EntergyFitzPatrick would be a choice based on their recent handling of a primary containment breach). Next, check each site assigned person against the specified job requirements.
Note that this can be done at zero percent power. And, it could be done under a 0350 committee. In fact, I request that it be done at zero power under a 0350 committee.
This is Letter 3. I need no reply.
Copy: D. Lochbaum GUG 1 9 2001
0
/
i i