{{#Wiki_filter:March 6, 2006Administrative Judge Alex S. Karlin, ChairAtomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001Administrative Judge Anthony J. BarattaAtomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001Administrative Judge Lester S. RubensteinAtomic Safety and Licensing Board Panel 4760 East Country Villa DriveTucson, AZ 85718In the Matter ofENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.(Vermont Yankee Nuclear Power Station)                       Docket No. 50-271-OLA                      
{{#Wiki_filter:March 6, 2006 Administrative Judge Alex S. Karlin, Chair          Administrative Judge Lester S. Rubenstein Atomic Safety and Licensing Board Panel            Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission                 4760 East Country Villa Drive Mail Stop: T-3F23                                   Tucson, AZ 85718 Washington, DC 20555-0001 Administrative Judge Anthony J. Baratta Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.
(Vermont Yankee Nuclear Power Station)
Docket No. 50-271-OLA


==Dear Administrative Judges:==
==Dear Administrative Judges:==
The NRC Staff hereby provides notice that it has updated the Hearing File for thisproceeding pursuant to 10 C.F.R. § 2.336(d). The Staff has no updates to its privilege logs at this time, but is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. Sincerely,/RA/
 
Jason C. ZornCounsel for NRC Staff
The NRC Staff hereby provides notice that it has updated the Hearing File for this proceeding pursuant to 10 C.F.R. § 2.336(d). The Staff has no updates to its privilege logs at this time, but is continuing to preserve and maintain all privileged documents during the pendency of this proceeding.
Sincerely,
                                                      /RA/
Jason C. Zorn Counsel for NRC Staff


==Enclosures:==
==Enclosures:==
Hearing File IndexAffidavit of G. Edward Miller, Jr.cc: Service List ENCLOSURE 1VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURESHEARING FILE INDEXSUPPLEMENT 24 - March 6, 2006Accession NumberDocument DateTitle/Description:499ML0604803831/5/2005Comment (31) of Carol E. Cone Opposing Vermont Yankee Proposed 20% Uprate inPower Output, 20 Year License Extension, & Expansion of High-Level WasteStorage Capacity.500ML0604100651/11/2006Comment (10) of Joanna and Charles Hamlin Opposing the VT Yankee ProposedUprate and the Risk Assessments in the Draft Safety Evaluation Released by theNRC Based on Fallacious Assumption that the Reactor is Brand New.501ML0603303101/19/2006Transcript of the Advisory Committee on Reactor Safeguards Thermal-HydraulicPhenomena Subcommittee - Open Session January 19, 2006, pages 1-80/184-236/389-457. Closed session pages 81-183 and 237-388.502ML0604100581/25/2006Comment (6) of Sally Shaw opposing Entergy VT Yankee License AmendmentUprate.503ML0604100551/26/2006Comment (3) of Jill Bromberg on The risk assessments in the draft safety evaluationreleased by the NRC are based on the assumption that the reactor is brand new.504ML0604100641/27/2006Comment (9) of Alice & Benjamine Jurick on the risk assessments in the draft SafetyEvaluation (SE) released by the NRC are based on the assumption that the reactoris brand new.505ML0604804102/2/2006Comment (40) of Margaret P. Bartenhagen on Proposed Uprate for the VermontYankee Nuclear Power Station. Independent Engineering Assessment of PlantShould be Required Before an Uprate is Granted due to Listed Reason.506ML0606000792/2/2006Comment (51) Opposing the VT Yankee Proposed Uprate and the RiskAssessments in the Draft Safety Evaluation Released by the NRC.
Hearing File Index Affidavit of G. Edward Miller, Jr.
HEARING FILE INDEXSUPPLEMENT 24 - MARCH 6, 2006Accession NumberDocument DateTitle/Description:2 of 6507ML0604803802/3/2006Comment (29) Opposing Proposed 20% Uprate for Vermont Yankee.508ML0604803862/3/2006Comment (33) of Mariquita Vitztham, Writing to Urge You to ConductComprehensive Independent Safety Assessment on the Vermont Yankee NuclearPower Plant Using the Same Methodology Scope that was Used with the MaineYankee Reactor.509ML0604803972/4/2006Comment (35) of Doris Lake regarding An Independent Safety Assessment atVermont Yankee.510ML0604804022/4/2006Comment (37) of Kenneth A. Shearer Opposing a 20% Uprate to the VT YankeeNuclear Plant in Vernon, VT.511ML0604803782/5/2006Comment (27) of Nancy Crompton Opposing Entergy's Push to Uprate VermontYankee Nuclear Plant for a 20% Increase in the Production of Electrical Power.512ML0604803792/5/2006Comment (28) on Proposed Uprate to VT Yankee Power Plant in Vernon, VT.513ML0604803822/5/2006Comment (30) of J. Levy and Fellow Residents Opposing Vermont Yankee 20%Power Increase Without an Independent Safety Assessment.514ML0604803852/5/2006Comment (32) of Allison Page and Alejandro Levins, regarding increase ofoperations at Vermont Yankee.515ML0604803872/5/2006Comment (34) of Sue Reed Opposing 20% Uprate to Vermont Yankee Power Plantin Vernon, Vermont.516ML0604804122/5/2006Comment (42) Lou Waronker Opposing the 20% Uprate as Proposed by Entergy, forVermont Yankee.
cc: Service List
HEARING FILE INDEXSUPPLEMENT 24 - MARCH 6, 2006Accession NumberDocument DateTitle/Description:3 of 6517ML0605400792/5/2006Comment (47) of Rita Pickette Strongly Objecting to Entergy's Push to Uprate AgingVermont Yankee Facility for a 20% Increase in the Production of Electrical Power.518ML0606000802/5/2006Comment (52) of Linda and Robert Hecker opposing the proposed 20% energyuprate at Vermont Yankee and to request an Independent Safety Assessment.519ML0604803722/6/2006Comment (25) of Ursula Post, re Independent Safety Assessment Before Grantingan Upgrade to the Vermont Yankee Nuclear Power Plant.520ML0604804042/6/2006Comment (38) of Robert Santway re Decision to Approve Uprate at Vermont YankeeNuclear Reactor.521ML0604804072/6/2006Comment (39) of Anne P. Tobey Opposing Vermont Yankee Uprate Without PriorIndependent Safety Assessment.522ML0604804132/6/2006Comment (43) of Sarah Kotkov on Entergy's Push to Uprate Vermont YankeeNuclear Plant for a 20% Increase in the Production of Electrical Power.523ML0604804002/6/2006Comment (46) of Victor and Mary Burdo Opposing Entergy's Push to UprateVermont Yankee Nuclear Plant for a 20% Increase in the Production of ElectricalPower.524ML0606000782/6/2006Comment (50) of Jesse Lepkoff Opposing the VT Yankee Proposed Uprate and theRisk Assessments in the Draft Safety Evaluation Released by the NRC525ML0606001082/7/2006Comment (56) of Leslie Read on Whether Vermont Yankee Nuclear Power Plant hasbeen Properly Evaluated for Safe Operations with the Applied for 20% PowerUprate.
 
HEARING FILE INDEXSUPPLEMENT 24 - MARCH 6, 2006Accession NumberDocument DateTitle/Description:4 of 6526ML0606001132/7/2006Comment (57) of Linda A. Bailey opposing the NRC staff's conclusion that a poweruprate at Vermont Yankee in Vernon, VT would not create a significant reduction inthe operational safety margin of the plant.527ML0604705292/8/2006Citizen Petition, Calling for a Complete Examination of the Vermont Yankee NuclearReactor, Equal in Scope to the Independent Safety Assessment Conducted at MaineYankee.528ML0604705322/8/2006Citizen Petition, Calling for an Independent Safety Assessment of Vermont Yankee,Similar to Those Already Conducted at Aging Nuclear Plants in Maine andConnecticut.529ML0604705352/8/2006Citizen Petition, Calling for an Independent Safety Assessment of Vermont Yankee,Similar to Those Already Conducted at Aging Nuclear Plants in Maine andConnecticut.530ML0604705282/8/2006Comment (22) of Raymond Shadis, Enclosing Petitions and Letters fromMassachusetts, Vermont, and New Hampshire on Proposed Power Rate Increase atEntergy Nuclear Vermont Yankee Reactor.531ML0604804162/8/2006Comment (44) of Maureen Ippolito and Jeff Young Opposing Entergy's Push toUprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production ofElectrical Power.532ML0605400802/8/2006Comment (48) of Jane Michaud opposing Entergy's proposed power uprate atVermont Yankee.533ML0605401062/8/2006Comment (49) of Gyuri Kepes re Vermont Yankee NRC Open Comment Period.
ENCLOSURE 1              VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX SUPPLEMENT 24 - March 6, 2006 Accession Number    Document Date                                    Title/Description:
HEARING FILE INDEXSUPPLEMENT 24 - MARCH 6, 2006Accession NumberDocument DateTitle/Description:5 of 6534ML0606001152/8/2006Comment (58) of Quinn Kepes Opposing the Vermont Yankee Uprate Without anIndependent Safety Assessment.535ML0606001172/8/2006Comment (59) of Imre Kepes on the Vermont Yankee power uprate and a need foran Independent Safety Analysis.536ML0604505242/9/2006Comment (24) of Benjamin C. Forbes regarding the Vermont Yankee Nuclear andsupporting a comprehensive Independent Safety Assessment.537ML0601201022/9/2006G20060018/LTR-06-0010 - Graham Wallis Ltr re. Vermont Yankee Extended PowerUprate.538ML0604500452/10/2006Comment (19) of David Wells re Uprate in Vermont Yankee Production Capacity,Findings of no Significant Hazards at Facility.539ML0604500432/10/2006Comment (21) of Emily Monosson on the NRC ruling on the Vermont Yankee uprate,opposes rule.540ML0604803752/14/2006Comment (26) of William C. Pearson Opposing Proposed Entergy Vermont YankeeUprate .541ML0604803992/14/2006Comment (36) of Lois Barber Opposing Uprate of Vermont Yankee WithoutRequirement of Prior Independent Safety Assessment.542ML0604804182/15/2006Comment (45) of Suzanne Maisner Opposing Entergy's Push to Uprate VermontYankee Nuclear Plant for a 20% Increase in the Production of Electrical Power.543ML0606000812/22/2006Comment (53) of Michael Marantz, Opposing the Vermont Yankee Uprate Withoutan Independent Safety Assessment.
499 ML060480383        1/5/2005          Comment (31) of Carol E. Cone Opposing Vermont Yankee Proposed 20% Uprate in Power Output, 20 Year License Extension, & Expansion of High-Level Waste Storage Capacity.
HEARING FILE INDEXSUPPLEMENT 24 - MARCH 6, 2006Accession NumberDocument DateTitle/Description:6 of 6544ML0606000832/22/2006Comment (54) of Jesse Peters Opposing the Vermont Yankee Uprate and the RiskAssessments in Draft Safety Evaluation Based Released by NRC Based on theFallacious Assumption that the Reactor is Brand New.545ML0606001482/22/2006E-mail, Gucwa, Entergy to Ennis, NRR, Re: VY EPU Supplement 45.546ML0605902612/22/2006Vermont Yankee, Technical Specification Proposed Change No. 263 - SupplementNo. 45, Extended Power Uprate - Revised Technical Specification Pages.547ML0606001002/23/2006Comment (55) of Peter Dramondstone on the Vermont Yankee Uprate and anIndependent Safety Inspection.548ML0606001202/24/2006Comment (60) of Michael Nix, on P1774 Federal Registry Vol. 71, No. 7, Insist UponIndependent Safety Assessment Before a 20 Percent Uprate is Allowed at Vernon,VT Nuclear Power Facility.549ML0606103952/26/2006E-mail Gucwa, Entergy, to Ennis, NRR, Re: VY EPU Steam Dryer Monitoring March 6, 2006UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)
500 ML060410065        1/11/2006          Comment (10) of Joanna and Charles Hamlin Opposing the VT Yankee Proposed Uprate and the Risk Assessments in the Draft Safety Evaluation Released by the NRC Based on Fallacious Assumption that the Reactor is Brand New.
)ENTERGY NUCLEAR VERMONT YANKEE)Docket No. 50-271-OLA   LLC and ENTERGY NUCLEAR)   OPERATIONS, INC.)ASLBP No. 04-832-02-OLA
501 ML060330310        1/19/2006          Transcript of the Advisory Committee on Reactor Safeguards Thermal-Hydraulic Phenomena Subcommittee - Open Session January 19, 2006, pages 1-80/184-236/389-457. Closed session pages 81-183 and 237-388.
)(Vermont Yankee Nuclear Power Station))AFFIDAVIT OF G. EDWARD MILLER, JR. CONCERNING MANDATORY     DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(d)     I, G. Edward Miller, Jr., do hereby state as follows:1.I am employed as a Project Manager in the Nuclear Regulatory Commission's("NRC") Office of Nuclear Reactor Regulation ("NRR"). I serve as a Project Manager in PlantLicensing Branch I-2, Division of Operating Reactor Licensing. Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the extended power uprate license amendment request at issue in this proceeding. 2.I hereby certify that all relevant materials required to be disclosed pursuant to10 C.F.R. §2.336 (b) and (d) in the captioned proceeding have been disclosed, and that thedisclosures are accurate and complete as of the date of this certification.3.I declare under penalty of perjury that the foregoing is true and correct to thebest of my knowledge, information and belief. /RA/_______________________G. Edward Miller, Jr.Executed in Rockville, MDthis 6 th day of March, 2006.
502 ML060410058        1/25/2006          Comment (6) of Sally Shaw opposing Entergy VT Yankee License Amendment Uprate.
UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)
503 ML060410055        1/26/2006          Comment (3) of Jill Bromberg on The risk assessments in the draft safety evaluation released by the NRC are based on the assumption that the reactor is brand new.
)ENTERGY NUCLEAR VERMONT YANKEE)Docket No. 50-271-OLA   LLC and ENTERGY NUCLEAR)   OPERATIONS, INC.)ASLBP No. 04-832-02-OLA
504 ML060410064        1/27/2006          Comment (9) of Alice & Benjamine Jurick on the risk assessments in the draft Safety Evaluation (SE) released by the NRC are based on the assumption that the reactor is brand new.
)(Vermont Yankee Nuclear Power Station))CERTIFICATE OF SERVICEI hereby certify that copies of the foregoing letter from Jason C. Zorn, Counsel for NRC Staff, tothe Atomic Safety and Licensing Board, dated March 6, 2006, providing notice of the availabilityof the Hearing File, together with attachments, in the captioned proceeding have been servedon the following. Service has been performed by deposit in the U.S. Mail, First Class; through electronic mail, with copies to follow by deposit in the NRC's internal mail system (as indicatedby a single asterisk); or through electronic mail, with copies to follow by deposit in the U.S. Mail, First Class (as indicated by two asterisks), this 6 th day of March, 2006.Alex S. Karlin, Chair*Administrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: ask2@nrc.gov)Dr. Anthony J. Baratta*Administrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: ajb5@nrc.gov)Lester S. Rubenstein**Administrative Judge Atomic Safety and Licensing Board Panel 4760 East Country Villa DriveTucson, AZ 85718 (E-mail: lesrrr@comcast.net)Office of the Secretary*ATTN: Rulemaking and Adjudications  Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: HEARINGDOCKET@nrc.gov)Office of Commission Appellate    Adjudication*
505 ML060480410        2/2/2006          Comment (40) of Margaret P. Bartenhagen on Proposed Uprate for the Vermont Yankee Nuclear Power Station. Independent Engineering Assessment of Plant Should be Required Before an Uprate is Granted due to Listed Reason.
Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001John M. Fulton, Esq.Assistant General Counsel Entergy Nuclear Operations, Inc.
506 ML060600079        2/2/2006          Comment (51) Opposing the VT Yankee Proposed Uprate and the Risk Assessments in the Draft Safety Evaluation Released by the NRC.
440 Hamilton Avenue White Plains, NY 10601 Jay E. Silberg, Esq.**Matias Travieso-Diaz, Esq.**
 
Pillsbury Winthrop Shaw Pittman, LLP 2300 N St., NW Washington, DC  20037-1128 (E-mail: jay.silberg@pillsburylaw.com matias.travieso-diaz@pillsburylaw.com)Raymond Shadis**Staff Technical Advisor New England Coalition
HEARING FILE INDEX                                                            SUPPLEMENT 24 - MARCH 6, 2006 Accession Number  Document Date                                Title/Description:
507  ML060480380      2/3/2006        Comment (29) Opposing Proposed 20% Uprate for Vermont Yankee.
508  ML060480386      2/3/2006        Comment (33) of Mariquita Vitztham, Writing to Urge You to Conduct Comprehensive Independent Safety Assessment on the Vermont Yankee Nuclear Power Plant Using the Same Methodology Scope that was Used with the Maine Yankee Reactor.
509  ML060480397      2/4/2006        Comment (35) of Doris Lake regarding An Independent Safety Assessment at Vermont Yankee.
510  ML060480402      2/4/2006        Comment (37) of Kenneth A. Shearer Opposing a 20% Uprate to the VT Yankee Nuclear Plant in Vernon, VT.
511  ML060480378      2/5/2006        Comment (27) of Nancy Crompton Opposing Entergys Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power.
512  ML060480379      2/5/2006        Comment (28) on Proposed Uprate to VT Yankee Power Plant in Vernon, VT.
513  ML060480382      2/5/2006        Comment (30) of J. Levy and Fellow Residents Opposing Vermont Yankee 20%
Power Increase Without an Independent Safety Assessment.
514  ML060480385      2/5/2006        Comment (32) of Allison Page and Alejandro Levins, regarding increase of operations at Vermont Yankee.
515  ML060480387      2/5/2006        Comment (34) of Sue Reed Opposing 20% Uprate to Vermont Yankee Power Plant in Vernon, Vermont.
516  ML060480412      2/5/2006        Comment (42) Lou Waronker Opposing the 20% Uprate as Proposed by Entergy, for Vermont Yankee.
2 of 6
 
HEARING FILE INDEX                                                            SUPPLEMENT 24 - MARCH 6, 2006 Accession Number  Document Date                                Title/Description:
517  ML060540079      2/5/2006        Comment (47) of Rita Pickette Strongly Objecting to Entergys Push to Uprate Aging Vermont Yankee Facility for a 20% Increase in the Production of Electrical Power.
518  ML060600080      2/5/2006        Comment (52) of Linda and Robert Hecker opposing the proposed 20% energy uprate at Vermont Yankee and to request an Independent Safety Assessment.
519  ML060480372      2/6/2006        Comment (25) of Ursula Post, re Independent Safety Assessment Before Granting an Upgrade to the Vermont Yankee Nuclear Power Plant.
520  ML060480404      2/6/2006        Comment (38) of Robert Santway re Decision to Approve Uprate at Vermont Yankee Nuclear Reactor.
521  ML060480407      2/6/2006        Comment (39) of Anne P. Tobey Opposing Vermont Yankee Uprate Without Prior Independent Safety Assessment.
522  ML060480413      2/6/2006        Comment (43) of Sarah Kotkov on Entergys Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power.
523  ML060480400      2/6/2006        Comment (46) of Victor and Mary Burdo Opposing Entergys Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power.
524  ML060600078      2/6/2006        Comment (50) of Jesse Lepkoff Opposing the VT Yankee Proposed Uprate and the Risk Assessments in the Draft Safety Evaluation Released by the NRC 525  ML060600108      2/7/2006        Comment (56) of Leslie Read on Whether Vermont Yankee Nuclear Power Plant has been Properly Evaluated for Safe Operations with the Applied for 20% Power Uprate.
3 of 6
 
HEARING FILE INDEX                                                                SUPPLEMENT 24 - MARCH 6, 2006 Accession Number  Document Date                                    Title/Description:
526  ML060600113      2/7/2006        Comment (57) of Linda A. Bailey opposing the NRC staffs conclusion that a power uprate at Vermont Yankee in Vernon, VT would not create a significant reduction in the operational safety margin of the plant.
527  ML060470529      2/8/2006        Citizen Petition, Calling for a Complete Examination of the Vermont Yankee Nuclear Reactor, Equal in Scope to the Independent Safety Assessment Conducted at Maine Yankee.
528  ML060470532      2/8/2006        Citizen Petition, Calling for an Independent Safety Assessment of Vermont Yankee, Similar to Those Already Conducted at Aging Nuclear Plants in Maine and Connecticut.
529  ML060470535      2/8/2006        Citizen Petition, Calling for an Independent Safety Assessment of Vermont Yankee, Similar to Those Already Conducted at Aging Nuclear Plants in Maine and Connecticut.
530  ML060470528      2/8/2006        Comment (22) of Raymond Shadis, Enclosing Petitions and Letters from Massachusetts, Vermont, and New Hampshire on Proposed Power Rate Increase at Entergy Nuclear Vermont Yankee Reactor.
531  ML060480416      2/8/2006        Comment (44) of Maureen Ippolito and Jeff Young Opposing Entergys Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power.
532  ML060540080      2/8/2006        Comment (48) of Jane Michaud opposing Entergys proposed power uprate at Vermont Yankee.
533  ML060540106      2/8/2006        Comment (49) of Gyuri Kepes re Vermont Yankee NRC Open Comment Period.
4 of 6
 
HEARING FILE INDEX                                                            SUPPLEMENT 24 - MARCH 6, 2006 Accession Number  Document Date                                  Title/Description:
534  ML060600115      2/8/2006        Comment (58) of Quinn Kepes Opposing the Vermont Yankee Uprate Without an Independent Safety Assessment.
535  ML060600117      2/8/2006        Comment (59) of Imre Kepes on the Vermont Yankee power uprate and a need for an Independent Safety Analysis.
536  ML060450524      2/9/2006        Comment (24) of Benjamin C. Forbes regarding the Vermont Yankee Nuclear and supporting a comprehensive Independent Safety Assessment.
537  ML060120102      2/9/2006        G20060018/LTR-06-0010 - Graham Wallis Ltr re. Vermont Yankee Extended Power Uprate.
538  ML060450045      2/10/2006      Comment (19) of David Wells re Uprate in Vermont Yankee Production Capacity, Findings of no Significant Hazards at Facility.
539  ML060450043      2/10/2006      Comment (21) of Emily Monosson on the NRC ruling on the Vermont Yankee uprate, opposes rule.
540  ML060480375      2/14/2006      Comment (26) of William C. Pearson Opposing Proposed Entergy Vermont Yankee Uprate .
541  ML060480399      2/14/2006      Comment (36) of Lois Barber Opposing Uprate of Vermont Yankee Without Requirement of Prior Independent Safety Assessment.
542  ML060480418      2/15/2006      Comment (45) of Suzanne Maisner Opposing Entergys Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power.
543  ML060600081      2/22/2006      Comment (53) of Michael Marantz, Opposing the Vermont Yankee Uprate Without an Independent Safety Assessment.
5 of 6
 
HEARING FILE INDEX                                                            SUPPLEMENT 24 - MARCH 6, 2006 Accession Number  Document Date                                Title/Description:
544  ML060600083      2/22/2006      Comment (54) of Jesse Peters Opposing the Vermont Yankee Uprate and the Risk Assessments in Draft Safety Evaluation Based Released by NRC Based on the Fallacious Assumption that the Reactor is Brand New.
545  ML060600148      2/22/2006      E-mail, Gucwa, Entergy to Ennis, NRR, Re: VY EPU Supplement 45.
546  ML060590261      2/22/2006      Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 45, Extended Power Uprate - Revised Technical Specification Pages.
547  ML060600100      2/23/2006      Comment (55) of Peter Dramondstone on the Vermont Yankee Uprate and an Independent Safety Inspection.
548  ML060600120      2/24/2006      Comment (60) of Michael Nix, on P1774 Federal Registry Vol. 71, No. 7, Insist Upon Independent Safety Assessment Before a 20 Percent Uprate is Allowed at Vernon, VT Nuclear Power Facility.
549  ML060610395      2/26/2006      E-mail Gucwa, Entergy, to Ennis, NRR, Re: VY EPU Steam Dryer Monitoring 6 of 6
 
March 6, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                   )
                                                    )
ENTERGY NUCLEAR VERMONT YANKEE                     )       Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR                           )
OPERATIONS, INC.                                 )       ASLBP No. 04-832-02-OLA
                                                    )
(Vermont Yankee Nuclear Power Station)             )
AFFIDAVIT OF G. EDWARD MILLER, JR. CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(d)
I, G. Edward Miller, Jr., do hereby state as follows:
: 1.       I am employed as a Project Manager in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). I serve as a Project Manager in Plant Licensing Branch I-2, Division of Operating Reactor Licensing. Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the extended power uprate license amendment request at issue in this proceeding.
: 2.       I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §2.336 (b) and (d) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
: 3.       I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
                                                    /RA/
_______________________
G. Edward Miller, Jr.
Executed in Rockville, MD this 6th day of March, 2006.
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                 )
                                                  )
ENTERGY NUCLEAR VERMONT YANKEE                   )       Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR                       )
OPERATIONS, INC.                               )       ASLBP No. 04-832-02-OLA
                                                  )
(Vermont Yankee Nuclear Power Station)           )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing letter from Jason C. Zorn, Counsel for NRC Staff, to the Atomic Safety and Licensing Board, dated March 6, 2006, providing notice of the availability of the Hearing File, together with attachments, in the captioned proceeding have been served on the following. Service has been performed by deposit in the U.S. Mail, First Class; through electronic mail, with copies to follow by deposit in the NRCs internal mail system (as indicated by a single asterisk); or through electronic mail, with copies to follow by deposit in the U.S. Mail, First Class (as indicated by two asterisks), this 6th day of March, 2006.
Alex S. Karlin, Chair*                             Dr. Anthony J. Baratta*
Administrative Judge                              Administrative Judge Atomic Safety and Licensing Board Panel           Atomic Safety and Licensing Board Panel Mail Stop T-3F23                                  Mail Stop T-3F23 U.S. Nuclear Regulatory Commission                U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                         Washington, DC 20555-0001 (E-mail: ask2@nrc.gov)                             (E-mail: ajb5@nrc.gov)
Lester S. Rubenstein**                            Office of the Secretary*
Administrative Judge                               ATTN: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel           Mail Stop: O-16C1 4760 East Country Villa Drive                      U.S. Nuclear Regulatory Commission Tucson, AZ 85718                                  Washington, DC 20555-0001 (E-mail: lesrrr@comcast.net)                      (E-mail: HEARINGDOCKET@nrc.gov)
Office of Commission Appellate                    John M. Fulton, Esq.
Adjudication*                                     Assistant General Counsel Mail Stop: O-16C1                                  Entergy Nuclear Operations, Inc.
U.S. Nuclear Regulatory Commission                440 Hamilton Avenue Washington, DC 20555-0001                         White Plains, NY 10601


P.O. Box 98 Edgecomb, ME 04556 (E-mail: shadis@prexar.com shadis@ime.net)Sarah Hofmann, Esq.**Special Counsel Department of Public Service 112 State Street - Drawer 20 Montpelier, VT 05620-2601 (E-mail: sarah.hofmann@state.vt.us)Anthony Z. Roisman, Esq.**National Legal Scholars Law Firm 84 East Thetford Rd.
Jay E. Silberg, Esq.**                  Raymond Shadis**
Lyme, NH 03768 (E-mail:
Matias Travieso-Diaz, Esq.**            Staff Technical Advisor Pillsbury Winthrop Shaw Pittman, LLP    New England Coalition 2300 N St., NW                          P.O. Box 98 Washington, DC 20037-1128              Edgecomb, ME 04556 (E-mail: jay.silberg@pillsburylaw.com  (E-mail: shadis@prexar.com matias.travieso-diaz@pillsburylaw.com)  shadis@ime.net)
aroisman@nationallegalscholars.com)Jonathan M. Rund, Esq.*Law Clerk Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: jmr3@nrc.gov
Sarah Hofmann, Esq.**                   Anthony Z. Roisman, Esq.**
)Jared Lindsay, Esq.*Law Clerk Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001 (E-mail: jjl5@nrc.gov
Special Counsel                         National Legal Scholars Law Firm Department of Public Service           84 East Thetford Rd.
)/RA/                                                   Jason C. ZornCounsel for NRC Staff}}
112 State Street - Drawer 20           Lyme, NH 03768 Montpelier, VT 05620-2601               (E-mail:
(E-mail: sarah.hofmann@state.vt.us)     aroisman@nationallegalscholars.com)
Jonathan M. Rund, Esq.*                 Jared Lindsay, Esq.*
Law Clerk                              Law Clerk Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23                      Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission     U.S. Nuclear Regulatory Commission Washington, DC 20555-0001              Washington, DC 20555-0001 (E-mail: jmr3@nrc.gov)                 (E-mail: jjl5@nrc.gov)
                                        /RA/
Jason C. Zorn Counsel for NRC Staff}}

Revision as of 22:27, 23 November 2019

2006/03/06-Vermont Yankee - Letter from Jason C. Zorn to Administrative Judges Enclosing Supplement 24 to the Hearing File Index and the Affidavit of G. Edward Miller, Jr
ML060660136
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 03/06/2006
From: Zorn J
NRC/OGC
To: Anthony Baratta, Karlin A, Rubenstein L
Atomic Safety and Licensing Board Panel
Jason Zorn 301-415-8350
References
50-271-OLA, ASLBP 04-832-02-OLA, RAS 11310
Download: ML060660136 (10)


Text

March 6, 2006 Administrative Judge Alex S. Karlin, Chair Administrative Judge Lester S. Rubenstein Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission 4760 East Country Villa Drive Mail Stop: T-3F23 Tucson, AZ 85718 Washington, DC 20555-0001 Administrative Judge Anthony J. Baratta Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.

(Vermont Yankee Nuclear Power Station)

Docket No. 50-271-OLA

Dear Administrative Judges:

The NRC Staff hereby provides notice that it has updated the Hearing File for this proceeding pursuant to 10 C.F.R. § 2.336(d). The Staff has no updates to its privilege logs at this time, but is continuing to preserve and maintain all privileged documents during the pendency of this proceeding.

Sincerely,

/RA/

Jason C. Zorn Counsel for NRC Staff

Enclosures:

Hearing File Index Affidavit of G. Edward Miller, Jr.

cc: Service List

ENCLOSURE 1 VERMONT YANKEE EPU HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX SUPPLEMENT 24 - March 6, 2006 Accession Number Document Date Title/Description:

499 ML060480383 1/5/2005 Comment (31) of Carol E. Cone Opposing Vermont Yankee Proposed 20% Uprate in Power Output, 20 Year License Extension, & Expansion of High-Level Waste Storage Capacity.

500 ML060410065 1/11/2006 Comment (10) of Joanna and Charles Hamlin Opposing the VT Yankee Proposed Uprate and the Risk Assessments in the Draft Safety Evaluation Released by the NRC Based on Fallacious Assumption that the Reactor is Brand New.

501 ML060330310 1/19/2006 Transcript of the Advisory Committee on Reactor Safeguards Thermal-Hydraulic Phenomena Subcommittee - Open Session January 19, 2006, pages 1-80/184-236/389-457. Closed session pages81-183 and 237-388.

502 ML060410058 1/25/2006 Comment (6) of Sally Shaw opposing Entergy VT Yankee License Amendment Uprate.

503 ML060410055 1/26/2006 Comment (3) of Jill Bromberg on The risk assessments in the draft safety evaluation released by the NRC are based on the assumption that the reactor is brand new.

504 ML060410064 1/27/2006 Comment (9) of Alice & Benjamine Jurick on the risk assessments in the draft Safety Evaluation (SE) released by the NRC are based on the assumption that the reactor is brand new.

505 ML060480410 2/2/2006 Comment (40) of Margaret P. Bartenhagen on Proposed Uprate for the Vermont Yankee Nuclear Power Station. Independent Engineering Assessment of Plant Should be Required Before an Uprate is Granted due to Listed Reason.

506 ML060600079 2/2/2006 Comment (51) Opposing the VT Yankee Proposed Uprate and the Risk Assessments in the Draft Safety Evaluation Released by the NRC.

HEARING FILE INDEX SUPPLEMENT 24 - MARCH 6, 2006 Accession Number Document Date Title/Description:

507 ML060480380 2/3/2006 Comment (29) Opposing Proposed 20% Uprate for Vermont Yankee.

508 ML060480386 2/3/2006 Comment (33) of Mariquita Vitztham, Writing to Urge You to Conduct Comprehensive Independent Safety Assessment on the Vermont Yankee Nuclear Power Plant Using the Same Methodology Scope that was Used with the Maine Yankee Reactor.

509 ML060480397 2/4/2006 Comment (35) of Doris Lake regarding An Independent Safety Assessment at Vermont Yankee.

510 ML060480402 2/4/2006 Comment (37) of Kenneth A. Shearer Opposing a 20% Uprate to the VT Yankee Nuclear Plant in Vernon, VT.

511 ML060480378 2/5/2006 Comment (27) of Nancy Crompton Opposing Entergys Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power.

512 ML060480379 2/5/2006 Comment (28) on Proposed Uprate to VT Yankee Power Plant in Vernon, VT.

513 ML060480382 2/5/2006 Comment (30) of J. Levy and Fellow Residents Opposing Vermont Yankee 20%

Power Increase Without an Independent Safety Assessment.

514 ML060480385 2/5/2006 Comment (32) of Allison Page and Alejandro Levins, regarding increase of operations at Vermont Yankee.

515 ML060480387 2/5/2006 Comment (34) of Sue Reed Opposing 20% Uprate to Vermont Yankee Power Plant in Vernon, Vermont.

516 ML060480412 2/5/2006 Comment (42) Lou Waronker Opposing the 20% Uprate as Proposed by Entergy, for Vermont Yankee.

2 of 6

HEARING FILE INDEX SUPPLEMENT 24 - MARCH 6, 2006 Accession Number Document Date Title/Description:

517 ML060540079 2/5/2006 Comment (47) of Rita Pickette Strongly Objecting to Entergys Push to Uprate Aging Vermont Yankee Facility for a 20% Increase in the Production of Electrical Power.

518 ML060600080 2/5/2006 Comment (52) of Linda and Robert Hecker opposing the proposed 20% energy uprate at Vermont Yankee and to request an Independent Safety Assessment.

519 ML060480372 2/6/2006 Comment (25) of Ursula Post, re Independent Safety Assessment Before Granting an Upgrade to the Vermont Yankee Nuclear Power Plant.

520 ML060480404 2/6/2006 Comment (38) of Robert Santway re Decision to Approve Uprate at Vermont Yankee Nuclear Reactor.

521 ML060480407 2/6/2006 Comment (39) of Anne P. Tobey Opposing Vermont Yankee Uprate Without Prior Independent Safety Assessment.

522 ML060480413 2/6/2006 Comment (43) of Sarah Kotkov on Entergys Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power.

523 ML060480400 2/6/2006 Comment (46) of Victor and Mary Burdo Opposing Entergys Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power.

524 ML060600078 2/6/2006 Comment (50) of Jesse Lepkoff Opposing the VT Yankee Proposed Uprate and the Risk Assessments in the Draft Safety Evaluation Released by the NRC 525 ML060600108 2/7/2006 Comment (56) of Leslie Read on Whether Vermont Yankee Nuclear Power Plant has been Properly Evaluated for Safe Operations with the Applied for 20% Power Uprate.

3 of 6

HEARING FILE INDEX SUPPLEMENT 24 - MARCH 6, 2006 Accession Number Document Date Title/Description:

526 ML060600113 2/7/2006 Comment (57) of Linda A. Bailey opposing the NRC staffs conclusion that a power uprate at Vermont Yankee in Vernon, VT would not create a significant reduction in the operational safety margin of the plant.

527 ML060470529 2/8/2006 Citizen Petition, Calling for a Complete Examination of the Vermont Yankee Nuclear Reactor, Equal in Scope to the Independent Safety Assessment Conducted at Maine Yankee.

528 ML060470532 2/8/2006 Citizen Petition, Calling for an Independent Safety Assessment of Vermont Yankee, Similar to Those Already Conducted at Aging Nuclear Plants in Maine and Connecticut.

529 ML060470535 2/8/2006 Citizen Petition, Calling for an Independent Safety Assessment of Vermont Yankee, Similar to Those Already Conducted at Aging Nuclear Plants in Maine and Connecticut.

530 ML060470528 2/8/2006 Comment (22) of Raymond Shadis, Enclosing Petitions and Letters from Massachusetts, Vermont, and New Hampshire on Proposed Power Rate Increase at Entergy Nuclear Vermont Yankee Reactor.

531 ML060480416 2/8/2006 Comment (44) of Maureen Ippolito and Jeff Young Opposing Entergys Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power.

532 ML060540080 2/8/2006 Comment (48) of Jane Michaud opposing Entergys proposed power uprate at Vermont Yankee.

533 ML060540106 2/8/2006 Comment (49) of Gyuri Kepes re Vermont Yankee NRC Open Comment Period.

4 of 6

HEARING FILE INDEX SUPPLEMENT 24 - MARCH 6, 2006 Accession Number Document Date Title/Description:

534 ML060600115 2/8/2006 Comment (58) of Quinn Kepes Opposing the Vermont Yankee Uprate Without an Independent Safety Assessment.

535 ML060600117 2/8/2006 Comment (59) of Imre Kepes on the Vermont Yankee power uprate and a need for an Independent Safety Analysis.

536 ML060450524 2/9/2006 Comment (24) of Benjamin C. Forbes regarding the Vermont Yankee Nuclear and supporting a comprehensive Independent Safety Assessment.

537 ML060120102 2/9/2006 G20060018/LTR-06-0010 - Graham Wallis Ltr re. Vermont Yankee Extended Power Uprate.

538 ML060450045 2/10/2006 Comment (19) of David Wells re Uprate in Vermont Yankee Production Capacity, Findings of no Significant Hazards at Facility.

539 ML060450043 2/10/2006 Comment (21) of Emily Monosson on the NRC ruling on the Vermont Yankee uprate, opposes rule.

540 ML060480375 2/14/2006 Comment (26) of William C. Pearson Opposing Proposed Entergy Vermont Yankee Uprate .

541 ML060480399 2/14/2006 Comment (36) of Lois Barber Opposing Uprate of Vermont Yankee Without Requirement of Prior Independent Safety Assessment.

542 ML060480418 2/15/2006 Comment (45) of Suzanne Maisner Opposing Entergys Push to Uprate Vermont Yankee Nuclear Plant for a 20% Increase in the Production of Electrical Power.

543 ML060600081 2/22/2006 Comment (53) of Michael Marantz, Opposing the Vermont Yankee Uprate Without an Independent Safety Assessment.

5 of 6

HEARING FILE INDEX SUPPLEMENT 24 - MARCH 6, 2006 Accession Number Document Date Title/Description:

544 ML060600083 2/22/2006 Comment (54) of Jesse Peters Opposing the Vermont Yankee Uprate and the Risk Assessments in Draft Safety Evaluation Based Released by NRC Based on the Fallacious Assumption that the Reactor is Brand New.

545 ML060600148 2/22/2006 E-mail, Gucwa, Entergy to Ennis, NRR, Re: VY EPU Supplement 45.

546 ML060590261 2/22/2006 Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 45, Extended Power Uprate - Revised Technical Specification Pages.

547 ML060600100 2/23/2006 Comment (55) of Peter Dramondstone on the Vermont Yankee Uprate and an Independent Safety Inspection.

548 ML060600120 2/24/2006 Comment (60) of Michael Nix, on P1774 Federal Registry Vol. 71, No. 7, Insist Upon Independent Safety Assessment Before a 20 Percent Uprate is Allowed at Vernon, VT Nuclear Power Facility.

549 ML060610395 2/26/2006 E-mail Gucwa, Entergy, to Ennis, NRR, Re: VY EPU Steam Dryer Monitoring 6 of 6

March 6, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR VERMONT YANKEE ) Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 04-832-02-OLA

)

(Vermont Yankee Nuclear Power Station) )

AFFIDAVIT OF G. EDWARD MILLER, JR. CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(d)

I, G. Edward Miller, Jr., do hereby state as follows:

1. I am employed as a Project Manager in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). I serve as a Project Manager in Plant Licensing Branch I-2, Division of Operating Reactor Licensing. Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the extended power uprate license amendment request at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §2.336 (b) and (d) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/RA/

_______________________

G. Edward Miller, Jr.

Executed in Rockville, MD this 6th day of March, 2006.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR VERMONT YANKEE ) Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 04-832-02-OLA

)

(Vermont Yankee Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing letter from Jason C. Zorn, Counsel for NRC Staff, to the Atomic Safety and Licensing Board, dated March 6, 2006, providing notice of the availability of the Hearing File, together with attachments, in the captioned proceeding have been served on the following. Service has been performed by deposit in the U.S. Mail, First Class; through electronic mail, with copies to follow by deposit in the NRCs internal mail system (as indicated by a single asterisk); or through electronic mail, with copies to follow by deposit in the U.S. Mail, First Class (as indicated by two asterisks), this 6th day of March, 2006.

Alex S. Karlin, Chair* Dr. Anthony J. Baratta*

Administrative Judge Administrative Judge Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3F23 Mail Stop T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 (E-mail: ask2@nrc.gov) (E-mail: ajb5@nrc.gov)

Lester S. Rubenstein** Office of the Secretary*

Administrative Judge ATTN: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel Mail Stop: O-16C1 4760 East Country Villa Drive U.S. Nuclear Regulatory Commission Tucson, AZ 85718 Washington, DC 20555-0001 (E-mail: lesrrr@comcast.net) (E-mail: HEARINGDOCKET@nrc.gov)

Office of Commission Appellate John M. Fulton, Esq.

Adjudication* Assistant General Counsel Mail Stop: O-16C1 Entergy Nuclear Operations, Inc.

U.S. Nuclear Regulatory Commission 440 Hamilton Avenue Washington, DC 20555-0001 White Plains, NY 10601

Jay E. Silberg, Esq.** Raymond Shadis**

Matias Travieso-Diaz, Esq.** Staff Technical Advisor Pillsbury Winthrop Shaw Pittman, LLP New England Coalition 2300 N St., NW P.O. Box 98 Washington, DC 20037-1128 Edgecomb, ME 04556 (E-mail: jay.silberg@pillsburylaw.com (E-mail: shadis@prexar.com matias.travieso-diaz@pillsburylaw.com) shadis@ime.net)

Sarah Hofmann, Esq.** Anthony Z. Roisman, Esq.**

Special Counsel National Legal Scholars Law Firm Department of Public Service 84 East Thetford Rd.

112 State Street - Drawer 20 Lyme, NH 03768 Montpelier, VT 05620-2601 (E-mail:

(E-mail: sarah.hofmann@state.vt.us) aroisman@nationallegalscholars.com)

Jonathan M. Rund, Esq.* Jared Lindsay, Esq.*

Law Clerk Law Clerk Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 (E-mail: jmr3@nrc.gov) (E-mail: jjl5@nrc.gov)

/RA/

Jason C. Zorn Counsel for NRC Staff