{{#Wiki_filter:October 4, 2006Mr. Mano K. NazarSenior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106SUBJECTD. C. COOK NUCLEAR PLANT, UNITS 1 AND 2 - AUDIT OF THE LICENSEE'SMANAGEMENT OF REGULATORY COMMITMENTS (TAC NOS. MD1359 AND MD1360)
{{#Wiki_filter:October 4, 2006 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 SUBJECT        D. C. COOK NUCLEAR PLANT, UNITS 1 AND 2 - AUDIT OF THE LICENSEES MANAGEMENT OF REGULATORY COMMITMENTS (TAC NOS. MD1359 AND MD1360)


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==


On September 7, 2004, the Office of Nuclear Reactor Regulation Office Instruction LIC-105,"Managing Regulatory Commitments Made by Licensees to the NRC [Nuclear RegulatoryCommission]," Revision 1, was published. LIC-105, which is publicly available electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the Internet at the NRC web site (Accession NumberML042320463), provides the NRC staff and its stakeholders with a common reference forhandling regulatory commitments made by commercial nuclear reactor licensees to the NRC staff. The guidance is consistent with the industry guidance prepared by the Nuclear Energy Institute (NEI), NEI 99-04, "Guidance for Managing NRC Commitment Changes.LIC-105specifies that once every 3 years, the NRC staff will audit a licensee's commitmentmanagement program.An audit of D.C. Cook's commitment management program was performed on site onSeptember 11, 2006. Based on this audit, the NRC staff concludes that (1) the licensee hadimplemented NRC commitments on a timely basis; and (2) the licensee had implemented aneffective program for managing regulatory commitments and commitment changes. Details of the audit are set forth in the enclosed audit report.Sincerely,/RA/Peter S. Tam, Senior Project ManagerPlant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-315 and 50-316
On September 7, 2004, the Office of Nuclear Reactor Regulation Office Instruction LIC-105, Managing Regulatory Commitments Made by Licensees to the NRC [Nuclear Regulatory Commission], Revision 1, was published. LIC-105, which is publicly available electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the Internet at the NRC web site (Accession Number ML042320463), provides the NRC staff and its stakeholders with a common reference for handling regulatory commitments made by commercial nuclear reactor licensees to the NRC staff. The guidance is consistent with the industry guidance prepared by the Nuclear Energy Institute (NEI), NEI 99-04, Guidance for Managing NRC Commitment Changes. LIC-105 specifies that once every 3 years, the NRC staff will audit a licensees commitment management program.
An audit of D.C. Cooks commitment management program was performed on site on September 11, 2006. Based on this audit, the NRC staff concludes that (1) the licensee had implemented NRC commitments on a timely basis; and (2) the licensee had implemented an effective program for managing regulatory commitments and commitment changes. Details of the audit are set forth in the enclosed audit report.
Sincerely,
                                              /RA/
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316


==Enclosure:==
==Enclosure:==
As statedcc w/encl:  See next page


ML061280475 OFFICELPL3-1\PMLPL3-1/LALPL3-1/BC(A)    NAMEPTam THarrisMMurphyDATE10/3/0609/20/0610/4/06 AUDIT REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION (NRR)REGULATORY COMMITMENTS MADE BY THE LICENSEE TO THE NUCLEAR REGULATORY COMMISSION (NRC)DONALD C. COOK NUCLEAR PLANT (DCCNP), UNITS 1 AND 2DOCKET NOS. 50-315 AND 50-31
As stated cc w/encl: See next page


==61.0 INTRODUCTION==
ML061280475 OFFICE LPL3-1\PM            LPL3-1/LA          LPL3-1/BC(A)
AND BACKGROUND On September 7, 2004, the Office of Nuclear Reactor Regulation Office Instruction LIC-105,"Managing Regulatory Commitments Made by Licensees to the NRC," Revision 1, waspublished. LIC-105, Rev. 1, which is publicly available electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the Internet at the NRC web site (Accession Number ML042320463), provides the NRC staffand its stakeholders with a common reference for handling regulatory commitments made by commercial nuclear reactor licensees to the NRC staff. The guidance is consistent with theindustry guidance prepared by the Nuclear Energy Institute (NEI), NEI 99-04, "Guidance for Managing NRC Commitment Changes."According to LIC-105, Rev. 1, which cites the definition from NEI-99-04, a "regulatorycommitment" is an explicit statement to take a specific action agreed to, or volunteered by, a licensee and submitted in writing on the docket to the NRC. LIC-105, Rev 1, further directs theNRR Project Manager to "audit the licensee's commitment management program by assessingthe adequacy of the licensee's implementation of a sample of commitments made to the NRC in past licensing actions [amendments, reliefs, exemptions, etc.] and activities [bulletins, generic letters, etc.].The audit is to be performed every 3 years.2.0 AUDIT PROCEDURE AND RESULTS Since no such audit was performed before the date of the subject audit, the NRC staff definedthe period covered by this audit to go back approximately 3 years from the date of the audit.
NAME PTam                  THarris            MMurphy DATE      10/3/06          09/20/06            10/4/06
 
AUDIT REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
REGULATORY COMMITMENTS MADE BY THE LICENSEE TO THE NUCLEAR REGULATORY COMMISSION (NRC)
DONALD C. COOK NUCLEAR PLANT (DCCNP), UNITS 1 AND 2 DOCKET NOS. 50-315 AND 50-316
 
==1.0     INTRODUCTION AND BACKGROUND==
 
On September 7, 2004, the Office of Nuclear Reactor Regulation Office Instruction LIC-105, Managing Regulatory Commitments Made by Licensees to the NRC, Revision 1, was published. LIC-105, Rev. 1, which is publicly available electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the Internet at the NRC web site (Accession Number ML042320463), provides the NRC staff and its stakeholders with a common reference for handling regulatory commitments made by commercial nuclear reactor licensees to the NRC staff. The guidance is consistent with the industry guidance prepared by the Nuclear Energy Institute (NEI), NEI 99-04, Guidance for Managing NRC Commitment Changes.
According to LIC-105, Rev. 1, which cites the definition from NEI-99-04, a regulatory commitment is an explicit statement to take a specific action agreed to, or volunteered by, a licensee and submitted in writing on the docket to the NRC. LIC-105, Rev 1, further directs the NRR Project Manager to audit the licensees commitment management program by assessing the adequacy of the licensees implementation of a sample of commitments made to the NRC in past licensing actions [amendments, reliefs, exemptions, etc.] and activities [bulletins, generic letters, etc.]. The audit is to be performed every 3 years.
2.0     AUDIT PROCEDURE AND RESULTS Since no such audit was performed before the date of the subject audit, the NRC staff defined the period covered by this audit to go back approximately 3 years from the date of the audit.
The audit was performed onsite at DCCNP on September 11, 2006.
The audit was performed onsite at DCCNP on September 11, 2006.
2.1 Verification of Licensee's Implementation of NRC CommitmentsThe primary focus of this part of the audit is to confirm that the licensee has implemented those commitments made to the NRC as part of past licensing actions/activities. For commitmentsthat had not yet been implemented, the NRC staff aimed to ascertain that they have beencaptured in an effective program for future implementation.ENCLOSURE 2.1.1 Audit ScopeBefore the audit, the NRC staff searched ADAMS for the licensee's licensing action andlicensing activity submittals dated in the last 3 years. Some of these submittals contain regulatory commitments, but the NRC staff found that commitments meeting the definition inLIC-105, Rev. 1, are few in number. Table 1 lists most of the licensee's commitments made in the subject period. Table 1 deliberately omitted the licensee's commitments conveyed viasubmittals that are non-public, even though the NRC did audit those commitments. LIC-105, Rev 1, limits the audit of commitments to those made in writing to the NRC as a resultof past licensing actions (amendments, exemptions, etc.) or licensing activities (bulletins, generic letters, etc.). Accordingly, the audit excluded the following types of commitments:(1)Commitments made as a result of Licensee Event Reports (LER)s - Thesecommitments are controlled by the licensee's LER process, which is imposed by Title 10 of the Code of Federal Regulations (10 CFR) Section 50.73. (2)Commitments made on the licensee's own initiative among internal organizationalcomponents.(3) Commitments that pertain to milestones of licensing actions/activities (e.g., respond toan NRC request for additional information by a certain date). Fulfillment of thesecommitments was indicated by the fact that the subject licensing action/activity was completed.(4)Commitments made as an internal reminder to take actions to comply with existingregulatory requirements such as regulations, Technical Specifications, and Updated Final Safety Analysis Reports. Fulfillment of these commitments was indicated by thelicensee having taken timely action in accordance with the subject requirements.2.1.2 Audit Results The NRC staff reviewed reports generated the licensee's tracking program for the commitmentslisted in Table 1 to evaluate the status of completion. The NRC staff found that the licensee'scommitment tracking program had captured all the regulatory commitments that were identifiedby the NRC staff before the audit. Table 1 summarizes what the NRC staff observed as thecurrent status of licensee commitments. 2.2 Verification of the Licensee's Program for Managing NRC Commitment C hangesThe NRC staff reviewed the licensee's procedure entitled "Commitment Management," PMP-2350-CMS-001, Revision 1, against NEI 99-04. In particular, in regards to managing a change or deviation from a previously completed commitment, this procedure specifically refers to the guidance of NEI-99-04. In general, the licensee's procedure follows closely the guidance of NEI-99-04: it sets forth the need for identifying, tracking, and reporting commitments, and it provides a mechanism for changing commitments. The effectiveness of a procedure can be indicated by the products that are produced by theprocedure. As set forth in Section 2.1 above, the NRC staff found that the licensee had properly addressed each regulatory commitment selected for this audit. As a result of review of the licensee's information, as well as information from other sources, the NRC staff f ound noreason to differ from the licensee's reported status of the audited commitments. Thus, the NRCstaff surmises that the procedure used by the licensee to manage commitments is appropriate and effective.3.0 LICENSEE PERSONNEL CONTACTED FOR THIS AUDITRandy CraneJulie Newmiller
2.1     Verification of Licensees Implementation of NRC Commitments The primary focus of this part of the audit is to confirm that the licensee has implemented those commitments made to the NRC as part of past licensing actions/activities. For commitments that had not yet been implemented, the NRC staff aimed to ascertain that they have been captured in an effective program for future implementation.
ENCLOSURE
 
2.1.1   Audit Scope Before the audit, the NRC staff searched ADAMS for the licensees licensing action and licensing activity submittals dated in the last 3 years. Some of these submittals contain regulatory commitments, but the NRC staff found that commitments meeting the definition in LIC-105, Rev. 1, are few in number. Table 1 lists most of the licensees commitments made in the subject period. Table 1 deliberately omitted the licensees commitments conveyed via submittals that are non-public, even though the NRC did audit those commitments.
LIC-105, Rev 1, limits the audit of commitments to those made in writing to the NRC as a result of past licensing actions (amendments, exemptions, etc.) or licensing activities (bulletins, generic letters, etc.). Accordingly, the audit excluded the following types of commitments:
(1)     Commitments made as a result of Licensee Event Reports (LER)s - These commitments are controlled by the licensees LER process, which is imposed by Title 10 of the Code of Federal Regulations (10 CFR) Section 50.73.
(2)     Commitments made on the licensees own initiative among internal organizational components.
(3)     Commitments that pertain to milestones of licensing actions/activities (e.g., respond to an NRC request for additional information by a certain date). Fulfillment of these commitments was indicated by the fact that the subject licensing action/activity was completed.
(4)     Commitments made as an internal reminder to take actions to comply with existing regulatory requirements such as regulations, Technical Specifications, and Updated Final Safety Analysis Reports. Fulfillment of these commitments was indicated by the licensee having taken timely action in accordance with the subject requirements.
2.1.2     Audit Results The NRC staff reviewed reports generated the licensees tracking program for the commitments listed in Table 1 to evaluate the status of completion. The NRC staff found that the licensees commitment tracking program had captured all the regulatory commitments that were identified by the NRC staff before the audit. Table 1 summarizes what the NRC staff observed as the current status of licensee commitments.
2.2     Verification of the Licensees Program for Managing NRC Commitment Changes The NRC staff reviewed the licensees procedure entitled Commitment Management, PMP-2350-CMS-001, Revision 1, against NEI 99-04. In particular, in regards to managing a change or deviation from a previously completed commitment, this procedure specifically refers to the guidance of NEI-99-04. In general, the licensees procedure follows closely the guidance of NEI-99-04: it sets forth the need for identifying, tracking, and reporting commitments, and it provides a mechanism for changing commitments.
 
The effectiveness of a procedure can be indicated by the products that are produced by the procedure. As set forth in Section 2.1 above, the NRC staff found that the licensee had properly addressed each regulatory commitment selected for this audit. As a result of review of the licensees information, as well as information from other sources, the NRC staff found no reason to differ from the licensees reported status of the audited commitments. Thus, the NRC staff surmises that the procedure used by the licensee to manage commitments is appropriate and effective.
3.0     LICENSEE PERSONNEL CONTACTED FOR THIS AUDIT Randy Crane Julie Newmiller
 
==4.0    CONCLUSION==
 
The NRC staff concludes that, based on the above audit, (1) the licensee had implemented or is tracking for future implementation regulatory commitments; and (2) the licensee had implemented an effective program to manage regulatory commitment changes.
Principal Contributor: P.S. Tam Date: October 4, 2006
 
TABLE 1 D.C. COOK NUCLEAR PLANT AUDIT OF WRITTEN LICENSEE COMMITMENTS (2003 THROUGH 2006)
DCCNP        NRC    NRC Issuance          Summary of Commitment                        Licensee Submittal    TAC                                                                        Implementation No.                                                                        Status 3/27/03      MC1498 Amend. No. 264,      Within 60 days of issuance of the            2/19/04 AEP:NRC:            12/10/03              amendment, will conduct a comprehensive 3591-01                                  root cause analysis evaluation of the Commitment No.
ML033460380                              12/7/03 emergency diesel failure with a      8278 multi-discipline team, including external component experts.
8/27/03      MC0600 Amend. Nos. 281,      Within 45 days after issuance of              2/23/04 AEP:NRC-3304 MC0601 265                  amendment, will implement a Tech. Spec.      Commitment No.
ML032471660        6/25/04              Bases Control program.                        8242 7/26/04      MC3473 (pending)            Within 60 days of plant start following the  6/24/05 AEP:NRC:4054 MC3474                      next scheduled inspections, the licensee      Commitment No.
-07                                      will submit the information requested in      8289 ML042160342                              Bulletin 2004-01, Item (2).
10/28/04    MC3473 (pending)            If circumferential cracking is observed in    Ongoing AEP:NRC:4054 MC3474                      either the pressure boundary or non-          Commitment No.
-10                                      pressure boundary portions of any location    8308 ML043090409                              covered under the scope of Bulletin 2004-01, the licensee will develop plans to perform an adequate extent-of-condition evaluation, and will discuss those plans with cognizant NRC staff prior to restarting the affected unit.
9/21/04      MC4525 Amend. Nos. 289,      Prior to the first time the extended allowed  11/4/05 AEP:NRC:4811 MC4526 271                  outage time is entered for the emergency      Commitment No.
ML042780478        9/9/05                diesel generators, the emergency service      8307 water system, or the closed cooling water system, develop procedures to support use of the supplemental diesel generators.
9/21/04      MC4525 Amend. Nos. 291,      Prior to the first time the extended allowed  11/4/05 AEP:NRC:4811 MC4526 273                  outage time is entered for the emergency      Commitment No.
ML042780478        9/30/05              diesel generators, the emergency service      8307 water system, or the closed cooling water system, develop procedures to support use of the supplemental diesel generators.


==4.0  CONCLUSION==
DCCNP        NRC    NRC Issuance    Summary of Commitment                          Licensee Submittal    TAC                                                                    Implementation No.                                                                    Status 7/29/05      MC8166 Amend. Nos. 292, Using an industry database, the licensee      Ongoing (to be AEP:NRC:5090 MC8167 274              will provide the NRC the operating date (for  considered complete ML052220266        1/12/06          each calendar month) that is described in      when procedure is GL 97-02, Revised Contents of the Monthly    written).
The NRC staff concludes that, based on the above audit, (1) the licensee had implemented oris tracking for future implementation regulatory commitments; and (2) the licensee had implemented an effective program to manage regulatory commitment changes.Principal Contributor: P.S. Tam Date: October 4, 2006 TABLE 1D.C. COOK NUCLEAR PLANTAUDIT OF WRITTEN LICENSEE COMMITMENTS (2003 THROUGH 2006)
Operating Report, by the last day of the      Commitment No.
DCCNPSubmittal NRCTAC No.NRC IssuanceSummary of CommitmentLicenseeImplementation Status3/27/03AEP:NRC:3591-01 ML033460380MC1498Amend. No. 264,12/10/03Within 60 days of issuance of theamendment, will conduct a comprehensiveroot cause analysis evaluation of the12/7/03 emergency diesel failure with amulti-discipline team, including externalcomponent experts.
month following the end of each calendar      8376 quarter. The commitment will be based on the use of an industry database (e.g., the industrys Consolidated Data Entry (CDE) program, currently being developed by the Institute of Nuclear Power Operations).
2/19/04Commitment No.
This regulatory commitment will be implemented to prevent any gaps in the monthly statistics and shutdown experience provided to the NRC (i.e., data for all months will be provided using one or both systems (month operating reports and CDE).
8/10/05      MC8805 Amend Nos. 293,  Will formalize in the nuclear fuel            3/6/06 AEP:NRC:5331 MC8806 275              administrative procedure for core designs      Commitment No.
ML052300238        2/10/06          performance of the dropped rod cluster        8358 control assembly analysis for future fuel cycles. The analysis will be done prior to the start of each fuel cycle 4/13/06      MD1131 Amend. No. 276  Prior to Unit 2 entering Mode 3 during the    4/22/06 AEP:NRC:6381        4/13/06          current refueling outage, will perform all    Commitment No.
-03                                  Technical Specification surveillance          8406 ML061150354                          requirements that challenge operation of the AB emergency diesel generator voltage regulator.
9/22/05      MC8569 Relief, 5/31/06  By 12/31/05, will develop and submit a risk-  Ongoing AEP:NRC:5055 MC8570                  informed inservice inspection program for      Commitment No.
-10                                  NRC review. This target date was revised      8356 ML052780450                          to 9/30/06 by the licensees letter of 7/28/06 (AEP:NRC:6055-13).
12/21/05    MB9794 Relief, 5/31/06  By 3/31/06, the licensee will update the      3/23/06 AEP:NRC:5054 MB9795                  evaluation of offsite sources of toxic gas. If Commitment No.
-15                                  it is necessary to quantify the potential      8273 ML060040237                          chemical concentrations in the control room, the update will include the assumption that the toxic gases enter the control room via the normal makeup flow.


82788/27/03AEP:NRC-3304ML032471660MC0600MC0601Amend. Nos. 281, 2656/25/04Within 45 days after issuance ofamendment, will implement a Tech. Spec.Bases Control program. 2/23/04Commitment No.
DCCNP        NRC   NRC Issuance Summary of Commitment                          Licensee Submittal    TAC                                                                Implementation No.                                                               Status 3/4/05      MC4679 (pending )   The licensee has established a contract        3/17/06 AEP:NRC:5054 MC4680              with Westinghouse to provide a plant-         Commitment No.
82427/26/04AEP:NRC:4054-07ML042160342MC3473MC3474(pending)Within 60 days of plant start following thenext scheduled inspections, the licenseewill submit the information requested inBulletin 2004-01, Item (2).6/24/05Commitment No.
-04                              specific evaluation of debris generation, and  8309 ML050750069                      develop a computational fluid dynamics model of the containment to determine sump fluid velocity profiles, debris transport to the ECCS recirculation sump screens, head loss associated with debris accumulation, and the effect f head loss on available NPSH. The final Westinghouse report and licensee's acceptance will be completed in time to support submittal of the response to Requested Information Item 2 of GL 2004-02 no later than 9/1/05.
828910/28/04AEP:NRC:4054-10ML043090409MC3473MC3474(pending)If circumferential cracking is observed ineither the pressure boundary or non-pressure boundary portions of any locationcovered under the scope of Bulletin 2004-01, the licensee will develop plans toperform an adequate extent-of-conditionevaluation, and will discuss those plans withcognizant NRC staff prior to restarting theaffected unit.OngoingCommitment No.
3/4/05      MC4679 (pending )   During the next refueling outages, the        4/15/05 AEP:NRC:5054 MC4680              licensee will perform additional containment  Commitment Nos.
83089/21/04AEP:NRC:4811ML042780478MC4525MC4526Amend. Nos. 289, 2719/9/05Prior to the first time the extended allowedoutage time is entered for the emergencydiesel generators, the emergency servicewater system, or the closed cooling watersystem, develop procedures to support useof the supplemental diesel generators.11/4/05Commitment No.
-04                              walkdowns using guidance provided in NEI      8312 and 8313 ML050750069                      04-07 and NEI 02-02.
83079/21/04AEP:NRC:4811ML042780478MC4525MC4526Amend. Nos. 291, 2739/30/05Prior to the first time the extended allowedoutage time is entered for the emergencydiesel generators, the emergency servicewater system, or the closed cooling watersystem, develop procedures to support useof the supplemental diesel generators.11/4/05Commitment No.
8/31/05      MC4679 (pending)   By 12/31/05, the licensee will complete the    Ongoing AEP:NRC:5054 MC4680              final acceptance review of the                Commitment No.
8307  DCCNPSubmittal NRCTAC No.NRC IssuanceSummary of CommitmentLicenseeImplementation Status7/29/05AEP:NRC:5090ML052220266MC8166MC8167Amend. Nos. 292, 2741/12/06Using an industry database, the licenseewill provide the NRC the operating date (foreach calendar month) that is described inGL 97-02, "Revised Contents of the MonthlyOperating Report," by the last day of themonth following the end of each calendarquarter. The commitment will be based onthe use of an industry database (e.g., theindustry's Consolidated Data Entry (CDE)program, currently being developed by theInstitute of Nuclear Power Operations). This regulatory commitment will beimplemented to prevent any gaps in themonthly statistics and shutdown experienceprovided to the NRC (i.e., data for allmonths will be provided using one or bothsystems (month operating reports andCDE). Ongoing (to beconsidered completewhen procedure iswritten).Commitment No.
-11                              Westinghouse summary report, and will          8362 ML052510512                      complete evaluations and submit any required license amendment requests. The target date was changed to 12/31/07 per the licensees commitment change procedure.
83768/10/05AEP:NRC:5331ML052300238MC8805MC8806Amend Nos. 293, 2752/10/06Will formalize in the nuclear fueladministrative procedure for core designsperformance of the dropped rod clustercontrol assembly analysis for future fuelcycles. The analysis will be done prior tothe start of each fuel cycle3/6/06Commitment No.
83584/13/06AEP:NRC:6381-03ML061150354MD1131Amend. No. 2764/13/06Prior to Unit 2 entering Mode 3 during thecurrent refueling outage, will perform allTechnical Specification surveillancerequirements that challenge operation ofthe AB emergency diesel generator voltageregulator. 4/22/06Commitment No.
84069/22/05AEP:NRC:5055-10ML052780450MC8569MC8570Relief, 5/31/06By 12/31/05, will develop and submit a risk-informed inservice inspection program forNRC review. This target date was revisedto 9/30/06 by the licensee's letter of 7/28/06(AEP:NRC:6055-13).OngoingCommitment No.
835612/21/05AEP:NRC:5054-15ML060040237MB9794MB9795Relief, 5/31/06By 3/31/06, the licensee will update theevaluation of offsite sources of toxic gas. Ifit is necessary to quantify the potentialchemical concentrations in the controlroom, the update will include theassumption that the toxic gases enter thecontrol room via the normal makeup flow.3/23/06Commitment No.
8273  DCCNPSubmittal NRCTAC No.NRC IssuanceSummary of CommitmentLicenseeImplementation Status3/4/05AEP:NRC:5054-04ML050750069MC4679MC4680(pending)The licensee has established a contractwith Westinghouse to provide a plant-specific evaluation of debris generation, anddevelop a computational fluid dynamicsmodel of the containment to determinesump fluid velocity profiles, debris transportto the ECCS recirculation sump screens,head loss associated with debrisaccumulation, and the effect f head loss onavailable NPSH. The final Westinghousereport and licensee's acceptance will becompleted in time to support submittal ofthe response to Requested Information Item2 of GL 2004-02 no later than 9/1/05. 3/17/06Commitment No.
83093/4/05AEP:NRC:5054-04ML050750069MC4679MC4680(pending)During the next refueling outages, thelicensee will perform additional containmentwalkdowns using guidance provided in NEI04-07 and NEI 02-02.4/15/05Commitment Nos.8312 and 83138/31/05AEP:NRC:5054-11ML052510512MC4679MC4680(pending)By 12/31/05, the licensee will complete thefinal acceptance review of theWestinghouse summary report, and willcomplete evaluations and submit anyrequired license amendment requests. Thetarget date was changed to 12/31/07 perthe licensee's commitment changeprocedure. OngoingCommitment No.
8362 Donald C. Cook Nuclear Plant, Units 1 and 2 cc:Regional Administrator, Region IIIU.S. Nuclear Regulatory Commission Suite 210 2443  Warrenville RoadLisle, IL  60532-4351Attorney GeneralDepartment of Attorney General 525 West Ottawa Street Lansing, MI  48913Township SupervisorLake Township Hall


P.O. Box 818 Bridgman, MI  49106U.S. Nuclear Regulatory CommissionResident Inspector's Office 7700 Red Arrow Highway Stevensville, MI 49127James M. Petro, Jr., EsquireIndiana Michigan Power Company One Cook Place Bridgman, MI  49106Mayor, City of Bridgman P.O. Box 366 Bridgman, MI  49106Special Assistant to the GovernorRoom 1 - State Capitol Lansing, MI  48909Mr. John A. ZwolinskiSafety Assurance Director Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI  49106Michigan Department of Environmental           Quality Waste and Hazardous Materials Div.
Donald C. Cook Nuclear Plant, Units 1 and 2 cc:
Hazardous Waste & Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P. O. Box 30241 Lansing, MI 48909-7741Lawrence J. Weber, Plant ManagerIndiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106Mr. Joseph N. Jensen, Site Vice President Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106}}
Regional Administrator, Region III          Michigan Department of Environmental U.S. Nuclear Regulatory Commission           Quality Suite 210                                  Waste and Hazardous Materials Div.
2443 Warrenville Road                      Hazardous Waste & Radiological Lisle, IL 60532-4351                        Protection Section Nuclear Facilities Unit Attorney General                            Constitution Hall, Lower-Level North Department of Attorney General              525 West Allegan Street 525 West Ottawa Street                      P. O. Box 30241 Lansing, MI 48913                          Lansing, MI 48909-7741 Township Supervisor                        Lawrence J. Weber, Plant Manager Lake Township Hall                          Indiana Michigan Power Company P.O. Box 818                                Nuclear Generation Group Bridgman, MI 49106                          One Cook Place Bridgman, MI 49106 U.S. Nuclear Regulatory Commission Resident Inspector's Office                Mr. Joseph N. Jensen, Site Vice President 7700 Red Arrow Highway                      Indiana Michigan Power Company Stevensville, MI 49127                      Nuclear Generation Group One Cook Place James M. Petro, Jr., Esquire                Bridgman, MI 49106 Indiana Michigan Power Company One Cook Place Bridgman, MI 49106 Mayor, City of Bridgman P.O. Box 366 Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, MI 48909 Mr. John A. Zwolinski Safety Assurance Director Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106}}

Revision as of 19:55, 23 November 2019

Audit of Licensee Commitment Management Program
ML061280475
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/04/2006
From: Tam P
NRC/NRR/ADRO/DORL/LPLIII-1
To: Nazar M
Indiana Michigan Power Co
Tam P
References
TAC MD1359, TAC MD1360
Download: ML061280475 (10)


Text

October 4, 2006 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 SUBJECT D. C. COOK NUCLEAR PLANT, UNITS 1 AND 2 - AUDIT OF THE LICENSEES MANAGEMENT OF REGULATORY COMMITMENTS (TAC NOS. MD1359 AND MD1360)

Dear Mr. Nazar:

On September 7, 2004, the Office of Nuclear Reactor Regulation Office Instruction LIC-105, Managing Regulatory Commitments Made by Licensees to the NRC [Nuclear Regulatory Commission], Revision 1, was published. LIC-105, which is publicly available electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the Internet at the NRC web site (Accession Number ML042320463), provides the NRC staff and its stakeholders with a common reference for handling regulatory commitments made by commercial nuclear reactor licensees to the NRC staff. The guidance is consistent with the industry guidance prepared by the Nuclear Energy Institute (NEI), NEI 99-04, Guidance for Managing NRC Commitment Changes. LIC-105 specifies that once every 3 years, the NRC staff will audit a licensees commitment management program.

An audit of D.C. Cooks commitment management program was performed on site on September 11, 2006. Based on this audit, the NRC staff concludes that (1) the licensee had implemented NRC commitments on a timely basis; and (2) the licensee had implemented an effective program for managing regulatory commitments and commitment changes. Details of the audit are set forth in the enclosed audit report.

Sincerely,

/RA/

Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316

Enclosure:

As stated cc w/encl: See next page

ML061280475 OFFICE LPL3-1\PM LPL3-1/LA LPL3-1/BC(A)

NAME PTam THarris MMurphy DATE 10/3/06 09/20/06 10/4/06

AUDIT REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION (NRR)

REGULATORY COMMITMENTS MADE BY THE LICENSEE TO THE NUCLEAR REGULATORY COMMISSION (NRC)

DONALD C. COOK NUCLEAR PLANT (DCCNP), UNITS 1 AND 2 DOCKET NOS. 50-315 AND 50-316

1.0 INTRODUCTION AND BACKGROUND

On September 7, 2004, the Office of Nuclear Reactor Regulation Office Instruction LIC-105, Managing Regulatory Commitments Made by Licensees to the NRC, Revision 1, was published. LIC-105, Rev. 1, which is publicly available electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the Internet at the NRC web site (Accession Number ML042320463), provides the NRC staff and its stakeholders with a common reference for handling regulatory commitments made by commercial nuclear reactor licensees to the NRC staff. The guidance is consistent with the industry guidance prepared by the Nuclear Energy Institute (NEI), NEI 99-04, Guidance for Managing NRC Commitment Changes.

According to LIC-105, Rev. 1, which cites the definition from NEI-99-04, a regulatory commitment is an explicit statement to take a specific action agreed to, or volunteered by, a licensee and submitted in writing on the docket to the NRC. LIC-105, Rev 1, further directs the NRR Project Manager to audit the licensees commitment management program by assessing the adequacy of the licensees implementation of a sample of commitments made to the NRC in past licensing actions [amendments, reliefs, exemptions, etc.] and activities [bulletins, generic letters, etc.]. The audit is to be performed every 3 years.

2.0 AUDIT PROCEDURE AND RESULTS Since no such audit was performed before the date of the subject audit, the NRC staff defined the period covered by this audit to go back approximately 3 years from the date of the audit.

The audit was performed onsite at DCCNP on September 11, 2006.

2.1 Verification of Licensees Implementation of NRC Commitments The primary focus of this part of the audit is to confirm that the licensee has implemented those commitments made to the NRC as part of past licensing actions/activities. For commitments that had not yet been implemented, the NRC staff aimed to ascertain that they have been captured in an effective program for future implementation.

ENCLOSURE

2.1.1 Audit Scope Before the audit, the NRC staff searched ADAMS for the licensees licensing action and licensing activity submittals dated in the last 3 years. Some of these submittals contain regulatory commitments, but the NRC staff found that commitments meeting the definition in LIC-105, Rev. 1, are few in number. Table 1 lists most of the licensees commitments made in the subject period. Table 1 deliberately omitted the licensees commitments conveyed via submittals that are non-public, even though the NRC did audit those commitments.

LIC-105, Rev 1, limits the audit of commitments to those made in writing to the NRC as a result of past licensing actions (amendments, exemptions, etc.) or licensing activities (bulletins, generic letters, etc.). Accordingly, the audit excluded the following types of commitments:

(1) Commitments made as a result of Licensee Event Reports (LER)s - These commitments are controlled by the licensees LER process, which is imposed by Title 10 of the Code of Federal Regulations (10 CFR) Section 50.73.

(2) Commitments made on the licensees own initiative among internal organizational components.

(3) Commitments that pertain to milestones of licensing actions/activities (e.g., respond to an NRC request for additional information by a certain date). Fulfillment of these commitments was indicated by the fact that the subject licensing action/activity was completed.

(4) Commitments made as an internal reminder to take actions to comply with existing regulatory requirements such as regulations, Technical Specifications, and Updated Final Safety Analysis Reports. Fulfillment of these commitments was indicated by the licensee having taken timely action in accordance with the subject requirements.

2.1.2 Audit Results The NRC staff reviewed reports generated the licensees tracking program for the commitments listed in Table 1 to evaluate the status of completion. The NRC staff found that the licensees commitment tracking program had captured all the regulatory commitments that were identified by the NRC staff before the audit. Table 1 summarizes what the NRC staff observed as the current status of licensee commitments.

2.2 Verification of the Licensees Program for Managing NRC Commitment Changes The NRC staff reviewed the licensees procedure entitled Commitment Management, PMP-2350-CMS-001, Revision 1, against NEI 99-04. In particular, in regards to managing a change or deviation from a previously completed commitment, this procedure specifically refers to the guidance of NEI-99-04. In general, the licensees procedure follows closely the guidance of NEI-99-04: it sets forth the need for identifying, tracking, and reporting commitments, and it provides a mechanism for changing commitments.

The effectiveness of a procedure can be indicated by the products that are produced by the procedure. As set forth in Section 2.1 above, the NRC staff found that the licensee had properly addressed each regulatory commitment selected for this audit. As a result of review of the licensees information, as well as information from other sources, the NRC staff found no reason to differ from the licensees reported status of the audited commitments. Thus, the NRC staff surmises that the procedure used by the licensee to manage commitments is appropriate and effective.

3.0 LICENSEE PERSONNEL CONTACTED FOR THIS AUDIT Randy Crane Julie Newmiller

4.0 CONCLUSION

The NRC staff concludes that, based on the above audit, (1) the licensee had implemented or is tracking for future implementation regulatory commitments; and (2) the licensee had implemented an effective program to manage regulatory commitment changes.

Principal Contributor: P.S. Tam Date: October 4, 2006

TABLE 1 D.C. COOK NUCLEAR PLANT AUDIT OF WRITTEN LICENSEE COMMITMENTS (2003 THROUGH 2006)

DCCNP NRC NRC Issuance Summary of Commitment Licensee Submittal TAC Implementation No. Status 3/27/03 MC1498 Amend. No. 264, Within 60 days of issuance of the 2/19/04 AEP:NRC: 12/10/03 amendment, will conduct a comprehensive 3591-01 root cause analysis evaluation of the Commitment No.

ML033460380 12/7/03 emergency diesel failure with a 8278 multi-discipline team, including external component experts.

8/27/03 MC0600 Amend. Nos. 281, Within 45 days after issuance of 2/23/04 AEP:NRC-3304 MC0601 265 amendment, will implement a Tech. Spec. Commitment No.

ML032471660 6/25/04 Bases Control program. 8242 7/26/04 MC3473 (pending) Within 60 days of plant start following the 6/24/05 AEP:NRC:4054 MC3474 next scheduled inspections, the licensee Commitment No.

-07 will submit the information requested in 8289 ML042160342 Bulletin 2004-01, Item (2).

10/28/04 MC3473 (pending) If circumferential cracking is observed in Ongoing AEP:NRC:4054 MC3474 either the pressure boundary or non- Commitment No.

-10 pressure boundary portions of any location 8308 ML043090409 covered under the scope of Bulletin 2004-01, the licensee will develop plans to perform an adequate extent-of-condition evaluation, and will discuss those plans with cognizant NRC staff prior to restarting the affected unit.

9/21/04 MC4525 Amend. Nos. 289, Prior to the first time the extended allowed 11/4/05 AEP:NRC:4811 MC4526 271 outage time is entered for the emergency Commitment No.

ML042780478 9/9/05 diesel generators, the emergency service 8307 water system, or the closed cooling water system, develop procedures to support use of the supplemental diesel generators.

9/21/04 MC4525 Amend. Nos. 291, Prior to the first time the extended allowed 11/4/05 AEP:NRC:4811 MC4526 273 outage time is entered for the emergency Commitment No.

ML042780478 9/30/05 diesel generators, the emergency service 8307 water system, or the closed cooling water system, develop procedures to support use of the supplemental diesel generators.

DCCNP NRC NRC Issuance Summary of Commitment Licensee Submittal TAC Implementation No. Status 7/29/05 MC8166 Amend. Nos. 292, Using an industry database, the licensee Ongoing (to be AEP:NRC:5090 MC8167 274 will provide the NRC the operating date (for considered complete ML052220266 1/12/06 each calendar month) that is described in when procedure is GL 97-02, Revised Contents of the Monthly written).

Operating Report, by the last day of the Commitment No.

month following the end of each calendar 8376 quarter. The commitment will be based on the use of an industry database (e.g., the industrys Consolidated Data Entry (CDE) program, currently being developed by the Institute of Nuclear Power Operations).

This regulatory commitment will be implemented to prevent any gaps in the monthly statistics and shutdown experience provided to the NRC (i.e., data for all months will be provided using one or both systems (month operating reports and CDE).

8/10/05 MC8805 Amend Nos. 293, Will formalize in the nuclear fuel 3/6/06 AEP:NRC:5331 MC8806 275 administrative procedure for core designs Commitment No.

ML052300238 2/10/06 performance of the dropped rod cluster 8358 control assembly analysis for future fuel cycles. The analysis will be done prior to the start of each fuel cycle 4/13/06 MD1131 Amend. No. 276 Prior to Unit 2 entering Mode 3 during the 4/22/06 AEP:NRC:6381 4/13/06 current refueling outage, will perform all Commitment No.

-03 Technical Specification surveillance 8406 ML061150354 requirements that challenge operation of the AB emergency diesel generator voltage regulator.

9/22/05 MC8569 Relief, 5/31/06 By 12/31/05, will develop and submit a risk- Ongoing AEP:NRC:5055 MC8570 informed inservice inspection program for Commitment No.

-10 NRC review. This target date was revised 8356 ML052780450 to 9/30/06 by the licensees letter of 7/28/06 (AEP:NRC:6055-13).

12/21/05 MB9794 Relief, 5/31/06 By 3/31/06, the licensee will update the 3/23/06 AEP:NRC:5054 MB9795 evaluation of offsite sources of toxic gas. If Commitment No.

-15 it is necessary to quantify the potential 8273 ML060040237 chemical concentrations in the control room, the update will include the assumption that the toxic gases enter the control room via the normal makeup flow.

DCCNP NRC NRC Issuance Summary of Commitment Licensee Submittal TAC Implementation No. Status 3/4/05 MC4679 (pending ) The licensee has established a contract 3/17/06 AEP:NRC:5054 MC4680 with Westinghouse to provide a plant- Commitment No.

-04 specific evaluation of debris generation, and 8309 ML050750069 develop a computational fluid dynamics model of the containment to determine sump fluid velocity profiles, debris transport to the ECCS recirculation sump screens, head loss associated with debris accumulation, and the effect f head loss on available NPSH. The final Westinghouse report and licensee's acceptance will be completed in time to support submittal of the response to Requested Information Item 2 of GL 2004-02 no later than 9/1/05.

3/4/05 MC4679 (pending ) During the next refueling outages, the 4/15/05 AEP:NRC:5054 MC4680 licensee will perform additional containment Commitment Nos.

-04 walkdowns using guidance provided in NEI 8312 and 8313 ML050750069 04-07 and NEI 02-02.

8/31/05 MC4679 (pending) By 12/31/05, the licensee will complete the Ongoing AEP:NRC:5054 MC4680 final acceptance review of the Commitment No.

-11 Westinghouse summary report, and will 8362 ML052510512 complete evaluations and submit any required license amendment requests. The target date was changed to 12/31/07 per the licensees commitment change procedure.

Donald C. Cook Nuclear Plant, Units 1 and 2 cc:

Regional Administrator, Region III Michigan Department of Environmental U.S. Nuclear Regulatory Commission Quality Suite 210 Waste and Hazardous Materials Div.

2443 Warrenville Road Hazardous Waste & Radiological Lisle, IL 60532-4351 Protection Section Nuclear Facilities Unit Attorney General Constitution Hall, Lower-Level North Department of Attorney General 525 West Allegan Street 525 West Ottawa Street P. O. Box 30241 Lansing, MI 48913 Lansing, MI 48909-7741 Township Supervisor Lawrence J. Weber, Plant Manager Lake Township Hall Indiana Michigan Power Company P.O. Box 818 Nuclear Generation Group Bridgman, MI 49106 One Cook Place Bridgman, MI 49106 U.S. Nuclear Regulatory Commission Resident Inspector's Office Mr. Joseph N. Jensen, Site Vice President 7700 Red Arrow Highway Indiana Michigan Power Company Stevensville, MI 49127 Nuclear Generation Group One Cook Place James M. Petro, Jr., Esquire Bridgman, MI 49106 Indiana Michigan Power Company One Cook Place Bridgman, MI 49106 Mayor, City of Bridgman P.O. Box 366 Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, MI 48909 Mr. John A. Zwolinski Safety Assurance Director Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106