{{#Wiki_filter:August 31, 2007Mr. Michael A. BalduzziSr. Vice President & COO Regional Operations, NE Entergy Nuclear Operations, Inc.
{{#Wiki_filter:August 31, 2007 Mr. Michael A. Balduzzi Sr. Vice President & COO Regional Operations, NE Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601  
440 Hamilton Avenue White Plains, NY 10601


==SUBJECT:==
==SUBJECT:==
GENERAL ELECTRIC COMPANY'S REQUEST FOR WITHHOLDINGINFORMATION FROM PUBLIC DISCLOSURE FOR PILGRIM NUCLEAR POWER STATION (TAC NO. MD4918)
GENERAL ELECTRIC COMPANYS REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PILGRIM NUCLEAR POWER STATION (TAC NO. MD4918)


==Dear Mr. Balduzzi:==
==Dear Mr. Balduzzi:==


By letter dated March 22, 2007, Entergy Nuclear Operations, Inc. submitted two affidavits datedMarch 14, 2007, and March 21, 2007, executed by George B. Stramback, requesting that the information contained in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: 1.General Electric Report GE-NE-0000-0061-6306-R4-P, "Pilgrim Nuclear PowerStation, Shroud Repair Replacement Upper Support Assembly-Stress AnalysisReport."2.General Electric Report GE-NE-0000-0064-9392-R2-P, "Pilgrim Unit 1, IGSCC[Intergranular Stress Corrosion Cracking] Assessment of Shroud Repair X-750 Component Other Than The Replacement Upper Support Assembly and Tie Rod Nut."Nonproprietary copies of these documents have been placed in the Nuclear RegulatoryCommission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room (ADAMS Accession Nos.ML070930313 and ML070870134).The affidavits stated that the submitted information should be considered exempt frommandatory public disclosure for the following reasons: a.Information that discloses a process, method, or apparatus, including supportingdata and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies;b.Information which, if used by a competitor, would reduce his expenditure ofresources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; We have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submitted M. Balduzzi-2-information sought to be withheld contains proprietary commercial information and should bewithheld from public disclosure.
By letter dated March 22, 2007, Entergy Nuclear Operations, Inc. submitted two affidavits dated March 14, 2007, and March 21, 2007, executed by George B. Stramback, requesting that the information contained in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at 301-415-4125. Sincerely,/RA/James Kim, Project ManagerPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-293 cc:  See next page M. Balduzzi-2-Therefore, the version of the submitted information marked as proprietary will be withheld frompublic disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at 301-415-4125. Sincerely,/RA/James Kim, Project ManagerPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-293 cc:  See next pageDISTRIBUTION
: 1. General Electric Report GE-NE-0000-0061-6306-R4-P, Pilgrim Nuclear Power Station, Shroud Repair Replacement Upper Support Assembly-Stress Analysis Report.
:PUBLICRidsNrrDorlLpl1-1RidsOgcRPBElliot LPLI-1 R/FSLittleRidsAcrsAcnwMailCenter RidsNrrPMJKimRidsRgn1MailCenterMMitchellAccession Number:  ML072410446OFFICELPL1-1/PMLPL1-1/LACVIB/BCLPL1-1/BCNAMEJKimSLittleMMitchellMKowalDATE8/30/078/30/078/30/078/31/07OFFICIAL RECORD COPY Pilgrim Nuclear Power Station cc:
: 2. General Electric Report GE-NE-0000-0064-9392-R2-P, Pilgrim Unit 1, IGSCC
Regional Administrator, Region IU. S. Nuclear Regulatory Commission
[Intergranular Stress Corrosion Cracking] Assessment of Shroud Repair X-750 Component Other Than The Replacement Upper Support Assembly and Tie Rod Nut.
Nonproprietary copies of these documents have been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room (ADAMS Accession Nos.
ML070930313 and ML070870134).
The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
: a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies;
: b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted


475 Allendale Road King of Prussia, PA  19406-1415Senior Resident InspectorU. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA  02360Chairman, Board of Selectmen11 Lincoln Street Plymouth, MA  02360ChairmanNuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA  02360Chairman, Duxbury Board of SelectmenTown Hall 878 Tremont Street Duxbury, MA  02332Office of the CommissionerMassachusetts Department of Environmental Protection One Winter Street Boston, MA  02108Office of the Attorney GeneralOne Ashburton Place 20th Floor Boston, MA  02108MA Department of Public HealthRadiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129Secretary of Public SafetyExecutive Office of Public Safety One Ashburton Place Boston, MA  02108 Director, Massachusetts EmergencyManagement Agency Attn:  James Muckerheide 400 Worcester Road Framingham, MA  01702-5399Mr. William D. MeinertNuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA  01056-0426Mr. Kevin H. BronsonSite Vice President Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA  02360-5508Mr. Robert G. SmithGeneral Manager, Plant Operations Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508Mr. Stephen J. BethayDirector, Nuclear Safety Assurance Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA  02360-5508Mr. Bryan S. FordManager, Licensing Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA  02360-5508 Pilgrim Nuclear Power Station cc:Mr. John T. Herron Sr. Vice President Entergy Nuclear Operations 1340 Echelon Parkway Jackson, MS 39213Mr. Oscar LimpiasVice President, Engineering Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY  10601Mr. John A. VentosaGM, Engineering Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601Mr. Joseph P. DeRoyVP, Operations Support Entergy Operations, Inc.
M. Balduzzi                                      information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
1340 Echelon parkway Jackson, MS 39213Mr. Michael KanslerPresident & CEO/CNO Entergy Nuclear Operations 1340 Echelon Parkway Jackson, MS 39213Mr. John F. McCannDirector, Nuclear Safety & Licensing Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY  10601
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-4125.
Sincerely,
                                                /RA/
James Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page


Mr. George B. Stramback Regulatory Services Manager General Electric Company 175 Curtner Avenue San Jose, CA 95125Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601Mr. Ernest J. HarknessDirector, Oversight Entergy Nuclear Operations, Inc.
M. Balduzzi                                      Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
1340 Echelon Parkway Jackson, MS 39213Mr. William C. DennisAssistant General Counsel Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601Ms. Stacey LousteauTreasury Department Entergy Services, Inc.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
639 Loyola Avenue New Orleans, LA 70113Mr. James Sniezek5486 Nithsdale Drive Salisbury, MD 21801-2490Mr. Michael D. Lyster5931 Barclay Lane Naples, FL 34110-7306Mr. Garrett D. Edwards814 Waverly Road Kennett Square, PA 19348Mr. John DoeringP.O. Box 189 Parker Ford, PA 19457}}
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-4125.
Sincerely,
                                                /RA/
James Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page DISTRIBUTION:
PUBLIC                  RidsNrrDorlLpl1-1      RidsOgcRP                    BElliot LPLI-1 R/F              SLittle                RidsAcrsAcnwMailCenter RidsNrrPMJKim          RidsRgn1MailCenter MMitchell Accession Number: ML072410446 OFFICE              LPL1-1/PM          LPL1-1/LA          CVIB/BC            LPL1-1/BC NAME                JKim                SLittle            MMitchell          MKowal DATE                8/30/07            8/30/07            8/30/07            8/31/07 OFFICIAL RECORD COPY
 
Pilgrim Nuclear Power Station cc:
Regional Administrator, Region I    Secretary of Public Safety U. S. Nuclear Regulatory Commission  Executive Office of Public Safety 475 Allendale Road                  One Ashburton Place King of Prussia, PA 19406-1415      Boston, MA 02108 Senior Resident Inspector            Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission  Management Agency Pilgrim Nuclear Power Station        Attn: James Muckerheide Post Office Box 867                  400 Worcester Road Plymouth, MA 02360                  Framingham, MA 01702-5399 Chairman, Board of Selectmen        Mr. William D. Meinert 11 Lincoln Street                    Nuclear Engineer Plymouth, MA 02360                  Massachusetts Municipal Wholesale Electric Company Chairman                            P.O. Box 426 Nuclear Matters Committee            Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street                    Mr. Kevin H. Bronson Plymouth, MA 02360                  Site Vice President Entergy Nuclear Operations Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall                            600 Rocky Hill Road 878 Tremont Street                  Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Robert G. Smith Office of the Commissioner          General Manager, Plant Operations Massachusetts Department of          Entergy Nuclear Operations Environmental Protection            Pilgrim Nuclear Power Station One Winter Street                    600 Rocky Hill Road Boston, MA 02108                    Plymouth, MA 02360-5508 Office of the Attorney General       Mr. Stephen J. Bethay One Ashburton Place                  Director, Nuclear Safety Assurance 20th Floor                          Entergy Nuclear Operations Boston, MA 02108                    Pilgrim Nuclear Power Station 600 Rocky Hill Road MA Department of Public Health      Plymouth, MA 02360-5508 Radiation Control Program Schrafft Center, Suite 1M2A          Mr. Bryan S. Ford 529 Main Street                      Manager, Licensing Charlestown, MA 02129                Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
 
Pilgrim Nuclear Power Station cc:
Mr. John T. Herron                  Ms. Charlene D. Faison Sr. Vice President                  Manager, Licensing Entergy Nuclear Operations           Entergy Nuclear Operations 1340 Echelon Parkway                440 Hamilton Avenue Jackson, MS 39213                    White Plains, NY 10601 Mr. Oscar Limpias                    Mr. Ernest J. Harkness Vice President, Engineering          Director, Oversight Entergy Nuclear Operations          Entergy Nuclear Operations, Inc.
440 Hamilton Avenue                  1340 Echelon Parkway White Plains, NY 10601              Jackson, MS 39213 Mr. John A. Ventosa                  Mr. William C. Dennis GM, Engineering                      Assistant General Counsel Entergy Nuclear Operations           Entergy Nuclear Operations 440 Hamilton Avenue                  440 Hamilton Avenue White Plains, NY 10601              White Plains, NY 10601 Mr. Joseph P. DeRoy                  Ms. Stacey Lousteau VP, Operations Support              Treasury Department Entergy Operations, Inc.            Entergy Services, Inc.
1340 Echelon parkway                639 Loyola Avenue Jackson, MS 39213                    New Orleans, LA 70113 Mr. Michael Kansler                  Mr. James Sniezek President & CEO/CNO                  5486 Nithsdale Drive Entergy Nuclear Operations          Salisbury, MD 21801-2490 1340 Echelon Parkway Jackson, MS 39213                    Mr. Michael D. Lyster 5931 Barclay Lane Mr. John F. McCann                  Naples, FL 34110-7306 Director, Nuclear Safety & Licensing Entergy Nuclear Operations          Mr. Garrett D. Edwards 440 Hamilton Avenue                  814 Waverly Road White Plains, NY 10601              Kennett Square, PA 19348 Mr. George B. Stramback              Mr. John Doering Regulatory Services Manager          P.O. Box 189 General Electric Company            Parker Ford, PA 19457 175 Curtner Avenue San Jose, CA 95125}}

Latest revision as of 04:08, 23 November 2019

General Electric Company'S Request for Withholding Information from Public Disclosure for Pilgrim Nuclear Power Station
ML072410446
Person / Time
Site: Pilgrim
Issue date: 08/31/2007
From: James Kim
NRC/NRR/ADRO/DORL/LPLI-1
To: Balduzzi M
Entergy Nuclear Operations
kim J, NRR/ADRO/DORL, 415-4125
References
TAC MD4918
Download: ML072410446 (7)


Text

August 31, 2007 Mr. Michael A. Balduzzi Sr. Vice President & COO Regional Operations, NE Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

GENERAL ELECTRIC COMPANYS REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PILGRIM NUCLEAR POWER STATION (TAC NO. MD4918)

Dear Mr. Balduzzi:

By letter dated March 22, 2007, Entergy Nuclear Operations, Inc. submitted two affidavits dated March 14, 2007, and March 21, 2007, executed by George B. Stramback, requesting that the information contained in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:

1. General Electric Report GE-NE-0000-0061-6306-R4-P, Pilgrim Nuclear Power Station, Shroud Repair Replacement Upper Support Assembly-Stress Analysis Report.
2. General Electric Report GE-NE-0000-0064-9392-R2-P, Pilgrim Unit 1, IGSCC

[Intergranular Stress Corrosion Cracking] Assessment of Shroud Repair X-750 Component Other Than The Replacement Upper Support Assembly and Tie Rod Nut.

Nonproprietary copies of these documents have been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room (ADAMS Accession Nos.

ML070930313 and ML070870134).

The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies;
b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted

M. Balduzzi information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-4125.

Sincerely,

/RA/

James Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page

M. Balduzzi Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-4125.

Sincerely,

/RA/

James Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page DISTRIBUTION:

PUBLIC RidsNrrDorlLpl1-1 RidsOgcRP BElliot LPLI-1 R/F SLittle RidsAcrsAcnwMailCenter RidsNrrPMJKim RidsRgn1MailCenter MMitchell Accession Number: ML072410446 OFFICE LPL1-1/PM LPL1-1/LA CVIB/BC LPL1-1/BC NAME JKim SLittle MMitchell MKowal DATE 8/30/07 8/30/07 8/30/07 8/31/07 OFFICIAL RECORD COPY

Pilgrim Nuclear Power Station cc:

Regional Administrator, Region I Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety 475 Allendale Road One Ashburton Place King of Prussia, PA 19406-1415 Boston, MA 02108 Senior Resident Inspector Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission Management Agency Pilgrim Nuclear Power Station Attn: James Muckerheide Post Office Box 867 400 Worcester Road Plymouth, MA 02360 Framingham, MA 01702-5399 Chairman, Board of Selectmen Mr. William D. Meinert 11 Lincoln Street Nuclear Engineer Plymouth, MA 02360 Massachusetts Municipal Wholesale Electric Company Chairman P.O. Box 426 Nuclear Matters Committee Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street Mr. Kevin H. Bronson Plymouth, MA 02360 Site Vice President Entergy Nuclear Operations Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Robert G. Smith Office of the Commissioner General Manager, Plant Operations Massachusetts Department of Entergy Nuclear Operations Environmental Protection Pilgrim Nuclear Power Station One Winter Street 600 Rocky Hill Road Boston, MA 02108 Plymouth, MA 02360-5508 Office of the Attorney General Mr. Stephen J. Bethay One Ashburton Place Director, Nuclear Safety Assurance 20th Floor Entergy Nuclear Operations Boston, MA 02108 Pilgrim Nuclear Power Station 600 Rocky Hill Road MA Department of Public Health Plymouth, MA 02360-5508 Radiation Control Program Schrafft Center, Suite 1M2A Mr. Bryan S. Ford 529 Main Street Manager, Licensing Charlestown, MA 02129 Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

Pilgrim Nuclear Power Station cc:

Mr. John T. Herron Ms. Charlene D. Faison Sr. Vice President Manager, Licensing Entergy Nuclear Operations Entergy Nuclear Operations 1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. Oscar Limpias Mr. Ernest J. Harkness Vice President, Engineering Director, Oversight Entergy Nuclear Operations Entergy Nuclear Operations, Inc.

440 Hamilton Avenue 1340 Echelon Parkway White Plains, NY 10601 Jackson, MS 39213 Mr. John A. Ventosa Mr. William C. Dennis GM, Engineering Assistant General Counsel Entergy Nuclear Operations Entergy Nuclear Operations 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. Joseph P. DeRoy Ms. Stacey Lousteau VP, Operations Support Treasury Department Entergy Operations, Inc. Entergy Services, Inc.

1340 Echelon parkway 639 Loyola Avenue Jackson, MS 39213 New Orleans, LA 70113 Mr. Michael Kansler Mr. James Sniezek President & CEO/CNO 5486 Nithsdale Drive Entergy Nuclear Operations Salisbury, MD 21801-2490 1340 Echelon Parkway Jackson, MS 39213 Mr. Michael D. Lyster 5931 Barclay Lane Mr. John F. McCann Naples, FL 34110-7306 Director, Nuclear Safety & Licensing Entergy Nuclear Operations Mr. Garrett D. Edwards 440 Hamilton Avenue 814 Waverly Road White Plains, NY 10601 Kennett Square, PA 19348 Mr. George B. Stramback Mr. John Doering Regulatory Services Manager P.O. Box 189 General Electric Company Parker Ford, PA 19457 175 Curtner Avenue San Jose, CA 95125