| issue date = 08/23/2007
| issue date = 08/23/2007
| title = Steam Generator Tube Inspection Discussion During Upcoming Palisades Outage
| title = Steam Generator Tube Inspection Discussion During Upcoming Palisades Outage
| author name = Chawla M L
| author name = Chawla M
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
| addressee name = Lahti L A
| addressee name = Lahti L
| addressee affiliation = Entergy Corp
| addressee affiliation = Entergy Corp
| docket = 05000255
| docket = 05000255
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From: Mahesh ChawlaTo:llahti@entergy.comDate: 08/23/2007 1:24:24 PM
{{#Wiki_filter:From:             Mahesh Chawla To:               llahti@entergy.com Date:             08/23/2007 1:24:24 PM


==Subject:==
==Subject:==
MD 6564 - STEAM GENERATOR TUBE INSPECTION DISCUSSION DURING UPCOMING PALISADES OUTAGEThe NRC staff would like to discuss the results of the SG tube inspections to be conductedduring the upcoming Palisades Nuclear Generating Station refueling outage. This phone call shall be scheduled towards the end of the planned SG tube inspection interval, but before the unit completes the inspections and repairs. Please inform me when you get to that point so I can arrange a teleconference with the staff. Following are the points of discussion:1.Discuss any trends in the amount of primary-to-secondary leakage observed during therecently completed cycle.2.Discuss whether any secondary side pressure tests were performed during the outageand the associated results.3.Discuss any exceptions taken to the industry guidelines.
MD 6564 - STEAM GENERATOR TUBE INSPECTION DISCUSSION DURING UPCOMING PALISADES OUTAGE The NRC staff would like to discuss the results of the SG tube inspections to be conducted during the upcoming Palisades Nuclear Generating Station refueling outage. This phone call shall be scheduled towards the end of the planned SG tube inspection interval, but before the unit completes the inspections and repairs. Please inform me when you get to that point so I can arrange a teleconference with the staff. Following are the points of discussion:
4.For each steam generator, provide a description of the inspections performed includingthe areas examined and the probes used (e.g., dents/dings, sleeves, expansion-transition, U-bends with a rotating probe), the scope of the inspection (e.g., 100% of dents/dings greater than 5 volts and a 20% sample between 2 and 5 volts), and the expansion criteria.5.For each area examined (e.g., tube supports, dent/dings, sleeves, etc), provide asummary of the number of indications identified to-date of each degradation mode (e.g.,
: 1.       Discuss any trends in the amount of primary-to-secondary leakage observed during the recently completed cycle.
number of circumferential primary water stress corrosion cracking indications at the expansion transition). For the most significant indications in each area, provide an estimate of the severity of the indication (e.g., provide the voltage, depth, and length of the indication). In particular, address whether tube integrity (structural and accident induced leakage integrity) was maintained during the previous operating cycle. In addition, discuss whether any location exhibited a degradation mode that had not previously been observed at this location at this unit (e.g., observed circumferential primary water stress corrosion cracking at the expansion transition for the first time at this unit).6.Describe repair/plugging plans.
: 2.       Discuss whether any secondary side pressure tests were performed during the outage and the associated results.
7.Describe in-situ pressure test and tube pull plans and results (as applicable and ifavailable).8.Provide the schedule for steam generator-related activities during the remainder of thecurrent outage.9.Discuss the following regarding loose parts:
: 3.       Discuss any exceptions taken to the industry guidelines.
!what inspections are performed to detect loose parts
: 4.       For each steam generator, provide a description of the inspections performed including the areas examined and the probes used (e.g., dents/dings, sleeves, expansion-transition, U-bends with a rotating probe), the scope of the inspection (e.g., 100% of dents/dings greater than 5 volts and a 20% sample between 2 and 5 volts), and the expansion criteria.
!a description of any loose parts detected and their location within the SG
: 5.       For each area examined (e.g., tube supports, dent/dings, sleeves, etc), provide a summary of the number of indications identified to-date of each degradation mode (e.g.,
!if the loose parts were removed from the SG
number of circumferential primary water stress corrosion cracking indications at the expansion transition). For the most significant indications in each area, provide an estimate of the severity of the indication (e.g., provide the voltage, depth, and length of the indication). In particular, address whether tube integrity (structural and accident induced leakage integrity) was maintained during the previous operating cycle. In addition, discuss whether any location exhibited a degradation mode that had not previously been observed at this location at this unit (e.g., observed circumferential primary water stress corrosion cracking at the expansion transition for the first time at this unit).
!indications of tube damage associated with the loose parts
: 6.       Describe repair/plugging plans.
!the source or nature of the loose parts if known10.Discuss the results of any secondary side inspections.
: 7.       Describe in-situ pressure test and tube pull plans and results (as applicable and if available).
11.Discuss any unexpected or unusual results.
: 8.       Provide the schedule for steam generator-related activities during the remainder of the current outage.
 
: 9.       Discuss the following regarding loose parts:
CC:Allen Hiser; John Burke; Justin Poole; Kenneth KarwoskiMail Envelope Properties(46CDC2C8.DA0 : 2 : 35476)  
!       what inspections are performed to detect loose parts
!       a description of any loose parts detected and their location within the SG
!       if the loose parts were removed from the SG
!       indications of tube damage associated with the loose parts
!       the source or nature of the loose parts if known
: 10.     Discuss the results of any secondary side inspections.
: 11.     Discuss any unexpected or unusual results.
CC:               Allen Hiser; John Burke; Justin Poole; Kenneth Karwoski Mail Envelope Properties         (46CDC2C8.DA0 : 2 : 35476)


==Subject:==
==Subject:==
MD 6564 - STEAM GENERATOR TUBE INSPECTION DISCUSSIONDURING UPCOMING PALISADES OUTAGE Creation Date08/23/2007 1:24:24 PMFrom: Mahesh ChawlaCreated By:MLC@nrc.govRecipientsActionDate & Timeentergy.comTransferred08/23/2007 1:24:46
MD 6564 - STEAM GENERATOR TUBE INSPECTION DISCUSSION DURING UPCOMING PALISADES OUTAGE Creation Date            08/23/2007 1:24:24 PM From:                     Mahesh Chawla Created By:               MLC@nrc.gov Recipients                                        Action              Date & Time entergy.com                                        Transferred          08/23/2007 1:24:46 PM llahti (llahti@entergy.com) nrc.gov OWGWPO01.HQGWDO01                                Delivered            08/23/2007 1:24:27 PM JPB3 CC (John Burke)                           Opened              08/23/2007 1:30:30 PM nrc.gov OWGWPO04.HQGWDO01                                Delivered            08/23/2007 1:24:27 PM ALH1 CC (Allen Hiser)                           Opened              08/23/2007 4:40:10 PM KJK1 CC (Kenneth Karwoski)                     Opened              08/23/2007 7:01:06 PM nrc.gov TWGWPO03.HQGWDO01                                Delivered            08/23/2007 1:24:28 PM JCP5 CC (Justin Poole)                         Opened              08/23/2007 3:53:43 PM Post Office                                         Delivered          Route entergy.com OWGWPO01.HQGWDO01                                08/23/2007 1:24:27 PM      nrc.gov OWGWPO04.HQGWDO01                                08/23/2007 1:24:27 PM      nrc.gov TWGWPO03.HQGWDO01                                08/23/2007 1:24:28 PM      nrc.gov Files                            Size              Date & Time MESSAGE                          4265              08/23/2007 1:24:24 PM Options Auto Delete:                     No Expiration Date:                 None Notify Recipients:               Yes Priority:                       Standard ReplyRequested:                 No Return Notification:             None Concealed  
 
PM llahti (llahti@entergy.com)nrc.gov OWGWPO01.HQGWDO01Delivered08/23/2007 1:24:27
 
PM JPB3 CC (John Burke)Opened08/23/2007 1:30:30
 
PMnrc.gov OWGWPO04.HQGWDO01Delivered08/23/2007 1:24:27
 
PM ALH1 CC (Allen Hiser)Opened08/23/2007 4:40:10
 
PM KJK1 CC (Kenneth Karwoski)Opened08/23/2007 7:01:06
 
PMnrc.gov TWGWPO03.HQGWDO01Delivered08/23/2007 1:24:28
 
PM JCP5 CC (Justin Poole)Opened08/23/2007 3:53:43
 
PMPost Office DeliveredRouteentergy.com OWGWPO01.HQGWDO0108/23/2007 1:24:27 PMnrc.gov OWGWPO04.HQGWDO0108/23/2007 1:24:27 PMnrc.gov TWGWPO03.HQGWDO0108/23/2007 1:24:28 PMnrc.govFilesSizeDate & Time MESSAGE426508/23/2007 1:24:24 PM Options Auto Delete:
No Expiration Date:
None Notify Recipients:
Yes Priority:Standard ReplyRequested:
No Return Notification:
None Concealed  


==Subject:==
==Subject:==
 
No Security:                       Standard To Be Delivered:                 Immediate Status Tracking:                 Delivered & Opened}}
No Security:Standard To Be Delivered:Immediate Status Tracking:Delivered & Opened}}

Latest revision as of 02:19, 23 November 2019

Steam Generator Tube Inspection Discussion During Upcoming Palisades Outage
ML072690282
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/23/2007
From: Mahesh Chawla
NRC/NRR/ADRO/DORL/LPLIII-1
To: Lahti L
Entergy Corp
Chawla M, NRR/DORL/LPL3-1, 301-415-8371
References
TAC MD6564
Download: ML072690282 (4)


Text

From: Mahesh Chawla To: llahti@entergy.com Date: 08/23/2007 1:24:24 PM

Subject:

MD 6564 - STEAM GENERATOR TUBE INSPECTION DISCUSSION DURING UPCOMING PALISADES OUTAGE The NRC staff would like to discuss the results of the SG tube inspections to be conducted during the upcoming Palisades Nuclear Generating Station refueling outage. This phone call shall be scheduled towards the end of the planned SG tube inspection interval, but before the unit completes the inspections and repairs. Please inform me when you get to that point so I can arrange a teleconference with the staff. Following are the points of discussion:

1. Discuss any trends in the amount of primary-to-secondary leakage observed during the recently completed cycle.
2. Discuss whether any secondary side pressure tests were performed during the outage and the associated results.
3. Discuss any exceptions taken to the industry guidelines.
4. For each steam generator, provide a description of the inspections performed including the areas examined and the probes used (e.g., dents/dings, sleeves, expansion-transition, U-bends with a rotating probe), the scope of the inspection (e.g., 100% of dents/dings greater than 5 volts and a 20% sample between 2 and 5 volts), and the expansion criteria.
5. For each area examined (e.g., tube supports, dent/dings, sleeves, etc), provide a summary of the number of indications identified to-date of each degradation mode (e.g.,

number of circumferential primary water stress corrosion cracking indications at the expansion transition). For the most significant indications in each area, provide an estimate of the severity of the indication (e.g., provide the voltage, depth, and length of the indication). In particular, address whether tube integrity (structural and accident induced leakage integrity) was maintained during the previous operating cycle. In addition, discuss whether any location exhibited a degradation mode that had not previously been observed at this location at this unit (e.g., observed circumferential primary water stress corrosion cracking at the expansion transition for the first time at this unit).

6. Describe repair/plugging plans.
7. Describe in-situ pressure test and tube pull plans and results (as applicable and if available).
8. Provide the schedule for steam generator-related activities during the remainder of the current outage.
9. Discuss the following regarding loose parts:

! what inspections are performed to detect loose parts

! a description of any loose parts detected and their location within the SG

! if the loose parts were removed from the SG

! indications of tube damage associated with the loose parts

! the source or nature of the loose parts if known

10. Discuss the results of any secondary side inspections.
11. Discuss any unexpected or unusual results.

CC: Allen Hiser; John Burke; Justin Poole; Kenneth Karwoski Mail Envelope Properties (46CDC2C8.DA0 : 2 : 35476)

Subject:

MD 6564 - STEAM GENERATOR TUBE INSPECTION DISCUSSION DURING UPCOMING PALISADES OUTAGE Creation Date 08/23/2007 1:24:24 PM From: Mahesh Chawla Created By: MLC@nrc.gov Recipients Action Date & Time entergy.com Transferred 08/23/2007 1:24:46 PM llahti (llahti@entergy.com) nrc.gov OWGWPO01.HQGWDO01 Delivered 08/23/2007 1:24:27 PM JPB3 CC (John Burke) Opened 08/23/2007 1:30:30 PM nrc.gov OWGWPO04.HQGWDO01 Delivered 08/23/2007 1:24:27 PM ALH1 CC (Allen Hiser) Opened 08/23/2007 4:40:10 PM KJK1 CC (Kenneth Karwoski) Opened 08/23/2007 7:01:06 PM nrc.gov TWGWPO03.HQGWDO01 Delivered 08/23/2007 1:24:28 PM JCP5 CC (Justin Poole) Opened 08/23/2007 3:53:43 PM Post Office Delivered Route entergy.com OWGWPO01.HQGWDO01 08/23/2007 1:24:27 PM nrc.gov OWGWPO04.HQGWDO01 08/23/2007 1:24:27 PM nrc.gov TWGWPO03.HQGWDO01 08/23/2007 1:24:28 PM nrc.gov Files Size Date & Time MESSAGE 4265 08/23/2007 1:24:24 PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened