{{#Wiki_filter:June 16, 2008  
{{#Wiki_filter:UNITED STATES
EA-08-182  
                                  NUC LE AR RE G UL AT O RY C O M M I S S I O N
 
                                                    R E GI ON I V
James R. Becker Site Vice President - Station  Director Diablo Canyon Power Plant P.O. Box 56  
                                        612 EAST LAMAR BLVD , SU I TE 400
Avila Beach, CA 93424  
                                          AR LI N GTON , TEXAS 76011-4125
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000323/2008002 - RESPONSE TO NONCITED VIOLATION  
                                              June 16, 2008
Dear Mr. Becker:  
EA-08-182
James R. Becker
This refers to your letter dated June 2, 2008, submitted in response to Noncited Violation 05000323/2008002-03, "Failure to Follow Procedures," issued in the NRC Integrated Inspection Report 05000275/20008002 and 05000323/2008002 dated May 1, 2008. In your letter, you denied the violation cited in the NRC Integrated Inspection Report. The violation identified the site's failure to implement Procedure RCP D-430, "Plant Airborne Radioactivity Surveillance," Revision 18.  
Site Vice President - Station
The NRC staff is currently reviewing your letter. You will be notified in writing when our evaluation has been completed.  
   Director
Diablo Canyon Power Plant
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your letter dated June 2, 2008, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.  
P.O. Box 56
Should you have any questions concerning this letter, please contact me at (817) 860-8215 or Mr. Chris Graves, Health Physicist, at (817) 860-6542.  
Avila Beach, CA 93424
      Sincerely,
SUBJECT:       DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INSPECTION
        /RA/      
                REPORT 05000323/2008002 - RESPONSE TO NONCITED VIOLATION
      Michael P. Shannon, Chief       Plant Support Branch       Division of Reactor Safety UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
Dear Mr. Becker:
Pacific Gas and Electric Company - 2 - EA-08-182
This refers to your letter dated June 2, 2008, submitted in response to Noncited
  Docket No.:  50-275; 50-323 License No.:  DPR-80; DPR-82
Violation 05000323/2008002-03, Failure to Follow Procedures, issued in the NRC Integrated
Inspection Report 05000275/20008002 and 05000323/2008002 dated May 1, 2008. In your
letter, you denied the violation cited in the NRC Integrated Inspection Report. The violation
identified the sites failure to implement Procedure RCP D-430, Plant Airborne Radioactivity
Surveillance, Revision 18.
The NRC staff is currently reviewing your letter. You will be notified in writing when our
evaluation has been completed.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your
letter dated June 2, 2008, will be made available electronically for public inspection in the NRC
Public Document Room or from the NRCs document system (ADAMS), accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Should you have any questions concerning this letter, please contact me at (817) 860-8215 or
Mr. Chris Graves, Health Physicist, at (817) 860-6542.
                                                    Sincerely,
                                                    /RA/
                                                    Michael P. Shannon, Chief
                                                    Plant Support Branch
                                                    Division of Reactor Safety


cc w/enclosure: Sierra Club San Lucia Chapter ATTN: Andrew Christie P.O. Box 15755  
Pacific Gas and Electric Company      -2-
San Luis Obispo, CA 93406  
EA-08-182
Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448  
Docket No.: 50-275; 50-323
License No.: DPR-80; DPR-82
cc w/enclosure:
Sierra Club San Lucia Chapter
ATTN: Andrew Christie
P.O. Box 15755
San Luis Obispo, CA 93406
Nancy Culver
San Luis Obispo
Mothers for Peace
P.O. Box 164
Pismo Beach, CA 93448
Chairman
San Luis Obispo County
  Board of Supervisors
1055 Monterey Street, Suite D430
San Luis Obispo, CA 93408
Truman Burns\Robert Kinosian
California Public Utilities Commission
505 Van Ness Ave., Rm. 4102
San Francisco, CA 94102
Diablo Canyon Independent Safety Committee
Attn: Robert R. Wellington, Esq.
Legal Counsel
857 Cass Street, Suite D
Monterey, CA 93940
Director, Radiological Health Branch
State Department of Health Services
P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414
City Editor
The Tribune
3825 South Higuera Street
P.O. Box 112
San Luis Obispo, CA 93406-0112
James D. Boyd, Commissioner
California Energy Commission
1516 Ninth Street (MS 31)
Sacramento, CA 95814


Chairman San Luis Obispo County    Board of Supervisors 1055 Monterey Street, Suite D430
Pacific Gas and Electric Company       -3-
San Luis Obispo, CA  93408
EA-08-182
Truman Burns\Robert Kinosian California Public Utilities Commission 505 Van Ness Ave., Rm. 4102
John T. Conway
San Francisco, CA  94102
Senior Vice President - Station
Diablo Canyon Independent Safety Committee Attn:  Robert R. Wellington, Esq. Legal Counsel
Generation and Chief Nuclear Officer
857 Cass Street, Suite D Monterey, CA  93940
Pacific Gas and Electric Company
Director, Radiological Health Branch State Department of Health Services
Diablo Canyon Power Plant
P.O. Box 997414 (MS 7610) Sacramento, CA  95899-7414
P.O. Box 770000
City Editor The Tribune 3825 South Higuera Street P.O. Box 112
San Francisco, CA 94177-0001
San Luis Obispo, CA  93406-0112
Jennifer Tang
James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)
Field Representative
Sacramento, CA  95814 
United States Senator Barbara Boxer
Pacific Gas and Electric Company - 3 - EA-08-182  
1700 Montgomery Street, Suite 240
  John T. Conway Senior Vice President - Station  
San Francisco, CA 94111
  Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 770000 San Francisco, CA 94177-0001  
Chief, Radiological Emergency Preparedness Section
National Preparedness Directorate
Technological Hazards Division
Department of Homeland Security
1111 Broadway, Suite 1200
Oakland, CA 94607-4052


Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA  94111
Pacific Gas and Electric Company           -4-
 
EA-08-182
Chief, Radiological Emergency Preparedness Section National Preparedness Directorate Technological Hazards Division Department of Homeland Security 1111 Broadway, Suite 1200
Electronic distribution by RIV:
Oakland, CA  94607-4052 
Regional Administrator (Elmo.Collins@nrc.gov)
Pacific Gas and Electric Company - 4 - EA-08-182  
DRP Director (Dwight.Chamberlain@nrc.gov)
  Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov) DRS Director (Roy.Caniano@nrc.gov) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Michael.Peck@nrc.gov) Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov) Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) DRS STA (Dale.Powers@nrc.gov) J. Adams, OEDO RIV Coordinator (John.Adams@nrc.gov) P. Lougheed, OEDO RIV Coordinator (Patricia.Lougheed@nrc.gov) ROPreports  
DRS Director (Roy.Caniano@nrc.gov)
DC Site Secretary (Agnes.Chan@nrc.gov) OE (John.Wray@nrc.gov) OE Mail Resource  
DRS Deputy Director (Troy.Pruett@nrc.gov)
 
Senior Resident Inspector (Michael.Peck@nrc.gov)
   
Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)
   
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
   
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
  SUNSI Review Completed: __MPS___ ADAMS:     Yes   No    Initials:  _MPS_  Publicly Available       Non-Publicly Available           Sensitive             Non-Sensitive  
RITS Coordinator (Marisa.Herrera@nrc.gov)
DOCUMENT:  
DRS STA (Dale.Powers@nrc.gov)
PSB C:PSB RA:ACES C:DRP/PBB STA C:PSB DCGraves MPShannon GMVasquez VGGaddy DAPowers MPShannon /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ 6/16/08 6/16/08 6/16/08 6/16/08 6/16/08 6/16/08 OFFICIAL RECORD COPY   T=Telephone           E=E-mail F=Fax
J. Adams, OEDO RIV Coordinator (John.Adams@nrc.gov)
P. Lougheed, OEDO RIV Coordinator (Patricia.Lougheed@nrc.gov)
ROPreports
DC Site Secretary (Agnes.Chan@nrc.gov)
OE (John.Wray@nrc.gov)
OE Mail Resource
SUNSI Review Completed: __MPS___             ADAMS: Yes           No    Initials: _MPS_
  Publicly Available       Non-Publicly Available       Sensitive       Non-Sensitive
DOCUMENT:
PSB               C:PSB         RA:ACES           C:DRP/PBB     STA               C:PSB
DCGraves         MPShannon     GMVasquez         VGGaddy       DAPowers         MPShannon
/RA/             /RA/           /RA/             /RA/           /RA/             /RA/
6/16/08           6/16/08       6/16/08           6/16/08       6/16/08           6/16/08
OFFICIAL RECORD COPY                 T=Telephone                   E=E-mail             F=Fax
}}
}}

Latest revision as of 16:46, 14 November 2019

NRC Inspection Report 05000323/2008002 - Response to Noncited Violation
ML081680731
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/16/2008
From: Shannon M
Plant Support Branch Region IV
To: Becker J
Pacific Gas & Electric Co
References
EA-08-182, IR-08-002
Download: ML081680731 (4)


See also: IR 05000323/2008002

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

June 16, 2008

EA-08-182

James R. Becker

Site Vice President - Station

Director

Diablo Canyon Power Plant

P.O. Box 56

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INSPECTION

REPORT 05000323/2008002 - RESPONSE TO NONCITED VIOLATION

Dear Mr. Becker:

This refers to your letter dated June 2, 2008, submitted in response to Noncited

Violation 05000323/2008002-03, Failure to Follow Procedures, issued in the NRC Integrated

Inspection Report 05000275/20008002 and 05000323/2008002 dated May 1, 2008. In your

letter, you denied the violation cited in the NRC Integrated Inspection Report. The violation

identified the sites failure to implement Procedure RCP D-430, Plant Airborne Radioactivity

Surveillance, Revision 18.

The NRC staff is currently reviewing your letter. You will be notified in writing when our

evaluation has been completed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your

letter dated June 2, 2008, will be made available electronically for public inspection in the NRC

Public Document Room or from the NRCs document system (ADAMS), accessible from the

NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Should you have any questions concerning this letter, please contact me at (817) 860-8215 or

Mr. Chris Graves, Health Physicist, at (817) 860-6542.

Sincerely,

/RA/

Michael P. Shannon, Chief

Plant Support Branch

Division of Reactor Safety

Pacific Gas and Electric Company -2-

EA-08-182

Docket No.: 50-275; 50-323

License No.: DPR-80; DPR-82

cc w/enclosure:

Sierra Club San Lucia Chapter

ATTN: Andrew Christie

P.O. Box 15755

San Luis Obispo, CA 93406

Nancy Culver

San Luis Obispo

Mothers for Peace

P.O. Box 164

Pismo Beach, CA 93448

Chairman

San Luis Obispo County

Board of Supervisors

1055 Monterey Street, Suite D430

San Luis Obispo, CA 93408

Truman Burns\Robert Kinosian

California Public Utilities Commission

505 Van Ness Ave., Rm. 4102

San Francisco, CA 94102

Diablo Canyon Independent Safety Committee

Attn: Robert R. Wellington, Esq.

Legal Counsel

857 Cass Street, Suite D

Monterey, CA 93940

Director, Radiological Health Branch

State Department of Health Services

P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

City Editor

The Tribune

3825 South Higuera Street

P.O. Box 112

San Luis Obispo, CA 93406-0112

James D. Boyd, Commissioner

California Energy Commission

1516 Ninth Street (MS 31)

Sacramento, CA 95814

Pacific Gas and Electric Company -3-

EA-08-182

John T. Conway

Senior Vice President - Station

Generation and Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 770000

San Francisco, CA 94177-0001

Jennifer Tang

Field Representative

United States Senator Barbara Boxer

1700 Montgomery Street, Suite 240

San Francisco, CA 94111

Chief, Radiological Emergency Preparedness Section

National Preparedness Directorate

Technological Hazards Division

Department of Homeland Security

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Pacific Gas and Electric Company -4-

EA-08-182

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Michael.Peck@nrc.gov)

Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

DRS STA (Dale.Powers@nrc.gov)

J. Adams, OEDO RIV Coordinator (John.Adams@nrc.gov)

P. Lougheed, OEDO RIV Coordinator (Patricia.Lougheed@nrc.gov)

ROPreports

DC Site Secretary (Agnes.Chan@nrc.gov)

OE (John.Wray@nrc.gov)

OE Mail Resource

SUNSI Review Completed: __MPS___ ADAMS: Yes No Initials: _MPS_

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

DOCUMENT:

PSB C:PSB RA:ACES C:DRP/PBB STA C:PSB

DCGraves MPShannon GMVasquez VGGaddy DAPowers MPShannon

/RA/ /RA/ /RA/ /RA/ /RA/ /RA/

6/16/08 6/16/08 6/16/08 6/16/08 6/16/08 6/16/08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax