(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 10/20/2008 | | | issue date = 10/20/2008 |
| | title = Request for Additional Information, License Renewal Application, Boral Neutron Absorbing Material in Spent Fuel Pool Racks | | | title = Request for Additional Information, License Renewal Application, Boral Neutron Absorbing Material in Spent Fuel Pool Racks |
| | author name = Robinson J E | | | author name = Robinson J |
| | author affiliation = NRC/NRR/DLR/RPB1 | | | author affiliation = NRC/NRR/DLR/RPB1 |
| | addressee name = Gallagher M P | | | addressee name = Gallagher M |
| | addressee affiliation = AmerGen Energy Co, LLC | | | addressee affiliation = AmerGen Energy Co, LLC |
| | docket = 05000289 | | | docket = 05000289 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:October 20, 2008 Mr. Michael P. Gallagher Vice President License Renewal Projects AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348 | | {{#Wiki_filter:October 20, 2008 Mr. Michael P. Gallagher Vice President License Renewal Projects AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| REQUEST FOR ADDITIONAL INFORMATION FOR BORAL NEUTRON ABSORBING MATERIAL IN SPENT FUEL POOL RACKS, THREE MILE ISLAND NUCLEAR STATION, UNIT 1, LICENSE RENEWAL APPLICATION (TAC NO. MD7701) | | REQUEST FOR ADDITIONAL INFORMATION FOR BORAL NEUTRON ABSORBING MATERIAL IN SPENT FUEL POOL RACKS, THREE MILE ISLAND NUCLEAR STATION, UNIT 1, LICENSE RENEWAL APPLICATION (TAC NO. MD7701) |
|
| |
|
| ==Dear Mr. Gallagher:== | | ==Dear Mr. Gallagher:== |
|
| |
|
| By letter dated January 8, 2008, AmerGen Energy Company, LLC (AmerGen) submitted an application pursuant to 10 Code of Federal Regulation (10 CFR Part 54) to renew the operating license for Three Mile Island Nuclear Station, Unit 1 for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is continuing to review the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future. | | By letter dated January 8, 2008, AmerGen Energy Company, LLC (AmerGen) submitted an application pursuant to 10 Code of Federal Regulation (10 CFR Part 54) to renew the operating license for Three Mile Island Nuclear Station, Unit 1 for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is continuing to review the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future. |
| Items in the enclosure were discussed with Chris Wilson, of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2878 or e-mail Jay.Robinson@nrc.gov. Sincerely, \RA\ Jay Robinson, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation | | Items in the enclosure were discussed with Chris Wilson, of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2878 or e-mail Jay.Robinson@nrc.gov. |
| | Sincerely, |
| | \RA\ |
| | Jay Robinson, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-289 |
| | |
| | ==Enclosure:== |
|
| |
|
| Docket No. 50-289
| | As stated cc w/encl: See next page |
|
| |
|
| ==Enclosure:==
| | ML082520122 OFFICE LA:DLR DCI:SGCB PM:DLR:RPB1 BC:DLR:RPB1 NAME SFigueroa AHiser (EMurphy for) JRobinson DPelton (JRobinson for) |
| As stated cc w/encl: See next page
| | DATE 9/11/08 10/15/08 10/20/08 10/20/08 |
|
| |
|
| ML082520122 OFFICE LA:DLR DCI:SGCB PM:DLR:RPB1 BC:DLR:RPB1 NAME SFigueroa AHiser (EMurphy for) JRobinson DPelton (JRobinson for) DATE 9/11/08 10/15/08 10/20/08 10/20/08 Letter to AmerGen Energy Company, LLC from J. Robinson dated October 20, 2008 DISTRIBUTION
| | Letter to AmerGen Energy Company, LLC from J. Robinson dated October 20, 2008 DISTRIBUTION: |
| : | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| REQUEST FOR ADDITIONAL INFORMATION FOR BORAL NEUTRON ABSORBING MATERIAL IN SPENT FUEL POOL RACKS, THREE MILE ISLAND NUCLEAR STATION, UNIT 1, LICENSE RENEWAL APPLICATION (TAC NO. MD7701) | | REQUEST FOR ADDITIONAL INFORMATION FOR BORAL NEUTRON ABSORBING MATERIAL IN SPENT FUEL POOL RACKS, THREE MILE ISLAND NUCLEAR STATION, UNIT 1, LICENSE RENEWAL APPLICATION (TAC NO. MD7701) |
| HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr RidsNrrDlrRpb1 RidsNrrDlrRpb2 RdsNrrDlrRer1 RidsNrrDlrRer2 RidsNrrDlrRerb RidsNrrDciCsgb RidsOgcMailCenter ------------- EWongMModes, RI DKern JBrand RConte RBellamy PBamford Three Mile Island Nuclear Station, Unit 1 cc: | | HARD COPY: |
| Site Vice President - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P.O. Box 480 Middletown, PA 17057
| | DLR RF E-MAIL: |
| | | PUBLIC RidsNrrDlr RidsNrrDlrRpb1 RidsNrrDlrRpb2 RdsNrrDlrRer1 RidsNrrDlrRer2 RidsNrrDlrRerb RidsNrrDciCsgb RidsOgcMailCenter |
| Senior Vice President - Operations, Mid- Atlantic AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348
| | ------------- |
| | | EWong MModes, RI DKern JBrand RConte RBellamy PBamford |
| Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
| |
| | |
| Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Chairman Board of County Commissioners of Dauphin County Dauphin County Courthouse Harrisburg, PA 17120 Chairman Board of Supervisors of Londonderry Township R.D. #1, Geyers Church Road Middletown, PA 17057 Senior Resident Inspector (TMI-1) U.S. Nuclear Regulatory Commission P.O. Box 219 Middletown, PA 17057 Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Plant Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P. O. Box 480 Middletown, PA 17057 Regulatory Assurance Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P.O. Box 480 Middletown, PA 17057 Ronald Bellamy, Region I U.S. Nuclear Regulatory Commission
| |
| | |
| 475 Allendale Road King of Prussia, PA 19406 Michael A. Schoppman Framatome ANP Suite 705 1911 North Ft. Myer Drive Rosslyn, VA 22209 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Eric Epstein TMI Alert
| |
|
| |
|
| 4100 Hillsdale Road Harrisburg, PA 17112 Correspondence Control Desk AmerGen Energy Company, LLC 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348 Three Mile Island Nuclear Station, Unit 1 cc: Manager Licensing - Three Mile Island Nuclear Station, Unit 1 Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
| | Three Mile Island Nuclear Station, Unit 1 cc: |
| | Site Vice President - Three Mile Island Director Nuclear Station, Unit 1 Bureau of Radiation Protection AmerGen Energy Company, LLC Pennsylvania Department of P.O. Box 480 Environmental Protection Middletown, PA 17057 Rachel Carson State Office Building P.O. Box 8469 Senior Vice President - Operations, Mid- Harrisburg, PA 17105-8469 Atlantic AmerGen Energy Company, LLC Plant Manager - Three Mile Island Nuclear 200 Exelon Way, KSA 3-N Station, Unit 1 Kennett Square, PA 19348 AmerGen Energy Company, LLC P. O. Box 480 Vice President - Licensing and Regulatory Middletown, PA 17057 Affairs AmerGen Energy Company, LLC Regulatory Assurance Manager - Three 4300 Winfield Road Mile Island Nuclear Station, Unit 1 Warrenville, IL 60555 AmerGen Energy Company, LLC P.O. Box 480 Regional Administrator Middletown, PA 17057 Region I U.S. Nuclear Regulatory Commission Ronald Bellamy, Region I 475 Allendale Road U.S. Nuclear Regulatory Commission King of Prussia, PA 19406 475 Allendale Road King of Prussia, PA 19406 Chairman Board of County Commissioners Michael A. Schoppman of Dauphin County Framatome ANP Dauphin County Courthouse Suite 705 Harrisburg, PA 17120 1911 North Ft. Myer Drive Rosslyn, VA 22209 Chairman Board of Supervisors Dr. Judith Johnsrud of Londonderry Township National Energy Committee R.D. #1, Geyers Church Road Sierra Club Middletown, PA 17057 433 Orlando Avenue State College, PA 16803 Senior Resident Inspector (TMI-1) |
| | U.S. Nuclear Regulatory Commission Eric Epstein P.O. Box 219 TMI Alert Middletown, PA 17057 4100 Hillsdale Road Harrisburg, PA 17112 Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC Correspondence Control Desk Correspondence Control AmerGen Energy Company, LLC P.O. Box 160 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348 Kennett Square, PA 19348 |
|
| |
|
| Mr. Charles G. Pardee Chief Nuclear Officer AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348 Associate General Counsel AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Chief Operating Officer (COO) | | Three Mile Island Nuclear Station, Unit 1 cc: |
| AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Frederick W. Polaski Manager License Renewal Exelon Nuclear 200 Exelon Way Kennett Square, PA 19348 | | Manager Licensing - Three Mile Island Nuclear Station, Unit 1 Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Charles G. Pardee Chief Nuclear Officer AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348 Associate General Counsel AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Chief Operating Officer (COO) |
| | AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Frederick W. Polaski Manager License Renewal Exelon Nuclear 200 Exelon Way Kennett Square, PA 19348 Albert A. Fulvio License Renewal Senior Project Manager Exelon Nuclear 200 Exelon Way Kennett Square, PA 19348 |
|
| |
|
| Albert A. Fulvio License Renewal Senior Project Manager Exelon Nuclear 200 Exelon Way Kennett Square, PA 19348 REQUEST FOR ADDITIONAL INFORMATION BORAL NEUTRON ABSORBING MATERIAL IN SPENT FUEL POOL RACKS THREE MILE ISLAND NUCLEAR STATION, UNIT 1 LICENSE RENEWAL APPLICATION DOCKET NUMBER 50-289 RAI#: 3.3.2.2.6-1 Reduction of Neutron-Absorbing Capacity and Loss of Material due to General Corrosion
| | REQUEST FOR ADDITIONAL INFORMATION BORAL NEUTRON ABSORBING MATERIAL IN SPENT FUEL POOL RACKS THREE MILE ISLAND NUCLEAR STATION, UNIT 1 LICENSE RENEWAL APPLICATION DOCKET NUMBER 50-289 RAI#: 3.3.2.2.6-1 Reduction of Neutron-Absorbing Capacity and Loss of Material due to General Corrosion The Generic Aging Lessons Learned (GALL) Report recognizes the possibility of the existence of aging effects in the Boral used in the spent fuel storage racks and the need for having a plant specific aging management program (AMP). However, in the Three Mile Island Nuclear Station Unit 1 (TMI-1) License Renewal Application (LRA), Amergen Energy Company, LLC, (the applicant) has indicated that degradation of Boral is insignificant and no AMP is required. The applicant provided several justifications for not having an AMP, but has stated that they will continue to implement a surveillance program. |
| | In order to complete its review, the staff requests that the applicant provide a description of the surveillance program that will be implemented during the period of extended and include the following information in the response: |
| | : 1. Provide the scope of the program, including the structures and components that will be under surveillance. |
| | : 2. Describe how the neutron-absorbing capacity and degradation of material will be monitored, including a description of the parameters, calculations, and acceptance criteria. |
| | : 3. Discuss how the structures and components will be maintained for the period of extended operation, including the methods, techniques (e.g., visual, weight, volumetric, surface inspection), frequency, sample size, data collection and timing. |
| | : 4. Confirm that TMI-1 has sufficient Boral coupon samples to maintain the sampling frequency through the period of extended operation. Also include: |
| | : a. The location of coupons relative to the spent fuel racks. |
| | : b. The mounting of the coupons and whether or not they are fully exposed to the spent fuel pool water. |
| | : c. The specific testing procedures used for determining Boral-10 areal density, verifying surface corrosion, (if any), and examining for blister formation. |
| | : d. The location of the coupons after removal from the pool for inspection and reinsertion in the pool. |
| | : 5. Describe how Boral will be monitored and trended. |
| | : 6. Describe the acceptance criteria of the program and how it ensures that Borals structure and function are maintained over the period of extended operation. |
| | : 7. Describe the corrective actions that would be implemented if coupon test results are not acceptable. |
| | : 8. In September 2003, inspection of Boral test coupons at Seabrook Nuclear Station revealed bulging and blistering of the aluminum cladding. Discuss the impact, if any, that this event is considered to have on the Boral surveillance program at TMI-1. |
|
| |
|
| The Generic Aging Lessons Learned (GALL) Report recognizes the possibility of the existence of aging effects in the Boral used in the spent fuel storage racks and the need for having a plant specific aging management program (AMP). However, in the Three Mile Island Nuclear Station Unit 1 (TMI-1) License Renewal Application (LRA), Amergen Energy Company, LLC, (the applicant) has indicated that degradation of Boral is insignificant and no AMP is required. The applicant provided several justifications for not having an AMP, but has stated that they will continue to implement a surveillance program.
| | Industry experience has indicated that during longer exposure such blisters may form. |
| In order to complete its review, the staff requests that the applicant provide a description of the surveillance program that will be implemented during the period of extended and include the following information in the response:
| | Since formation of blisters may affect the efficiency of the Boral panels to attenuate neutrons (through flux trap formation) and may cause deformation of the fuel cells, explain why blistering will not be a safety concern. |
| : 1. Provide the scope of the program, including the structures and components that will be under surveillance.
| | : 9. Discuss any other operating experience of Boral that may be applicable to TMI-1 and describe why it will not be a safety concern. |
| : 2. Describe how the neutron-absorbing capacity and degradation of material will be monitored, including a description of the parameters, calculations, and acceptance criteria.
| | : 10. Describe how the Water Chemistry program will be used to manage the loss of material due to general corrosion of Boral. Include the parameters that will be monitored, the parameters acceptance criteria, and how they will effectively manage the loss of Boral.}} |
| : 3. Discuss how the structures and components will be maintained for the period of extended operation, including the methods, techniques (e.g., visual, weight, volumetric, surface inspection), frequency, sample size, data collection and timing.
| |
| : 4. Confirm that TMI-1 has sufficient Boral coupon samples to maintain the sampling frequency through the period of extended operation. Also include: a. The location of coupons relative to the spent fuel racks. b. The mounting of the coupons and whether or not they are fully exposed to the spent fuel pool water. c. The specific testing procedures used for determining Boral-10 areal density, verifying surface corrosion, (if any), and examining for blister formation. d. The location of the coupons after removal from the pool for inspection and reinsertion in the pool.
| |
| : 5. Describe how Boral will be monitored and trended.
| |
| : 6. Describe the acceptance criteria of the program and how it ensures that Boral's structure and function are maintained over the period of extended operation.
| |
| : 7. Describe the corrective actions that would be implemented if coupon test results are not acceptable.
| |
| : 8. In September 2003, inspection of Boral test coupons at Seabrook Nuclear Station revealed bulging and blistering of the aluminum cladding. Discuss the impact, if any, that this event is considered to have on the Boral surveillance program at TMI-1. Industry experience has indicated that during longer exposure such blisters may form. Since formation of blisters may affect the efficiency of the Boral panels to attenuate neutrons (through flux trap formation) and may cause deformation of the fuel cells, explain why blistering will not be a safety concern.
| |
| : 9. Discuss any other operating experience of Boral that may be applicable to TMI-1 and describe why it will not be a safety concern. | |
| : 10. Describe how the Water Chemistry program will be used to manage the loss of material due to general corrosion of Boral. Include the parameters that will be monitored, the parameters' acceptance criteria, and how they will effectively manage the loss of Boral.}} | |
Letter Sequence RAI |
---|
|
|
MONTHYEARML0817104702008-05-19019 May 2008 License Renewal Application, May 19, 2008 Draft Request for Additional Information, for Sections 4.2 and 4.4 Project stage: Draft RAI ML0817800062008-07-23023 July 2008 License Renewal Application, June 5, 2008 Conference Call Between USNRC and Amergen to Discuss Draft Requests for Additional Information for Sections 4.2 and 4.4 Project stage: Draft RAI ML0821700462008-08-20020 August 2008 Unit - 1, Request for Additional Information, License Renewal Application, Sections 4.2 and 4.4, TAC MD7701 Project stage: RAI ML0821804992008-08-20020 August 2008 Request for Additional Information, License Renewal Application, Sections 2.3.3 & 2.3.4 Project stage: RAI ML0821800062008-08-22022 August 2008 License Renewal Application, Summary of June 25, 2008 Conference Call with Amergen Energy Company LLC, to Discuss Draft Request for Additional Information for Sections 2.2, 2.3, 2.4, and 2.5 Project stage: Draft RAI ML0821907812008-08-22022 August 2008 Request for Additional Information, License Renewal Application, Section 2.1.5.2 Project stage: RAI ML0822000322008-08-22022 August 2008 Request for Additional Information, on License Renewal Application Sections 2.2, 2.3, 2.4 & 2.5 Project stage: RAI ML0823301922008-08-26026 August 2008 License Renewal Application, Enclosure 2 to Summary of June 25, 2008 Conference Call with Amergen Energy Company to Discuss Draft Request for Additional Information, Sections 2.2, 2.3, 2.4 & 2.5 Project stage: Draft RAI ML0825601782008-09-10010 September 2008 Response to NRC Request for Additional Information Related to Three Mile Island Nuclear Station, Unit 1, License Renewal Application Project stage: Response to RAI ML0826300302008-09-16016 September 2008 Response to NRC Request for Additional Information Related to Three Mile Island Nuclear Station, Unit 1, License Renewal Application Project stage: Response to RAI ML0826703592008-09-19019 September 2008 Response to Request for Additional Information Related to License Renewal Application Project stage: Response to RAI ML0824900892008-09-29029 September 2008 Unit - 1, Request for Additional Information, License Renewal Application, Appendix B, Aging Management Programs, Part 1 Project stage: RAI ML0825205732008-09-30030 September 2008 Unit - 1, Request for Additional Information, License Renewal Application, Time Limited Aging Analysis Project stage: RAI ML0825200202008-10-0707 October 2008 Request for Additional Information, License Renewal Application, Appendix B, Aging Management Programs, Part 2 Project stage: RAI ML0825206142008-10-16016 October 2008 Unit - 1, Request for Additional Information, License Renewal Application, Aging Management Review Results Project stage: RAI ML0825201222008-10-20020 October 2008 Request for Additional Information, License Renewal Application, Boral Neutron Absorbing Material in Spent Fuel Pool Racks Project stage: RAI ML0830204062008-10-23023 October 2008 Response to NRC Request for Additional Information on License Renewal Application Project stage: Response to RAI ML0830803762008-10-30030 October 2008 Response to NRC Request for Additional Information Related to Three Mile Island, Unit 1, License Renewal Application Project stage: Response to RAI ML0831900392008-11-12012 November 2008 Response to NRC Request for Additional Information Related to Three Mile Island Nuclear Station, Unit 1, License Renewal Application Project stage: Response to RAI ML0831900382008-11-12012 November 2008 Response to NRC Request for Additional Information on License Renewal Application Project stage: Response to RAI ML0830900532008-11-17017 November 2008 License Renewal Application, Summary of Conference Call with Amergen Energy Company Regarding Responses to Request for Additional Information for Sections 2.3.3 and 2.3.4 Project stage: RAI ML0831700382008-11-24024 November 2008 License Renewal Application, Request for Additional Information, Sections 2.3 & 2.4 Project stage: RAI ML0828800032008-11-24024 November 2008 Unit - 1, License Renewal Application, Aging Management Programs, Audit Summary Report Project stage: Acceptance Review ML0832402452008-12-0303 December 2008 License Renewal Application Regarding Scoping and Screening Audit Summary Project stage: Other ML0834400582008-12-0505 December 2008 Response to NRC Request for Additional Information Related to License Renewal Application, Sections 2.3 & 2.4 Project stage: Response to RAI ML0835100402009-01-0505 January 2009 Unit - 1, License Renewal Application, Request for Additional Information Project stage: RAI ML0907106042009-03-31031 March 2009 Safety Evaluation Report with Open Items Related to the License Renewal of Three Mile Island Nuclear Station, Unit 1 Project stage: Approval ML0913200422009-06-30030 June 2009 Safety Evaluation Report Related to the License Renewal of Three Mile Island, Unit 1 Project stage: Approval ML0916604702009-06-30030 June 2009 Safety Evaluation Report Related to the License Renewal of Three Mile Island, Unit 1 Project stage: Approval 2008-07-23
[Table View] |
|
---|
Category:Letter
MONTHYEARRS-24-097, Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 12024-10-23023 October 2024 Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 1 ML24256A0422024-10-0404 October 2024 Updated Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24242A3032024-09-0909 September 2024 Letter - Three Mile Island Station, Unit 2, Issuance of Amendment No. 68, Historic and Cultural Resources IR 05000320/20240012024-08-28028 August 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2024001 and 05000320/2024002 ML24240A2222024-08-27027 August 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24220A2742024-08-15015 August 2024 Request for Additional Information Clarification Call Regarding Three Mile Island Station, Unit 2, Amended Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24135A3292024-08-0909 August 2024 Amendment No 68, Historic and Cultural Resources Cover Letter IR 07200077/20240012024-06-18018 June 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 07200077/2024001 ML24157A3672024-06-13013 June 2024 Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter ML24135A1972024-06-13013 June 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0091 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24120A3242024-05-24024 May 2024 TMI-2 Email to Fws RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24120A2552024-04-29029 April 2024 Annual Radiological Environmental Operating Report ML24113A0212024-04-18018 April 2024 (TMI-2), Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A0012024-03-28028 March 2024 (TMI-2), Decommissioning Trust Fund Annual Report ML24088A0122024-03-28028 March 2024 Notification of Amended Post-Shutdown Decommissioning Activities Report (PSDAR) in Accordance with 10 CFR 50.82(a)(7), Revision 6 ML24065A0042024-03-28028 March 2024 Submittal of 2023 Aircraft Movement Data Annual Report ML24085A2152024-03-25025 March 2024 (TMI-2) - Annual Notification of Property Insurance Coverage RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. ML24052A0602024-03-20020 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0061 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24075A0062024-03-14014 March 2024 List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24074A3922024-03-14014 March 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change ML24044A0092024-02-12012 February 2024 License Amendment Request – Three Mile Island, Unit 2, Historic and Cultural Resources Review, Response to Request for Additional Information IR 05000320/20230042024-02-0707 February 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023004 ML24038A0222024-02-0505 February 2024 Achp Letter on Section 106 Programmatic Agreement Participation IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 ML23342A1242024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23325A1092024-01-0505 January 2024 Review of the Management Plan for Three Mile Island Station, Unit No. 2, Debris Material ML23354A2062023-12-20020 December 2023 (TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23354A2112023-12-20020 December 2023 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 ML23243A9082023-08-29029 August 2023 Shpo Letter to TMI-2 Regarding Section 106 Activities IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 ML23216A1732023-08-14014 August 2023 Consultation Letter to Christine Turner for TMI-2 ML23216A1782023-08-14014 August 2023 Consultation Letter to Steve Letavic for TMI-2 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 ML23216A1752023-08-14014 August 2023 Consultation Letter to Joanna Cain for TMI-2 ML23216A1742023-08-14014 August 2023 Consultation Letter to David Morrison for TMI-2 ML23216A1772023-08-14014 August 2023 Consultation Letter to Rebecca Countess for TMI-2 ML23221A1402023-08-0808 August 2023 (TMI-2), Response to Requests for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML23200A1882023-07-31031 July 2023 TMI-2 Correction Letter Amendment 67 ML23209A7632023-07-28028 July 2023 Letter from PA Shpo to TMI-2 Solutions on Cultural and Historic Impacts of Decommissioning ML23192A8272023-07-10010 July 2023 TMI-2 Solutions, LLC - Response to Shpo Request for Additional Information for Er Project 2021PR03278.006, TMI-2 Decommissioning Project ML23167A4642023-07-0505 July 2023 Letter - TMI-2- Exemption 10 CFR Part 20 Append G Issuance ML23167A0312023-06-28028 June 2023 Acceptance Review and Schedule for the Request for Exemption from a Requirement from 10 CFR 20, Appendix G, Section Iii.E, EPID L-2023-LLE-0016 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24220A2742024-08-15015 August 2024 Request for Additional Information Clarification Call Regarding Three Mile Island Station, Unit 2, Amended Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24157A3672024-06-13013 June 2024 Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter ML24011A2352024-01-11011 January 2024 Eco Request for Additional Information for 2023 License Amendment Request 1-11-24 ML23187A0202023-06-29029 June 2023 TMI Unit 2 RAI Related to the Amended Post-Shutdown Decommissioning Activities Report ML23187A0332023-06-29029 June 2023 TMI Unit 2, PSDAR Rev. 5 RAIs ML23082A3432023-03-31031 March 2023 Enclosure - RAI - Three Mile Island, Unit 2 - Acceptance Review and Request for Additional Information for the Historic and Cultural Resources License Amendment Request - EPID: 2023-LLA-0026 ML22357A0142022-12-22022 December 2022 NRC Request for Additional Information Related to the TMI-2 Pdms Transition License Amendment Request ML22210A0882022-07-29029 July 2022 Enclosure - Three Mile Island, Unit No. 2 - Request for Additional Information for Requested Licensing Action Regarding Decommissioning Technical Specifications ML22143A8902022-05-23023 May 2022 Request for Additional information- TMI-1 ISFSI Only Physical Security License Amendment Request ML22125A0122022-04-28028 April 2022 Clarification RAI Partial Response Email from C Smith to a Snyder ML22110A0202022-04-19019 April 2022 Unit 1 Request for Additional Information ML22038A9362022-02-0707 February 2022 TMI2 Accident Analyses Questions ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML20164A0902020-06-10010 June 2020 Request for Additional Information Related to TMI-1 License Amendment Request to Delete Permanently Defueled Technical Specification 3/4.1.4 (L-2019-LLA-0250) ML19319B2082019-11-15015 November 2019 NRR E-mail Capture - Request for Additional Information Related to TMI-1 Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E (L-2019-LLA-0216) ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML18220A7832018-08-0707 August 2018 NRR E-mail Capture - Request for Additional Information Related to TMI Fall 2017 Steam Generator Tube Inspection Report ML18212A2712018-07-31031 July 2018 NRR E-mail Capture - Request for Additional Information Related to Amendment Regarding Decommissioning ERO Staffing Changes ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16356A4802016-12-21021 December 2016 NRR E-mail Capture - RAIs on TMI License Amendment Request for Approval of Changes to the Three Mile Island Nuclear Station Emergency Plan Related to Staffing ML16337A0072016-12-0101 December 2016 NRR E-mail Capture - Draft RAIs Three Mile Island Nuclear Station, Units 1 and 2, License Amendment Request for Approval of Changes to the Three Mile Island Nuclear Station Emergency Plan Related to Staffing ML16287A4042016-10-11011 October 2016 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML15230A5332015-08-18018 August 2015 Draft Request for Additional Information ML15020A7372015-03-0808 March 2015 Request for Additional Information Regarding Related to December 22, 2014, Report Submitted Pursuant to 10 CFR 50.46 ML14307A1172014-11-14014 November 2014 Request for Additional Information Regarding Relief Request RR-14-01 Concerning Alternative Root Mean Square Depth Sizing Requirements ML14240A4122014-09-0404 September 2014 Request for Additional Information Regarding License Amendment Request to Eliminate Certain Technical Specification Reporting Requirements (Tac MF0628) ML14134A3222014-05-22022 May 2014 Request for Additional Information Regarding Review of Three Mile Island Nuclear Station Unit 1 Cycle 20 Core Operating Limits Report ML14134A1722014-05-14014 May 2014 Draft RAIs in Support of NRC Staff Review of TMI Cycle 20 COLR ML14052A2592014-02-27027 February 2014 Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specification Reporting Requirements ML14030A5832014-01-29029 January 2014 Draft Request for Additional Information Proposed Revision to Technical Specifications Reporting Requirements Exelon Generation Company, LLC Three Mile Island Nuclear Station, Unit 1 ML13266A2852013-10-21021 October 2013 Request for Additional Information on Three Mile Island Nuclear Station Unit 2 - post-shutdown Decommissioning Activities Report ML13276A6492013-10-0303 October 2013 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML13269A1792013-09-25025 September 2013 Draft Request for Additional Information ML13253A2252013-09-10010 September 2013 Draft Request for Additional Information ML13249A2072013-09-0505 September 2013 Draft Request for Additional Information ML13193A1752013-07-22022 July 2013 Request for Additional Information Regarding Revision to Pressure and Temperature Limit Curves and Exemption Request for Initial Reference Temperature Values ML13196A3382013-07-15015 July 2013 2013 Decommissioning Fund Report RAI ML13193A1452013-07-12012 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding Proposed Revision to Pressure and Temperature Limit Curves and Exemption Request for Initial Reference Temperature Values (TAC Nos. MF0425 & MF0426) ML13176A4702013-06-26026 June 2013 Request for Additional Information Regarding Overall Integrated Plan in Response to Order Number EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13177A3902013-06-26026 June 2013 Electronic Transmission, Draft Request for Additional Information Regarding Overall Integrated Plan in Response to Order Number EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13066A2442013-03-19019 March 2013 Request for Additional Information Regarding Fifth Inservice Test Interval Relief Request PR-01 Nuclear Services Closed Cooling Water Flow Measurement ML13066A1262013-03-0707 March 2013 Electronic Transmission, Draft Request for Additional Information Regarding Fifth Inservice Test Interval Relief Request PR-01 Nuclear Services Closed Cooling Water Flow Measurement ML13044A3212013-03-0505 March 2013 Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13045A6432013-02-25025 February 2013 Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval ML13051A3852013-02-25025 February 2013 Request for Additional Information Regarding End-of-Interval Relief Request RR-12-01, Pressure Nozzle-to-Head Weld Exams ML13050A6362013-02-20020 February 2013 Draft RAI Memo ML13044A3122013-02-13013 February 2013 Electronic Transmission, Draft Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13044A6652013-02-13013 February 2013 Electronic Transmission, Draft Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval 2024-08-15
[Table view] |
Text
October 20, 2008 Mr. Michael P. Gallagher Vice President License Renewal Projects AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR BORAL NEUTRON ABSORBING MATERIAL IN SPENT FUEL POOL RACKS, THREE MILE ISLAND NUCLEAR STATION, UNIT 1, LICENSE RENEWAL APPLICATION (TAC NO. MD7701)
Dear Mr. Gallagher:
By letter dated January 8, 2008, AmerGen Energy Company, LLC (AmerGen) submitted an application pursuant to 10 Code of Federal Regulation (10 CFR Part 54) to renew the operating license for Three Mile Island Nuclear Station, Unit 1 for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is continuing to review the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Chris Wilson, of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2878 or e-mail Jay.Robinson@nrc.gov.
Sincerely,
\RA\
Jay Robinson, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-289
Enclosure:
As stated cc w/encl: See next page
ML082520122 OFFICE LA:DLR DCI:SGCB PM:DLR:RPB1 BC:DLR:RPB1 NAME SFigueroa AHiser (EMurphy for) JRobinson DPelton (JRobinson for)
DATE 9/11/08 10/15/08 10/20/08 10/20/08
Letter to AmerGen Energy Company, LLC from J. Robinson dated October 20, 2008 DISTRIBUTION:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR BORAL NEUTRON ABSORBING MATERIAL IN SPENT FUEL POOL RACKS, THREE MILE ISLAND NUCLEAR STATION, UNIT 1, LICENSE RENEWAL APPLICATION (TAC NO. MD7701)
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr RidsNrrDlrRpb1 RidsNrrDlrRpb2 RdsNrrDlrRer1 RidsNrrDlrRer2 RidsNrrDlrRerb RidsNrrDciCsgb RidsOgcMailCenter
EWong MModes, RI DKern JBrand RConte RBellamy PBamford
Three Mile Island Nuclear Station, Unit 1 cc:
Site Vice President - Three Mile Island Director Nuclear Station, Unit 1 Bureau of Radiation Protection AmerGen Energy Company, LLC Pennsylvania Department of P.O. Box 480 Environmental Protection Middletown, PA 17057 Rachel Carson State Office Building P.O. Box 8469 Senior Vice President - Operations, Mid- Harrisburg, PA 17105-8469 Atlantic AmerGen Energy Company, LLC Plant Manager - Three Mile Island Nuclear 200 Exelon Way, KSA 3-N Station, Unit 1 Kennett Square, PA 19348 AmerGen Energy Company, LLC P. O. Box 480 Vice President - Licensing and Regulatory Middletown, PA 17057 Affairs AmerGen Energy Company, LLC Regulatory Assurance Manager - Three 4300 Winfield Road Mile Island Nuclear Station, Unit 1 Warrenville, IL 60555 AmerGen Energy Company, LLC P.O. Box 480 Regional Administrator Middletown, PA 17057 Region I U.S. Nuclear Regulatory Commission Ronald Bellamy, Region I 475 Allendale Road U.S. Nuclear Regulatory Commission King of Prussia, PA 19406 475 Allendale Road King of Prussia, PA 19406 Chairman Board of County Commissioners Michael A. Schoppman of Dauphin County Framatome ANP Dauphin County Courthouse Suite 705 Harrisburg, PA 17120 1911 North Ft. Myer Drive Rosslyn, VA 22209 Chairman Board of Supervisors Dr. Judith Johnsrud of Londonderry Township National Energy Committee R.D. #1, Geyers Church Road Sierra Club Middletown, PA 17057 433 Orlando Avenue State College, PA 16803 Senior Resident Inspector (TMI-1)
U.S. Nuclear Regulatory Commission Eric Epstein P.O. Box 219 TMI Alert Middletown, PA 17057 4100 Hillsdale Road Harrisburg, PA 17112 Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC Correspondence Control Desk Correspondence Control AmerGen Energy Company, LLC P.O. Box 160 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348 Kennett Square, PA 19348
Three Mile Island Nuclear Station, Unit 1 cc:
Manager Licensing - Three Mile Island Nuclear Station, Unit 1 Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Charles G. Pardee Chief Nuclear Officer AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348 Associate General Counsel AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Chief Operating Officer (COO)
AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Frederick W. Polaski Manager License Renewal Exelon Nuclear 200 Exelon Way Kennett Square, PA 19348 Albert A. Fulvio License Renewal Senior Project Manager Exelon Nuclear 200 Exelon Way Kennett Square, PA 19348
REQUEST FOR ADDITIONAL INFORMATION BORAL NEUTRON ABSORBING MATERIAL IN SPENT FUEL POOL RACKS THREE MILE ISLAND NUCLEAR STATION, UNIT 1 LICENSE RENEWAL APPLICATION DOCKET NUMBER 50-289 RAI#: 3.3.2.2.6-1 Reduction of Neutron-Absorbing Capacity and Loss of Material due to General Corrosion The Generic Aging Lessons Learned (GALL) Report recognizes the possibility of the existence of aging effects in the Boral used in the spent fuel storage racks and the need for having a plant specific aging management program (AMP). However, in the Three Mile Island Nuclear Station Unit 1 (TMI-1) License Renewal Application (LRA), Amergen Energy Company, LLC, (the applicant) has indicated that degradation of Boral is insignificant and no AMP is required. The applicant provided several justifications for not having an AMP, but has stated that they will continue to implement a surveillance program.
In order to complete its review, the staff requests that the applicant provide a description of the surveillance program that will be implemented during the period of extended and include the following information in the response:
- 1. Provide the scope of the program, including the structures and components that will be under surveillance.
- 2. Describe how the neutron-absorbing capacity and degradation of material will be monitored, including a description of the parameters, calculations, and acceptance criteria.
- 3. Discuss how the structures and components will be maintained for the period of extended operation, including the methods, techniques (e.g., visual, weight, volumetric, surface inspection), frequency, sample size, data collection and timing.
- 4. Confirm that TMI-1 has sufficient Boral coupon samples to maintain the sampling frequency through the period of extended operation. Also include:
- a. The location of coupons relative to the spent fuel racks.
- b. The mounting of the coupons and whether or not they are fully exposed to the spent fuel pool water.
- c. The specific testing procedures used for determining Boral-10 areal density, verifying surface corrosion, (if any), and examining for blister formation.
- d. The location of the coupons after removal from the pool for inspection and reinsertion in the pool.
- 5. Describe how Boral will be monitored and trended.
- 6. Describe the acceptance criteria of the program and how it ensures that Borals structure and function are maintained over the period of extended operation.
- 7. Describe the corrective actions that would be implemented if coupon test results are not acceptable.
- 8. In September 2003, inspection of Boral test coupons at Seabrook Nuclear Station revealed bulging and blistering of the aluminum cladding. Discuss the impact, if any, that this event is considered to have on the Boral surveillance program at TMI-1.
Industry experience has indicated that during longer exposure such blisters may form.
Since formation of blisters may affect the efficiency of the Boral panels to attenuate neutrons (through flux trap formation) and may cause deformation of the fuel cells, explain why blistering will not be a safety concern.
- 9. Discuss any other operating experience of Boral that may be applicable to TMI-1 and describe why it will not be a safety concern.
- 10. Describe how the Water Chemistry program will be used to manage the loss of material due to general corrosion of Boral. Include the parameters that will be monitored, the parameters acceptance criteria, and how they will effectively manage the loss of Boral.