BVY 08-079, Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 10/31/2008
| issue date = 10/31/2008
| title = Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications
| title = Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications
| author name = Colomb M J
| author name = Colomb M
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Entergy Nuclear Operations, Inc.Vermont Yankee P.O. Box 1250 Governor Hunt Road SEntergy Vernon, VT 05354 Tel 802 257 7711 October 31, 2008 BVY 08-079 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:Entergy Nuclear Operations, Inc.
Vermont Yankee P.O. Box 1250 Governor Hunt Road SEntergy                                                     Vernon, VT 05354 Tel 802 257 7711 October 31, 2008 BVY 08-079 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Reference:==
==Reference:==
(a) Letter, VYNPS to USNRC, "Technical Specification Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications," BVY 08-059, dated September 22, 2008  
(a) Letter, VYNPS to USNRC, "Technical Specification Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications," BVY 08-059, dated September 22, 2008


==Subject:==
==Subject:==
Line 25: Line 26:


==Dear Sir or Madam,==
==Dear Sir or Madam,==
In Reference (a), Entergy Nuclear Operations, Inc. (Entergy) proposed to amend Operating License DPR-28 for Vermont Yankee Nuclear Power Station (VY) to relocate Technical Specification requirements to the Technical Requirements Manual. During the acceptance review, the NRC staff requested additional information related to how the change satisfied the requirements of 10CFR50.36(d)(2)(ii)(B)
 
Criterion 2 and on the proposed administrative controls.Attachment 1 provides the requested information.
In Reference (a), Entergy Nuclear Operations, Inc. (Entergy) proposed to amend Operating License DPR-28 for Vermont Yankee Nuclear Power Station (VY) to relocate Technical Specification requirements to the Technical Requirements Manual. During the acceptance review, the NRC staff requested additional information related to how the change satisfied the requirements of 10CFR50.36(d)(2)(ii)(B) Criterion 2 and on the proposed administrative controls. provides the requested information.
This supplement to the original license amendment request does not change the scope or conclusions in the original application, nor does it change the Entergy's determination of no significant hazards consideration There are no new regulatory commitments made in this letter.If you have any questions on this transmittal, please contact Mr. David Mannai at (802) 452-3304.I declare under penalty of perjury that the foregoing is true and correct.Executed on October 31, 2008.Sincerely, Micael J. C Site Vice President Vermont Yankee Nuclear Power Station Attachment cc listing (next page) 1 ._
This supplement to the original license amendment request does not change the scope or conclusions in the original application, nor does it change the Entergy's determination of no significant hazards consideration There are no new regulatory commitments made in this letter.
BVY 08-079 / page 2 of 2 cc: Mr. Samuel J. Collins (w/o attachments)
If you have any questions on this transmittal, please contact Mr. David Mannai at (802) 452-3304.
Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. James S. Kim, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street -Drawer 20 Montpelier, Vermont 05620-2601  
I declare under penalty of perjury that the foregoing is true and correct.
.4 BVY 08-079 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station Proposed Change 280 Supplement 1 Response to Request for Additional Information BVY 08-079 / Attachment 1 / Page 1 of 2 Vermont Yankee Nuclear Power Station Proposed Change 280, Supplement 1 Response to Request for Add itional Information Requested Information:
Executed on October 31, 2008.
Provide additional justification for how the proposed change satisfies the requirements of 10CFR50.36(d)(2)(ii)(B)
Sincerely, Micael J. C Site Vice President Vermont Yankee Nuclear Power Station Attachment cc listing (next page)                                                                                 1 ._
Criterion 2 and why the proposed administrative controls are adequate.Response: 10CFR50.36(a)(2)(ii)(B)
 
Criterion 2, requires Technical Specifications (TS) for "A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier." Accidents that can result in the release of radioactive materials to the containment, when the drywell is open, are documented in. the Vermont Yankee Updated Final Safety Analysis (UFSAR). The UFSAR states that greatest potential for release occurs when the drywell head and reactor head have been removed. The UFSAR states that the only accident that could result in the release of significant quantities of fission products is the accidental dropping of a fuel bundle onto the top of the core.The design basis Fuel Handling Accident (FHA) is described in UFSAR Section 14.6.4. The FHA assumes an irradiated fuel assembly is dropped onto the reactor core from the maximum height allowed by the fuel handling equipment.
BVY 08-079 / page 2 of 2 cc:     Mr. Samuel J. Collins (w/o attachments)
The analysis assumes that the entire amount of potential energy is available for appliation to the fuel assemblies involved in the accident.Also, none of the energy associated with the dropped fuel assembly is absorbed by the fuel material.
Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. James S. Kim, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601
The FHA is assumed to bound other credible fuel handling accidents.
 
The fuel handling equipment used to transport irradiated fuel from the fuel pool to the reactor core is the refueling platform and associated components (e.g., mast, grapple, controls).
.4 BVY 08-079 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station Proposed Change 280 Supplement 1 Response to Request for Additional Information
The refueling platform is independent of the reactor building crane. The reactor building crane is not used to move irradiated fuel from the fuel pool to the reactor core.The TS related to reactor building !crane operability (TS 3.12.G and TS 4.12.G) were established by License Amendment' No. 29 to Facility Operating License No. DPR-28 (Reference 1). License Amendment No. 29 established requirements to ensure that the reactor building crane would be inspected and tested before use to lift a spent fuel cask and established requirements that would prohibit the movement of a spent fuel cask over irradiated fuel assemblies within the spent fuel pool.
 
BVY 08-079 / Attachment 1 / Page 2 of 2 Entergy has also made commitments related to the control of heavy loads. The reactor building crane was identified as within the scope of NUREG-0612 and a number of improvements were implemented.
BVY 08-079 / Attachment 1 / Page 1 of 2 Vermont Yankee Nuclear Power Station Proposed Change 280, Supplement 1 Response to Request for Add itional Information Requested Information:
For example, the reactor building crane was modified in 1976 by replacing the original trolley with one that has a dual load path on the main hoist when used for cask handling operations.
Provide additional justification for how the proposed change satisfies the requirements of 10CFR50.36(d)(2)(ii)(B) Criterion 2 and why the proposed administrative controls are adequate.
The design of the new trolley satisfies the criteria for dual load path or "single-failure-proof" cranes.In addition to the hardware improvements implemented to satisfy commitments made to NUREG 0612 a number of administrative improvements were committed to. Examples include: " Maintenance procedures were revised to define safe load paths for major loads.* Procedures were revised to include training and qualification requirements for crane operators, sling selection criteria, crane inspections prior to use and supervisory oversight of heavy lift operations." Special lifting devices were identified and obtained and periodic non-destructive examination was scheduled to monitor the condition of lifting devices.Entergy's position is that the combination of hardware improvements and crane safety design features, commitments to establish safe load paths and the other commitments discussed above provide a level of assurance such that TS level administrative controls are not necessary to assure safety.Entergy's proposal to relocate the current crane operability and surveillance requirements to the Technical Requirements Manual (TRM) is acceptable for the following reasons:* Commitments made in response to NUREG 0612 are managed in accordance with NEI 99-04 "Guidelines for Managing NRC Commitment Changes", Revision 0, dated July 1999. This ensures a safety review of commitment changes is performed and the NRC notified of changes to regulatory commitments as required.* Additionally, the TRM is "included by reference" in the UFSAR. As such changes to the TRM are evaluated in accordance with 10CFR50.59.
 
This provides requirements that future changes to the operability and surveillance requirements will be evaluated to ensure that they do not create the possibility of an accident that is different than or that has greater consequences that the design basis FHA without prior NRC approval.Changes made under 10CFR50.59 are reported to the NRC as required." Finally, the industry and NRC have worked to establish the expected scope and content of the TS to ensure compliance with 1OCFR 50.36 requirements.
===Response===
For a General Electric Boiling Water Reactor (BWR), NUREG-1433 Revision 3, establishes the current expectations.
10CFR50.36(a)(2)(ii)(B) Criterion 2, requires Technical Specifications (TS) for "A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier."
Reactor Building Crane operability and surveillance requirements are not within the scope of NUREG-1433.
Accidents that can result in the release of radioactive materials to the containment, when the drywell is open, are documented in.the Vermont Yankee Updated Final Safety Analysis (UFSAR). The UFSAR states that greatest potential for release occurs when the drywell head and reactor head have been removed. The UFSAR states that the only accident that could result in the release of significant quantities of fission products is the accidental dropping of a fuel bundle onto the top of the core.
The design basis Fuel Handling Accident (FHA) is described in UFSAR Section 14.6.4. The FHA assumes an irradiated fuel assembly is dropped onto the reactor core from the maximum height allowed by the fuel handling equipment. The analysis assumes that the entire amount of potential energy is available for appliation to the fuel assemblies involved in the accident.
Also, none of the energy associated with the dropped fuel assembly is absorbed by the fuel material. The FHA is assumed to bound other credible fuel handling accidents.
The fuel handling equipment used to transport irradiated fuel from the fuel pool to the reactor core is the refueling platform and associated components (e.g., mast, grapple, controls). The refueling platform is independent of the reactor building crane. The reactor building crane is not used to move irradiated fuel from the fuel pool to the reactor core.
The TS related to reactor building !crane operability (TS 3.12.G and TS 4.12.G) were established by License Amendment' No. 29 to Facility Operating License No. DPR-28 (Reference 1). License Amendment No. 29 established requirements to ensure that the reactor building crane would be inspected and tested before use to lift a spent fuel cask and established requirements that would prohibit the movement of a spent fuel cask over irradiated fuel assemblies within the spent fuel pool.
 
BVY 08-079 / Attachment 1 / Page 2 of 2 Entergy has also made commitments related to the control of heavy loads. The reactor building crane was identified as within the scope of NUREG-0612 and a number of improvements were implemented. For example, the reactor building crane was modified in 1976 by replacing the original trolley with one that has a dual load path on the main hoist when used for cask handling operations. The design of the new trolley satisfies the criteria for dual load path or "single-failure-proof" cranes.
In addition to the hardware improvements implemented to satisfy commitments made to NUREG 0612 a number of administrative improvements were committed to. Examples include:
        "   Maintenance procedures were revised to define safe load paths for major loads.
* Procedures were revised to include training and qualification requirements for crane operators, sling selection criteria, crane inspections prior to use and supervisory oversight of heavy lift operations.
        "   Special lifting devices were identified and obtained and periodic non-destructive examination was scheduled to monitor the condition of lifting devices.
Entergy's position is that the combination of hardware improvements and crane safety design features, commitments to establish safe load paths and the other commitments discussed above provide a level of assurance such that TS level administrative controls are not necessary to assure safety.
Entergy's proposal to relocate the current crane operability and surveillance requirements to the Technical Requirements Manual (TRM) is acceptable for the following reasons:
* Commitments made in response to NUREG 0612 are managed in accordance with NEI 99-04 "Guidelines for Managing NRC Commitment Changes", Revision 0, dated July 1999. This ensures a safety review of commitment changes is performed and the NRC notified of changes to regulatory commitments as required.
* Additionally, the TRM is "included by reference" in the UFSAR. As such changes to the TRM are evaluated in accordance with 10CFR50.59. This provides requirements that future changes to the operability and surveillance requirements will be evaluated to ensure that they do not create the possibility of an accident that is different than or that has greater consequences that the design basis FHA without prior NRC approval.
Changes made under 10CFR50.59 are reported to the NRC as required.
        "   Finally, the industry and NRC have worked to establish the expected scope and       content of the TS to ensure compliance with 10CFR 50.36 requirements. For a General         Electric Boiling Water Reactor (BWR), NUREG-1433 Revision 3, establishes the                 current expectations. Reactor Building Crane operability and surveillance requirements     are not within the scope of NUREG-1433.


==Reference:==
==Reference:==
: 1. Letter, USNRC to YAEC, dated January 28, 1977}}
: 1. Letter, USNRC to YAEC, dated January 28, 1977}}

Latest revision as of 12:27, 14 November 2019

Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications
ML083110414
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/31/2008
From: Michael Colomb
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 08-079
Download: ML083110414 (5)


Text

Entergy Nuclear Operations, Inc.

Vermont Yankee P.O. Box 1250 Governor Hunt Road SEntergy Vernon, VT 05354 Tel 802 257 7711 October 31, 2008 BVY 08-079 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Reference:

(a) Letter, VYNPS to USNRC, "Technical Specification Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications," BVY 08-059, dated September 22, 2008

Subject:

Vermont Yankee Nuclear Power Station Docket No. 50-271, License No. DPR-28 Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications

Dear Sir or Madam,

In Reference (a), Entergy Nuclear Operations, Inc. (Entergy) proposed to amend Operating License DPR-28 for Vermont Yankee Nuclear Power Station (VY) to relocate Technical Specification requirements to the Technical Requirements Manual. During the acceptance review, the NRC staff requested additional information related to how the change satisfied the requirements of 10CFR50.36(d)(2)(ii)(B) Criterion 2 and on the proposed administrative controls. provides the requested information.

This supplement to the original license amendment request does not change the scope or conclusions in the original application, nor does it change the Entergy's determination of no significant hazards consideration There are no new regulatory commitments made in this letter.

If you have any questions on this transmittal, please contact Mr. David Mannai at (802) 452-3304.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on October 31, 2008.

Sincerely, Micael J. C Site Vice President Vermont Yankee Nuclear Power Station Attachment cc listing (next page) 1 ._

BVY 08-079 / page 2 of 2 cc: Mr. Samuel J. Collins (w/o attachments)

Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. James S. Kim, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601

.4 BVY 08-079 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station Proposed Change 280 Supplement 1 Response to Request for Additional Information

BVY 08-079 / Attachment 1 / Page 1 of 2 Vermont Yankee Nuclear Power Station Proposed Change 280, Supplement 1 Response to Request for Add itional Information Requested Information:

Provide additional justification for how the proposed change satisfies the requirements of 10CFR50.36(d)(2)(ii)(B) Criterion 2 and why the proposed administrative controls are adequate.

Response

10CFR50.36(a)(2)(ii)(B) Criterion 2, requires Technical Specifications (TS) for "A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier."

Accidents that can result in the release of radioactive materials to the containment, when the drywell is open, are documented in.the Vermont Yankee Updated Final Safety Analysis (UFSAR). The UFSAR states that greatest potential for release occurs when the drywell head and reactor head have been removed. The UFSAR states that the only accident that could result in the release of significant quantities of fission products is the accidental dropping of a fuel bundle onto the top of the core.

The design basis Fuel Handling Accident (FHA) is described in UFSAR Section 14.6.4. The FHA assumes an irradiated fuel assembly is dropped onto the reactor core from the maximum height allowed by the fuel handling equipment. The analysis assumes that the entire amount of potential energy is available for appliation to the fuel assemblies involved in the accident.

Also, none of the energy associated with the dropped fuel assembly is absorbed by the fuel material. The FHA is assumed to bound other credible fuel handling accidents.

The fuel handling equipment used to transport irradiated fuel from the fuel pool to the reactor core is the refueling platform and associated components (e.g., mast, grapple, controls). The refueling platform is independent of the reactor building crane. The reactor building crane is not used to move irradiated fuel from the fuel pool to the reactor core.

The TS related to reactor building !crane operability (TS 3.12.G and TS 4.12.G) were established by License Amendment' No. 29 to Facility Operating License No. DPR-28 (Reference 1). License Amendment No. 29 established requirements to ensure that the reactor building crane would be inspected and tested before use to lift a spent fuel cask and established requirements that would prohibit the movement of a spent fuel cask over irradiated fuel assemblies within the spent fuel pool.

BVY 08-079 / Attachment 1 / Page 2 of 2 Entergy has also made commitments related to the control of heavy loads. The reactor building crane was identified as within the scope of NUREG-0612 and a number of improvements were implemented. For example, the reactor building crane was modified in 1976 by replacing the original trolley with one that has a dual load path on the main hoist when used for cask handling operations. The design of the new trolley satisfies the criteria for dual load path or "single-failure-proof" cranes.

In addition to the hardware improvements implemented to satisfy commitments made to NUREG 0612 a number of administrative improvements were committed to. Examples include:

" Maintenance procedures were revised to define safe load paths for major loads.

  • Procedures were revised to include training and qualification requirements for crane operators, sling selection criteria, crane inspections prior to use and supervisory oversight of heavy lift operations.

" Special lifting devices were identified and obtained and periodic non-destructive examination was scheduled to monitor the condition of lifting devices.

Entergy's position is that the combination of hardware improvements and crane safety design features, commitments to establish safe load paths and the other commitments discussed above provide a level of assurance such that TS level administrative controls are not necessary to assure safety.

Entergy's proposal to relocate the current crane operability and surveillance requirements to the Technical Requirements Manual (TRM) is acceptable for the following reasons:

  • Commitments made in response to NUREG 0612 are managed in accordance with NEI 99-04 "Guidelines for Managing NRC Commitment Changes", Revision 0, dated July 1999. This ensures a safety review of commitment changes is performed and the NRC notified of changes to regulatory commitments as required.
  • Additionally, the TRM is "included by reference" in the UFSAR. As such changes to the TRM are evaluated in accordance with 10CFR50.59. This provides requirements that future changes to the operability and surveillance requirements will be evaluated to ensure that they do not create the possibility of an accident that is different than or that has greater consequences that the design basis FHA without prior NRC approval.

Changes made under 10CFR50.59 are reported to the NRC as required.

" Finally, the industry and NRC have worked to establish the expected scope and content of the TS to ensure compliance with 10CFR 50.36 requirements. For a General Electric Boiling Water Reactor (BWR), NUREG-1433 Revision 3, establishes the current expectations. Reactor Building Crane operability and surveillance requirements are not within the scope of NUREG-1433.

Reference:

1. Letter, USNRC to YAEC, dated January 28, 1977