| {{#Wiki_filter:July 20, 2009 | | {{#Wiki_filter:July 20, 2009 Mr. Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 |
| | |
| Mr. Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| WATTS BAR NUCLEAR PLANT, UNIT 1 - EMERGENCY DIESEL GENERATOR FUEL OIL - ALTERNATIVE SAMPLING PROCEDURE OF STORAGE TANKS (TAC NO. ME1330) | | WATTS BAR NUCLEAR PLANT, UNIT 1 - EMERGENCY DIESEL GENERATOR FUEL OIL - ALTERNATIVE SAMPLING PROCEDURE OF STORAGE TANKS (TAC NO. ME1330) |
|
| |
|
| ==Dear Mr. Swafford:== | | ==Dear Mr. Swafford:== |
|
| |
|
| By letter dated May 19, 2009 (Agencywide Document and Management System Accession No. ML091400199), as supplemented by letter dated June 16, 2009 (ML091670518), | | By letter dated May 19, 2009 (Agencywide Document and Management System Accession No. ML091400199), as supplemented by letter dated June 16, 2009 (ML091670518), |
| Tennessee Valley Authority (TVA) submitted a licensing action request for Watts Bar Nuclear Plant (WBN), Unit 1. The licensing action request was to allow for an alternative sampling procedure for the emergency diesel generator (EDG) fuel oil storage tanks (FOST). | | Tennessee Valley Authority (TVA) submitted a licensing action request for Watts Bar Nuclear Plant (WBN), Unit 1. The licensing action request was to allow for an alternative sampling procedure for the emergency diesel generator (EDG) fuel oil storage tanks (FOST). |
| Technical Specification (TS) 5.7.2.16, "Diesel Fuel Oil Testing Program," requires that sampling and testing of new and stored fuel be performed in accordance with applicable American Society for Testing Materials (ASTM) standards. TVA has performed a manual "all-levels" sample in accordance with Section 8 of ASTM D4057-1988, "Standard Practice for Manual Sampling of Petroleum and Petroleum Products." However, Section 8.1 of ASTM D4057-1988 specified that alternate sampling methods may be used with agreement of the parties involved. | | Technical Specification (TS) 5.7.2.16, Diesel Fuel Oil Testing Program, requires that sampling and testing of new and stored fuel be performed in accordance with applicable American Society for Testing Materials (ASTM) standards. TVA has performed a manual all-levels sample in accordance with Section 8 of ASTM D4057-1988, Standard Practice for Manual Sampling of Petroleum and Petroleum Products. However, Section 8.1 of ASTM D4057-1988 specified that alternate sampling methods may be used with agreement of the parties involved. |
| TVA determined that U.S. Nuclear Regulatory Commission (NRC) staff approval of alternative sampling methods was necessary to satisfy the criteria of ASTM D4057-1988; there is no change to the Technical Specifications (TSs) or its bases. | | TVA determined that U.S. Nuclear Regulatory Commission (NRC) staff approval of alternative sampling methods was necessary to satisfy the criteria of ASTM D4057-1988; there is no change to the Technical Specifications (TSs) or its bases. |
| The "all-levels" sample process draws a sample representative of the entire tank by opening an empty specialized container near the bottom of the tank and drawing the container upward to the top of the tank as it fills. Instead of this process, TVA proposed to take samples from the fuel oil transfer pump discharge lines of each storage tank. The transfer pumps take suction near the bottom of their respective storage tanks through a 5-inch diameter line. There is a 1-inch diameter line and valve off each discharge line that will be used as the sample point. To obtain a fuel oil sample, TVA proposed that the fuel oil transfer pump for the tank to be sampled will be placed in the recirculation mode for a period of time necessary to ensure adequate mixing based on the volume of diesel fuel in the tank. After the tank has been recirculated for the appropriate time, TVA proposed that the sample line will be flushed and a sample obtained. The sample line and transfer pump will then be secured and the fuel oil sample will be analyzed in accordance with existing TS requirements. | | The all-levels sample process draws a sample representative of the entire tank by opening an empty specialized container near the bottom of the tank and drawing the container upward to the top of the tank as it fills. Instead of this process, TVA proposed to take samples from the fuel oil transfer pump discharge lines of each storage tank. The transfer pumps take suction near the bottom of their respective storage tanks through a 5-inch diameter line. There is a 1-inch diameter line and valve off each discharge line that will be used as the sample point. To obtain a fuel oil sample, TVA proposed that the fuel oil transfer pump for the tank to be sampled will be placed in the recirculation mode for a period of time necessary to ensure adequate mixing based on the volume of diesel fuel in the tank. After the tank has been recirculated for the appropriate time, TVA proposed that the sample line will be flushed and a sample obtained. |
| | The sample line and transfer pump will then be secured and the fuel oil sample will be analyzed in accordance with existing TS requirements. |
|
| |
|
| P. Swafford The NRC staff reviewed the proposed sampling process and the comparison of test results of the sampling of Main Fuel Oil Storage Tank Number 1 taken from the top of the tank using the method specified in ASTM D40457-1988 and sampling taken using the proposed method. Based on a comparison of the methods and test results, the NRC staff finds that the proposed sampling method provides an equally representative sample of useable tank contents. | | P. Swafford The NRC staff reviewed the proposed sampling process and the comparison of test results of the sampling of Main Fuel Oil Storage Tank Number 1 taken from the top of the tank using the method specified in ASTM D40457-1988 and sampling taken using the proposed method. |
| | Based on a comparison of the methods and test results, the NRC staff finds that the proposed sampling method provides an equally representative sample of useable tank contents. |
| Based on the NRC staff review of the TVA request, the NRC staff finds the alternative sampling technique for WBN Unit 1 EDG FOST acceptable. Pursuant to ASTM D4057-1988, Section 8.1, TVA is authorized to obtain samples by the described process in lieu of specific methods described in applicable ASTM standards. | | Based on the NRC staff review of the TVA request, the NRC staff finds the alternative sampling technique for WBN Unit 1 EDG FOST acceptable. Pursuant to ASTM D4057-1988, Section 8.1, TVA is authorized to obtain samples by the described process in lieu of specific methods described in applicable ASTM standards. |
| Sincerely, /RA/ | | Sincerely, |
| L. Raghavan, Chief Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | | /RA/ |
| | | L. Raghavan, Chief Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390 cc w/encl: Distribution via Listserv |
| Docket No. 50-390 cc w/encl: Distribution via Listserv | |
|
| |
|
| ML091950053 OFFICE DORL/LPWB/PM DORL/LPWB/LA DSS/SBPB/BC DORL/LPWB/BC NAME JLamb BClayton GCasto LRaghavan DATE 07/14/09 07/14/09 07/16/09 07 / 20 /09}} | | ML091950053 OFFICE DORL/LPWB/PM DORL/LPWB/LA DSS/SBPB/BC DORL/LPWB/BC NAME JLamb BClayton GCasto LRaghavan DATE 07/14/09 07/14/09 07/16/09 07 / 20 /09}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML0914001992009-05-19019 May 2009 Emergency Diesel Generator (EDG) Fuel Oil - Sampling of Storage Tanks Project stage: Request ML0916705182009-06-16016 June 2009 Emergency Diesel Generator (EDG) Fuel Oil - Sampling of Storage Tanks - Supplemental Information Project stage: Request ML0919500532009-07-20020 July 2009 Emergency Diesel Generator Fuel Oil - Sampling of Storage Tanks (Tac ME1330) Project stage: Other 2009-06-16
[Table View] |
|
---|
Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] |
Text
July 20, 2009 Mr. Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 1 - EMERGENCY DIESEL GENERATOR FUEL OIL - ALTERNATIVE SAMPLING PROCEDURE OF STORAGE TANKS (TAC NO. ME1330)
Dear Mr. Swafford:
By letter dated May 19, 2009 (Agencywide Document and Management System Accession No. ML091400199), as supplemented by letter dated June 16, 2009 (ML091670518),
Tennessee Valley Authority (TVA) submitted a licensing action request for Watts Bar Nuclear Plant (WBN), Unit 1. The licensing action request was to allow for an alternative sampling procedure for the emergency diesel generator (EDG) fuel oil storage tanks (FOST).
Technical Specification (TS) 5.7.2.16, Diesel Fuel Oil Testing Program, requires that sampling and testing of new and stored fuel be performed in accordance with applicable American Society for Testing Materials (ASTM) standards. TVA has performed a manual all-levels sample in accordance with Section 8 of ASTM D4057-1988, Standard Practice for Manual Sampling of Petroleum and Petroleum Products. However, Section 8.1 of ASTM D4057-1988 specified that alternate sampling methods may be used with agreement of the parties involved.
TVA determined that U.S. Nuclear Regulatory Commission (NRC) staff approval of alternative sampling methods was necessary to satisfy the criteria of ASTM D4057-1988; there is no change to the Technical Specifications (TSs) or its bases.
The all-levels sample process draws a sample representative of the entire tank by opening an empty specialized container near the bottom of the tank and drawing the container upward to the top of the tank as it fills. Instead of this process, TVA proposed to take samples from the fuel oil transfer pump discharge lines of each storage tank. The transfer pumps take suction near the bottom of their respective storage tanks through a 5-inch diameter line. There is a 1-inch diameter line and valve off each discharge line that will be used as the sample point. To obtain a fuel oil sample, TVA proposed that the fuel oil transfer pump for the tank to be sampled will be placed in the recirculation mode for a period of time necessary to ensure adequate mixing based on the volume of diesel fuel in the tank. After the tank has been recirculated for the appropriate time, TVA proposed that the sample line will be flushed and a sample obtained.
The sample line and transfer pump will then be secured and the fuel oil sample will be analyzed in accordance with existing TS requirements.
P. Swafford The NRC staff reviewed the proposed sampling process and the comparison of test results of the sampling of Main Fuel Oil Storage Tank Number 1 taken from the top of the tank using the method specified in ASTM D40457-1988 and sampling taken using the proposed method.
Based on a comparison of the methods and test results, the NRC staff finds that the proposed sampling method provides an equally representative sample of useable tank contents.
Based on the NRC staff review of the TVA request, the NRC staff finds the alternative sampling technique for WBN Unit 1 EDG FOST acceptable. Pursuant to ASTM D4057-1988, Section 8.1, TVA is authorized to obtain samples by the described process in lieu of specific methods described in applicable ASTM standards.
Sincerely,
/RA/
L. Raghavan, Chief Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390 cc w/encl: Distribution via Listserv
ML091950053 OFFICE DORL/LPWB/PM DORL/LPWB/LA DSS/SBPB/BC DORL/LPWB/BC NAME JLamb BClayton GCasto LRaghavan DATE 07/14/09 07/14/09 07/16/09 07 / 20 /09