| title = Watts Bar Nuclear Plant, Unit 2 - Operating License Application Review - Environmental Scoping
| title = Operating License Application Review - Environmental Scoping
| author name = Wiebe J S
| author name = Wiebe J
| author affiliation = NRC/NRR/DORL/LPWB
| author affiliation = NRC/NRR/DORL/LPWB
| addressee name = Klima D L
| addressee name = Klima D
| addressee affiliation = US Advisory Council On Historic Preservation
| addressee affiliation = US Advisory Council On Historic Preservation
| docket = 05000391
| docket = 05000391
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 September 10, 2009 Mr. Don L. Klima, Director Advisory Council on Historic Preservation Office of Federal Agency Programs 1100 Pennsylvania Ave, NW, Suite 803 Washington, DC 20004 WATTS BAR NUCLEAR PLANT, UNIT 2, OPERATING LICENSE APPLICATION REVIEW -ENVIRONMENTAL SCOPING  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 10, 2009 Mr. Don L. Klima, Director Advisory Council on Historic Preservation Office of Federal Agency Programs 1100 Pennsylvania Ave, NW, Suite 803 Washington, DC 20004
 
==SUBJECT:==
WATTS BAR NUCLEAR PLANT, UNIT 2, OPERATING LICENSE APPLICATION REVIEW - ENVIRONMENTAL SCOPING


==Dear Mr. Klima:==
==Dear Mr. Klima:==
The U.S. Nuclear Regulatory Commission (NRC) is reviewing an application submitted by the Tennessee Valley Authority (TVA) for an operating license for Watts Bar Nuclear Plant (WBN), Unit 2, located in Rhea County, Tennessee at the northern end of the Chickamauga Reservoir, Tennessee River Mile 528. The NRC is conducting a scoping process for preparing a Supplement to the Final Environmental Statement (FES) published in 1978. The Supplement to the FES will be prepared under Title 10, Code of Federal Regulations (10 CFR) Part 51, the NRC's regulation that implements the National Environmental Policy Act of 1969. You are invited to participate in the scoping process. The proposed action in response to the application is the issuance of an operating license that would authorize TVA to possess, use, and operate a second lightwater nuclear reactor, WBN Unit 2, located on the applicant's site in Rhea County, Tennessee.
 
Major buildings at the plant were completed prior to 1985 so the existing footprint of Unit 2 remains as almost originally planned. The matters to be addressed in the supplement include evaluation of new and significant circumstances or information, relevant to environmental concerns that developed after the 1978 FES and a previous supplement to the FES published by the NRC in 1995. The NRC is notifying you that, in accordance with 36 CFR 800.8(c), the NRC intends to use the National Environmental Protection Act process for section 106 purposes.
The U.S. Nuclear Regulatory Commission (NRC) is reviewing an application submitted by the Tennessee Valley Authority (TVA) for an operating license for Watts Bar Nuclear Plant (WBN),
The NRC staff plans to hold a public environmental scoping meeting on Tuesday, October 6, 2009. The scoping meeting will be held at the Magnuson Hotel at 1421 Murrays Chapel Road in Sweetwater, Tennessee, on Tuesday, October 6, 2009. There will be two sessions to accommodate interested parties. The first session will be at 1:30 p.m. and the second at 6:30 p.m. You may send written comments on the environmental scope of the WBN Unit 2 operating license review to: Chief, Rulemaking, Directives and Editing Branch, Division of Administrative Services, Office of Administration, Mailstop T-6D59, U.S. Nuclear Regulatory Commission, Washington, D.C., 20555-0001.
Unit 2, located in Rhea County, Tennessee at the northern end of the Chickamauga Reservoir, Tennessee River Mile 528. The NRC is conducting a scoping process for preparing a Supplement to the Final Environmental Statement (FES) published in 1978. The Supplement to the FES will be prepared under Title 10, Code of Federal Regulations (10 CFR) Part 51, the NRC's regulation that implements the National Environmental Policy Act of 1969. You are invited to participate in the scoping process.
Electronic comments may be sent bye-mail to the NRC at RidsNrrPMWattsBar2.Resource@nrc.gov.
The proposed action in response to the application is the issuance of an operating license that would authorize TVA to possess, use, and operate a second lightwater nuclear reactor, WBN Unit 2, located on the applicant's site in Rhea County, Tennessee. Major buildings at the plant were completed prior to 1985 so the existing footprint of Unit 2 remains as almost originally planned.
Comments should be sent no later than October 30, 2009, to be considered in the scoping process. Comments will be available electronically and D. Klima -2 accessible through ADAMS at http://adamswebsearch.nrc.gov/doloqin.htm.
The matters to be addressed in the supplement include evaluation of new and significant circumstances or information, relevant to environmental concerns that developed after the 1978 FES and a previous supplement to the FES published by the NRC in 1995. The NRC is notifying you that, in accordance with 36 CFR 800.8(c), the NRC intends to use the National Environmental Protection Act process for section 106 purposes.
Because your comments will not be edited to remove any identifying or contact information, the NRC cautions against including any information in your submission that you do not want to be publicly disclosed.
The NRC staff plans to hold a public environmental scoping meeting on Tuesday, October 6, 2009. The scoping meeting will be held at the Magnuson Hotel at 1421 Murrays Chapel Road in Sweetwater, Tennessee, on Tuesday, October 6, 2009. There will be two sessions to accommodate interested parties. The first session will be at 1:30 p.m. and the second at 6:30 p.m.
You may send written comments on the environmental scope of the WBN Unit 2 operating license review to: Chief, Rulemaking, Directives and Editing Branch, Division of Administrative Services, Office of Administration, Mailstop T-6D59, U.S. Nuclear Regulatory Commission, Washington, D.C., 20555-0001. Electronic comments may be sent bye-mail to the NRC at RidsNrrPMWattsBar2.Resource@nrc.gov. Comments should be sent no later than October 30, 2009, to be considered in the scoping process. Comments will be available electronically and
 
D. Klima                                       -2 accessible through ADAMS at http://adamswebsearch.nrc.gov/doloqin.htm. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions against including any information in your submission that you do not want to be publicly disclosed.
The NRC requests that any party soliciting or aggregating comments received from other persons for submission to the NRC inform those persons that the NRC will not edit their comments to remove any identifying or contact information, and therefore, they should not include any information in their comments that they do not want publicly disclosed.
The NRC requests that any party soliciting or aggregating comments received from other persons for submission to the NRC inform those persons that the NRC will not edit their comments to remove any identifying or contact information, and therefore, they should not include any information in their comments that they do not want publicly disclosed.
At the conclusion of the scoping process, the NRC staff will prepare a summary of the significant issues identified and the conclusions reached, and mail a copy to you. If you have any questions concerning the NRC's review of this operating license application, please contact me at 301-415-6606 or bye-mail at JoeI.Wiebe@nrc.gov.
At the conclusion of the scoping process, the NRC staff will prepare a summary of the significant issues identified and the conclusions reached, and mail a copy to you.
Sincerely, 9:!! Project Manager Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv D. Klima -2 accessible through ADAMS at http://adamswebsearch.nrc.gov/doloqin.htm.
If you have any questions concerning the NRC's review of this operating license application, please contact me at 301-415-6606 or bye-mail at JoeI.Wiebe@nrc.gov.
Because your comments will not be edited to remove any identifying or contact information, the NRC cautions against including any information in your submission that you do not want to be publicly disclosed.
Sincerely, 9:!!~~or t;;~~ Bar Special Projects Branch Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv
 
D. Klima                                       -2 accessible through ADAMS at http://adamswebsearch.nrc.gov/doloqin.htm. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions against including any information in your submission that you do not want to be publicly disclosed.
The NRC requests that any party soliciting or aggregating comments received from other persons for submission to the NRC inform those persons that the NRC will not edit their comments to remove any identifying or contact information, and therefore, they should not include any information in their comments that they do not want publicly disclosed.
The NRC requests that any party soliciting or aggregating comments received from other persons for submission to the NRC inform those persons that the NRC will not edit their comments to remove any identifying or contact information, and therefore, they should not include any information in their comments that they do not want publicly disclosed.
At the conclusion of the scoping process, the NRC staff will prepare a summary of the significant issues identified and the conclusions reached, and mail a copy to you. If you have any questions concerning the NRC's review of this operating license application, please contact me at 301-415-6606 or bye-mail at JoeI.Wiebe@nrc.gov.
At the conclusion of the scoping process, the NRC staff will prepare a summary of the significant issues identified and the conclusions reached, and mail a copy to you.
If you have any questions concerning the NRC's review of this operating license application, please contact me at 301-415-6606 or bye-mail at JoeI.Wiebe@nrc.gov.
Sincerely, IRAI Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv DISTRIBUTION:
Sincerely, IRAI Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv DISTRIBUTION:
EMAIL: PUBLIC RidsNrrLABClayton Resource RidsNrrDlr Resource RidsNrrDlrRerb Resource RidsNrrDorlLp_WB Resource RidsNrrPMWattsBar2 Resource RidsRgn2MailCenter Resource RidsAcrsAcnw
EMAIL:
_MailCTR Resource RidsOpaMail Resource RidsOgcRp Resource LPWB Reading File DBeissel, NRR DRathbum, FSME AStegan, PNNL ADAMS Accession No ML092120105  
PUBLIC RidsNrrLABClayton Resource RidsNrrDlr Resource RidsNrrDlrRerb Resource RidsNrrDorlLp_WB Resource RidsNrrPMWattsBar2 Resource RidsRgn2MailCenter Resource RidsAcrsAcnw_MailCTR Resource RidsOpaMail Resource RidsOgcRp Resource LPWB Reading File DBeissel, NRR DRathbum, FSME AStegan, PNNL ADAMS Accession No ML092120105                         *via e-mail OFFICE       PM:RERB:DLR         PM:LP-WB:DORL     LADORL           BC:RERB:DLR     OGC NAME         D. Beissel
*via e-mail OFFICE PM:RERB:DLR PM:LP-WB:DORL LADORL BC:RERB:DLR OGC NAME D. Beissel
* J. Wiebe           B. Clayton       B. Pham         D. Roth NLO w/comments DATE         08/28/09           08/31/09           09/08/09       08/31/09         09/03/09 OFFICE       BC:LP-WB:DORL       PM:LP-WB:DORL NAME         L. Raghavan         J. Wiebe
* J. Wiebe B. Clayton B. Pham D. Roth NLO w/comments DATE 08/28/09 08/31/09 09/08/09 08/31/09 09/03/09 OFFICE BC:LP-WB:DORL PM:LP-WB:DORL NAME L. Raghavan J. Wiebe .(Signature)
                                .(Signature)
DATE 09/10/09 09/10/09 OFFICIAL RECORD COpy}}
DATE         09/10/09           09/10/09 OFFICIAL RECORD COpy}}

Latest revision as of 04:43, 14 November 2019

Operating License Application Review - Environmental Scoping
ML092120105
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/10/2009
From: Joel Wiebe
Watts Bar Special Projects Branch
To: Klima D
US Advisory Council On Historic Preservation
BEISSEL, D, NRR/DLR/RERB, 415-2145
References
Download: ML092120105 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 10, 2009 Mr. Don L. Klima, Director Advisory Council on Historic Preservation Office of Federal Agency Programs 1100 Pennsylvania Ave, NW, Suite 803 Washington, DC 20004

SUBJECT:

WATTS BAR NUCLEAR PLANT, UNIT 2, OPERATING LICENSE APPLICATION REVIEW - ENVIRONMENTAL SCOPING

Dear Mr. Klima:

The U.S. Nuclear Regulatory Commission (NRC) is reviewing an application submitted by the Tennessee Valley Authority (TVA) for an operating license for Watts Bar Nuclear Plant (WBN),

Unit 2, located in Rhea County, Tennessee at the northern end of the Chickamauga Reservoir, Tennessee River Mile 528. The NRC is conducting a scoping process for preparing a Supplement to the Final Environmental Statement (FES) published in 1978. The Supplement to the FES will be prepared under Title 10, Code of Federal Regulations (10 CFR) Part 51, the NRC's regulation that implements the National Environmental Policy Act of 1969. You are invited to participate in the scoping process.

The proposed action in response to the application is the issuance of an operating license that would authorize TVA to possess, use, and operate a second lightwater nuclear reactor, WBN Unit 2, located on the applicant's site in Rhea County, Tennessee. Major buildings at the plant were completed prior to 1985 so the existing footprint of Unit 2 remains as almost originally planned.

The matters to be addressed in the supplement include evaluation of new and significant circumstances or information, relevant to environmental concerns that developed after the 1978 FES and a previous supplement to the FES published by the NRC in 1995. The NRC is notifying you that, in accordance with 36 CFR 800.8(c), the NRC intends to use the National Environmental Protection Act process for section 106 purposes.

The NRC staff plans to hold a public environmental scoping meeting on Tuesday, October 6, 2009. The scoping meeting will be held at the Magnuson Hotel at 1421 Murrays Chapel Road in Sweetwater, Tennessee, on Tuesday, October 6, 2009. There will be two sessions to accommodate interested parties. The first session will be at 1:30 p.m. and the second at 6:30 p.m.

You may send written comments on the environmental scope of the WBN Unit 2 operating license review to: Chief, Rulemaking, Directives and Editing Branch, Division of Administrative Services, Office of Administration, Mailstop T-6D59, U.S. Nuclear Regulatory Commission, Washington, D.C., 20555-0001. Electronic comments may be sent bye-mail to the NRC at RidsNrrPMWattsBar2.Resource@nrc.gov. Comments should be sent no later than October 30, 2009, to be considered in the scoping process. Comments will be available electronically and

D. Klima -2 accessible through ADAMS at http://adamswebsearch.nrc.gov/doloqin.htm. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions against including any information in your submission that you do not want to be publicly disclosed.

The NRC requests that any party soliciting or aggregating comments received from other persons for submission to the NRC inform those persons that the NRC will not edit their comments to remove any identifying or contact information, and therefore, they should not include any information in their comments that they do not want publicly disclosed.

At the conclusion of the scoping process, the NRC staff will prepare a summary of the significant issues identified and the conclusions reached, and mail a copy to you.

If you have any questions concerning the NRC's review of this operating license application, please contact me at 301-415-6606 or bye-mail at JoeI.Wiebe@nrc.gov.

Sincerely, 9:!!~~or t;;~~ Bar Special Projects Branch Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv

D. Klima -2 accessible through ADAMS at http://adamswebsearch.nrc.gov/doloqin.htm. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions against including any information in your submission that you do not want to be publicly disclosed.

The NRC requests that any party soliciting or aggregating comments received from other persons for submission to the NRC inform those persons that the NRC will not edit their comments to remove any identifying or contact information, and therefore, they should not include any information in their comments that they do not want publicly disclosed.

At the conclusion of the scoping process, the NRC staff will prepare a summary of the significant issues identified and the conclusions reached, and mail a copy to you.

If you have any questions concerning the NRC's review of this operating license application, please contact me at 301-415-6606 or bye-mail at JoeI.Wiebe@nrc.gov.

Sincerely, IRAI Joel S. Wiebe, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 cc: Distribution via Listserv DISTRIBUTION:

EMAIL:

PUBLIC RidsNrrLABClayton Resource RidsNrrDlr Resource RidsNrrDlrRerb Resource RidsNrrDorlLp_WB Resource RidsNrrPMWattsBar2 Resource RidsRgn2MailCenter Resource RidsAcrsAcnw_MailCTR Resource RidsOpaMail Resource RidsOgcRp Resource LPWB Reading File DBeissel, NRR DRathbum, FSME AStegan, PNNL ADAMS Accession No ML092120105 *via e-mail OFFICE PM:RERB:DLR PM:LP-WB:DORL LADORL BC:RERB:DLR OGC NAME D. Beissel

  • J. Wiebe B. Clayton B. Pham D. Roth NLO w/comments DATE 08/28/09 08/31/09 09/08/09 08/31/09 09/03/09 OFFICE BC:LP-WB:DORL PM:LP-WB:DORL NAME L. Raghavan J. Wiebe

.(Signature)

DATE 09/10/09 09/10/09 OFFICIAL RECORD COpy