ML102450183: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 10/14/2009 | | issue date = 10/14/2009 | ||
| title = CG-2009-10-Simulator JPM C | | title = CG-2009-10-Simulator JPM C | ||
| author name = Garchow S | | author name = Garchow S | ||
| author affiliation = NRC/RGN-IV/DRS/OB | | author affiliation = NRC/RGN-IV/DRS/OB | ||
| addressee name = | | addressee name = | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:INSTRUCTIONAL COVER SHEET PROGRAM TITLE OPERATIONS TRAINING COURSE TITLE JOB PERFORMANCE MEASURE LESSON TITLE REACTOR FEED PUMP | {{#Wiki_filter:INSTRUCTIONAL COVER SHEET PROGRAM TITLE OPERATIONS TRAINING COURSE TITLE JOB PERFORMANCE MEASURE LESSON TITLE REACTOR FEED PUMP A QUICK RESTART (SIM) | ||
LESSON LENGTH | LESSON LENGTH .5 HRS MAXIMUM STUDENTS 1 INSTRUCTIONAL MATERIALS INCLUDED Lesson Plan PQD Code Rev. No. | ||
Simulator Guide PQD Code Rev. No. | |||
DIVISION TITLE Nuclear Training DEPARTMENT Operations Training PREPARED BY STAFF DATE 1995 | JPM PQD Code LR000131 Rev. No. 6 Exam PQD Code Rev. No. | ||
DIVISION TITLE Nuclear Training DEPARTMENT Operations Training PREPARED BY STAFF DATE 1995 REVISED BY Ron Hayden DATE 6/11/09 TECHNICAL REVIEW BY DATE INSTRUCTIONAL REVIEW BY DATE APPROVED BY DATE Operations Training Manager Verify materials current IAW SWP-TQS-01 prior to use. | |||
MINOR REVISION RECORD Minor Description Affected Entered Effective Manager Rev Number of Revision Pages By Date Approval JPM SETUP Simulator ICs; Malfunctions; Triggers; Overrides: | |||
Post scram IC where both RFPs have tripped at 54.5 and current RPV level will allow the RFP to be reset (LT +54.5) | |||
Special Setup Instructions: | Special Setup Instructions: | ||
None | None JPM Instructions: | ||
Verify Current Procedure against JPM and ensure procedure critical steps match if procedure is different revision than listed in JPM. If critical | Verify Current Procedure against JPM and ensure procedure critical steps match if procedure is different revision than listed in JPM. If critical steps have changed, the JPM should be revised. | ||
The evaluator and student shall use current procedure. The evaluator should mark off steps as they are completed, note comments, and transfer the comments to the Results of JPM page. | |||
The evaluator and student shall use current procedure. The evaluator should mark off steps as they are completed, note comments, and transfer the comments to the | Tools/Equipment: None Safety Items: None Task Number: RO-0371 Validation Time: 15 Minutes Prerequisite Training: None Time Critical: No PPM | ||
Tools/Equipment: | |||
None Safety Items: | |||
None Task Number: | |||
RO-0371 Validation Time: | |||
15 Minutes Prerequisite Training: | |||
None Time Critical: | |||
No PPM | |||
==Reference:== | ==Reference:== | ||
SOP-RFW-RESTART-QC Rev. 2 Location: Simulator NUREG 1123 Ref: | SOP-RFW-RESTART-QC Rev. 2 Location: Simulator NUREG 1123 Ref: 259001A4.02 (3.9/3.7) Performance Method: Perform LR000131 Rev. 6 Page 1 of 6 | ||
259001A4.02 (3.9/3.7) | |||
Performance Method: | |||
Perform LR000131 Rev. 6 Page | |||
follows (H13-P840): | JPM CHECKLIST PROCEDURE Procedure copies for evaluator and student, if procedure revision is different from VALIDATION that listed on JPM, critical tasks reverified. Evaluator copy may be used for marking step completion, and comments. | ||
INITIAL A reactor scram was inserted as part of a controlled shutdown. RPV level increased CONDITIONS: to GT 54.5 and both RFPs tripped. | |||
INITIATING CUE: You have been directed by the CRS to perform a quick restart of the A RFW Pump using SOP-RFT-RESTART-QC. Inform the CRS when the A RFW pumps speed is GT 800 rpm and RFW-P-1A has been transferred to MDEM. | |||
* Items are Critical Steps Comments Element Standard Sat/Unsat RECORD START TIME: __________ | |||
Step 2.1.1 If desired, then transfer RPV level control to RFW- N/A N/A FCV-10A/10B per SOP-RFW-FCV-QC concurrently with this procedure Step 2.12 If performing this section Takes control switch for RFW-V- S/U* | |||
following a reactor scram, 112A ands RFW-V-112B then verify RFW-V-112A momentarily to the closed and RFW-V-112B have position and observes dual light started to close indication Step 2.13 Verify MSIVs are open Observes all MSIV red lights are S/U (H13-P601) lit and green lights are out on P601 Step 2.14 Verify at least two high Depresses at least two of the S/U* | |||
level seal ins are reset (H13- High Level Seal In P/Bs on P603 P603) | |||
PROCEDURE NOTE: RFT-COMP-1 and RFT-COMP-2 are redundant units, either screen will allow operation of the Reactor Feed Turbine control system. | |||
LR000131 Rev. 6 Page 2 of 6 | |||
* Items are Critical Steps Comments Element Standard Sat/Unsat Step 2.15 Verify RFW-P-1A(B) in Verifies: | |||
MDVP mode at 0% using a. Selects MDVP on either RFT- S/U RFT-COMP-1 or RFT- COMP-1 or RFT-COMP-2 COMP-2 (Pump Control | |||
: b. Selects YES S/U Screen) as follows (H13-P840): c. If required, then DEPRESS the DOWN arrow for RFW-P-1A(B) S/U | |||
: a. Select MDVP using RFT-COMP-1 or | |||
: b. Select YES RFT-COMP-2 for 0% output | |||
: c. If required, then DEPRESS the DOWN arrow for RFW-P-1A(B) using RFT-COMP-1 or RFT-COMP-2 for 0% | |||
output (Pump Control Screen) (H13-P840) | |||
Step 2.16 Hold the trip/reset switch to Places the Turbine Emergency reset until RFW-P-1A(B) Trip/Reset switch to the Reset HP and LP stop valves position until the LP and HP Stop S/U* | |||
indicate full open (H13- valves red light is on and the P840) green light is off, then release the Trip/Reset switch PROCEDURE NOTE: If the Main Turbine is tripped, the RFP Turbine will not roll until Main Steam is admitted at approximately 60% GV position. | |||
Step 2.17 Raise Turbine speed as Does not perform this step as MT follows: is tripped S/U | |||
: a. If the Main Turbine is not tripped. | |||
: b. If the Main Turbine is In MDVP, depresses increase tripped, then perform the pushbutton as necessary to raise S/U* | |||
following: GV position to GT 60% and then | |||
* Slowly raise RFW-P- to increase turbine speed to raise 1A(B) GV position GT 800 rpm using RFT-COMP-1 or RFT-COMP-2 | |||
* Monitor RFW-P-1A(B) speed on RFT-COMP-1 or RFW-COMP-2 as GV position increases GT 60% GV position LR000131 Rev. 6 Page 3 of 6 | |||
* Items are Critical Steps Comments Element Standard Sat/Unsat Step 2.18 Transfer RFW-P-1A(B) to With speed GT 800 rpm, MDEM using RFT-COMP- transfers RFW-P-1A to MDEM 1 or RFT-COMP-2 as soon by: | |||
as practical (GT 800 rpm) a. depressing the MDEM (Pump Control Screen) as S/U* | |||
pushbutton follows (H13-P840): | |||
: b. depresses Yes pushbutton S/U* | |||
: a. Select MDEM | : a. Select MDEM | ||
: b. Select Yes | : b. Select Yes Termination Criteria: Student informs CRS that A RFW pumps speed is GT 800 rpm and the speed controller has been transferred to MDEM RECORD TERMINATION TIME: _________ | ||
Transfer to Results of JPM page the following information: Procedures validated prior to use; Comments from marked up evaluators procedure copy; Unsatisfactory critical tasks; Total JPM time; Marked Up procedure and remaining JPM pages may be discarded. | |||
LR000131 Rev. 6 Page 4 of 6 | |||
RESULTS OF JPM: | |||
REACTOR FEED PUMP QUICK RESTART Examinee (Please Print): ______________________________________________ | |||
Evaluator (Please Print): ______________________________________________ | |||
Task Standard: RFP A is running with rpm is GT 800 and the controller is in MDEM Overall Evaluation Exam Code SAT / UNSAT (Circle One) | |||
Verified Procedure #/Rev. Used for Validation/Critical JPM Completion JPM Time Time 15 Minutes / NA COMMENTS: | |||
______________________________________________ | Evaluator's Signature: Date: | ||
Evaluator (Please Print): | LR000131 Rev. 6 Page 5 of 6 | ||
______________________________________________ | |||
Task Standard: | |||
RFP | |||
Verified Procedure #/Rev. Used for | |||
Date: | |||
LR000131 Rev. 6 Page | |||
Cue: You have been directed by the CRS to perform a quick restart of the | STUDENT JPM INFORMATION CARD Initial Conditions: | ||
A reactor scram was inserted as part of a controlled shutdown RPV level increased to GT 54.5 and both RFPs tripped Cue: | |||
You have been directed by the CRS to perform a quick restart of the A RFW Pump using SOP-RFT-RESTART-QC Inform the CRS when the A RFW pumps speed is GT 800 rpm and RFW-P-1A has been transferred to MDEM LR000131 Rev. 6 Page 6 of 6}} |
Latest revision as of 13:49, 13 November 2019
ML102450183 | |
Person / Time | |
---|---|
Site: | Columbia |
Issue date: | 10/14/2009 |
From: | Garchow S Operations Branch IV |
To: | Energy Northwest |
References | |
Download: ML102450183 (7) | |
Text
INSTRUCTIONAL COVER SHEET PROGRAM TITLE OPERATIONS TRAINING COURSE TITLE JOB PERFORMANCE MEASURE LESSON TITLE REACTOR FEED PUMP A QUICK RESTART (SIM)
LESSON LENGTH .5 HRS MAXIMUM STUDENTS 1 INSTRUCTIONAL MATERIALS INCLUDED Lesson Plan PQD Code Rev. No.
Simulator Guide PQD Code Rev. No.
JPM PQD Code LR000131 Rev. No. 6 Exam PQD Code Rev. No.
DIVISION TITLE Nuclear Training DEPARTMENT Operations Training PREPARED BY STAFF DATE 1995 REVISED BY Ron Hayden DATE 6/11/09 TECHNICAL REVIEW BY DATE INSTRUCTIONAL REVIEW BY DATE APPROVED BY DATE Operations Training Manager Verify materials current IAW SWP-TQS-01 prior to use.
MINOR REVISION RECORD Minor Description Affected Entered Effective Manager Rev Number of Revision Pages By Date Approval JPM SETUP Simulator ICs; Malfunctions; Triggers; Overrides:
Post scram IC where both RFPs have tripped at 54.5 and current RPV level will allow the RFP to be reset (LT +54.5)
Special Setup Instructions:
None JPM Instructions:
Verify Current Procedure against JPM and ensure procedure critical steps match if procedure is different revision than listed in JPM. If critical steps have changed, the JPM should be revised.
The evaluator and student shall use current procedure. The evaluator should mark off steps as they are completed, note comments, and transfer the comments to the Results of JPM page.
Tools/Equipment: None Safety Items: None Task Number: RO-0371 Validation Time: 15 Minutes Prerequisite Training: None Time Critical: No PPM
Reference:
SOP-RFW-RESTART-QC Rev. 2 Location: Simulator NUREG 1123 Ref: 259001A4.02 (3.9/3.7) Performance Method: Perform LR000131 Rev. 6 Page 1 of 6
JPM CHECKLIST PROCEDURE Procedure copies for evaluator and student, if procedure revision is different from VALIDATION that listed on JPM, critical tasks reverified. Evaluator copy may be used for marking step completion, and comments.
INITIAL A reactor scram was inserted as part of a controlled shutdown. RPV level increased CONDITIONS: to GT 54.5 and both RFPs tripped.
INITIATING CUE: You have been directed by the CRS to perform a quick restart of the A RFW Pump using SOP-RFT-RESTART-QC. Inform the CRS when the A RFW pumps speed is GT 800 rpm and RFW-P-1A has been transferred to MDEM.
- Items are Critical Steps Comments Element Standard Sat/Unsat RECORD START TIME: __________
Step 2.1.1 If desired, then transfer RPV level control to RFW- N/A N/A FCV-10A/10B per SOP-RFW-FCV-QC concurrently with this procedure Step 2.12 If performing this section Takes control switch for RFW-V- S/U*
following a reactor scram, 112A ands RFW-V-112B then verify RFW-V-112A momentarily to the closed and RFW-V-112B have position and observes dual light started to close indication Step 2.13 Verify MSIVs are open Observes all MSIV red lights are S/U (H13-P601) lit and green lights are out on P601 Step 2.14 Verify at least two high Depresses at least two of the S/U*
level seal ins are reset (H13- High Level Seal In P/Bs on P603 P603)
PROCEDURE NOTE: RFT-COMP-1 and RFT-COMP-2 are redundant units, either screen will allow operation of the Reactor Feed Turbine control system.
LR000131 Rev. 6 Page 2 of 6
- Items are Critical Steps Comments Element Standard Sat/Unsat Step 2.15 Verify RFW-P-1A(B) in Verifies:
MDVP mode at 0% using a. Selects MDVP on either RFT- S/U RFT-COMP-1 or RFT- COMP-1 or RFT-COMP-2 COMP-2 (Pump Control
- b. Selects YES S/U Screen) as follows (H13-P840): c. If required, then DEPRESS the DOWN arrow for RFW-P-1A(B) S/U
- a. Select MDVP using RFT-COMP-1 or
- b. Select YES RFT-COMP-2 for 0% output
- c. If required, then DEPRESS the DOWN arrow for RFW-P-1A(B) using RFT-COMP-1 or RFT-COMP-2 for 0%
output (Pump Control Screen) (H13-P840)
Step 2.16 Hold the trip/reset switch to Places the Turbine Emergency reset until RFW-P-1A(B) Trip/Reset switch to the Reset HP and LP stop valves position until the LP and HP Stop S/U*
indicate full open (H13- valves red light is on and the P840) green light is off, then release the Trip/Reset switch PROCEDURE NOTE: If the Main Turbine is tripped, the RFP Turbine will not roll until Main Steam is admitted at approximately 60% GV position.
Step 2.17 Raise Turbine speed as Does not perform this step as MT follows: is tripped S/U
- a. If the Main Turbine is not tripped.
- b. If the Main Turbine is In MDVP, depresses increase tripped, then perform the pushbutton as necessary to raise S/U*
following: GV position to GT 60% and then
- Slowly raise RFW-P- to increase turbine speed to raise 1A(B) GV position GT 800 rpm using RFT-COMP-1 or RFT-COMP-2
- Monitor RFW-P-1A(B) speed on RFT-COMP-1 or RFW-COMP-2 as GV position increases GT 60% GV position LR000131 Rev. 6 Page 3 of 6
- Items are Critical Steps Comments Element Standard Sat/Unsat Step 2.18 Transfer RFW-P-1A(B) to With speed GT 800 rpm, MDEM using RFT-COMP- transfers RFW-P-1A to MDEM 1 or RFT-COMP-2 as soon by:
as practical (GT 800 rpm) a. depressing the MDEM (Pump Control Screen) as S/U*
pushbutton follows (H13-P840):
- b. depresses Yes pushbutton S/U*
- a. Select MDEM
- b. Select Yes Termination Criteria: Student informs CRS that A RFW pumps speed is GT 800 rpm and the speed controller has been transferred to MDEM RECORD TERMINATION TIME: _________
Transfer to Results of JPM page the following information: Procedures validated prior to use; Comments from marked up evaluators procedure copy; Unsatisfactory critical tasks; Total JPM time; Marked Up procedure and remaining JPM pages may be discarded.
LR000131 Rev. 6 Page 4 of 6
RESULTS OF JPM:
REACTOR FEED PUMP QUICK RESTART Examinee (Please Print): ______________________________________________
Evaluator (Please Print): ______________________________________________
Task Standard: RFP A is running with rpm is GT 800 and the controller is in MDEM Overall Evaluation Exam Code SAT / UNSAT (Circle One)
Verified Procedure #/Rev. Used for Validation/Critical JPM Completion JPM Time Time 15 Minutes / NA COMMENTS:
Evaluator's Signature: Date:
LR000131 Rev. 6 Page 5 of 6
STUDENT JPM INFORMATION CARD Initial Conditions:
A reactor scram was inserted as part of a controlled shutdown RPV level increased to GT 54.5 and both RFPs tripped Cue:
You have been directed by the CRS to perform a quick restart of the A RFW Pump using SOP-RFT-RESTART-QC Inform the CRS when the A RFW pumps speed is GT 800 rpm and RFW-P-1A has been transferred to MDEM LR000131 Rev. 6 Page 6 of 6