INSTRUCTIONAL COVER SHEET PROGRAM TITLE OPERATIONS TRAINING COURSE TITLE JOB PERFORMANCE MEASURE LESSON TITLE REACTOR FEED PUMP A QUICK RESTART (SIM)
LESSON LENGTH
.5 HRS MAXIMUM STUDENTS 1
INSTRUCTIONAL MATERIALS INCLUDED Lesson Plan PQD Code Rev. No.
Simulator Guide PQD Code Rev. No.
JPM PQD Code LR000131 Rev. No.
6 Exam PQD Code Rev. No.
DIVISION TITLE Nuclear Training DEPARTMENT Operations Training PREPARED BY STAFF DATE 1995 REVISED BY Ron Hayden DATE 6/11/09 TECHNICAL REVIEW BY DATE INSTRUCTIONAL REVIEW BY DATE APPROVED BY DATE Operations Training Manager Verify materials current IAW SWP-TQS-01 prior to use.
LR000131 Rev. 6 Page 1 of 6 MINOR REVISION RECORD Minor Rev Number Description of Revision Affected Pages Entered By Effective Date Manager Approval JPM SETUP Simulator ICs; Malfunctions; Triggers; Overrides:
Post scram IC where both RFPs have tripped at 54.5 and current RPV level will allow the RFP to be reset (LT +54.5)
Special Setup Instructions:
None JPM Instructions:
Verify Current Procedure against JPM and ensure procedure critical steps match if procedure is different revision than listed in JPM. If critical steps have changed, the JPM should be revised.
The evaluator and student shall use current procedure. The evaluator should mark off steps as they are completed, note comments, and transfer the comments to the Results of JPM page.
Tools/Equipment: None Safety Items: None Task Number: RO-0371 Validation Time: 15 Minutes Prerequisite Training: None Time Critical: No PPM
Reference:
SOP-RFW-RESTART-QC Rev. 2 Location: Simulator NUREG 1123 Ref: 259001A4.02 (3.9/3.7)
Performance Method: Perform
LR000131 Rev. 6 Page 2 of 6 JPM CHECKLIST PROCEDURE VALIDATION Procedure copies for evaluator and student, if procedure revision is different from that listed on JPM, critical tasks reverified. Evaluator copy may be used for marking step completion, and comments.
INITIAL CONDITIONS:
A reactor scram was inserted as part of a controlled shutdown. RPV level increased to GT 54.5 and both RFPs tripped.
INITIATING CUE: You have been directed by the CRS to perform a quick restart of the A RFW Pump using SOP-RFT-RESTART-QC. Inform the CRS when the A RFW pumps speed is GT 800 rpm and RFW-P-1A has been transferred to MDEM.
- Items are Critical Steps Comments Element Standard Sat/Unsat RECORD START TIME: __________
Step 2.1.1 If desired, then transfer RPV level control to RFW-FCV-10A/10B per SOP-RFW-FCV-QC concurrently with this procedure N/A N/A Step 2.12 If performing this section following a reactor scram, then verify RFW-V-112A and RFW-V-112B have started to close Takes control switch for RFW-V-112A ands RFW-V-112B momentarily to the closed position and observes dual light indication S / U
- Step 2.13 Verify MSIVs are open (H13-P601)
Observes all MSIV red lights are lit and green lights are out on P601 S / U Step 2.14 Verify at least two high level seal ins are reset (H13-P603)
Depresses at least two of the High Level Seal In P/Bs on P603 S / U
- PROCEDURE NOTE: RFT-COMP-1 and RFT-COMP-2 are redundant units, either screen will allow operation of the Reactor Feed Turbine control system.
LR000131 Rev. 6 Page 3 of 6
- Items are Critical Steps Comments Element Standard Sat/Unsat Step 2.15 Verify RFW-P-1A(B) in MDVP mode at 0% using RFT-COMP-1 or RFT-COMP-2 (Pump Control Screen) as follows (H13-P840):
- a. Select MDVP
- b. Select YES
- c. If required, then DEPRESS the DOWN arrow for RFW-P-1A(B) using RFT-COMP-1 or RFT-COMP-2 for 0%
output (Pump Control Screen) (H13-P840)
Verifies:
- a. Selects MDVP on either RFT-COMP-1 or RFT-COMP-2
- b. Selects YES
- c. If required, then DEPRESS the DOWN arrow for RFW-P-1A(B) using RFT-COMP-1 or RFT-COMP-2 for 0% output S / U S / U S / U Step 2.16 Hold the trip/reset switch to reset until RFW-P-1A(B)
HP and LP stop valves indicate full open (H13-P840)
Places the Turbine Emergency Trip/Reset switch to the Reset position until the LP and HP Stop valves red light is on and the green light is off, then release the Trip/Reset switch S / U
- PROCEDURE NOTE: If the Main Turbine is tripped, the RFP Turbine will not roll until Main Steam is admitted at approximately 60% GV position.
Step 2.17 Raise Turbine speed as follows:
- a. If the Main Turbine is not tripped.
Does not perform this step as MT is tripped S / U
- b. If the Main Turbine is tripped, then perform the following:
- Slowly raise RFW-P-1A(B) GV position using RFT-COMP-1 or RFT-COMP-2
- Monitor RFW-P-1A(B) speed on RFT-COMP-1 or RFW-COMP-2 as GV position increases GT 60% GV position In MDVP, depresses increase pushbutton as necessary to raise GV position to GT 60% and then to increase turbine speed to raise GT 800 rpm S / U
- LR000131 Rev. 6 Page 4 of 6
- Items are Critical Steps Comments Element Standard Sat/Unsat Step 2.18 Transfer RFW-P-1A(B) to MDEM using RFT-COMP-1 or RFT-COMP-2 as soon as practical (GT 800 rpm)
(Pump Control Screen) as follows (H13-P840):
- a. Select MDEM
- b. Select Yes With speed GT 800 rpm, transfers RFW-P-1A to MDEM by:
- a. depressing the MDEM pushbutton
- b. depresses Yes pushbutton S / U
- S / U
- Termination Criteria: Student informs CRS that A RFW pumps speed is GT 800 rpm and the speed controller has been transferred to MDEM RECORD TERMINATION TIME: _________
Transfer to Results of JPM page the following information: Procedures validated prior to use; Comments from marked up evaluators procedure copy; Unsatisfactory critical tasks; Total JPM time; Marked Up procedure and remaining JPM pages may be discarded.
LR000131 Rev. 6 Page 5 of 6 RESULTS OF JPM:
REACTOR FEED PUMP QUICK RESTART Examinee (Please Print): ______________________________________________
Evaluator (Please Print): ______________________________________________
Task Standard: RFP A is running with rpm is GT 800 and the controller is in MDEM Overall Evaluation Exam Code SAT / UNSAT (Circle One)
Verified Procedure #/Rev. Used for JPM Validation/Critical Time JPM Completion Time 15 Minutes / NA COMMENTS:
Evaluator's Signature:
Date:
LR000131 Rev. 6 Page 6 of 6 STUDENT JPM INFORMATION CARD Initial Conditions:
A reactor scram was inserted as part of a controlled shutdown RPV level increased to GT 54.5 and both RFPs tripped Cue:
You have been directed by the CRS to perform a quick restart of the A RFW Pump using SOP-RFT-RESTART-QC Inform the CRS when the A RFW pumps speed is GT 800 rpm and RFW-P-1A has been transferred to MDEM