{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Admin A MCR 'B' RO panel walk downs JPM Number: 412 Revision Number: 00 Date: 08/31/2010 Developed By:
{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Admin A MCR B RO panel walk downs JPM Number: 412 Revision Number: 00 Date: 08/31/2010 Developed By: Tallion French                   08/31/2010 Instructor                       Date Validated By:
Tallion French 08/31/2010 Instructor Date Validated By:
SME or Instructor               Date Reviewed By:
SME or Instructor Date Reviewed By:
Operations Representative       Date Approved By:
Operations Representative Date Approved By:
Training Department             Date
Training Department Date JPM Number:
412  Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validat ion. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.
________ 1. Task description an d number, JPM description and number areidentified.
 
________ 2. Knowledge and Abilities (K
/A) references are included.
 
________ 3. Performance location specified. (in-plant, control room, or simulator)
 
________ 4. Initial setup c onditions are identified.
 
________ 5. Initiating and terminating cues are properly identified.
 
________ 6. Task standards identifi ed and verified by SME review.
 
________ 7. Critical steps m eet the criteria for critical steps and are identified with an asterisk (*).


JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.
________ 1. Task description and number, JPM description and number areidentified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, or simulator)
________ 4. Initial setup conditions are identified.
________ 5. Initiating and terminating cues are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________  
Procedure Rev. _____ Date _____________
 
________ 9. Pilot test the JPM:
________ 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.  
: b. ensure performance time is accurate.
 
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.  
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                          Date SME/Instructor                          Date SME/Instructor                          Date Page 2 of 10


SME/Instructor    Date SME/Instructor    Date  
JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision    Date                            Description 00      08/31/10 New JPM Page 3 of 10


SME/Instructor    Date Page 2 of 10 JPM Number:
JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)
412 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 10 Revision Record (Summary) Revision Date Description 00 08/31/10 New JPM JPM Number:
412  Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions (This page is applicable only to JPMs performed in the Simulator.)
Simulator Setup Instructions (This page is applicable only to JPMs performed in the Simulator.)
: 1. Reset the simulator to IC-01.
: 1. Reset the simulator to IC-01.
NOTE: It is permissible to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with th is and other JPMs that are scheduled to be run concurrently.
NOTE:       It is permissible to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Load the log taking JPM 412 lesson on the simulator.
: 2. Load the log taking JPM 412 lesson on the simulator.
: 3. When the above steps are completed for this and other JPMs to be run conc urrently, then validate the concurrently run JPMs if applicable.
: 3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: 4. This completes the setup for this JPM.
: 4. This completes the setup for this JPM.
Page 4 of 10 JPM Number:
Page 4 of 10
412 Clinton Power Station Job Performance Measure (JPM)
 
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur. TASK STANDARDS
JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)
The evolution completed IAW OP-AA-101-111 Ro les and Responsibilities of On-shift Personnel.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: Log sheet for panel walk down. Red pen available PROCEDURAL/
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
TASK STANDARDS:
* The evolution completed IAW OP-AA-101-111 Roles and Responsibilities of On-shift Personnel.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* Log sheet for panel walk down.
* Red pen available PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
Log sheet EVALUATOR INSTRUCTIONS:
* Log sheet EVALUATOR INSTRUCTIONS:
Instructions for evaluator, th ey should know/understand during JPM. The following are examples: Amplifying cues are provided within the JPM steps.
Instructions for evaluator, they should know/understand during JPM. The following are examples:
* Amplifying cues are provided within the JPM steps.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is operating at 97% power.
The plant is operating at 97% power.
Page 5 of 10 JPM Number:
Page 5 of 10
412 Clinton Power Station Job Performance Measure (JPM)
 
JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed. Do NOT shine any type light into a panel.
CAUTION All pre-job briefings are completed.
You are the 'B' RO complete hourly panel walk down. Inform the CRS when you have completed the panel walk down and give the CRS the log sheet for review. START TIME:
Do NOT shine any type light into a panel.
Page 6 of 10 JPM Number:
You are the B RO complete hourly panel walk down.
412 Clinton Power Station Job Performance Measure (JPM)
Inform the CRS when you have completed the panel walk down and give the CRS the log sheet for review.
START TIME:
Page 6 of 10
 
JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS  
PERFORMANCE STEPS
  *1) Identifies the MC and CY tank capacities are less than 66% combined Standard:
            *1)   Identifies the MC and CY tank capacities are less than 66% combined Standard:           Logs are circled in red or CRS informed Cue:               1. None Comments SAT               UNSAT                   Comment Number Page 7 of 10
Logs are circled in red or CRS informed Cue: 1. None Comments   SAT   UNSAT   Comment Number Page 7 of 10 JPM Number:
 
412 Clinton Power Station Job Performance Measure (JPM)
JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)
: 2)  Identifies the turbine generator gas pressure is less than 75 psig Standard:        Notifies CRS need to add hydrogen to main generator Cue:            IF asked: Another RO will dispatch area operator to add H2 to the generator.
Comments SAT                  UNSAT                    Comment Number
            *3)  Identifies the FC pump amps are in the red zone of the meter Standard:        Logs are circled in red or CRS informed Cue:            None Comments SAT                  UNSAT                    Comment Number
            *4)  ADS air pressures are out of band low Standard:        Logs are circled in red or CRS informed Cue:            None Comments SAT                  UNSAT                    Comment Number TERMINATING CUES:
Logs are completed and deficiencies identified.
STOP TIME:
Page 8 of 10
Page 8 of 10
: 2) Identifies the turbine generator gas pressure is less than 75 psig Standard:
Notifies CRS need to add hydrogen to main generator Cue: IF asked:  Another RO will dispatch area operator to add H2 to the generator. Comments  SAT  UNSAT    Comment Number 
*3) Identifies the FC pump amps are in the red zone of the meter Standard:
Logs are circled in red or CRS informed Cue: None Comments SAT  UNSAT    Comment Number 
*4) ADS air pressures are out of band low Standard:
Logs are circled in red or CRS informed Cue: None Comments SAT  UNSAT    Comment Number TERMINATING CUES: Logs are completed and deficiencies identified.
STOP TIME: 


JPM Number:
JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)
412 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Operator's Name:
Job Title:           NLO           RO             SRO             STA           SRO Cert JPM Title:       MCR B RO panel walk downs JPM Number:     JPM 412 Admin A                                   Revision Number: 00 Task Number and Title: OP-AA-101-111 Roles and Responsibilities of On-shift Personnel K/A System         K/A Number           Importance (RO/SRO)
Job Title:   NLO   RO   SRO   STA   SRO Cert JPM Title: MCR 'B' RO panel walk downs JPM Number: JPM 412 Admin A Revision Number: 00 Task Number and Title: OP-AA-101-111 Roles and Responsibili ties of On-shift Personnel K/A System K/A Number Importance (RO/SRO)
Generic             2.1.18             3.6 Suggested Testing Environment:       Simulator Actual Testing Environment:           Simulator             Plant           Control Room Testing Method:         Simulate                     Faulted:         Yes       No Perform             Alternate Path:         Yes         No Time Critical:         Yes         No Estimated Time to Complete: 20 minutes                   Actual Time Used:             minutes
Generic 2.1.18 3.6       Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator   Plant   Control Room Testing Method:
Simulate Faulted:     Yes   No     Perform Alternate Path:
Yes   No Time Critical:
Yes   No Estimated Time to Complete: 20 minutes Actual Time Used:   minutes  


==References:==
==References:==
OP-AA-101-111 Roles and Res ponsibilities of On-shift Personnel.
OP-AA-101-111 Roles and Responsibilities of On-shift Personnel.
EVALUATION  
EVALUATION  


==SUMMARY==
==SUMMARY==
: Were all the Critical Elements performed satisfactorily?   Yes   No The operator's performance was eval uated against the standards contai ned in this JPM, and has been determined to be:   Satisfactory   Unsatisfactory Comments:
:
Evaluator's Name:
Were all the Critical Elements performed satisfactorily?         Yes         No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                         Satisfactory           Unsatisfactory Comments:
(Print)  
Evaluators Name:                                                   (Print)
Evaluators Signature:                                                  Date:
Page 9 of 10


Evaluator's Signature:  Date:  Page 9 of 10 Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Initial Conditions The plant is opera ting at 97% power.
Initial Conditions The plant is operating at 97% power.
Initiating Cue CAUTION All pre-job briefings are completed. No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur. (This statement should be removed if this is a Simulator JPM) Do NOT shine any type light into a panel.
Initiating Cue CAUTION All pre-job briefings are completed.
You are the 'B' RO complete hourly panel walk down. Inform the CRS when you have completed the panel walk down and give the CRS the log sheet for review. Page 10 of 10 CLINTON POWER STATION Job Performance Measure Admin B. License Maintenance Check JPM Number:  409 Revision Number: 00 Date:  08/31/2010 Developed By:
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur. (This statement should be removed if this is a Simulator JPM)
Tallion French 08/31/2010 Instructor Date  Validated By:
Do NOT shine any type light into a panel.
SME or Instructor Date  Reviewed By:
You are the B RO complete hourly panel walk down.
Operations Representative Date  Approved By:
Inform the CRS when you have completed the panel walk down and give the CRS the log sheet for review.
Training Department Date JPM Number:  409 Clinton Power Station Job Performance Measure (JPM)
Page 10 of 10
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validat ion. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.
 
________ 1. Task description an d number, JPM description and number areidentified.
 
________ 2. Knowledge and Abilities (K
/A) references are included.


________ 3. Performance location specified. (in-plant, control room, or simulator)
CLINTON POWER STATION Job Performance Measure Admin B.
 
License Maintenance Check JPM Number: 409 Revision Number: 00 Date: 08/31/2010 Developed By: Tallion French                  08/31/2010 Instructor                      Date Validated By:
________ 4. Initial setup c onditions are identified.  
SME or Instructor              Date Reviewed By:
 
Operations Representative      Date Approved By:
________ 5. Initiating and terminating cues are properly identified.
Training Department            Date
 
________ 6. Task standards identifi ed and verified by SME review.
 
________ 7. Critical steps m eet the criteria for critical steps and are identified with an asterisk (*).


JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.
________ 1. Task description and number, JPM description and number areidentified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, or simulator)
________ 4. Initial setup conditions are identified.
________ 5. Initiating and terminating cues are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________  
Procedure Rev. _____ Date _____________
 
________ 9. Pilot test the JPM:
________ 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.  
: b. ensure performance time is accurate.
 
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.  
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                          Date SME/Instructor                          Date SME/Instructor                          Date Page 2 of 11


SME/Instructor     Date SME/Instructor    Date 
JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision     Date                           Description Rev # 00  8/31/2010 New JPM Page 3 of 11


SME/Instructor    Date Page 2 of 11 JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)
JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 11 Revision Record (Summary) Revision Date Description Rev # 00 8/31/2010 New JPM JPM Number:  409 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions (This page is applicable only to JPMs performed in the Simulator.)
Simulator Setup Instructions (This page is applicable only to JPMs performed in the Simulator.)
: 1. Admin JPM.
: 1. Admin JPM.
NOTE: It is permissible to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with th is and other JPMs that are scheduled to be run concurrently.
NOTE:     It is permissible to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. When the above steps are completed for this and other JPMs to be run conc urrently, then validate the concurrently run JPMs if applicable.
: 2. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: 3. This completes the setup for this JPM.
: 3. This completes the setup for this JPM.
Page 4 of 11 JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 11
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur. TASK STANDARDS
 
The evolution completed IAW OP-AA-105-102 Rev.9.
JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: Attachment 1 PROCEDURAL/
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
TASK STANDARDS:
* The evolution completed IAW OP-AA-105-102 Rev.9.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* Attachment 1 PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
OP-AA-105-102 Rev.9. EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. All pre-job briefings are completed.
* OP-AA-105-102 Rev.9.
EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is opera ting at 98% power.
The plant is operating at 98% power.
Today is 1/31/2011.
Today is 1/31/2011.
Page 5 of 11 JPM Number:  409 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 11
You have been asked to complete a license maintenance check on yourself prior to going home on your relief week IAW OP-AA-105-102 and the ESOMS log attachment. Determine if you will be proficient for the next quarter. If not, determine the number of watches required to maintain proficiency. Based on the current report, on what day will your license be active until. START TIME:
Page 6 of 11 JPM Number:  409 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.


PERFORMANCE STEPS  
JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)
  *1) Candidate determines the minimum hou rs of watch standing for credit for proficiency has NOT been met.
You have been asked to complete a license maintenance check on yourself prior to going home on your relief week IAW OP-AA-105-102 and the ESOMS log attachment.
Standard:
Determine if you will be proficient for the next quarter. If not, determine the number of watches required to maintain proficiency. Based on the current report, on what day will your license be active until.
Shift: as defined for maintaining an active license must be a minimum of 8 hours in duration.
START TIME:
MAINTAIN an active license by actively performing the functions of RO, SRO, or SROL. RO licenses by performing the duties of th e Unit RO and/or Unit Assist RO for a minimum of seven 8-hour or five 12-hour shifts per calendar quarter, including turnover to the next shift. The second Unit Assist RO (fourth RO) can receive watchstanding credit because duties are analogous to the duties of the first Unit Assist RO (third RO - who is re quired by Technical Specifications).
Page 6 of 11
Cue: Comments   SAT   UNSAT   Comment Number Page 7 of 11 JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)  
 
*2) Candidate determines they need total of twenty more hours of watch standing in order to maintain their license active. Any one of the following combinations is acceptable. - two twelve hours shifts  
JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)
- one twelve hour and one eight hour  
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
- three eight hour shifts Standard:
PERFORMANCE STEPS
The hours that are less than 8 hours do not count and the candidate determines that they need a minimum of two shifts before the quarter expires to keep the license active. Cue: Comments   SAT   UNSAT   Comment Number Page 8 of 11 JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)
            *1)   Candidate determines the minimum hours of watch standing for credit for proficiency has NOT been met.
Standard:           Shift: as defined for maintaining an active license must be a minimum of 8 hours in duration.
MAINTAIN an active license by actively performing the functions of RO, SRO, or SROL.
RO licenses by performing the duties of the Unit RO and/or Unit Assist RO for a minimum of seven 8-hour or five 12-hour shifts per calendar quarter, including turnover to the next shift. The second Unit Assist RO (fourth RO) can receive watchstanding credit because duties are analogous to the duties of the first Unit Assist RO (third RO - who is required by Technical Specifications).
Cue:
Comments SAT               UNSAT                   Comment Number Page 7 of 11
 
JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)
          *2) Candidate determines they need total of twenty more hours of watch standing in order to maintain their license active. Any one of the following combinations is acceptable.
              - two twelve hours shifts
              - one twelve hour and one eight hour
              - three eight hour shifts Standard:     The hours that are less than 8 hours do not count and the candidate determines that they need a minimum of two shifts before the quarter expires to keep the license active.
Cue:
Comments SAT                 UNSAT                 Comment Number Page 8 of 11
 
JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)
: 3)  Candidate determines their license will be active until 31 March 2011.
Standard:        If the candidates determines all hours count they would conclude that their license would be active until Q-2 June 30th 2011.
Cue:
Comments SAT                UNSAT                    Comment Number TERMINATING CUES:
Candidate has determined based on the log report from ESOMS that they need two more shifts.
STOP TIME:
Page 9 of 11
Page 9 of 11
: 3) Candidate determines their license will be active until 31 March 2011.
Standard: If the candidates determines all hours count they would conclude that their license would be active until Q-2 June 30th 2011.
Cue:  Comments  SAT  UNSAT    Comment Number TERMINATING CUES: Candidate has determined based on the log report from ESOMS that they need two more shifts.
STOP TIME: 


JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)
JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)
Operator's Name:
Operators Name:
Job Title:   NLO   RO   SRO   STA   SRO Cert JPM Title: License Maintenance Check JPM Number: 409 Admin B Revision Number: 00 Task Number and Title:LP85801.2.1.4 Knowledge of individual licensed opera tor responsibilities related to shift staffing, such as medical requirements, "no solo" operation, maintenance of active license status, 10CFR55, etc. K/A System K/A Number Importance (RO/SRO)
Job Title:           NLO           RO             SRO           STA             SRO Cert JPM Title:       License Maintenance Check JPM Number:       409 Admin B                                       Revision Number: 00 Task Number and Title:LP85801.2.1.4 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no solo operation, maintenance of active license status, 10CFR55, etc.
Generic 2.1.4 3.3       Suggested Testing Environment: Class Room Actual Testing Environment:
K/A System           K/A Number             Importance (RO/SRO)
Simulator   Plant   Control Room  
Generic               2.1.4             3.3 Suggested Testing Environment:         Class Room Actual Testing Environment:             Simulator           Plant           Control Room Testing Method:           Simulate                   Faulted:       Yes         No Perform             Alternate Path:       Yes         No Time Critical:           Yes         No Estimated Time to Complete:         14   minutes         Actual Time Used:               minutes
 
Testing Method:
Simulate Faulted:   Yes   No     Perform Alternate Path:
Yes   No Time Critical:
Yes   No Estimated Time to Complete:   14   minutes Actual Time Used:   minutes  


==References:==
==References:==
Line 201: Line 214:


==SUMMARY==
==SUMMARY==
: Were all the Critical Elements performed satisfactorily?   Yes   No The operator's performance was eval uated against the standards contai ned in this JPM, and has been determined to be:   Satisfactory   Unsatisfactory Comments:
:
Evaluator's Name:
Were all the Critical Elements performed satisfactorily?           Yes           No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                           Satisfactory         Unsatisfactory Comments:
(Print)  
Evaluators Name:                                                     (Print)
Evaluators Signature:                                                    Date:
Page 10 of 11


Evaluator's Signature:  Date:  Page 10 of 11 Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Initial Conditions The plant is opera ting at 98% power.
Initial Conditions The plant is operating at 98% power.
Today is 1/31/2011.
Today is 1/31/2011.
Initiating Cue You have been asked to complete a license maintenance check on yourself prior to going home on your relief week IAW OP-AA-105-102 and the ESOMS log attachment. Determine if you will be proficient for the next quarter. If not, determine the number of watches required to maintain proficiency. Based on the current report, on what day will your license be active until.
Initiating Cue You have been asked to complete a license maintenance check on yourself prior to going home on your relief week IAW OP-AA-105-102 and the ESOMS log attachment.
Page 11 of 11 CLINTON POWER STATION Job Performance Measure Admin C Print Reading/Tag out verification JPM Number:  JPM411 Revision Number: 00 Date:  08/31/2010 Developed By: Tallion French 08/31/10  Instructor Date  Validated By:
Determine if you will be proficient for the next quarter. If not, determine the number of watches required to maintain proficiency. Based on the current report, on what day will your license be active until.
SME or Instructor Date  Reviewed By:
Page 11 of 11
Operations Representative Date  Approved By:
Training Department                                        Date


JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
CLINTON POWER STATION Job Performance Measure Admin C Print Reading/Tag out verification JPM Number: JPM411 Revision Number: 00 Date: 08/31/2010 Developed By: Tallion French                        08/31/10 Instructor                            Date Validated By:
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validat ion. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.
SME or Instructor                    Date Reviewed By:
________ 1. Task description an d number, JPM description and number are identified.
Operations Representative            Date Approved By:
 
Training Department                  Date
________ 2. Knowledge and Abilities (K
/A) references are included.
 
________ 3. Performance location specified. (in-plant, control room, or simulator)
 
________ 4. Initial setup c onditions are identified.
 
________ 5. Initiating and terminating cues are properly identified.
 
________ 6. Task standards identifi ed and verified by SME review.
 
________ 7. Critical steps m eet the criteria for critical steps and are identified with an asterisk (*).


JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, or simulator)
________ 4. Initial setup conditions are identified.
________ 5. Initiating and terminating cues are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________  
Procedure Rev. _____ Date _____________
 
________ 9. Pilot test the JPM:
________ 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.  
: b. ensure performance time is accurate.
 
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.  
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                          Date SME/Instructor                          Date SME/Instructor                          Date Page 2 of 10


SME/Instructor    Date SME/Instructor    Date 
JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision  Date                          Description 00    8/31/10 New JPM Page 3 of 10


SME/Instructor    Date Page 2 of 10 JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 10 Revision Record (Summary) Revision Date Description 00 8/31/10 New JPM JPM Number:  JPM411 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. TASK STANDARDS
TASK STANDARDS:
Applicant determines that two tags are incorrect and makes correc tions to OP-AA-109-101.
* Applicant determines that two tags are incorrect and makes corrections to OP-AA-109-101.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: OP-AA-109-101 Attachment 14 Part 1 and 2. PROCEDURAL/
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* OP-AA-109-101 Attachment 14 Part 1 and 2.
PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
The evolution completed IAW with OP-AA-109-101 R3. EVALUATOR INSTRUCTIONS: Passport and EDMS are down. Page 4 of 10 JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
* The evolution completed IAW with OP-AA-109-101 R3.
INITIAL CONDITIONS: The plant is at rated conditions and CCW pump B needs to be tagge d out for oil change. Passport and EDMS are down.
EVALUATOR INSTRUCTIONS:
* Passport and EDMS are down.
Page 4 of 10
 
JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
The plant is at rated conditions and CCW pump B needs to be tagged out for oil change. Passport and EDMS are down.
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed. Do NOT shine any type light into a panel. Determine if the provided cleara nce order has adequate boundaries. Perform independent technical review of the worker tag out.
CAUTION All pre-job briefings are completed.
Do NOT shine any type light into a panel.
Determine if the provided clearance order has adequate boundaries. Perform independent technical review of the worker tag out.
START TIME:
START TIME:
Page 5 of 10 JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 10
 
JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS
PERFORMANCE STEPS
: 1) Verifies 1HSCC005 in correct position Standard: Determines that 1HSC005 is in the correct position Pull to Lock (PTL)
: 1)       Verifies 1HSCC005 in correct position Standard:       Determines that 1HSC005 is in the correct position Pull to Lock (PTL)
Cue: Comments   SAT   UNSAT   Comment Number Page 6 of 10 JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
Cue:
Page 7 of 10
Comments SAT                 UNSAT                   Comment Number Page 6 of 10
*2) Verifies 1CC002A is th e incorrect component.
 
Standard: Determines that 1CC002A is incorrect and should be 1CC002B Cue: Examinee may need to be told to comp lete the independent technical review. Comments   SAT   UNSAT   Comment Number
JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
: 3) Verifies 1CC225B is the correct component.
    *2)       Verifies 1CC002A is the incorrect component.
Standard:
Standard:     Determines that 1CC002A is incorrect and should be 1CC002B Cue:         Examinee may need to be told to complete the independent technical review.
Verifies 1CC225B is the correct component.
Comments SAT               UNSAT                 Comment Number
Cue: Comments SAT   UNSAT   Comment Number  
: 3)       Verifies 1CC225B is the correct component.
*4) Verifies 1AP08EN is NOT correct position.
Standard:     Verifies 1CC225B is the correct component.
Standard: Determines that 1AP08EN is NOT in the correct position RACKED OUT.
Cue:
Comments SAT               UNSAT                 Comment Number
    *4)       Verifies 1AP08EN is NOT correct position.
Standard:     Determines that 1AP08EN is NOT in the correct position RACKED OUT.
L/O is locked open.
L/O is locked open.
Cue: Comments   SAT   UNSAT   Comment Number TERMINATING CUES: Applicant submits his attachment 14 parts one and two of OP-AA-109-101. Based on the wrong breaker position and wrong valve.
Cue:
STOP TIME:
Comments SAT               UNSAT                 Comment Number TERMINATING CUES:
Applicant submits his attachment 14 parts one and two of OP-AA-109-101. Based on the wrong breaker position and wrong valve.
STOP TIME:
Page 7 of 10


JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
Operator's Name:
Operators Name:
Job Title:   NLO RO   SRO   STA   SRO Cert JPM Title:
Job Title:         NLO         RO               SRO           STA           SRO Cert JPM Title:     Print Reading/Tag out verification JPM Number:   JPM411 Admin C                                     Revision Number: 00 Task Number and Title: LP85146.01.01 Given a situation requiring the use of the following documents be able to recognize when they are required to be referenced while operating the plant performing an out of service, or on an exam in accordance with the student text:
Print Reading/Tag out verification JPM Number: JPM411 Admin C Revision Number: 00 Task Number and Title: LP85146.01.01 Given a situation requiri ng the use of the following documents be able to recognize when th ey are required to be referenced while operating the plant performing an out of service, or on an exam in accordance with the student text:  
                        .1) Mechanical Drawings
.1) Mechanical Drawings  
                        .2) Electrical Drawings K/A         K/A Number             Importance (RO/SRO)
.2) Electrical Drawings K/A System K/A Number Importance (RO/SRO)
System Generic           2.2.13               4.1 Suggested Testing Environment:       Simulator Actual Testing Environment:           Simulator         Plant           Control Room
Generic 2.2.13 4.1   Suggested Testing Environment: Simulator Actual Testing Environment:
.
Simulator   Plant   Control Room . Testing Method:
Testing Method:       Simulate                     Faulted:       Yes           No Perform               Alternate Path:       Yes           No Time Critical:       Yes           No Estimated Time to Complete:15 minutes                 Actual Time Used:               minutes
Simulate Faulted: Yes   No     Perform Alternate Path:
Yes   No Time Critical:
Yes   No Estimated Time to Complete:15 minutes Actual Time Used:   minutes  


==References:==
==References:==
EO2-1CC99 sheet 2 MO5-1032 sheet 1  
EO2-1CC99 sheet 2 MO5-1032 sheet 1 Page 8 of 10


Page 8 of 10 JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)
Page 9 of 10 EVALUATION  
EVALUATION  


==SUMMARY==
==SUMMARY==
: Were all the Critical Elements performed satisfactorily?   Yes   No The operator's performance was eval uated against the standards contai ned in this JPM, and has been determined to be:   Satisfactory   Unsatisfactory Comments:
:
Evaluator's Name:
Were all the Critical Elements performed satisfactorily?       Yes         No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                         Satisfactory         Unsatisfactory Comments:
(Print)  
Evaluators Name:                                                 (Print)
Evaluators Signature:                                                Date:
Page 9 of 10


Evaluator's Signature:  Date:
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Initial Conditions The plant is at rated conditions and CCW pump B needs to be ta gged out for oil change. Passport and EDMS are down.
Initial Conditions The plant is at rated conditions and CCW pump B needs to be tagged out for oil change. Passport and EDMS are down.
CAUTION All pre-job briefings are completed. Do NOT shine any type light into a panel.
CAUTION All pre-job briefings are completed.
Initiating Cue Determine if the provided cleara nce order has adequate boundaries. Perform independent technical review of the worker tag out.
Do NOT shine any type light into a panel.
Page 10 of 10 CLINTON POWER STATION Job Performance Measure Admin D Read Survey Map JPM Number:  410 Revision Number: 00 Date:  08/31/2010 Developed By:
Initiating Cue Determine if the provided clearance order has adequate boundaries. Perform independent technical review of the worker tag out.
Tallion French 08/31/2010 Instructor Date  Validated By:
Page 10 of 10
SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date JPM Number:  410 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validat ion. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.
________ 1. Task description an d number, JPM description and number areidentified.


________ 2. Knowledge and Abilities (K
CLINTON POWER STATION Job Performance Measure Admin D Read Survey Map JPM Number: 410 Revision Number: 00 Date: 08/31/2010 Developed By: Tallion French                08/31/2010 Instructor                    Date Validated By:
/A) references are included.
SME or Instructor              Date Reviewed By:
 
Operations Representative      Date Approved By:
________ 3. Performance location specified. (in-plant, control room, or simulator)
Training Department            Date
 
________ 4. Initial setup c onditions are identified.
 
________ 5. Initiating and terminating cues are properly identified.
 
________ 6. Task standards identifi ed and verified by SME review.
 
________ 7. Critical steps m eet the criteria for critical steps and are identified with an asterisk (*).


JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.
________ 1. Task description and number, JPM description and number areidentified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, or simulator)
________ 4. Initial setup conditions are identified.
________ 5. Initiating and terminating cues are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________  
Procedure Rev. _____ Date _____________
 
________ 9. Pilot test the JPM:
________ 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.  
: b. ensure performance time is accurate.
 
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.  
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                          Date SME/Instructor                          Date SME/Instructor                          Date Revision Record (Summary)
Page 2 of 13


SME/Instructor    Date SME/Instructor    Date 
JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
Revision  Date                          Description 00    08/31/10 New JPM Page 3 of 13


SME/Instructor    Date  Revision Record (Summary) Page 2 of 13 JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 13 Revision Date Description 00 08/31/10 New JPM JPM Number:  410 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions (This page is applicable only to JPMs performed in the Simulator.)
Simulator Setup Instructions (This page is applicable only to JPMs performed in the Simulator.)
: 1. Administrative NOTE: It is permissible to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with th is and other JPMs that are scheduled to be run concurrently.
: 1. Administrative NOTE:     It is permissible to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Attachment 1 is the survey map.
: 2. Attachment 1 is the survey map.
: 3. Attachment 2 is the Question sheet.
: 3. Attachment 2 is the Question sheet.
: 4. When the above steps are completed for this and other JPMs to be run conc urrently, then validate the concurrently run JPMs if applicable.
: 4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
: 5. This completes the setup for this JPM.
: 5. This completes the setup for this JPM.
Page 4 of 13 JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 13
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur. TASK STANDARDS
 
The evolution completed IAW RP-AA-203 EX POSURE CONTROLS AND LIMITS Rev. 03.
JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: Calculator PROCEDURAL/
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
TASK STANDARDS:
* The evolution completed IAW RP-AA-203 EXPOSURE CONTROLS AND LIMITS Rev. 03.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* Calculator PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
RP-AA-203 EXPOSURE CONTRO LS AND LIMITS Rev. 03. EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps.
* RP-AA-203 EXPOSURE CONTROLS AND LIMITS Rev. 03.
EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The plant is operating at 97%.
The plant is operating at 97%.
Page 5 of 13 JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 13
 
JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
INITIATING CUE:
INITIATING CUE:
Your preparing to enter the RT 'B' Pump room to vent RT Pump per 3303.01 section 8.1.4.3.
Your preparing to enter the RT B Pump room to vent RT Pump per 3303.01 section 8.1.4.3.
You have been tasked with reviewing the survey map and identifying the items listed on Enclosure 2 and determining your dose if you stay by RT pump 'B' valve 1G33F010B for 4 minutes.
You have been tasked with reviewing the survey map and identifying the items listed on Enclosure 2 and determining your dose if you stay by RT pump B valve 1G33F010B for 4 minutes.
START TIME:
START TIME:
Page 6 of 13 JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 13
 
JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS  
PERFORMANCE STEPS
  *1) What is the highest contamination level?
            *1)   What is the highest contamination level?
Standard:
Standard:
Cue: Comments   SAT   UNSAT   Comment Number Page 7 of 13 JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)  
Cue:
*2) What is the highest c ontact radiation level?
Comments SAT               UNSAT                     Comment Number Page 7 of 13
 
JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
          *2) What is the highest contact radiation level?
Standard:
Standard:
Cue: Comments   SAT   UNSAT   Comment Number  
Cue:
*3) What is the highest dose rate level?
Comments SAT               UNSAT                   Comment Number
          *3) What is the highest dose rate level?
Standard:
Standard:
Cue: Comments   SAT   UNSAT   Comment Number Page 8 of 13 JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)  
Cue:
*4) Where is the low dose waiting area after entering the HCA?
Comments SAT               UNSAT                   Comment Number Page 8 of 13
 
JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
            *4)   Where is the low dose waiting area after entering the HCA?
Standard:
Standard:
Cue: Comments   SAT   UNSAT   Comment Number
Cue:
: 5) What is the dose for venting RT pump 'B'?
Comments SAT               UNSAT                 Comment Number
: 5)   What is the dose for venting RT pump B?
Standard:
Standard:
Cue: Comments   SAT   UNSAT   Comment Number TERMINATING CUES: The candidate turns in the answer sheet.
Cue:
Comments SAT               UNSAT                 Comment Number TERMINATING CUES:
The candidate turns in the answer sheet.
STOP TIME:
STOP TIME:
Page 9 of 13 JPM Number:  410 Clinton Power Station Job Performance Measure (JPM)
Page 9 of 13
Page 10 of 13 What is the highest contamination level?
15K What is the highest c ontact radiation level ?
700 mr on the 1G33F005B What is the highest general area dose rate level?
60 mr Where is the low dose waiting area after entering the HCA? Z-120 at 8 mr What is the estimated dose for venting RT pump


'B' ?  4min/60minX60mr/hr=4mr JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
Operator's Name:
What is the highest contamination level?          15K What is the highest contact radiation level ?    700 mr on the 1G33F005B What is the highest general area dose rate level? 60 mr Where is the low dose waiting area after entering Z120 at 8 mr the HCA?
Job Title:  NLO  RO  SRO  STA  SRO Cert JPM Title: Read Survey Map  Admin D JPM Number: 410 Revision Number: 00 Task Number and Title: 102405.01 Apply the administrative requirements of the ALARA program K/A System K/A Number Importance (RO/SRO)
What is the estimated dose for venting RT pump    4min/60minX60mr/hr=4mr B ?
Generic 2.3.7 3.5      Suggested Testing Environment: Simulator Actual Testing Environment:
Page 10 of 13
Simulator  Plant  Control Room


Testing Method:
JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)
Simulate Faulted:   Yes No     Perform Alternate Path:
Operators Name:
Yes   No Time Critical:
Job Title:          NLO          RO            SRO            STA            SRO Cert JPM Title:      Read Survey Map Admin D JPM Number:      410                                                Revision Number: 00 Task Number and Title: 102405.01 Apply the administrative requirements of the ALARA program K/A System          K/A Number            Importance (RO/SRO)
Yes   No Estimated Time to Complete:   20 minutes Actual Time Used:   minutes  
Generic              2.3.7              3.5 Suggested Testing Environment:        Simulator Actual Testing Environment:          Simulator            Plant          Control Room Testing Method:         Simulate                     Faulted:       Yes       No Perform             Alternate Path:         Yes         No Time Critical:         Yes         No Estimated Time to Complete:       20 minutes           Actual Time Used:             minutes


==References:==
==References:==
Line 396: Line 435:


==SUMMARY==
==SUMMARY==
: Were all the Critical Elements performed satisfactorily?   Yes   No The operator's performance was eval uated against the standards contai ned in this JPM, and has been determined to be:   Satisfactory   Unsatisfactory Comments:
:
Evaluator's Name:
Were all the Critical Elements performed satisfactorily?         Yes         No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                         Satisfactory           Unsatisfactory Comments:
(Print)  
Evaluators Name:                                                   (Print)
Evaluators Signature:                                                  Date:
Page 11 of 13


Evaluator's Signature:  Date:  Page 11 of 13 Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Initial Conditions The plant is operating at 97%.
Initial Conditions The plant is operating at 97%.
Initiating Cue Your preparing to enter the RT 'B' Pump room to vent RT Pump per 3303.01 section 8.1.4.3.
Initiating Cue Your preparing to enter the RT B Pump room to vent RT Pump per 3303.01 section 8.1.4.3.
You have been tasked with reviewing the survey map and identifying the items listed on Enclosure 2 and determining your dose if you stay by RT pump 'B' valve 1G33F010B for 4 minutes.
You have been tasked with reviewing the survey map and identifying the items listed on Enclosure 2 and determining your dose if you stay by RT pump B valve 1G33F010B for 4 minutes.
Page 12 of 13 Clinton Power Station Job Performance Measure (JPM)
Page 12 of 13
Page 13 of 13  What is the highest contamination level?
 
Clinton Power Station Job Performance Measure (JPM)
Enclosure 2 What is the highest contamination level?
What is the highest contact radiation level level?
What is the highest contact radiation level level?
What is the highest general area dose rate level?
What is the highest general area dose rate level?
Where is the low dose waiting area after entering  
Where is the low dose waiting area after entering the HCA?
 
Determine your dose if you stay by RT pump B valve 1G33F010B for 4 minutes?
the HCA? Determine your dose if you stay by RT pump  
Page 13 of 13}}
'B' valve 1G33F010B for 4 minutes?}}

Revision as of 05:40, 13 November 2019

2010 Clinton Power Station Initial License Examination As-Administered Admin JPMs
ML103360141
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/03/2010
From: French T
Exelon Nuclear
To:
NRC/RGN-III
References
JPM412
Download: ML103360141 (44)


Text

CLINTON POWER STATION Job Performance Measure Admin A MCR B RO panel walk downs JPM Number: 412 Revision Number: 00 Date: 08/31/2010 Developed By: Tallion French 08/31/2010 Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

________ 1. Task description and number, JPM description and number areidentified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, or simulator)

________ 4. Initial setup conditions are identified.

________ 5. Initiating and terminating cues are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 08/31/10 New JPM Page 3 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions (This page is applicable only to JPMs performed in the Simulator.)

1. Reset the simulator to IC-01.

NOTE: It is permissible to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Load the log taking JPM 412 lesson on the simulator.
3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
4. This completes the setup for this JPM.

Page 4 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS:

  • The evolution completed IAW OP-AA-101-111 Roles and Responsibilities of On-shift Personnel.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Log sheet for panel walk down.
  • Red pen available PROCEDURAL/

REFERENCES:

  • Log sheet EVALUATOR INSTRUCTIONS:

Instructions for evaluator, they should know/understand during JPM. The following are examples:

  • Amplifying cues are provided within the JPM steps.

INITIAL CONDITIONS:

The plant is operating at 97% power.

Page 5 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Do NOT shine any type light into a panel.

You are the B RO complete hourly panel walk down.

Inform the CRS when you have completed the panel walk down and give the CRS the log sheet for review.

START TIME:

Page 6 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS

  • 1) Identifies the MC and CY tank capacities are less than 66% combined Standard: Logs are circled in red or CRS informed Cue: 1. None Comments SAT UNSAT Comment Number Page 7 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

2) Identifies the turbine generator gas pressure is less than 75 psig Standard: Notifies CRS need to add hydrogen to main generator Cue: IF asked: Another RO will dispatch area operator to add H2 to the generator.

Comments SAT UNSAT Comment Number

  • 3) Identifies the FC pump amps are in the red zone of the meter Standard: Logs are circled in red or CRS informed Cue: None Comments SAT UNSAT Comment Number
  • 4) ADS air pressures are out of band low Standard: Logs are circled in red or CRS informed Cue: None Comments SAT UNSAT Comment Number TERMINATING CUES:

Logs are completed and deficiencies identified.

STOP TIME:

Page 8 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job Title: NLO RO SRO STA SRO Cert JPM Title: MCR B RO panel walk downs JPM Number: JPM 412 Admin A Revision Number: 00 Task Number and Title: OP-AA-101-111 Roles and Responsibilities of On-shift Personnel K/A System K/A Number Importance (RO/SRO)

Generic 2.1.18 3.6 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted: Yes No Perform Alternate Path: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

OP-AA-101-111 Roles and Responsibilities of On-shift Personnel.

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 9 of 10

Clinton Power Station Job Performance Measure (JPM)

Initial Conditions The plant is operating at 97% power.

Initiating Cue CAUTION All pre-job briefings are completed.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur. (This statement should be removed if this is a Simulator JPM)

Do NOT shine any type light into a panel.

You are the B RO complete hourly panel walk down.

Inform the CRS when you have completed the panel walk down and give the CRS the log sheet for review.

Page 10 of 10

CLINTON POWER STATION Job Performance Measure Admin B.

License Maintenance Check JPM Number: 409 Revision Number: 00 Date: 08/31/2010 Developed By: Tallion French 08/31/2010 Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

________ 1. Task description and number, JPM description and number areidentified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, or simulator)

________ 4. Initial setup conditions are identified.

________ 5. Initiating and terminating cues are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description Rev # 00 8/31/2010 New JPM Page 3 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions (This page is applicable only to JPMs performed in the Simulator.)

1. Admin JPM.

NOTE: It is permissible to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
3. This completes the setup for this JPM.

Page 4 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS:

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Attachment 1 PROCEDURAL/

REFERENCES:

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

INITIAL CONDITIONS:

The plant is operating at 98% power.

Today is 1/31/2011.

Page 5 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

You have been asked to complete a license maintenance check on yourself prior to going home on your relief week IAW OP-AA-105-102 and the ESOMS log attachment.

Determine if you will be proficient for the next quarter. If not, determine the number of watches required to maintain proficiency. Based on the current report, on what day will your license be active until.

START TIME:

Page 6 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS

  • 1) Candidate determines the minimum hours of watch standing for credit for proficiency has NOT been met.

Standard: Shift: as defined for maintaining an active license must be a minimum of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> in duration.

MAINTAIN an active license by actively performing the functions of RO, SRO, or SROL.

RO licenses by performing the duties of the Unit RO and/or Unit Assist RO for a minimum of seven 8-hour or five 12-hour shifts per calendar quarter, including turnover to the next shift. The second Unit Assist RO (fourth RO) can receive watchstanding credit because duties are analogous to the duties of the first Unit Assist RO (third RO - who is required by Technical Specifications).

Cue:

Comments SAT UNSAT Comment Number Page 7 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

  • 2) Candidate determines they need total of twenty more hours of watch standing in order to maintain their license active. Any one of the following combinations is acceptable.

- two twelve hours shifts

- one twelve hour and one eight hour

- three eight hour shifts Standard: The hours that are less than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> do not count and the candidate determines that they need a minimum of two shifts before the quarter expires to keep the license active.

Cue:

Comments SAT UNSAT Comment Number Page 8 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

3) Candidate determines their license will be active until 31 March 2011.

Standard: If the candidates determines all hours count they would conclude that their license would be active until Q-2 June 30th 2011.

Cue:

Comments SAT UNSAT Comment Number TERMINATING CUES:

Candidate has determined based on the log report from ESOMS that they need two more shifts.

STOP TIME:

Page 9 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job Title: NLO RO SRO STA SRO Cert JPM Title: License Maintenance Check JPM Number: 409 Admin B Revision Number: 00 Task Number and Title:LP85801.2.1.4 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no solo operation, maintenance of active license status, 10CFR55, etc.

K/A System K/A Number Importance (RO/SRO)

Generic 2.1.4 3.3 Suggested Testing Environment: Class Room Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted: Yes No Perform Alternate Path: Yes No Time Critical: Yes No Estimated Time to Complete: 14 minutes Actual Time Used: minutes

References:

OP-AA-105-102 Rev.9 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 10 of 11

Clinton Power Station Job Performance Measure (JPM)

Initial Conditions The plant is operating at 98% power.

Today is 1/31/2011.

Initiating Cue You have been asked to complete a license maintenance check on yourself prior to going home on your relief week IAW OP-AA-105-102 and the ESOMS log attachment.

Determine if you will be proficient for the next quarter. If not, determine the number of watches required to maintain proficiency. Based on the current report, on what day will your license be active until.

Page 11 of 11

CLINTON POWER STATION Job Performance Measure Admin C Print Reading/Tag out verification JPM Number: JPM411 Revision Number: 00 Date: 08/31/2010 Developed By: Tallion French 08/31/10 Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, or simulator)

________ 4. Initial setup conditions are identified.

________ 5. Initiating and terminating cues are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 8/31/10 New JPM Page 3 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Applicant determines that two tags are incorrect and makes corrections to OP-AA-109-101.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

PROCEDURAL/

REFERENCES:

EVALUATOR INSTRUCTIONS:

  • Passport and EDMS are down.

Page 4 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is at rated conditions and CCW pump B needs to be tagged out for oil change. Passport and EDMS are down.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Do NOT shine any type light into a panel.

Determine if the provided clearance order has adequate boundaries. Perform independent technical review of the worker tag out.

START TIME:

Page 5 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS

1) Verifies 1HSCC005 in correct position Standard: Determines that 1HSC005 is in the correct position Pull to Lock (PTL)

Cue:

Comments SAT UNSAT Comment Number Page 6 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

  • 2) Verifies 1CC002A is the incorrect component.

Standard: Determines that 1CC002A is incorrect and should be 1CC002B Cue: Examinee may need to be told to complete the independent technical review.

Comments SAT UNSAT Comment Number

3) Verifies 1CC225B is the correct component.

Standard: Verifies 1CC225B is the correct component.

Cue:

Comments SAT UNSAT Comment Number

  • 4) Verifies 1AP08EN is NOT correct position.

Standard: Determines that 1AP08EN is NOT in the correct position RACKED OUT.

L/O is locked open.

Cue:

Comments SAT UNSAT Comment Number TERMINATING CUES:

Applicant submits his attachment 14 parts one and two of OP-AA-109-101. Based on the wrong breaker position and wrong valve.

STOP TIME:

Page 7 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job Title: NLO RO SRO STA SRO Cert JPM Title: Print Reading/Tag out verification JPM Number: JPM411 Admin C Revision Number: 00 Task Number and Title: LP85146.01.01 Given a situation requiring the use of the following documents be able to recognize when they are required to be referenced while operating the plant performing an out of service, or on an exam in accordance with the student text:

.1) Mechanical Drawings

.2) Electrical Drawings K/A K/A Number Importance (RO/SRO)

System Generic 2.2.13 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room

.

Testing Method: Simulate Faulted: Yes No Perform Alternate Path: Yes No Time Critical: Yes No Estimated Time to Complete:15 minutes Actual Time Used: minutes

References:

EO2-1CC99 sheet 2 MO5-1032 sheet 1 Page 8 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 9 of 10

Clinton Power Station Job Performance Measure (JPM)

Initial Conditions The plant is at rated conditions and CCW pump B needs to be tagged out for oil change. Passport and EDMS are down.

CAUTION All pre-job briefings are completed.

Do NOT shine any type light into a panel.

Initiating Cue Determine if the provided clearance order has adequate boundaries. Perform independent technical review of the worker tag out.

Page 10 of 10

CLINTON POWER STATION Job Performance Measure Admin D Read Survey Map JPM Number: 410 Revision Number: 00 Date: 08/31/2010 Developed By: Tallion French 08/31/2010 Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

________ 1. Task description and number, JPM description and number areidentified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, or simulator)

________ 4. Initial setup conditions are identified.

________ 5. Initiating and terminating cues are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Revision Record (Summary)

Page 2 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

Revision Date Description 00 08/31/10 New JPM Page 3 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions (This page is applicable only to JPMs performed in the Simulator.)

1. Administrative NOTE: It is permissible to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Attachment 1 is the survey map.
3. Attachment 2 is the Question sheet.
4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
5. This completes the setup for this JPM.

Page 4 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS:

  • The evolution completed IAW RP-AA-203 EXPOSURE CONTROLS AND LIMITS Rev. 03.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Calculator PROCEDURAL/

REFERENCES:

  • RP-AA-203 EXPOSURE CONTROLS AND LIMITS Rev. 03.

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.

INITIAL CONDITIONS:

The plant is operating at 97%.

Page 5 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

INITIATING CUE:

Your preparing to enter the RT B Pump room to vent RT Pump per 3303.01 section 8.1.4.3.

You have been tasked with reviewing the survey map and identifying the items listed on Enclosure 2 and determining your dose if you stay by RT pump B valve 1G33F010B for 4 minutes.

START TIME:

Page 6 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS

  • 1) What is the highest contamination level?

Standard:

Cue:

Comments SAT UNSAT Comment Number Page 7 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

  • 2) What is the highest contact radiation level?

Standard:

Cue:

Comments SAT UNSAT Comment Number

  • 3) What is the highest dose rate level?

Standard:

Cue:

Comments SAT UNSAT Comment Number Page 8 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

  • 4) Where is the low dose waiting area after entering the HCA?

Standard:

Cue:

Comments SAT UNSAT Comment Number

5) What is the dose for venting RT pump B?

Standard:

Cue:

Comments SAT UNSAT Comment Number TERMINATING CUES:

The candidate turns in the answer sheet.

STOP TIME:

Page 9 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

What is the highest contamination level? 15K What is the highest contact radiation level ? 700 mr on the 1G33F005B What is the highest general area dose rate level? 60 mr Where is the low dose waiting area after entering Z120 at 8 mr the HCA?

What is the estimated dose for venting RT pump 4min/60minX60mr/hr=4mr B ?

Page 10 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job Title: NLO RO SRO STA SRO Cert JPM Title: Read Survey Map Admin D JPM Number: 410 Revision Number: 00 Task Number and Title: 102405.01 Apply the administrative requirements of the ALARA program K/A System K/A Number Importance (RO/SRO)

Generic 2.3.7 3.5 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted: Yes No Perform Alternate Path: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

RP-AA-203 EXPOSURE CONTROLS AND LIMITS Rev. 03 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 11 of 13

Clinton Power Station Job Performance Measure (JPM)

Initial Conditions The plant is operating at 97%.

Initiating Cue Your preparing to enter the RT B Pump room to vent RT Pump per 3303.01 section 8.1.4.3.

You have been tasked with reviewing the survey map and identifying the items listed on Enclosure 2 and determining your dose if you stay by RT pump B valve 1G33F010B for 4 minutes.

Page 12 of 13

Clinton Power Station Job Performance Measure (JPM)

Enclosure 2 What is the highest contamination level?

What is the highest contact radiation level level?

What is the highest general area dose rate level?

Where is the low dose waiting area after entering the HCA?

Determine your dose if you stay by RT pump B valve 1G33F010B for 4 minutes?

Page 13 of 13