{{#Wiki_filter:~J~Ik., M.odify Plant Issue Page 1 of2 2 plant'=status daily enter daily plant statujs sal archives in Oconee Information for 09/10/2009 (Modify/Update)
{{#Wiki_filter:~J~Ik.
Outside of Scope Significant TS / Issues: 411-Exterior, Core Bore was completedyesterday and holes are plugged/caulked.
  ,M.odify Plant Issue                                                                                               Page 1 of22 plant'=status daily enter daily plant statujs   sal archives                                     in Oconee Information for 09/10/2009 (Modify/Update)
The attached photos show the three holes :through..the exterior wall of the, SSF after being sealed and the device'used to seal the holes once the core bores were completed.
Outside of Scope Significant TS / Issues:
The RI's looked at.-the sealing process to ensure the SSF was appropriately protected from external flooding once the wall was breached.
            -Exterior, Core Bore was completedyesterday and holes are plugged/caulked.
Excavation to uncover existing ASW.Piping will begin today in preparation for tie-in and is expected to take 3 days to complete.
The attached photos show the three holes :through..the exterior wall of the, SSF after being sealed and the device'used to seal the holes once the core bores were completed.           The RI's looked at.-the sealing process to ensure the SSF was appropriately protected from external flooding once the wall was breached.           Excavation to uncover existing ASW.Piping will begin today in
The licensee has established contingencies to quickly refill the hole to cover the ASW piping once less than 4.5' of soil covers the pipe in the event of a tornado through the use of prestaged trucks with sand and steel plates.The residents are following.
                                                                                                                            ,I preparation for tie-in         and is expected to take 3 days to complete.                 The 411 licensee has established contingencies to quickly refill                     the hole to cover the ASW piping once less than 4.5' of soil covers the pipe in the event of a tornado through the use of prestaged trucks with sand and steel plates.
.9:15 mtg. (F Yes C No [',I E Idelete Cors Drills 003,jpg delete Core Drills 001,jpg add attachment
The residents are following.
ý//1 htti://r2 .nrc.p-ov/webapps/pita/Modifylssue.cfm?iid=.14944&sname=Oconee 11/4/2010  
          .9:15 mtg. (F Yes C No           ['
, 1 odify Plant Issue Page 2 of 2 I*1 I O\As\e *0(htiin.//r?  
delete E   Idelete Cors Drills 003,jpg                             Core Drills 001,jpg add attachment htti://r2 .nrc.p-ov/webapps/pita/Modifylssue.cfm?iid=.14944&sname=Oconee                                             11/4/2010
*nrmr ov/webanns/nita/Modifvlssue.cfm?iid=14944&sname=Oconee 11/4/2010 Page 1 of 1 http://r2.nrc.gov/webapps/pita/Attachments/Plantlssue/09102009_08253 1_Core%20Drills...
                                                                                                                                    ý//1
11/8/2010 Page 1 of 1 http://r2.nrc.gov/webapps/pita/Attachments/Plantlssue/O9102009_082839_Core%20Drills...
 
11/8/2010}}
  ,1 odify Plant Issue                                                     Page 2 of 2 I
O\As\Že *0(
*1 I
htiin.//r? *nrmr ov/webanns/nita/Modifvlssue.cfm?iid=14944&sname=Oconee   11/4/2010
 
Page 1 of 1 http://r2.nrc.gov/webapps/pita/Attachments/Plantlssue/09102009_08253 1_Core%20Drills... 11/8/2010
 
Page 1 of 1 http://r2.nrc.gov/webapps/pita/Attachments/Plantlssue/O9102009_082839_Core%20Drills... 11/8/2010}}

Latest revision as of 05:52, 13 November 2019

Plant Issue Tracking Application; Plant Status Daily - Oconee Information for 09/10/2009
ML110040433
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/10/2009
From:
NRC/RGN-II
To:
References
FOIA/PA-2011-0021
Download: ML110040433 (4)


Text

~J~Ik.

,M.odify Plant Issue Page 1 of22 plant'=status daily enter daily plant statujs sal archives in Oconee Information for 09/10/2009 (Modify/Update)

Outside of Scope Significant TS / Issues:

-Exterior, Core Bore was completedyesterday and holes are plugged/caulked.

The attached photos show the three holes :through..the exterior wall of the, SSF after being sealed and the device'used to seal the holes once the core bores were completed. The RI's looked at.-the sealing process to ensure the SSF was appropriately protected from external flooding once the wall was breached. Excavation to uncover existing ASW.Piping will begin today in

,I preparation for tie-in and is expected to take 3 days to complete. The 411 licensee has established contingencies to quickly refill the hole to cover the ASW piping once less than 4.5' of soil covers the pipe in the event of a tornado through the use of prestaged trucks with sand and steel plates.

The residents are following.

.9:15 mtg. (F Yes C No ['

delete E Idelete Cors Drills 003,jpg Core Drills 001,jpg add attachment htti://r2 .nrc.p-ov/webapps/pita/Modifylssue.cfm?iid=.14944&sname=Oconee 11/4/2010

ý//1

,1 odify Plant Issue Page 2 of 2 I

O\As\Že *0(

  • 1 I

htiin.//r? *nrmr ov/webanns/nita/Modifvlssue.cfm?iid=14944&sname=Oconee 11/4/2010

Page 1 of 1 http://r2.nrc.gov/webapps/pita/Attachments/Plantlssue/09102009_08253 1_Core%20Drills... 11/8/2010

Page 1 of 1 http://r2.nrc.gov/webapps/pita/Attachments/Plantlssue/O9102009_082839_Core%20Drills... 11/8/2010