Modify Plant Issue Page I of 2 Oilc
- 1
.4 I
pla'nit status daily enter daily plant status saf archives in Oconee Information for 09130/2009 (Modify/Update)
I Outside of Scope 27 L
I Risk Significant I Emergent Activities:
11/4/2010 C
http://r2.nrc.gov/webapps/pita/Modifylssue.cfm~iid=1 5205&sname=Oconee
IA J'ý D
M dif Plant*
- "*HIL
- '; ***,l*!*
Issue Page 2J*J,,!
of 2
- +/-,*
Modify Plant Issue Page 2 of 2
'.1 The tie-in work for the SSF ASW systemnbegi over the weekend.
Unit 2 work is complete; i.e,,
the new piping is installed and pressure tested.
All three old sections of piping are capped-in'the outside hole.
Tie-in on all 3 ASW pipes outside the building is complete and preparations are underway to start coating. the pipes with the: coal tar protection.
Inside the SSF building, tie-in work is underway for, Unit 1 and 3.
There have been fit-up issues with the final connections on both units which may push completion for Unit 3 until Thursday morning.', Following the tie-in inside the building, the headers will have the vT-2 testing performed and the operability test performed.
The VT-2 for Unit 1 is currently scheduled for 1700 today; for Unit 3 0600 tomorrow.
Refill of the hole will commence once the testing is complete.
Currently, Unit 2 is available and Unit 1 &
3 are inoperable in terms of the SSF.