- -;,*odify Plant Issue P
plant status daily enter daily plant sta archives Oconee Information forlO101/2009 (Modify/Update)
Outside of Scope
.1
- 1I age I "f 2 atus saf in qil Risk Significant/ Emergent Activities:
C12 5222&§name==Oconee 1_.
_/,
0 11/4/2010
111"ý ANA"l-
"I iý1111r..'L'11111ýý __
FAMW_ -
azaýj
"-Modify Plant Issue Page 2 of 2 The tie-in work for the SSFPASW system has been" completed for all three units (both inside and outside the'SSF building).
The hydrostatic test of the new piping has been completedsuccessfully on. Unit 1 and 2 piping with Unit 3 piping being aligned for testing, this morning.
Once the test is complete and results deemed acceptablej; the asw functional test will commence.
Currently all three headers.are AVAILABLE and OPERABLILTY will be assessed when the functional test is performed.
The old piping has been j,
capped on both ends and will be left' in-place. R*ts have followed the repair / replacement work activities including:the execution of the critical activity plan, protection of otherýplant equipment as required, application of the external"coating on the buried sections of piping and testing of the system following repairs.
The',hotos show the as-left configuration of the ASW piping inside the building.(the new line and abandoned old line) as well as the piping that will be buried in its coated 9state,_-. (Y N
9:15 mtg. Ge: Yes C-No j delete Burled Piping - Coated.jpg 1I delete Inside tie-in.Jpg addlattachment Outside of Scope mkýt LZ.
httn-//r2.nrc. gov/webapis/iita/Modifylssue.cfm?iid= 15222&sname=Oconee 11/4/2010
Page 1 of I http://r2.nrc.gov/webapps/pita/Attachments/Plantlssue/10012009_072809_Buried%20Pipi...
11/8/2010
Page 1 of 1 http://r2.nrc.gov/webapps/pita/Attachments/Plantlssue/1 0012009_072809_Inside%20tie-in...
11/8/2010