.;k.. V M odify Plant Issue Page 1 of 2 plant status daily archives enter daily plant status sat in Oconee Information for 09/03/2009 (Modify/Update)
Outside of Scope SignificantTS I Issues:
"11 9
0Iju ASW PIPING LEAK: Work continues onthe excavation phase of the restoration of the ASW system to addresslthe OBDN condition.
Currently, approximately 4.5' of soil has been removed and support I-beams installed to allow shoring to be used in order to expose the old piping and the area where the new piping will come through the SSF building wall below-grade.
Fabrication of the replacement-piping is in progress.
The current schedule shows installation of the new piping anrd exiting the OBDU status on.or around 9/17/09.
9:15 mtg. C; Yes C No W
ý +/-j
.90 1 ýdelete Picture OO6.Jpg delete Picture 008.jpg I delete I-Beams jpq C-http://r2.nrc.gov/webapps/pita/Modifylssue.cfm?iid= 14866&sname=Oconee 11/4/2010
"Modify Plant Issue Page 2 of'2 Outside of Scope r,'J Aii.
?1
!.I httn://r2.nrc.zov/webatpps/pita/Modifylssue.cfm?iid= 14866&sname=Oconee 11/4/2010
Page 1 of 1 http://r2.nrc.gov/webapps/pita/Attachments/Plantlssue/09032009-07452 1-Picture%20006....
11/8/2010
Page 1 of 1 L
http://r2.nrc.gov/webapps/pita/Attachments/Plantlssue/09032009_07452 1_Picture%20008....
11/8/2010
Page 1 ofI http://r2.nrc.gov/webapps/pita/Attachments/Plantlssue/O9032009_081829_I-Beams.jpg 11/8/2010