{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 October29, 2010 10 CFR 55.5 Mr. Luis A. Reyes Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1 257 Attention:        Malcolm T. Widmann Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
 
==Reference:==
Letter from the Nuclear Regulatory Commission to the Tennessee Valley Authority dated August 17, 2010, Browns Ferry Nuclear Plant Notification
                                                                              -
of Licensed Operator Initial Examination
 
==Subject:==
Submittal of Initial Operator License Examination Outlines In accordance with the above referenced NRC letter dated August 17, 2010, the Tennessee Valley Authority is providing all appropriate Examination Standard forms and outlines in accordance with NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1, for the upcoming Browns Ferry Nuclear Plant Units 1, 2, and 3 Initial Operator License Examination.
Enclosed are the examination outlines, supporting the Initial License Operator Examination scheduled for the weeks of February 7 and 14, 2011.
In accordance with NUREG-1 021, Revision 9, Supplement 1, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these materials are withheld from public disclosure until after the examinations are administered.
 
Mr. Luis A. Reyes Page 2 October 29, 2010 Should you have any questions regarding this matter, please contact Mr. Daniel Zielinski, at (256) 729-2783.
Respectfully, K. J. Poison Vice President
 
==Enclosure:==
Examination Outlines Supporting the initial Operator License Examinations Scheduled for the Weeks of February 7 and 14, 2011
 
Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1,2, and 3 Examination Outlines Supporting the Initial Operator License Examinations Scheduled for the Weeks of February 7 and 14, 2011 (See Attached)
 
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 November 11,2010 10 CFR 55.5 10 CFR 55.40(b)(3)
Mr. Luis A. Reyes Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1 257 Attention:        Malcolm T. Widmann Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
 
==Subject:==
Submittal of Initial Operator Licensing Examinations
 
==Reference:==
Letter from the Nuclear Regulatory Commission to the Tennessee Valley Authority Browns Ferry Nuclear Plant Notification of Licensed
                                                                            -
Operator Initial Examination, dated August 17, 2010 In accordance with the referenced NRC letter dated August 17, 2010, the Tennessee Valley Authority is providing written examinations, operating tests, and supporting reference materials in accordance with NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1. The Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3 Initial Operator Licensing Examinations are scheduled for the weeks of February 7 and 14, 2011. In order to meet the examination schedule, BFN was requested by the NRC to furnish this material by November 16, 2010.
Enclosed are the written examinations, operating tests, and supporting reference materials for the Reactor Operators and Senior Reactor Operators examinations to be given the weeks of February 7 and 14, 2011. The enclosed materials have been approved for use by BEN in accordance with 10 CFR 55.40(b)(3).
NOV 152010
 
Mr. Luis A. Reyes Page2 November 11,2010 In accordance with NUREG-1021, Revision 9, Supplement 1, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these materials are withheld from public disclosure until after the examinations are administered.
Should you have any questions regarding this matter, please contact Mr. Daniel Zielinski, at (256) 729-2783.
Respectfully, K. J. Poison Vice President
 
==Enclosure:==
Written Examinations, Operating Tests, and Supporting Reference Materials Operator License Examinations Scheduled for the Weeks of
                          -
February 7 and 14, 2011
 
a -
Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1,2, and 3 Written Examinations, Operating Tests, and Supporting Reference Materials -
Operator Initial License Examinations Scheduled for the Weeks of February 7 and 14, 2011 This enclosure contains the following:
: 1. A notebook containing the following:
* ES-201-3, Examination Security Agreement
* ES-301-3, Operating Test Quality Checklist
* ES-301-4, Simulator Scenario Quality Checklist
* ES-401-6, Written Exam Quality Checklist
* Written Exam
* Operating Exam
: 2. Iron Key USB drive containing the examination and references
 
Personally Identifiable Information Withhold Under 10 CFR 2.390
                                                                  -
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 21, 2011 10 CFR 55.5 Mr. Victor M. McCree Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1 257 Attention:        Malcolm T. Widmann Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
 
==Subject:==
Final Senior Reactor Operator and Reactor Operator License Applications
 
==Reference:==
Letter from the Nuclear Regulatory Commission to the Tennessee Valley Authority, Browns Ferry Nuclear Plant Notification of Licensed Operator
                                                                      -
Initial Examination, dated August 17, 2010 In accordance with the referenced NRC letter dated August 17, 2010, the Tennessee Valley Authority (WA) is providing final license applications for Senior Reactor Operators (SROs) and Reactor Operators (ROs). The Browns Ferry Nuclear Plant, Units 1, 2, and 3 Initial Operator Licensing Examinations are scheduled for the weeks of February 7 and 14, 2011. In order to meet the examination schedule, WA was requested by the NRC to furnish final (signed) applications 14 days prior to the examination.
Enclosed are the signed applications and medical certifications for the SRO and RO examinations to be given during the weeks of February 7 and 14, 2011.
 
Mr. Victor M. McCree Page 2 January21, 2011 The enclosure to this letter is considered by WA to be of a personal nature and, as such, is to be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6).
Should you have any questions regarding this matter, please contact Mr. David A. Malinowski, at (256) 729-3439.
Respectfully, K. J. Fson Vice President
 
==Enclosure:==
Final Senior Reactor Operator and Reactor Operator Applications and Medical Cerfifications for the Operator License Examinations Scheduled for the Weeks of February 7 and 14, 2011
 
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 28, 2011 U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1 257 Attention:        Mr. Ronald Aiello Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
 
==Subject:==
Final Submittal Post NRC Exam Review Comments
 
==Reference:==
The Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3 Initial Operator Licensing Examinations scheduled for the weeks of February 7 and 14, 2011.
BFN was requested by the NRC to furnish the following revised exam materials/documentation with a transmittal and approval cover letter from the facility signed at the same authority level as the original exam submittal.
* Complete Copy of the Operating Exam (Scenarios and JPMs)
* 301-1 Administrative Topics Outline
* 301-2 Control Room/In-Plant Systems Outline
* 301-3 Operating Test Quality Checklist
* 301-4 Simulator Scenario Quality Checklist
* 301-5 Transient and Event Checklist
* 301-6 Competencies Checklist
* 401-4 Record of Rejected K/As
* 401-6 Written Examination Quality Checklist The enclosed materials have been assembled and are being provided to Mr. Aiello for use.
Approval by the Site Vice President will be provided via signed cover letter when available.
In accordance with NUREG-1021, Revision 9, Supplement 1, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these materials are withheld from public disclosure until after the examinations are administered.
Should you have any questions regarding this matter, please contact Mr. Daniel Zielinski, at (256) 729-2783.
Resi ns Training Manager
 
Personally Identifiable Information Withhold Under 10 CFR 2.390
                                                            -
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2 March 11,2011 10 CFR 55.5 Mr. Victor M. McCree Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1 257 Attention:        Malcolm T. Widmann Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
 
==Subject:==
Reactor Operator and Senior Reactor Operator Initial License Written Examinations Post Examination Response
                                                  -
The Tennessee Valley Authority (WA) administered the final NRC Written Examination for the Browns Ferry Nuclear Plant Reactor Operator and Senior Reactor Operator Initial License Training (ILT) Class 1102 on February 18, 2011. The supporting documentation specified by Section ES-501 of NUREG 1021, Revision 9, Supplement 1, Operator Licensing Examination Standards for Power Reactors, for Post Examination Activities is enclosed. The enclosures content listing is provided at the end of this letter.
 
Victor M. McCree Page 2 March 11,2011 Analysis of the preliminary facility graded examination results indicated five questions, numbers 12, 29, 37, 41, and 92, had a 50 percent or greater failure rate. The results of this analysis, where applicable, will be forwarded to the ILT Supervisor for potential inclusion in the appropriate training material.
The enclosures to this letter were provided directly to the NRC Chief Examiner. These enclosures are considered by TVA to be of a personal nature and, as such, are requested to be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6).
If you have any questions or comments, please telephone Mr. David A. Malinowski at (256) 729-3439.
Respecifully, K. J. lson Vice President
 
==Enclosures:==
 
Enclosure 1 -  Form ES-403-1, Written Examination Grading Quality Check Enclosure 2 Graded Written Examinations (Each Applicants Original
                          -
Answer and Examination Cover Sheets) and a Clean Copy of Each Applicants Answer Sheet Enclosure 3 Master Examination(s) Excerpt Annotated to Indicate Any
                          -
Changes Made While Administering the Examination One Change Was Made to Question 13 Enclosure 4 Questions Asked By and Answers Given to the Applicants
                          -
During the Written Examination Enclosure 5 -  Examination Seating Chart Enclosure 6  - Results of Written Examination Performance Analysis That Was Performed
 
Personally Identifiable Information Withhold Under 10 CFR 2.390
                                        -
Enclosure I Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response
                                    -
Form ES-403-1, Written Examination Grading Quality Check Material for this enclosure previously provided to NRC Chief Examiner.
 
Personally Identifiable Information Withhold Under 10 CFR 2.390
                                      -
Enclosure 2 Browns Ferry Nuclear Plant Units 1,2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response
                                    -
Graded Written Examinations (Each Applicants Original Answer and Examination Cover Sheets) and a Clean Copy of Each Applicants Answer Sheet Material for this enclosure previously provided to NRC Chief Examiner.
 
Personally Identifiable Information Withhold Under 10 CFR 2.390
                                              -
Enclosure 3 Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response
                                            -
Master Examination(s) Excerpt Annotated to Indicate Any Changes Made While Administering the Examination One Change Was Made to Question 13
                                      -
Material for this enclosure previously provided to NRC Chief Examiner.
 
Personally Identifiable Information Withhold Under 10 CFR 2.390
                                        -
Enclosure 4 Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response
                                    -
Questions Asked By and Answers Given to the Applicants During the Written Examination Material for this enclosure previously provided to NRC Chief Examiner.
 
Personally Identifiable Information Withhold Under 10 CFR 2.390
                                        -
Enclosure 5 Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response
                                    -
Examination Seating Chart Material for this enclosure previously provided to NRC Chief Examiner.
 
Personally Identifiable Information Withhold Under 10 CFR 2.390
                                              -
Enclosure 6 Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response
                                          -
Results of Any Written Examination Performance Analysis That Was Performed Material for this enclosure previously provided to NRC Chief Examiner.}}

Revision as of 02:03, 13 November 2019

Initial Exam 2011-301 General Correspondence
ML111020054
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/04/2011
From:
NRC/RGN-II/DRS/OLB
To:
Tennessee Valley Authority
References
50-259/11-301, 50-260/11-301, 50-296/11-301
Download: ML111020054 (17)


Text

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 October29, 2010 10 CFR 55.5 Mr. Luis A. Reyes Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1 257 Attention: Malcolm T. Widmann Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296

Reference:

Letter from the Nuclear Regulatory Commission to the Tennessee Valley Authority dated August 17, 2010, Browns Ferry Nuclear Plant Notification

-

of Licensed Operator Initial Examination

Subject:

Submittal of Initial Operator License Examination Outlines In accordance with the above referenced NRC letter dated August 17, 2010, the Tennessee Valley Authority is providing all appropriate Examination Standard forms and outlines in accordance with NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1, for the upcoming Browns Ferry Nuclear Plant Units 1, 2, and 3 Initial Operator License Examination.

Enclosed are the examination outlines, supporting the Initial License Operator Examination scheduled for the weeks of February 7 and 14, 2011.

In accordance with NUREG-1 021, Revision 9, Supplement 1, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these materials are withheld from public disclosure until after the examinations are administered.

Mr. Luis A. Reyes Page 2 October 29, 2010 Should you have any questions regarding this matter, please contact Mr. Daniel Zielinski, at (256) 729-2783.

Respectfully, K. J. Poison Vice President

Enclosure:

Examination Outlines Supporting the initial Operator License Examinations Scheduled for the Weeks of February 7 and 14, 2011

Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1,2, and 3 Examination Outlines Supporting the Initial Operator License Examinations Scheduled for the Weeks of February 7 and 14, 2011 (See Attached)

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 November 11,2010 10 CFR 55.5 10 CFR 55.40(b)(3)

Mr. Luis A. Reyes Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1 257 Attention: Malcolm T. Widmann Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296

Subject:

Submittal of Initial Operator Licensing Examinations

Reference:

Letter from the Nuclear Regulatory Commission to the Tennessee Valley Authority Browns Ferry Nuclear Plant Notification of Licensed

-

Operator Initial Examination, dated August 17, 2010 In accordance with the referenced NRC letter dated August 17, 2010, the Tennessee Valley Authority is providing written examinations, operating tests, and supporting reference materials in accordance with NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1. The Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3 Initial Operator Licensing Examinations are scheduled for the weeks of February 7 and 14, 2011. In order to meet the examination schedule, BFN was requested by the NRC to furnish this material by November 16, 2010.

Enclosed are the written examinations, operating tests, and supporting reference materials for the Reactor Operators and Senior Reactor Operators examinations to be given the weeks of February 7 and 14, 2011. The enclosed materials have been approved for use by BEN in accordance with 10 CFR 55.40(b)(3).

NOV 152010

Mr. Luis A. Reyes Page2 November 11,2010 In accordance with NUREG-1021, Revision 9, Supplement 1, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these materials are withheld from public disclosure until after the examinations are administered.

Should you have any questions regarding this matter, please contact Mr. Daniel Zielinski, at (256) 729-2783.

Respectfully, K. J. Poison Vice President

Enclosure:

Written Examinations, Operating Tests, and Supporting Reference Materials Operator License Examinations Scheduled for the Weeks of

-

February 7 and 14, 2011

a -

Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1,2, and 3 Written Examinations, Operating Tests, and Supporting Reference Materials -

Operator Initial License Examinations Scheduled for the Weeks of February 7 and 14, 2011 This enclosure contains the following:

1. A notebook containing the following:
  • ES-201-3, Examination Security Agreement
  • ES-301-3, Operating Test Quality Checklist
  • ES-301-4, Simulator Scenario Quality Checklist
  • ES-401-6, Written Exam Quality Checklist
  • Written Exam
  • Operating Exam
2. Iron Key USB drive containing the examination and references

Personally Identifiable Information Withhold Under 10 CFR 2.390

-

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 21, 2011 10 CFR 55.5 Mr. Victor M. McCree Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1 257 Attention: Malcolm T. Widmann Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296

Subject:

Final Senior Reactor Operator and Reactor Operator License Applications

Reference:

Letter from the Nuclear Regulatory Commission to the Tennessee Valley Authority, Browns Ferry Nuclear Plant Notification of Licensed Operator

-

Initial Examination, dated August 17, 2010 In accordance with the referenced NRC letter dated August 17, 2010, the Tennessee Valley Authority (WA) is providing final license applications for Senior Reactor Operators (SROs) and Reactor Operators (ROs). The Browns Ferry Nuclear Plant, Units 1, 2, and 3 Initial Operator Licensing Examinations are scheduled for the weeks of February 7 and 14, 2011. In order to meet the examination schedule, WA was requested by the NRC to furnish final (signed) applications 14 days prior to the examination.

Enclosed are the signed applications and medical certifications for the SRO and RO examinations to be given during the weeks of February 7 and 14, 2011.

Mr. Victor M. McCree Page 2 January21, 2011 The enclosure to this letter is considered by WA to be of a personal nature and, as such, is to be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6).

Should you have any questions regarding this matter, please contact Mr. David A. Malinowski, at (256) 729-3439.

Respectfully, K. J. Fson Vice President

Enclosure:

Final Senior Reactor Operator and Reactor Operator Applications and Medical Cerfifications for the Operator License Examinations Scheduled for the Weeks of February 7 and 14, 2011

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 28, 2011 U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1 257 Attention: Mr. Ronald Aiello Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296

Subject:

Final Submittal Post NRC Exam Review Comments

Reference:

The Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3 Initial Operator Licensing Examinations scheduled for the weeks of February 7 and 14, 2011.

BFN was requested by the NRC to furnish the following revised exam materials/documentation with a transmittal and approval cover letter from the facility signed at the same authority level as the original exam submittal.

  • Complete Copy of the Operating Exam (Scenarios and JPMs)
  • 301-1 Administrative Topics Outline
  • 301-2 Control Room/In-Plant Systems Outline
  • 301-3 Operating Test Quality Checklist
  • 301-4 Simulator Scenario Quality Checklist
  • 301-6 Competencies Checklist
  • 401-4 Record of Rejected K/As
  • 401-6 Written Examination Quality Checklist The enclosed materials have been assembled and are being provided to Mr. Aiello for use.

Approval by the Site Vice President will be provided via signed cover letter when available.

In accordance with NUREG-1021, Revision 9, Supplement 1, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these materials are withheld from public disclosure until after the examinations are administered.

Should you have any questions regarding this matter, please contact Mr. Daniel Zielinski, at (256) 729-2783.

Resi ns Training Manager

Personally Identifiable Information Withhold Under 10 CFR 2.390

-

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2 March 11,2011 10 CFR 55.5 Mr. Victor M. McCree Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1 257 Attention: Malcolm T. Widmann Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296

Subject:

Reactor Operator and Senior Reactor Operator Initial License Written Examinations Post Examination Response

-

The Tennessee Valley Authority (WA) administered the final NRC Written Examination for the Browns Ferry Nuclear Plant Reactor Operator and Senior Reactor Operator Initial License Training (ILT) Class 1102 on February 18, 2011. The supporting documentation specified by Section ES-501 of NUREG 1021, Revision 9, Supplement 1, Operator Licensing Examination Standards for Power Reactors, for Post Examination Activities is enclosed. The enclosures content listing is provided at the end of this letter.

Victor M. McCree Page 2 March 11,2011 Analysis of the preliminary facility graded examination results indicated five questions, numbers 12, 29, 37, 41, and 92, had a 50 percent or greater failure rate. The results of this analysis, where applicable, will be forwarded to the ILT Supervisor for potential inclusion in the appropriate training material.

The enclosures to this letter were provided directly to the NRC Chief Examiner. These enclosures are considered by TVA to be of a personal nature and, as such, are requested to be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6).

If you have any questions or comments, please telephone Mr. David A. Malinowski at (256) 729-3439.

Respecifully, K. J. lson Vice President

Enclosures:

Enclosure 1 - Form ES-403-1, Written Examination Grading Quality Check Enclosure 2 Graded Written Examinations (Each Applicants Original

-

Answer and Examination Cover Sheets) and a Clean Copy of Each Applicants Answer Sheet Enclosure 3 Master Examination(s) Excerpt Annotated to Indicate Any

-

Changes Made While Administering the Examination One Change Was Made to Question 13 Enclosure 4 Questions Asked By and Answers Given to the Applicants

-

During the Written Examination Enclosure 5 - Examination Seating Chart Enclosure 6 - Results of Written Examination Performance Analysis That Was Performed

Personally Identifiable Information Withhold Under 10 CFR 2.390

-

Enclosure I Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response

-

Form ES-403-1, Written Examination Grading Quality Check Material for this enclosure previously provided to NRC Chief Examiner.

Personally Identifiable Information Withhold Under 10 CFR 2.390

-

Enclosure 2 Browns Ferry Nuclear Plant Units 1,2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response

-

Graded Written Examinations (Each Applicants Original Answer and Examination Cover Sheets) and a Clean Copy of Each Applicants Answer Sheet Material for this enclosure previously provided to NRC Chief Examiner.

Personally Identifiable Information Withhold Under 10 CFR 2.390

-

Enclosure 3 Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response

-

Master Examination(s) Excerpt Annotated to Indicate Any Changes Made While Administering the Examination One Change Was Made to Question 13

-

Material for this enclosure previously provided to NRC Chief Examiner.

Personally Identifiable Information Withhold Under 10 CFR 2.390

-

Enclosure 4 Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response

-

Questions Asked By and Answers Given to the Applicants During the Written Examination Material for this enclosure previously provided to NRC Chief Examiner.

Personally Identifiable Information Withhold Under 10 CFR 2.390

-

Enclosure 5 Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response

-

Examination Seating Chart Material for this enclosure previously provided to NRC Chief Examiner.

Personally Identifiable Information Withhold Under 10 CFR 2.390

-

Enclosure 6 Browns Ferry Nuclear Plant Units 1, 2, and 3 Reactor Operator and Senior Reactor Operator Initial License Written Examination Post Examination Response

-

Results of Any Written Examination Performance Analysis That Was Performed Material for this enclosure previously provided to NRC Chief Examiner.