ML11111A097: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-301 Control Room/In
{{#Wiki_filter:ES-301                               Control Room/In-Plant Systems Outline                                     Form ES-301-2 Facility: Point Beach                                                           Date of Examination: 04/25-5/6/2011 Exam Level: RO                 SRO-I         SRO-U                             Operating Test No.: 2011301
-Plant Systems Outline Form ES-301-2   Facility: Point Beach Date of Examination: 04/25
                              @
-5/6/2011 Exam Level: RO SRO-I       SRO-U       Operating Test No.: 2011301 Control Room Systems
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
@ (8 for RO); (7 for SRO
System / JPM Title                                       Type Code*               Safety Function
-I); (2 or 3 for SRO
: a. CRD / Recovery of a Dropped Rod                                                             A/N/S                   1
-U, including 1 ESF)
: b. CVCS / Respond to Failure of Normal Boration Path                                             D/S                   2
System / JPM Title Type Code*
: c. SI / Restore 1A Accumulator Pressure                                                         D/S                   3
Safety Function a. CRD / Recovery of a Dropped Rod A/N/S 1 b. CVCS / Respond to Failure of Normal Boration Path D/S 2 c. SI / Restore 1A Accumulator Pressure D/S 3 d. TG / Synchronize Turbine Generator with Grid D/S 4S e. HVAC / Perform Accident Recirc Fan
: d. TG / Synchronize Turbine Generator with Grid                                                 D/S                   4S
-Cooler Surveillance D/L/S 5 f. RH R / Respond to a Shutdown LOCA D/L/S 4P g. CCW / Switch Operating CCW Pumps D/S 8 h. RPS / Monthly RPS Surveillance A/N/S 7 In-Plant Systems
: e. HVAC / Perform Accident Recirc Fan-Cooler Surveillance                                     D/L/S                   5
@ (3 for RO); (3 for SRO
: f. RHR / Respond to a Shutdown LOCA                                                           D/L/S                   4P
-I); (3 or 2 for SRO
: g. CCW / Switch Operating CCW Pumps                                                             D/S                   8
-U) i. EDG / Local Manual Start of an EDG A/N/P 6 j. RHR / Transfer to Containment Sump Recirculation D/P 4P k. AFW / Perform Designated AOP 10 A Steps D/P 4S @ All RO and SRO
: h. RPS / Monthly RPS Surveillance                                                             A/N/S                   7
-I control room (and in
                      @
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
-plant systems and functions may overlap those tested in the control room.
: i. EDG / Local Manual Start of an EDG                                                         A/N/P                   6
* Type Codes Criteria for RO / SRO
: j. RHR / Transfer to Containment Sump Recirculation                                             D/P                   4P
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
: k. AFW / Perform Designated AOP 10 A Steps                                                       D/P                   4S
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
@           All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3      -  /  -  /      selected)}}
* Type Codes                                         Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                       4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                     9/8/4 (E)mergency or abnormal in-plant                                                       1/1/1 (EN)gineered safety feature                                                             - / - / 1 (control room system)
(L)ow-Power / Shutdown                                                                 1/1/1 (N)ew or (M)odified from bank including 1(A)                                           2/2/1 (P)revious 2 exams                                                                       3 /  3 /  2 (randomly selected)
(R)CA                                                                                   1/1/1 (S)imulator}}

Revision as of 00:40, 13 November 2019

2011 Point Beach Nuclear Plant Initial License Examination ES-301-2 RO JPMs Form.Pdf
ML11111A097
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/25/2011
From: Mcneil D
Operations Branch III
To:
References
Download: ML11111A097 (1)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Point Beach Date of Examination: 04/25-5/6/2011 Exam Level: RO SRO-I SRO-U Operating Test No.: 2011301

@

Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. CRD / Recovery of a Dropped Rod A/N/S 1
b. CVCS / Respond to Failure of Normal Boration Path D/S 2
c. SI / Restore 1A Accumulator Pressure D/S 3
d. TG / Synchronize Turbine Generator with Grid D/S 4S
e. HVAC / Perform Accident Recirc Fan-Cooler Surveillance D/L/S 5
f. RHR / Respond to a Shutdown LOCA D/L/S 4P
g. CCW / Switch Operating CCW Pumps D/S 8
h. RPS / Monthly RPS Surveillance A/N/S 7

@

In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. EDG / Local Manual Start of an EDG A/N/P 6
j. RHR / Transfer to Containment Sump Recirculation D/P 4P
k. AFW / Perform Designated AOP 10 A Steps D/P 4S

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator