{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 June 16, 2011 Mr. M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway P.O. Box 1295, Bin -038 Birmingham, AL 35201-1295 EDWIN I. HATCH NUCLEAR PLANT, UNIT NO.2 -WITHDRAWAL OF RELIEF REQUEST ISI-RR-04 (TAC NO. ME4219)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 16, 2011 Mr. M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway P.O. Box 1295, Bin - 038 Birmingham, AL 35201-1295 SUB"IECT:      EDWIN I. HATCH NUCLEAR PLANT, UNIT NO.2 - WITHDRAWAL OF RELIEF REQUEST ISI-RR-04 (TAC NO. ME4219)


==Dear Mr. Ajluni:==
==Dear Mr. Ajluni:==
By letter dated July 8, 2010, you submitted multiple relief requests for the Edwin I. Hatch Nuclear Plant, Unit No.2, Operating License No. NPF-5. In accordance with Title 10 of the Code of Federal Regulations Part 50, Section 50.55a(g)(5)(iii), Relief Request ISI-RR-04, "Pressure Retaining Dissimilar Metal Piping Welds," would have provided an alternative to the inspection requirements because of the impracticality of the American Society of Mechanical Engineers inservice inspection requirements.
By letter dated July 8, 2010, you submitted multiple relief requests for the Edwin I. Hatch Nuclear Plant, Unit No.2, Operating License No. NPF-5. In accordance with Title 10 of the Code of Federal Regulations Part 50, Section 50.55a(g)(5)(iii), Relief Request ISI-RR-04, "Pressure Retaining Dissimilar Metal Piping Welds," would have provided an alternative to the inspection requirements because of the impracticality of the American Society of Mechanical Engineers inservice inspection requirements.
On October 22, 2010, the Nuclear Regulatory Commission (NRC) staff requested additional information (Agencywide Documents and Access Management System (ADAMS) Accession No. ML102860083) and Southern Nuclear Operating Company, Inc. (SNC) responded in a letter dated November 23,2010 (ADAMS Accession No. ML103280372).
On October 22, 2010, the Nuclear Regulatory Commission (NRC) staff requested additional information (Agencywide Documents and Access Management System (ADAMS) Accession No. ML102860083) and Southern Nuclear Operating Company, Inc. (SNC) responded in a letter dated November 23,2010 (ADAMS Accession No. ML103280372). The NRC staff then requested additional information on February 23,2011 (ADAMS Accession No. ML110460476) and SNC responded in a letter dated March 22, 2011 (ADAMS Accession No. ML110820261).
The NRC staff then requested additional information on February 23,2011 (ADAMS Accession No. ML110460476) and SNC responded in a letter dated March 22, 2011 (ADAMS Accession No. ML110820261).
The response to the information associated with ISI-RR-04 for weld 2B21-1 FW-12AA-8 led to the need for a phone call for additional clarification, which was conducted on May 12, 2011.
The response to the information associated with ISI-RR-04 for weld 2B21-1 FW-12AA-8 led to the need for a phone call for additional clarification, which was conducted on May 12, 2011. Subsequently, by letter dated April 27, 2011, you withdrew Relief Request ISI-RR-04 that had been submitted in your July 8, 2010, letter mentioned above. The purpose of this letter is to advise that the above-cited relief request is being treated as withdrawn.
Subsequently, by letter dated April 27, 2011, you withdrew Relief Request ISI-RR-04 that had been submitted in your July 8, 2010, letter mentioned above.
Sincerely, Patrick G. Boyle, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-366 cc: Distribution via Listserv June 16, 2011 Mr. M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway P.O. Box 1295, Bin -038 Birmingham, AL 35201-1295 EDWIN I. HATCH NUCLEAR PLANT, UNIT NO.2 -WITHDRAWAL OF RELIEF REQUEST ISI-RR-04 (TAC NO. ME4219)
The purpose of this letter is to advise that the above-cited relief request is being treated as withdrawn.
Sincerely, Patrick G. Boyle, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-366 cc: Distribution via Listserv


==Dear Mr. Ajluni:==
ML103280372). The NRC staff then requested additional information on February 23,2011 (ADAMS Accession No. ML110460476) and SNC responded in a letter dated March 22, 2011 (ADAMS Accession No. ML110820261).
By letter dated July 8, 2010, you submitted multiple relief requests for the Edwin I. Hatch Nuclear Plant, Unit No.2, Operating License No. NPF-5. In accordance with Title 10 of the Code of Federal Regulations Part 50, Section 50.55a(g)(5)(iii), Relief Request ISI-RR-04, "Pressure Retaining Dissimilar Metal Piping Welds," would have provided an alternative to the inspection requirements because of the impracticality of the American Society of Mechanical Engineers inservice inspection requirements.
The response to the information associated with ISI-RR-04 for weld 2B21-1FW-12AA-8Ied to the need for a phone call for additional clarification, which was conducted on May 12, 2011.
On October 22,2010, the Nuclear Regulatory Commission (NRC) staff requested additional information (Agencywide Documents and Access Management System (ADAMS) Accession No. ML102860083) and Southern Nuclear Operating Company, Inc. (SNC) responded in a letter dated November 23, 2010 (ADAMS Accession No. ML103280372).
Subsequently, by letter dated April 27, 2011, you withdrew Relief Request ISI-RR-04 that had been submitted in your July 8, 2010, letter mentioned above.
The NRC staff then requested additional information on February 23,2011 (ADAMS Accession No. ML110460476) and SNC responded in a letter dated March 22, 2011 (ADAMS Accession No. ML110820261).
The purpose of this letter is to advise that the above-cited relief request is being treated as withdrawn.
The response to the information associated with ISI-RR-04 for weld 2B21-1FW-12AA-8Ied to the need for a phone call for additional clarification, which was conducted on May 12, 2011. Subsequently, by letter dated April 27, 2011, you withdrew Relief Request ISI-RR-04 that had been submitted in your July 8, 2010, letter mentioned above. The purpose of this letter is to advise that the above-cited relief request is being treated as withdrawn.
Sincerely, IRA!
Sincerely, IRA! Patrick G. Boyle, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-366 cc: Distribution via Listserv DISTRIBUTION:
Patrick G. Boyle, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-366 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-1 RlF RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl2-1 Resource RidsNrrLAMOBrien Resource RidsNrrPMHatch Resource RidsOgcRp Resource RidsRgn2MailCenter Resource ADAMS Accession No. ML11131A097 OFFICE NRRJLPL2-1JPM JLA NRR/LPL2-1/BC NAME PBoyte GKutesa DATE 6/14/11 6/7111 6/16/11 OFFICIAL RECORD COPY}}
PUBLIC                         LPL2-1 RlF                       RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource         RidsNrrDorlLpl2-1 Resource       RidsNrrLAMOBrien Resource RidsNrrPMHatch Resource         RidsOgcRp Resource               RidsRgn2MailCenter Resource ADAMS Accession No. ML11131A097 OFFICE   NRRJLPL2-1JPM                       JLA         NRR/LPL2-1/BC NAME     PBoyte                                         GKutesa DATE     6/14/11               6/7111                   6/16/11}}

Latest revision as of 00:46, 13 November 2019

Withdrawal of Relief Request ISI-RR-04
ML11131A097
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 06/16/2011
From: Patrick Boyle
Plant Licensing Branch II
To: Ajluni M
Southern Nuclear Operating Co
Boyle P
References
TAC ME4219
Download: ML11131A097 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 16, 2011 Mr. M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway P.O. Box 1295, Bin - 038 Birmingham, AL 35201-1295 SUB"IECT: EDWIN I. HATCH NUCLEAR PLANT, UNIT NO.2 - WITHDRAWAL OF RELIEF REQUEST ISI-RR-04 (TAC NO. ME4219)

Dear Mr. Ajluni:

By letter dated July 8, 2010, you submitted multiple relief requests for the Edwin I. Hatch Nuclear Plant, Unit No.2, Operating License No. NPF-5. In accordance with Title 10 of the Code of Federal Regulations Part 50, Section 50.55a(g)(5)(iii), Relief Request ISI-RR-04, "Pressure Retaining Dissimilar Metal Piping Welds," would have provided an alternative to the inspection requirements because of the impracticality of the American Society of Mechanical Engineers inservice inspection requirements.

On October 22, 2010, the Nuclear Regulatory Commission (NRC) staff requested additional information (Agencywide Documents and Access Management System (ADAMS) Accession No. ML102860083) and Southern Nuclear Operating Company, Inc. (SNC) responded in a letter dated November 23,2010 (ADAMS Accession No. ML103280372). The NRC staff then requested additional information on February 23,2011 (ADAMS Accession No. ML110460476) and SNC responded in a letter dated March 22, 2011 (ADAMS Accession No. ML110820261).

The response to the information associated with ISI-RR-04 for weld 2B21-1 FW-12AA-8 led to the need for a phone call for additional clarification, which was conducted on May 12, 2011.

Subsequently, by letter dated April 27, 2011, you withdrew Relief Request ISI-RR-04 that had been submitted in your July 8, 2010, letter mentioned above.

The purpose of this letter is to advise that the above-cited relief request is being treated as withdrawn.

Sincerely, Patrick G. Boyle, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-366 cc: Distribution via Listserv

ML103280372). The NRC staff then requested additional information on February 23,2011 (ADAMS Accession No. ML110460476) and SNC responded in a letter dated March 22, 2011 (ADAMS Accession No. ML110820261).

The response to the information associated with ISI-RR-04 for weld 2B21-1FW-12AA-8Ied to the need for a phone call for additional clarification, which was conducted on May 12, 2011.

Subsequently, by letter dated April 27, 2011, you withdrew Relief Request ISI-RR-04 that had been submitted in your July 8, 2010, letter mentioned above.

The purpose of this letter is to advise that the above-cited relief request is being treated as withdrawn.

Sincerely, IRA!

Patrick G. Boyle, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-366 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL2-1 RlF RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl2-1 Resource RidsNrrLAMOBrien Resource RidsNrrPMHatch Resource RidsOgcRp Resource RidsRgn2MailCenter Resource ADAMS Accession No. ML11131A097 OFFICE NRRJLPL2-1JPM JLA NRR/LPL2-1/BC NAME PBoyte GKutesa DATE 6/14/11 6/7111 6/16/11