ML112971553: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML112971553
| number = ML112971553
| issue date = 10/21/2011
| issue date = 10/21/2011
| title = Vogtle - Notification of Licensed Operator Initial Examination 50-424/12-301 and 50-425/12-301
| title = Notification of Licensed Operator Initial Examination 50-424/12-301 and 50-425/12-301
| author name = Caballero B L
| author name = Caballero B
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name = Tynan T E
| addressee name = Tynan T
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000424, 05000425
| docket = 05000424, 05000425
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000424/2012301]]
See also: [[see also::IR 05000424/2012301]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::October 21, 2011]]
                                NUCLEAR REGULATORY COMMISSION
                                              REGION II
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                    ATLANTA, GEORGIA 30303-1257
                                          October 21, 2011
Mr. Tom E. Tynan
Vice President
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant
7821 River Road
Waynesboro, GA 30830
SUBJECT:       VOGTLE - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION
                05000424/2012301 AND 05000425/2012301
Dear Mr. Tynan:
In a telephone conversation on October 12, 2011, between Mr. Greg Wainwright, Operations
Training Instructor, and Mr. Mark Bates, Senior Operations Engineer, arrangements were made
for the administration of licensing examinations at Vogtle. The operating test is scheduled to be
administered during the weeks of March 26, 2012, April 9, 2012; and April 16, 2012. The written
examination is scheduled to be administered either the week of April 16, 2012, or the week of
April 23, 2012, depending on the need for the third week of the operating test. The on-site
preparatory week is scheduled for the week of March 5, 2012.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by December 12, 2011. Mr. Mark Bates provided the written examination outline to your
staff in June, 2011. The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by January 17, 2012. Pursuant to
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
authorized representative of the facility licensee shall approve the outline, examination, and test
before they are submitted to the NRC for review and approval. All materials shall be complete
and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.


Mr. Tom Vice President Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
SNC                                            2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on February
28, 2013. The public reporting burden for this collection of information is estimated to average
500 hours per response, including the time for reviewing instructions, gathering and maintaining
the data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Wainwright has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Michael Meeks at (404) 997-4467,


SUBJECT: VOGTLE - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000424/2012301 AND 05000425/2012301
SNC                                      3
(Internet E-mail: Michael.Meeks@nrc.gov), Mr. Mark Bates at (404) 997-4612, (Internet E-mail:
Mark.Bates@nrc.gov), or me at (404) 997-4608, (Internet E-mail: Bruno.Caballero@nrc.gov).
                                          Sincerely,
                                          /RA/
                                          Bruno L. Caballero, Acting Chief
                                          Operations Branch 1
                                          Division of Reactor Safety
Docket No.: 50-424, 50-425
License No.: NPF-68, NPF-81
cc: See Page 4


==Dear Mr. Tynan:==
In a telephone conversation on October 12, 2011, between Mr. Greg Wainwright, Operations Training Instructor, and Mr. Mark Bates, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at Vogtle. The operating test is scheduled to be administered during the weeks of March 26, 2012, April 9, 2012; and April 16, 2012. The written examination is scheduled to be administered either the week of April 16, 2012, or the week of April 23, 2012, depending on the need for the third week of the operating test. The on-site preparatory week is scheduled for the week of March 5, 2012. As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination. To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by December 12, 2011. Mr. Mark Bates provided the written examination outline to your staff in June, 2011. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by January 17, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.


We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
_ML112971553______________      XG SUNSI REVIEW COMPLETE x FORM 665 ATTACHED
OFFICE            RII:DRS        RII:DRS      RII:DRS
SIGNATURE          RA              RA            RA
NAME              MEEKS          BATES        CABALLERO
DATE                  10/ 21/2011    10/21/2011    10/21/2011
E-MAIL COPY?        YES    NO    YES      NO  YES      NO    YES  NO      YES  NO    YES  NO      YES  NO
       
SNC                                      4
cc w/encl:                                B. D. McKinney, Jr.
S. Kuczynski                              Regulatory Response Manager
Chairman, President and CEO                Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc.  Electronic Mail Distribution
Electronic Mail Distribution
                                          T. D. Honeycutt
Jeffrey T. Gasser                          Regulatory Response Supervisor
Chief Nuclear Officer                      Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc.  Electronic Mail Distribution
Electronic Mail Distribution
                                          L. P. Hill
N. J. Stringfellow                        Licensing Supervisor
Licensing Manager                          Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc.  Electronic Mail Distribution
Electronic Mail Distribution
                                          R. L. Gladney
Paula Marino                              Licensing Engineer
Vice President                            Southern Nuclear Operating Company, Inc.
Engineering                                Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              L. L. Crumpton
                                          Administrative Assistant, Sr.
L. Mike Stinson                            Southern Nuclear Operating Company, Inc.
Vice President                            Electronic Mail Distribution
Joseph M. Farley Nuclear Plant
Southern Nuclear Operating Company, Inc.  Hickox, T. Mark
Electronic Mail Distribution              Vogtle Electric Generating Plant
                                          Electronic Mail Distribution
Dennis R. Madison
Vice President                            S. C. Swanson
Edwin I. Hatch Nuclear Plant              Site Support Manager
Southern Nuclear Operating Company, Inc.  Vogtle Electric Generating Plant
Electronic Mail Distribution              Electronic Mail Distribution
J. L. Pemberton                            Senior Resident Inspector
SVP & General Counsel-Ops & SNC            U.S. Nuclear Regulatory Commission
Southern Nuclear Operating Company, Inc.  Vogtle Electric Generating Plant
Electronic Mail Distribution              7821 River Road
                                          Waynesboro, GA 30830
T. E. Tynan
Site Vice President                        Bob Masse
Vogtle Electric Generating Plant          Resident Manager
Southern Nuclear Operating Company, Inc.  Vogtle Electric Generating Plant
Electronic Mail Distribution              Oglethorpe Power Corporation
                                          Electronic Mail Distribution
M. J. Ajluni
Nuclear Licensing Director
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
                                          (cc contd - See page 5)


SNC 2 In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
SNC                                     5
(cc contd)                              James A. Capp
Arthur H. Domby, Esq.                    Program Coordination Branch Chief
Troutman Sanders                          Environmental Protection Division
Electronic Mail Distribution              Georgia Department of Natural Resources
                                          Electronic Mail Distribution
Sandra Threatt, Manager
Nuclear Response and Emergency            James C. Hardeman
Environmental Surveillance                Environmental Radiation Program Manager
Bureau of Land and Waste Management      Environmental Protection Division
Department of Health and Environmental    Georgia Department of Natural Resources
Control                                  Electronic Mail Distribution
Electronic Mail Distribution
                                          Al Frazier
Division of Radiological Health          Emergency Response and Radiation
TN Dept. of Environment & Conservation    Program Manager
401 Church Street                        Environmental Protection Division
Nashville, TN 37243-1532                  Georgia Department of Natural Resources
                                          Electronic Mail Distribution
Richard Haynes
Director, Division of Waste Management    Mr. Steven M. Jackson
Bureau of Land and Waste Management      Senior Engineer - Power Supply
S.C. Department of Health and            Municipal Electric Authority of Georgia
Environmental Control                    Electronic Mail Distribution
2600 Bull Street
Columbia, SC 29201                        Reece McAlister
                                          Executive Secretary
Lee Foley                                Georgia Public Service Commission
Manager of Contracts Generation          Electronic Mail Distribution
Oglethorpe Power Corporation
Electronic Mail Distribution              Office of the Attorney General
                                          40 Capitol Square, SW
Mark Williams                            Atlanta, GA 30334
Commissioner
Georgia Department of Natural Resources  Office of the County Commissioner
Electronic Mail Distribution              Burke County Commission
                                          Electronic Mail Distribution
F. Allen Barnes
Director                                  Director
Environmental Protection Division        Consumers' Utility Counsel Division
Georgia Department of Natural Resources  Governor's Office of Consumer Affairs
Electronic Mail Distribution              2 M. L. King, Jr. Drive
                                          Plaza Level East; Suite 356
Cynthia A. Sanders                        Atlanta, GA 30334-4600
Radioactive Materials Program Manager
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
                                          (cc contd - See page 6)


Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
SNC                                    6
 
(cc contd)
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Wainwright has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Michael Meeks at (404) 997-4467, SNC 3 (Internet E-mail: Michael.Meeks@nrc.gov), Mr. Mark Bates at (404) 997-4612, (Internet E-mail: Mark.Bates@nrc.gov), or me at (404) 997-4608, (Internet E-mail: Bruno.Caballero@nrc.gov).
Amy Whaley
 
Engineer
Sincerely,/RA/  Bruno L. Caballero, Acting Chief Operations Branch 1 Division of Reactor Safety Docket No.: 50-424, 50-425 License No.: NPF-68, NPF-81 cc: See Page 4 SNC 3 (Internet E-mail: Michael.Meeks@nrc.gov), Mr. Mark Bates at (404) 997-4612, (Internet E-mail: Mark.Bates@nrc.gov), or me at (404) 997-4608, (Internet E-mail: Bruno.Caballero@nrc.gov).
Nuclear Generation Development and Construction
 
Electronic Mail Distribution
Sincerely,/RA/  Bruno L. Caballero, Acting Chief Operations Branch 1 Division of Reactor Safety Docket No.: 50-424, 50-425 License No.: NPF-68, NPF-81 cc: See Page 4 Distribution: RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource
Southern Nuclear Operations Company, Inc
 
ATTN: Mr. Richard D. Brigdon
xG PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE xG NON-SENSITIVE ADAMS: xG Yes ACCESSION NUMBER:_ML112971553______________ XG SUNSI REVIEW COMPLETE x FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA NAME MEEKS BATES CABALLERO DATE 10/ 21/2011 10/21/2011 10/21/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\VOGTLE EXAMINATIONS\INITIAL EXAMS\INITIAL EXAM 2012-301\CORRESPONDENCE\VOGTLE MARCH 2012 CORPORATE NOTIFICATION LETTER (120 DAY).DOCX SNC 4 cc w/encl: S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Jeffrey T. Gasser Chief Nuclear Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. Mike Stinson Vice President Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution J. L. Pemberton SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc. Electronic Mail Distribution T. Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. Electronic Mail Distribution B. D. McKinney, Jr. Regulatory Response Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. P. Hill Licensing Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution R. L. Gladney Licensing Engineer Southern Nuclear Operating Company, Inc.
      Plant Training and
 
      Emergency Preparedness Manager
Electronic Mail Distribution L. L. Crumpton Administrative Assistant, Sr. Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant
 
7821 River Road
Electronic Mail Distribution Hickox, T. Mark Vogtle Electric Generating Plant Electronic Mail Distribution S. C. Swanson Site Support Manager Vogtle Electric Generating Plant Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution (cc cont'd - See page 5)
Bin 63030
 
Waynesboro, GA 30830-2965
SNC 5 (cc cont'd) Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532 Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution F. Allen Barnes Director Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James A. Capp Program Coordination Branch Chief Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Al Frazier Emergency Response and Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Office of the Attorney General 40 Capitol Square, SW Atlanta, GA 30334 Office of the County Commissioner Burke County Commission Electronic Mail Distribution Director Consumers' Utility Counsel Division Governor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 (cc cont'd - See page 6)
SNC 6 (cc cont'd) Amy Whaley Engineer Nuclear Generation Development and Construction Electronic Mail Distribution Southern Nuclear Operations Company, Inc ATTN: Mr. Richard D. Brigdon Plant Training and Emergency Preparedness Manager Vogtle Electric Generating Plant 7821 River Road Bin 63030 Waynesboro, GA 30830-2965
}}
}}

Latest revision as of 14:05, 12 November 2019

Notification of Licensed Operator Initial Examination 50-424/12-301 and 50-425/12-301
ML112971553
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/21/2011
From: Bruno Caballero
Operations Branch III
To: Tynan T
Southern Nuclear Operating Co
References
50-424/12-301, 50-425/12/301
Download: ML112971553 (7)


See also: IR 05000424/2012301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

October 21, 2011

Mr. Tom E. Tynan

Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: VOGTLE - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION

05000424/2012301 AND 05000425/2012301

Dear Mr. Tynan:

In a telephone conversation on October 12, 2011, between Mr. Greg Wainwright, Operations

Training Instructor, and Mr. Mark Bates, Senior Operations Engineer, arrangements were made

for the administration of licensing examinations at Vogtle. The operating test is scheduled to be

administered during the weeks of March 26, 2012, April 9, 2012; and April 16, 2012. The written

examination is scheduled to be administered either the week of April 16, 2012, or the week of

April 23, 2012, depending on the need for the third week of the operating test. The on-site

preparatory week is scheduled for the week of March 5, 2012.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by December 12, 2011. Mr. Mark Bates provided the written examination outline to your

staff in June, 2011. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by January 17, 2012. Pursuant to

Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an

authorized representative of the facility licensee shall approve the outline, examination, and test

before they are submitted to the NRC for review and approval. All materials shall be complete

and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

SNC 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on February

28, 2013. The public reporting burden for this collection of information is estimated to average

500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining

the data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Wainwright has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Michael Meeks at (404) 997-4467,

SNC 3

(Internet E-mail: Michael.Meeks@nrc.gov), Mr. Mark Bates at (404) 997-4612, (Internet E-mail:

Mark.Bates@nrc.gov), or me at (404) 997-4608, (Internet E-mail: Bruno.Caballero@nrc.gov).

Sincerely,

/RA/

Bruno L. Caballero, Acting Chief

Operations Branch 1

Division of Reactor Safety

Docket No.: 50-424, 50-425

License No.: NPF-68, NPF-81

cc: See Page 4

_ML112971553______________ XG SUNSI REVIEW COMPLETE x FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS RII:DRS

SIGNATURE RA RA RA

NAME MEEKS BATES CABALLERO

DATE 10/ 21/2011 10/21/2011 10/21/2011

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

SNC 4

cc w/encl: B. D. McKinney, Jr.

S. Kuczynski Regulatory Response Manager

Chairman, President and CEO Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

T. D. Honeycutt

Jeffrey T. Gasser Regulatory Response Supervisor

Chief Nuclear Officer Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

L. P. Hill

N. J. Stringfellow Licensing Supervisor

Licensing Manager Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

R. L. Gladney

Paula Marino Licensing Engineer

Vice President Southern Nuclear Operating Company, Inc.

Engineering Electronic Mail Distribution

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution L. L. Crumpton

Administrative Assistant, Sr.

L. Mike Stinson Southern Nuclear Operating Company, Inc.

Vice President Electronic Mail Distribution

Joseph M. Farley Nuclear Plant

Southern Nuclear Operating Company, Inc. Hickox, T. Mark

Electronic Mail Distribution Vogtle Electric Generating Plant

Electronic Mail Distribution

Dennis R. Madison

Vice President S. C. Swanson

Edwin I. Hatch Nuclear Plant Site Support Manager

Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant

Electronic Mail Distribution Electronic Mail Distribution

J. L. Pemberton Senior Resident Inspector

SVP & General Counsel-Ops & SNC U.S. Nuclear Regulatory Commission

Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant

Electronic Mail Distribution 7821 River Road

Waynesboro, GA 30830

T. E. Tynan

Site Vice President Bob Masse

Vogtle Electric Generating Plant Resident Manager

Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant

Electronic Mail Distribution Oglethorpe Power Corporation

Electronic Mail Distribution

M. J. Ajluni

Nuclear Licensing Director

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

(cc contd - See page 5)

SNC 5

(cc contd) James A. Capp

Arthur H. Domby, Esq. Program Coordination Branch Chief

Troutman Sanders Environmental Protection Division

Electronic Mail Distribution Georgia Department of Natural Resources

Electronic Mail Distribution

Sandra Threatt, Manager

Nuclear Response and Emergency James C. Hardeman

Environmental Surveillance Environmental Radiation Program Manager

Bureau of Land and Waste Management Environmental Protection Division

Department of Health and Environmental Georgia Department of Natural Resources

Control Electronic Mail Distribution

Electronic Mail Distribution

Al Frazier

Division of Radiological Health Emergency Response and Radiation

TN Dept. of Environment & Conservation Program Manager

401 Church Street Environmental Protection Division

Nashville, TN 37243-1532 Georgia Department of Natural Resources

Electronic Mail Distribution

Richard Haynes

Director, Division of Waste Management Mr. Steven M. Jackson

Bureau of Land and Waste Management Senior Engineer - Power Supply

S.C. Department of Health and Municipal Electric Authority of Georgia

Environmental Control Electronic Mail Distribution

2600 Bull Street

Columbia, SC 29201 Reece McAlister

Executive Secretary

Lee Foley Georgia Public Service Commission

Manager of Contracts Generation Electronic Mail Distribution

Oglethorpe Power Corporation

Electronic Mail Distribution Office of the Attorney General

40 Capitol Square, SW

Mark Williams Atlanta, GA 30334

Commissioner

Georgia Department of Natural Resources Office of the County Commissioner

Electronic Mail Distribution Burke County Commission

Electronic Mail Distribution

F. Allen Barnes

Director Director

Environmental Protection Division Consumers' Utility Counsel Division

Georgia Department of Natural Resources Governor's Office of Consumer Affairs

Electronic Mail Distribution 2 M. L. King, Jr. Drive

Plaza Level East; Suite 356

Cynthia A. Sanders Atlanta, GA 30334-4600

Radioactive Materials Program Manager

Environmental Protection Division

Georgia Department of Natural Resources

Electronic Mail Distribution

(cc contd - See page 6)

SNC 6

(cc contd)

Amy Whaley

Engineer

Nuclear Generation Development and Construction

Electronic Mail Distribution

Southern Nuclear Operations Company, Inc

ATTN: Mr. Richard D. Brigdon

Plant Training and

Emergency Preparedness Manager

Vogtle Electric Generating Plant

7821 River Road

Bin 63030

Waynesboro, GA 30830-2965